Pig Catcher, Parque Industrial ... - AHK Mexiko (CAMEXA) · CENAGAS basic data 2017 1 People % Men...

7
Natural Gas Market April 11 CDMX “Pig Catcher, Parque Industrial Querétaro”

Transcript of Pig Catcher, Parque Industrial ... - AHK Mexiko (CAMEXA) · CENAGAS basic data 2017 1 People % Men...

Natural Gas MarketApril 11

CDMX

“Pig Catcher, Parque Industrial Querétaro”

CENAGAS basic data 2017

1

People %

Men 262 63%

Women 155 37%

Data

CENAGAS pipelines (Miles) 5,511

SISTRANGAS (Miles) 6,345

9 CENAGAS compression stations (HP) 266,160

6 Private compression stations (HP) 140,960

SISTRANGAS’ capacity (GJ/d) 6,466,185

SISTRANGAS’ capacity assigned (GJ/d) 6,285,962

Firm Base contracts 43

Interruptible Base contracts 24

Operating & Maintenance contracts 5

MISSION: “To guarantee the management, transportation and storage necessary for the safe, reliable and efficient supply of natural gas in the country".

2017 USD Millions*

Total Assets $609

Total Equity $94

Sales $1,040

Net Income $126

*Exchange rate used was 18.9 pesos per dollar

2

Mexico's gas pipeline systems

Tapachula

TijuanaMexicali

Zacatecas

Puerto Libertad

Guaymas

El Encino

El Oro

Topolobampo

Mazatlán

La Laguna

Durango

Ensenada

Los Algodones I y II

Hermosillo

Ojinaga

Piedras Negras

Altamira

Waha

Ehrenberg

Tucson

Acuña

Detalle 2

9

Lázaro Cárdenas

Aguascalientes

Nativitas

Tuxpan

Salina Cruz

Guadalajara

Valladolid

San Luis

Potosí

Apaseo el Alto

Manzanillo

Acapulco

Cancún

Tula

Rio Colorado

Gas Pipeline Length(Mile)

Capacity(MMcfd)

SNG (Cenagas System)5,511 5,618

Tamaulipas’ Pipelines 71 1,000

Bajío’ Pipelines127 90

Zacatecas’ Pipelines107 20

“Los Ramones I” Pipeline72 2,100

“Ramones Fase II Norte” Pipeline

278 1,363

“Ramones Fase II Sur” Pipeline

181 1,353

SISTRANGAS

Gulf-North Imp.54%

Southeast22%

Others9%

Burgos8%

LNG5%

Chihuahua Imp.2%

Power38%

PEMEX22%

Distribution21%

Industry19%

Supply

Demand

Supply and demand are averages from January to December 2017

Gasoducto Length(Mile)

Capacity(MMcfd)

Naco Hermosillo System 211 90

Otros Sistemas

SISTRANGAS’ capacity

2.35

1.31

6.29 6.47

1.03

2.15

1.46

1.79

0.69

0

1

2

3

4

5

6

7

MM

GJ

Capacity Assigned in the Open Season (MMGJD)

EPE Capacity Round (MMGJD)

Preexistent Capacity in Firm Base Contracts

(MMGJD)

Total AssignedCapacity 2017-2018

(MMGJD)

Published capacity of SISTRANGAS in Data Room

(MMGJD)

General public

Acquired rights

CFE

PEMEX

3

Modification of current contracts

Publication ofrenovation process

Renovation periodnotice

Reception ofrequests

Notification of results Signing of contracts

February 19 February February 26-March 9

May 2-June 1April 17-30 July 1 Effective start of new contracts

4

The released capacity will be offered in Open Season

Reception of modification and renovation requests

To March 9, 348 applications were

received for a capacity of 4.6 MMGJ

5

Renovation62%

Modification and Renovation

17%

Modification

21%

0.8 MMGJ 2.8 MMGJ

1 MMGJ