PIANC Conference2008

Coastal Flood Risk Management Analysis for the Mississippi

Coastal Improvements Program

By Jeremy M. LaDart&

Dennis MekkersUS Army Corps of Engineers, Mobile District

Page 2: PIANC Conference 2008 Coastal Flood Risk Management Analysis for the Mississippi Coastal Improvements Program By Jeremy M. LaDart & Dennis Mekkers US Army.

Mississippi Coastal Improvements

Program• $10 Million Emergency

Supplemental Appropriations(P.L. 109-359) 30 December 2005

• Cost Effective Projects in lieu of NED benefits

• No Incremental Benefit-Cost Analysis

• 6 month interim and 24 month comprehensive report requirements

• Hurricane and Storm Damage Reduction

• Salt Water Intrusion• Shoreline Erosion• Fish and Wildlife Preservation• Other Water Related Resource

Projects

Studies related to the consequences of the

2005 hurricanes

* All efforts fully coordinated with the Louisiana Coastal Protection and Restoration

Project (LACPR) team

Page 3: PIANC Conference 2008 Coastal Flood Risk Management Analysis for the Mississippi Coastal Improvements Program By Jeremy M. LaDart & Dennis Mekkers US Army.

Coastal Mississippi

Page 4: PIANC Conference 2008 Coastal Flood Risk Management Analysis for the Mississippi Coastal Improvements Program By Jeremy M. LaDart & Dennis Mekkers US Army.

Coastal Mississippi

Page 5: PIANC Conference 2008 Coastal Flood Risk Management Analysis for the Mississippi Coastal Improvements Program By Jeremy M. LaDart & Dennis Mekkers US Army.

H. Katrina Surge

Page 6: PIANC Conference 2008 Coastal Flood Risk Management Analysis for the Mississippi Coastal Improvements Program By Jeremy M. LaDart & Dennis Mekkers US Army.

Planning Sub-units

Page 7: PIANC Conference 2008 Coastal Flood Risk Management Analysis for the Mississippi Coastal Improvements Program By Jeremy M. LaDart & Dennis Mekkers US Army.

Planning Process

Page 8: PIANC Conference 2008 Coastal Flood Risk Management Analysis for the Mississippi Coastal Improvements Program By Jeremy M. LaDart & Dennis Mekkers US Army.

Surge Probability

Page 9: PIANC Conference 2008 Coastal Flood Risk Management Analysis for the Mississippi Coastal Improvements Program By Jeremy M. LaDart & Dennis Mekkers US Army.

Storm Tracks

Page 10: PIANC Conference 2008 Coastal Flood Risk Management Analysis for the Mississippi Coastal Improvements Program By Jeremy M. LaDart & Dennis Mekkers US Army.

Modeling Approach

These storms were developed viaa methodology that is similar to theJoint Probability Method – but retain the ability to be checked againstcharacteristics of real storms over at

leastpart of the range considered.

Page 11: PIANC Conference 2008 Coastal Flood Risk Management Analysis for the Mississippi Coastal Improvements Program By Jeremy M. LaDart & Dennis Mekkers US Army.

Surge ProbabilityHancock County

Page 12: PIANC Conference 2008 Coastal Flood Risk Management Analysis for the Mississippi Coastal Improvements Program By Jeremy M. LaDart & Dennis Mekkers US Army.

Structure Database

• Over 200,000 Parcels

• 800 – 11X17 Parcel Maps

• Over 3,000 man-hours

Page 13: PIANC Conference 2008 Coastal Flood Risk Management Analysis for the Mississippi Coastal Improvements Program By Jeremy M. LaDart & Dennis Mekkers US Army.

Structure Database (Cont.)

First Floor Elevation Structure and Content Values Katrina Damage Number of Stories Construction Type Occupancy Type

Page 14: PIANC Conference 2008 Coastal Flood Risk Management Analysis for the Mississippi Coastal Improvements Program By Jeremy M. LaDart & Dennis Mekkers US Army.

Coastal Flood Risk(HEC-FDA)

Sta

ge

Probability

Stage

Dam

ag

e

ProbabilityD

am

ag

e

Page 15: PIANC Conference 2008 Coastal Flood Risk Management Analysis for the Mississippi Coastal Improvements Program By Jeremy M. LaDart & Dennis Mekkers US Army.

Lines of Defense

Page 16: PIANC Conference 2008 Coastal Flood Risk Management Analysis for the Mississippi Coastal Improvements Program By Jeremy M. LaDart & Dennis Mekkers US Army.

Lines of Defense

Page 17: PIANC Conference 2008 Coastal Flood Risk Management Analysis for the Mississippi Coastal Improvements Program By Jeremy M. LaDart & Dennis Mekkers US Army.

Structural Measures

Page 18: PIANC Conference 2008 Coastal Flood Risk Management Analysis for the Mississippi Coastal Improvements Program By Jeremy M. LaDart & Dennis Mekkers US Army.

Nonstructural Measures

Page 19: PIANC Conference 2008 Coastal Flood Risk Management Analysis for the Mississippi Coastal Improvements Program By Jeremy M. LaDart & Dennis Mekkers US Army.

Scenario Planning

Current planning models do not account for relative sea level rise

Evaluation of multiple future without project scenarios

More Informed Decisions = More Time and Cost

Page 20: PIANC Conference 2008 Coastal Flood Risk Management Analysis for the Mississippi Coastal Improvements Program By Jeremy M. LaDart & Dennis Mekkers US Army.

Future Without Conditions

Future Scenarios

Page 21: PIANC Conference 2008 Coastal Flood Risk Management Analysis for the Mississippi Coastal Improvements Program By Jeremy M. LaDart & Dennis Mekkers US Army.

Application ExamplePearlington, MS

Page 22: PIANC Conference 2008 Coastal Flood Risk Management Analysis for the Mississippi Coastal Improvements Program By Jeremy M. LaDart & Dennis Mekkers US Army.

Types of MeasuresPearlington, MS

Page 23: PIANC Conference 2008 Coastal Flood Risk Management Analysis for the Mississippi Coastal Improvements Program By Jeremy M. LaDart & Dennis Mekkers US Army.

Impacts of Relative Sea Level

Rise

NED RED EQ OSE

Degradation of risk reduction

Increased impacts to regional economy

Greater degradation of ecological resources

Increased threats to health and safety

Increased emergency costs

Greater strain on local tax burden

Increased risk of plan failure

Greater potential for loss of life

Page 24: PIANC Conference 2008 Coastal Flood Risk Management Analysis for the Mississippi Coastal Improvements Program By Jeremy M. LaDart & Dennis Mekkers US Army.