Corporate Office & Works42 Hope Valley Road Naval BaseWestern Australia 6165

Workshop 2 51 Hope Valley RoadNaval BaseWestern Australia 6165

Postal AddressPO Box 263, KwinanaWestern Australia 6966

ABN35 813 081 087

ACN008 895 154

Websitewww.pacind.com.au

E-Mailmail@pacind.com.au

Telephone+61 8 9410 2566

DirectorsErasmo MosoleMarco Mosole

BankersCommonwealth Bank of AustraliaCORPORATE DIRECTORY1. Corporate Directory2. Introduction & Mission Statement3. Vision and Corporate Values 4. Accreditation Credentials4. Summary of Major ProjectsINDEX

Company Profile

Introduction

Pacific Industrial Company, Founded in 1969 by Erasmo Mosole and later joined by his sons, Marco and Sandro , is now established as one of Western Australias leading fabrication and construction organisations, presently combining main office and fabrication facilities at Naval Base, Western Australia.

Pacific Industrial Company is involved in all aspects of steel fabrication and construction from shop fabricated items through to major construction projects including: engineering, procurement, fabrication, installation, commissioning and related electrical, instrumentation and civil works.

Although the companys main clientele are involved in the oil and gas, mining, resource and industrial sector, Pacific Industrial Company is actively involved in all forms of fabrication and construction for a broad customer base.

Vision & Values Our vision is to develop a sustainable business by being the best at what we do through the investment in our people, technology and innovation

Accreditation CredentialsQuality Management System

ISO 9001:2008Certificate No: QEC0291Occupational Health & Safety Management SystemAS / NZS 4801:2001Certificate No: HSM40062Occupational Health & Safety Management SystemOHSAS 18001:2007Certificate No: HSM40062Environmental Management SystemISO 140001:2004Certificate No: EMS40134

Pacific Industrial Company has a majority shareholding in Como Engineers. Through this agreement PIC is able to offer its mineral resource clients a more cost and time efficient execution model through an EPC contracting arrangement. Como Engineers Pty Ltd was established in 1986. The core focus is to provide engineering services and specialist products to the Mining and Resource sector with a strong focus on process metallurgy, mechanical engineering and materials handling both in Australia and abroad.Como Engineers employs a team of experienced metallurgists, engineers, construction supervisors and drafts-people which enables us to offer a complete process and engineering service. Como Engineers are able to supply services from metallurgical testing through to scoping and definitive feasibility studies as well as detailed engineering design to project construction and commissioning.Como Engineers specialises in fit for purpose solutions utilising modular and transportable equipment in our plant designs. Where possible, Como Engineers likes to offer design and construct projects at a fixed duration, lump-sum price, thereby removing a large portion of the project risk from the client.Como Engineers works closely with our Clients to understand and deliver the product and service that is required for each individual project.Como Engineers operate worldwide offering localised support with offices in Perth, Melbourne and Jakarta.Services include:StudiesDesign and ConstructionPlant and InfrastructureRelocations and UpgradesMaintenance and RefurbishmentsModular Gold Stripping PlantsCertified Dangerous Goods Assessments

MAJORPROJECTS

Tropicana Gold MineAngloGold Ashanti2013$120 MILLIONWorks involved the total onsite construction of the Tankage, Structural, Mechanical and Piping works for the 5.5 million tonnes per annum gold process plant located 330klms North of Kalgoorlie W.A. Client:Completion:Value:

Client:Completion:Value:

Tropicana Gold Mine

Karara Iron OreKarara Mining Limited2012$40 MillionWorks involved the design, fabrication, Installation and surface treatment of the project tankage for the magnetite iron ore concentrator.

Client:Completion:Value:

Client:Completion:Value:

Karara Iron Ore

Client:Completion:Value:

Sino Iron ProjectCITIC Pacific Mining2012$32 MillionWorks involved the Installation of approx. 5000 tonnes of steelwork and mechanical items for the stockpile cover, conveying and recovery system for the Magnetite Iron Ore Concentrator. PIC subsidiary business COMO Engineers was also engaged under separate contracts for installation works for the Ball Mill and AG Mill equipment and other mechanical works.

Client:Completion:Value:

Sino Iron Project

Client:Completion:Value:

BHPBIO-Bucket Wheel ReclaimersThyssen Krupp2012$30 MillionWorks involved the supply, fabrication and assembly of 3 x 15000 tonnes per hour capacity Bucket Wheel Reclaimers for BHP Billiton Iron Ore. One machine located at the Jimblebar Mine and 2 machines at the Port Hedland port facilities.

