Pic booklet screen view 2

56

Transcript of Pic booklet screen view 2

Page 1: Pic booklet   screen view 2
Page 2: Pic booklet   screen view 2

Corporate Office & Works

42 Hope Valley Road

Naval Base

Western Australia 6165

Workshop 2

51 Hope Valley Road

Naval Base

Western Australia 6165

Postal Address

PO Box 263, Kwinana

Western Australia 6966

ABN

35 813 081 087

ACN

008 895 154

Website

www.pacind.com.au

E-Mail

[email protected]

Telephone

+61 8 9410 2566

Directors

Erasmo Mosole

Marco Mosole

Bankers

Commonwealth Bank of Australia

CORPORATE DIRECTORY

1. Corporate Directory

2. Introduction & Mission Statement

3. Vision and Corporate Values

4. Accreditation Credentials

4. Summary of Major Projects

INDEX

Company Profile

Page 3: Pic booklet   screen view 2

IntroductionPacific Industrial Company, Founded in 1969 by Erasmo Mosole and later joined by his sons, Marco and Sandro , is now established as one of Western Australia’s leading fabrication and construction organisations, presently combining main office and fabrication facilities at Naval Base, Western Australia.

Pacific Industrial Company is involved in all aspects of steel fabrication and construction from shop fabricated items through to major construction projects including: engineering, procurement, fabrication, installation, commissioning and related electrical, instrumentation and civil works.

Although the company’s main clientele are involved in the oil and gas, mining, resource and industrial sector, Pacific Industrial Company is actively involved in all forms of fabrication and construction for a broad customer base.

Page 4: Pic booklet   screen view 2

RESPECT

INTEGRITY

SAFETY TEAMWORK

PERSISTENCE

Vision & Values“Our vision is to develop a sustainable business by

being the best at what we do through the investment in our people, technology and innovation”

Page 5: Pic booklet   screen view 2

Accreditation Credentials

Quality Management System

ISO 9001:2008Certificate No: QEC0291

Occupational Health & Safety Management System

AS / NZS 4801:2001Certificate No: HSM40062

Occupational Health & Safety Management System

OHSAS 18001:2007Certificate No: HSM40062

Environmental Management System

ISO 140001:2004Certificate No: EMS40134

Page 6: Pic booklet   screen view 2

Pacific Industrial Company has a majority shareholding in Como Engineers. Through this agreement PIC is able to offer its mineral resource clients a more cost and time efficient execution model through an EPC contracting arrangement.

Como Engineers Pty Ltd was established in 1986. The core focus is to provide engineering services and specialist products to the Mining and Resource sector with a strong focus on process metallurgy, mechanical engineering and materials handling both in Australia and abroad.

Como Engineers employs a team of experienced metallurgists, engineers, construction supervisors and drafts-people which enables us to offer a complete process and engineering service. Como Engineers are able to supply services from metallurgical testing through to scoping and definitive feasibility studies as well as detailed engineering design to project construction and commissioning.

Como Engineers specialises in fit for purpose solutions utilising modular and transportable equipment in our plant designs. Where possible, Como Engineers likes to offer design and construct projects at a fixed duration, lump-sum price, thereby removing a large portion of the project risk from the client.

Como Engineers works closely with our Clients to understand and deliver the product and service that is required for each individual project.

Como Engineers operate worldwide offering localised support with offices in Perth, Melbourne and Jakarta.

Services include:

• Studies

• Design and Construction

• Plant and Infrastructure

• Relocations and Upgrades

• Maintenance and Refurbishments

• Modular Gold Stripping Plants

• Certified Dangerous Goods Assessments

Page 7: Pic booklet   screen view 2
Page 8: Pic booklet   screen view 2

Client:Completion:Value:

Tropicana Gold Mine

AngloGold Ashanti

2013

$120 MILLION

Works involved the total onsite construction of the Tankage, Structural, Mechanical and Piping works for the 5.5 million tonnes per annum gold process plant located 330klms North of Kalgoorlie W.A.

Client:Completion:Value:

Page 9: Pic booklet   screen view 2

Tropicana Gold Mine

Page 10: Pic booklet   screen view 2

Client:Completion:Value:

Karara Iron Ore

Karara Mining Limited

2012

$40 Million

Works involved the design, fabrication, Installation and surface treatment of the project tankage for the magnetite iron ore concentrator.Client:

Completion:Value:

Page 11: Pic booklet   screen view 2

Karara Iron Ore

Page 12: Pic booklet   screen view 2

Client:Completion:Value:

Client:Completion:Value:

Sino Iron Project

CITIC Pacific Mining

2012

$32 Million

Works involved the Installation of approx. 5000 tonnes of steelwork and mechanical items for the stockpile cover, conveying and recovery system for the Magnetite Iron Ore Concentrator. PIC subsidiary business COMO Engineers was also engaged under separate contracts for installation works for the Ball Mill and AG Mill equipment and other mechanical works.

