PIANC London June 11th 2012 Bigger Ships, Bigger Ports Oil & Gas : Martin Mannion
Presentation Title
Presentation Format
•Shipping / market trends
•Oil & gas port issues
•Examples / illustrations
CONFIDENTIAL PRIVATE INFORMATION 6/19/2012
2
Presentation Title
Shipping Trends
• Oil ships transport liquids in bulk, wide size range
• Circa 4,000 greater than 10,000DWT, 2/3rds double hulled
• Panamax 60,000DWT to 80,000DWT
• Aframax 80,000DWT to 120,000DWT
• Suezmax 120,000DWT to 165,000DWT
• VLCC 200,000DWT to 320,000DWT (90 number)
• ULCC 320,000DWT to 550,000DWT (7 number)
• Supertanker Seawise Giant 458m LOA scrapped 2010
• LNG ships transport liquefied natural gas (1/600th volume),
have increased in size from 160km3 to 266km3 (Qmax)
Presentation Title
Oil – Geography of Demand
Average Global Oil Demand Growth, 2009-15
thousand barrels per day
NORTH AMERICA
+60
LATIN AMERICA
+206
AFRICA
+94
EUROPE
-122
ASIA
+759
MIDDLE EAST
+345
FSU
+71
CONFIDENTIAL PRIVATE INFORMATION 6/19/2012
3
Presentation Title
Oil & Gas Exports
• Growth in activity in
emerging markets
including:
• Africa – Tanzania /
Mozambique
• Brazil
• SE Asia
• Upstream and
downstream investments
required in producing
countries
• Supply bases
• Ship repair facilities
• Export terminals (import too)
• Growth in LNG
• Changes in hubs, trade flows
Presentation Title
Oil and gas port issues
• Oil & Gas industry high HSE standards
• Deepwater access – dredge depth? Tranship offshore/SPM?
• Pressure to use jetty for wide shipping range
• Pressure to use older jetties for bigger ships
• Harder to find good sites – waves, currents, siltation
• Environmental protection
• Security
• LNG considering floating solutions
CONFIDENTIAL PRIVATE INFORMATION 6/19/2012
4
Presentation Title
Jetty planning issues
• Define ships - range with min, max; manifold variation
• Water depth at berth / underkeel clearance - ships, soils, waves, passing ships
• Navigation – channel to & from berth, turning, safety
• Safety distance : other berths, passing ships etc
• Dredging versus longer trestle to shore
• Downtime at berth (waves, winds, breakwater?) & access channel/traffic impacts
• Number & position of dolphins, elevation
• Platform layout (equipment), trestle alignment (road access?), deck level(s)
Presentation Title
Petroleum berth
17
CONFIDENTIAL PRIVATE INFORMATION 6/19/2012
5
Presentation Title
Marine Transfer Equipment
• Loading arms
• Cranes and lifting equipment, including cables
• Piping/manifolds, supports
• Oil transfer hoses
• Sumps/sump tanks
• Containment bunds
• Pumps/pump systems
Presentation Title
Topsides equipment : HSE, space issues
CONFIDENTIAL PRIVATE INFORMATION 6/19/2012
6
Presentation Title
Oil jetty hose tower
Presentation Title
LNG Tanker (Moss/spherical type)
CONFIDENTIAL PRIVATE INFORMATION 6/19/2012
7
Presentation Title
Qflex : 216,000m3, membrane tanks, 300m Long (Qmax 266,000m3, 345m long)
Presentation Title
LNG tanker manifolds
CONFIDENTIAL PRIVATE INFORMATION 6/19/2012
8
Presentation Title
LNG Loading arms
Powered
Emergency
Release
Coupling
QC/DC (quick
connect/qick
disconnect
coupling Presentation Title
Typical LNG Loading Platform Typical LNG Platform
CONFIDENTIAL PRIVATE INFORMATION 6/19/2012
9
Presentation Title
Mooring lines : synthetic, flexible tails
Presentation Title
Typical LNG terminals
• Ships pointing seaward for ease of exit
• Wide range of ship manifold positions (+30m fwd, -5m aft)
• 4 breasting dolphins, separate from platform
• 6 mooring dolphins, 25 to 50m set back
• Ships berth one side only (port or starboard)
• Turning circle min 1.5 x LOA, preferably 2+ times LOA
• Separation to other berths & adjacent channels vital
• Water depth 13.5-15m, depends on ships, local conditions
• Design for OCIMF : 60 knot winds @ berth, currents
• Platform main deck & raised mezzanine, containment
CONFIDENTIAL PRIVATE INFORMATION 6/19/2012
10
Presentation Title
NorthWest Sea Eagle at Dapeng PRC
Presentation Title
Golden Pass LNG, Texas
CONFIDENTIAL PRIVATE INFORMATION 6/19/2012
11
Presentation Title
Golden Pass LNG, Texas
Presentation Title
Loading platform, arms, gangway
CONFIDENTIAL PRIVATE INFORMATION 6/19/2012
12
Presentation Title
• Loading arms and
mezzanine platform
• Base of loading arm
Presentation Title
Dolphins, Quick Release Hooks
CONFIDENTIAL PRIVATE INFORMATION 6/19/2012
13
Presentation Title
Costa Azul LNG, Mexico
Presentation Title
Ship arrival, tug assistance
CONFIDENTIAL PRIVATE INFORMATION 6/19/2012
14
Presentation Title
Mooring analysis
Mooring Pattern for Cases 1 & 2
(107,000 DWT Vessel)
6 x head breast lines
4 x head spring lines 4 x stern spring lines
6 x stern breast lines
Presentation Title
Small ship on platform
4 x head breast lines
4 x stern breast lines
Mooring Pattern for Cases 7 & 8
(1,000 DWT Vessel)
CONFIDENTIAL PRIVATE INFORMATION 6/19/2012
15
Presentation Title
Single Point Mooring (SPMs)
421 27
Presentation Title
Floating LNG : newer concept
• LNG regas ships pumping ashore gas via SPM
• LNG regas ship at berth as storage with tankers to/from