Client:Completion:Value:

BHPBIO-Bucket Wheel Reclaimers

Client:Completion:Value:

City Square Brookfield PlaceBrookfield Multiplex2012$52 MillionWorks involved the supply, fabrication and delivery of 11,000 tonnes of steelwork, decking and column reinforcing for the 51 floor level steel frame building located in the Perth CBD.

Client:Completion:Value:

City Square Brookfield Place

Client:Completion:Value:

DIN ProjectRio Tinto Iron Ore2012$15 MillionWorks involved the supply, fabrication, surface treatment and load out and shipping to site of the 2 Surge Bins and associated steelwork for the Dampier Incremental Expansion Project located at Rio Tinto Iron Ore port facility at Parker Point W.A.

Client:Completion:Value:

DIN Project

Client:Completion:Value:

Gorgon LNG Subsea BISALLSEAS2011$15 MillionWorks involved the fabrication, testing and load out of 11 Buckle Initiator Structures weighing in excess of 120 tonnes each for the subsea gas pipelines delivering LNG to the Grogon LNG facility.

Client:Completion:Value:

Gorgon LNG Subsea BIS

Client:Completion:Value:

BHBIO RGP 5Rail BridgesBHP Billiton Iron Ore2010$40 MillionWorks involved the fabrication, assembly, transportation and Installation of 125 Bridge Truss assemblies totalling 6500 tonnes for 11 river crossings for the Rail Bridge Duplication works between Newman and Port Hedland.

Client:Completion:Value:

BHBIO RGP 5Rail Bridges

Client:Completion:Value:

FMG-Cloud Break MineFLSmisth - RAHCO2010$12 MillionWorks involved the supply, fabrication, surface treatment and assembly of 2 mobile overburden removal systems for Fortescue Metal Group Cloud Break MineClient:Completion:Value:

FMG-Cloud Break Mine

Client:Completion:Value:

Pluto LNG Emission ChimneysWoodside Petroleum2010$9 millionWorks involved the fabrication, surface treatment, refractory lining and load out of the 3 Gas Turbine emission chimneys. Sections completed where up to 7 meters in diameter and weighing in excess of 200 tonnes each.

Client:Completion:Value:

Pluto LNG Emission Chimneys

Client:Completion:Value:

Bluewaters Power StationALSTOM2009$22 MillionWorks involved the installation of steelwork, piping and the turbine and generating systems for both Units 1 and 2 for the Blue Waters Power Station.

Client:Completion:Value:

Bluewaters Power Station

Client:Completion:Value:

Rio Tinto Ship LoaderSandvik- Voest Alpine2009$20 millionWorks involved the supply, fabrication, surface treatment and assembly and load out of 4 x 10,000 tonnes per hour capacity Ship Loaders for various Rio Tinto port operations.

Client:Completion:Value:

Rio Tinto Ship Loader

Client:Completion:Value:

Pluto LNG Subsea BISALLSEAS2009$14 MillionWorks involved the fabrication, testing and load out of 21 Buckle Initiator Structures for the subsea gas pipeline delivering LNG to the Pluto LNG facility.

Client:Completion:Value:

Pluto LNG Subsea BIS

Client:Completion:Value:

NewGen Power StationALSTOM2008$12 MillionWorks involved the installation of the Heat Recovery Steam Generator Boiler (HRSG) for the combined cycle 280MW gas turbine power station located in Kwinana W.A.

Client:Completion:Value:

NewGen Power Station

Client:Completion:Value:

Burrup LNG Train 4 & 5Woodside Petroleum2008$11 MillionWorks involved the fabrication, surface treatment, refractory lining and load out of the 7 Gas Turbine emission chimneys and Thermal Combustion Unit. Sections completed where up to 7 metres in diameter and weighing in excess of 200 tonnes each.

Client:Completion:Value:

Burrup LNG Train 4 & 5

Client:Completion:Value:

Ravensthorpe Nickel MineOutotec2007$35 MillionWorks involved the supply, fabrication and installation of the 15 Thickeners 6 x CCD thickeners, 4 x Precipitation thickeners, 5 x PAL, SAP and LIM deep cone thickeners and associated tanks totalling approx. 5000 tonnes of steelwork.

Client:Completion:Value:

Ravensthorpe Nickel Mine

Client:Completion:Value:

Telfer Gold MineNewcrest Mining2005$11 millionWorks involved the fabrication and structural, mechanical and piping installation of the crushing, conveying, stockpiling and reclaim circuits for the gold copper treatment plant located 400 klms south east of Port Hedland WA.

Client:Completion:Value:

Telfer Gold Mine

Client:Completion:Value:

Hlsmelt ProjectRio Tinto Iron Ore2004$20 millionWorks involved