Pig Catcher, Parque Industrial ... - AHK Mexiko (CAMEXA) · CENAGAS basic data 2017 1 People % Men...
Transcript of Pig Catcher, Parque Industrial ... - AHK Mexiko (CAMEXA) · CENAGAS basic data 2017 1 People % Men...
CENAGAS basic data 2017
1
People %
Men 262 63%
Women 155 37%
Data
CENAGAS pipelines (Miles) 5,511
SISTRANGAS (Miles) 6,345
9 CENAGAS compression stations (HP) 266,160
6 Private compression stations (HP) 140,960
SISTRANGAS’ capacity (GJ/d) 6,466,185
SISTRANGAS’ capacity assigned (GJ/d) 6,285,962
Firm Base contracts 43
Interruptible Base contracts 24
Operating & Maintenance contracts 5
MISSION: “To guarantee the management, transportation and storage necessary for the safe, reliable and efficient supply of natural gas in the country".
2017 USD Millions*
Total Assets $609
Total Equity $94
Sales $1,040
Net Income $126
*Exchange rate used was 18.9 pesos per dollar
2
Mexico's gas pipeline systems
Tapachula
TijuanaMexicali
Zacatecas
Puerto Libertad
Guaymas
El Encino
El Oro
Topolobampo
Mazatlán
La Laguna
Durango
Ensenada
Los Algodones I y II
Hermosillo
Ojinaga
Piedras Negras
Altamira
Waha
Ehrenberg
Tucson
Acuña
Detalle 2
9
Lázaro Cárdenas
Aguascalientes
Nativitas
Tuxpan
Salina Cruz
Guadalajara
Valladolid
San Luis
Potosí
Apaseo el Alto
Manzanillo
Acapulco
Cancún
Tula
Rio Colorado
Gas Pipeline Length(Mile)
Capacity(MMcfd)
SNG (Cenagas System)5,511 5,618
Tamaulipas’ Pipelines 71 1,000
Bajío’ Pipelines127 90
Zacatecas’ Pipelines107 20
“Los Ramones I” Pipeline72 2,100
“Ramones Fase II Norte” Pipeline
278 1,363
“Ramones Fase II Sur” Pipeline
181 1,353
SISTRANGAS
Gulf-North Imp.54%
Southeast22%
Others9%
Burgos8%
LNG5%
Chihuahua Imp.2%
Power38%
PEMEX22%
Distribution21%
Industry19%
Supply
Demand
Supply and demand are averages from January to December 2017
Gasoducto Length(Mile)
Capacity(MMcfd)
Naco Hermosillo System 211 90
Otros Sistemas
SISTRANGAS’ capacity
2.35
1.31
6.29 6.47
1.03
2.15
1.46
1.79
0.69
0
1
2
3
4
5
6
7
MM
GJ
Capacity Assigned in the Open Season (MMGJD)
EPE Capacity Round (MMGJD)
Preexistent Capacity in Firm Base Contracts
(MMGJD)
Total AssignedCapacity 2017-2018
(MMGJD)
Published capacity of SISTRANGAS in Data Room
(MMGJD)
General public
Acquired rights
CFE
PEMEX
3
Modification of current contracts
Publication ofrenovation process
Renovation periodnotice
Reception ofrequests
Notification of results Signing of contracts
February 19 February February 26-March 9
May 2-June 1April 17-30 July 1 Effective start of new contracts
4
The released capacity will be offered in Open Season
Reception of modification and renovation requests
To March 9, 348 applications were
received for a capacity of 4.6 MMGJ
5
Renovation62%
Modification and Renovation
17%
Modification
21%
0.8 MMGJ 2.8 MMGJ
1 MMGJ