Page 13: Pic booklet   screen view 2

Sino Iron Project

Page 14: Pic booklet   screen view 2

Client:Completion:Value:

Client:Completion:Value:

BHPBIO-Bucket Wheel Reclaimers

Thyssen Krupp

2012

$30 Million

Works involved the supply, fabrication and assembly of 3 x 15000 tonnes per hour capacity Bucket Wheel Reclaimers for BHP Billiton Iron Ore. One machine located at the Jimblebar Mine and 2 machines at the Port Hedland port facilities.

Page 15: Pic booklet   screen view 2

BHPBIO-Bucket Wheel Reclaimers

Page 16: Pic booklet   screen view 2

Client:Completion:Value:

Client:Completion:Value:

City Square – Brookfield Place

Brookfield Multiplex

2012

$52 Million

Works involved the supply, fabrication and delivery of 11,000 tonnes of steelwork, decking and column reinforcing for the 51 floor level steel frame building located in the Perth CBD.

Page 17: Pic booklet   screen view 2

City Square – Brookfield Place

Page 18: Pic booklet   screen view 2

Client:Completion:Value:

Client:Completion:Value:

DIN Project

Rio Tinto Iron Ore

2012

$15 Million

Works involved the supply, fabrication, surface treatment and load out and shipping to site of the 2 Surge Bins and associated steelwork for the Dampier Incremental Expansion Project located at Rio Tinto Iron Ore port facility at Parker Point W.A.

Page 19: Pic booklet   screen view 2

DIN Project

Page 20: Pic booklet   screen view 2

Client:Completion:Value:

Client:Completion:Value:

Gorgon LNG Subsea BIS

ALLSEAS

2011

$15 Million

Works involved the fabrication, testing and load out of 11 Buckle Initiator Structures weighing in excess of 120 tonnes each for the subsea gas pipelines delivering LNG to the Grogon LNG facility.

Page 21: Pic booklet   screen view 2

Gorgon LNG Subsea BIS

Page 22: Pic booklet   screen view 2

Client:Completion:Value:

Client:Completion:Value:

BHBIO – RGP 5Rail Bridges

BHP Billiton Iron Ore

2010

$40 Million

Works involved the fabrication, assembly, transportation and Installation of 125 Bridge Truss assemblies totalling 6500 tonnes for 11 river crossings for the Rail Bridge Duplication works between Newman and Port Hedland.

Page 23: Pic booklet   screen view 2

BHBIO – RGP 5Rail Bridges

Page 24: Pic booklet   screen view 2

Client:Completion:Value:

Client:Completion:Value:

FMG-Cloud Break Mine

FLSmisth - RAHCO

2010

$12 Million

Works involved the supply, fabrication, surface treatment and assembly of 2 mobile overburden removal systems for Fortescue Metal Group Cloud Break Mine

Page 25: Pic booklet   screen view 2

FMG-Cloud Break Mine

Page 26: Pic booklet   screen view 2

Client:Completion:Value:

Client:Completion:Value:

Pluto LNG Emission Chimneys

Woodside Petroleum

2010

$9 million

Works involved the fabrication, surface treatment, refractory lining and load out of the 3 Gas Turbine emission chimneys. Sections completed where up to 7 meters in diameter and weighing in excess of 200 tonnes each.

Page 27: Pic booklet   screen view 2

Pluto LNG Emission Chimneys

Page 28: Pic booklet   screen view 2

Client:Completion:Value:

Client:Completion:Value:

Bluewaters Power Station

ALSTOM

2009

$22 Million

Works involved the installation of steelwork, piping and the turbine and generating systems for both Units 1 and 2 for the Blue Waters Power Station.

Page 29: Pic booklet   screen view 2

Bluewaters Power Station

Page 30: Pic booklet   screen view 2

Client:Completion:Value:

Client:Completion:Value:

Rio Tinto – Ship Loader

Sandvik- Voest Alpine

2009

$20 million

Works involved the supply, fabrication, surface treatment and assembly and load out of 4 x 10,000 tonnes per hour capacity Ship Loaders for various Rio Tinto port operations.

Page 31: Pic booklet   screen view 2

Rio Tinto – Ship Loader

Page 32: Pic booklet   screen view 2

Client:Completion:Value:

Client:Completion:Value:

Pluto LNG Subsea BIS

ALLSEAS

2009

$14 Million

Works involved the fabrication, testing and load out of 21 Buckle Initiator Structures for the subsea gas pipeline delivering LNG to the Pluto LNG facility.

Page 33: Pic booklet   screen view 2

Pluto LNG Subsea BIS

Page 34: Pic booklet   screen view 2

Client:Completion:Value:

Client:Completion:Value:

NewGen Power Station

ALSTOM

2008

$12 Million

Works involved the installation of the Heat Recovery Steam Generator Boiler (HRSG) for the combined cycle 280MW gas turbine power station located in Kwinana W.A.

Page 35: Pic booklet   screen view 2

NewGen Power Station

Page 36: Pic booklet   screen view 2

Client:Completion:Value:

Client:Completion:Value:

Burrup LNG Train 4 & 5

Woodside Petroleum

2008

$11 Million

Works involved the fabrication, surface treatment, refractory lining and load out of the 7 Gas Turbine emission chimneys and Thermal Combustion Unit. Sections completed where up to 7 metres in diameter and weighing in excess of 200 tonnes each.

Page 37: Pic booklet   screen view 2

Burrup LNG Train 4 & 5

Page 38: Pic booklet   screen view 2

Client:Completion:Value:

Client:Completion:Value:

Ravensthorpe Nickel Mine

Outotec

2007

$35 Million

Works involved the supply, fabrication and installation of the 15 Thickeners – 6 x CCD thickeners, 4 x Precipitation thickeners, 5 x PAL, SAP and LIM deep cone thickeners and associated tanks totalling approx. 5000 tonnes of steelwork.

Page 39: Pic booklet   screen view 2

Ravensthorpe Nickel Mine

Page 40: Pic booklet   screen view 2

Client:Completion:Value:

Client:Completion:Value:

Telfer Gold Mine

Newcrest Mining

2005

$11 million

Works involved the fabrication and structural, mechanical and piping installation of the crushing, conveying, stockpiling and reclaim circuits for the gold – copper treatment plant located 400 klms south east of Port Hedland WA.

Page 41: Pic booklet   screen view 2

Telfer Gold Mine

Page 42: Pic booklet   screen view 2

Client:Completion:Value:

Client:Completion:Value:

Hlsmelt Project

Rio Tinto Iron Ore

2004

$20 million

Works involved the fabrication and structural, mechanical and piping installation of the coal drying and preparation facility. In addition PIC fabricated the massive Smelt Reduction Vessel and two Hot Blast Stoves for the HIsmelt plant located at Kwinana WA.

Page 43: Pic booklet   screen view 2

Hlsmelt Project

Page 44: Pic booklet   screen view 2

Client:Completion:Value:

Client:Completion:Value:

BHPBIO- Yandicoogina Rail Bridge

BHP Billiton Iron Ore

2003

$3.5 million

Works involved the fabrication, assembly and transportation of the 7 rail truss assemblies for the Yandicoogina Creek bridge located 150 kms north east of Newman WA. Individual girders fabricated where 3.2 metres deep and 45 meters long weighing 50 tonnes each and assembled into truss arrangements weighing 150 tonnes each for transportation and incremental launching.

Page 45: Pic booklet   screen view 2

BHPBIO- Yandicoogina Rail Bridge

Page 46: Pic booklet   screen view 2

Client:Completion:Value:

Client:Completion:Value:

AMC – Assembly Hall

Brookfield Multiplex

20003

$5.0 million

Works involved the fabrication and assembly of the mobile assembly hall located at the Australian Marine Complex in Henderson WA. The building dimension was 45 metres high, 90 meters long and spanned 90 meters. Included was also the fabrication and assembly of the 200 tonne capacity portal crane.

Page 47: Pic booklet   screen view 2

AMC – Assembly Hall

Page 48: Pic booklet   screen view 2

Client:Completion:Value:

Client:Completion:Value:

Cockburn Power Station

ALSTOM

2003

$6.0 million

Works involved the structural, mechanical, piping installation, hydrostatic testing and certification to ASME standard of the Heat Recovery Steam Generation (HRSG) unit for the 240MW combined cycle gas fired power station at Kwinana WA. Additional works included the fabrication and installation of the 60 meter high emission chimney.

Page 49: Pic booklet   screen view 2

Cockburn Power Station

Page 50: Pic booklet   screen view 2

Client:Completion:Value:

Client:Completion:Value:

Redbank Power Station

ALSTOM

2001

$12 million

Works involved the EPC contract for the materials handling plant for the 151MW coal fired power station located at Singleton NSW. Scope included the design, civil, structural, mechanical, piping, electrical, instrumentation and performance testing requirements using both coal and beneficiated dewatered tailings as fuels.

Page 51: Pic booklet   screen view 2

Redbank Power Station

Page 52: Pic booklet   screen view 2

Client:Completion:Value:

Client:Completion:Value:

Globex Grain Terminal

GrainCorp

2000

$10 million

Works involved the EPC contract for the grain silo construction at the Globex Grain Export Terminal located in Melbourne Victoria. Scope included the design and construction of 4 x 750 tonne, 14 x 1500 tonne capacity elevated silos and 2 x 12000 tonne capacity flat bottom steel silos for grain storage.

Page 53: Pic booklet   screen view 2

Globex Grain Terminal

Page 54: Pic booklet   screen view 2

Client:Completion:Value:

Client:Completion:Value:

Merlin Diamond Mine

Rio Tinto

2000

$11 million

Works involved the total construction including the earthworks, civil works, structural, mechanical, piping, electrical and instrumentation requirements for the Merlin Diamond Mine located 800 klms south east of Darwin NT.

Page 55: Pic booklet   screen view 2

Merlin Diamond Mine

Page 56: Pic booklet   screen view 2

Client:Completion:Value: