Photovoltaic power plants Niksic mill, Niksic, Montenegro April, 2014

6
Investing in 50% share of company Amadint Ltd Cazin Mala Lisa bb Cazin 77 220 Bosnia and Herzegovina + Possibilities for other investments

description

Photovoltaic power plants Niksic mill, Niksic, Montenegro April, 2014 . Photovoltaic power plants. We have a huge facade surfaces that can be used to make the power plant. Economic analysis of project. Investment cost. Instal power. 399.000 €. 372.00 kWp. Return on investment. - PowerPoint PPT Presentation

Transcript of Photovoltaic power plants Niksic mill, Niksic, Montenegro April, 2014

Page 1: Photovoltaic power plants Niksic mill, Niksic, Montenegro April,  2014

Investing in 50% share of company

Amadint Ltd CazinMala Lisa bbCazin 77 220Bosnia and Herzegovina

+ Possibilities for other investments

Page 2: Photovoltaic power plants Niksic mill, Niksic, Montenegro April,  2014

Comparative advantages of project location:

Investing in Renewable Energy Sources,

Geostrategic position of the location,

Wood raw material availability,

All necessary permits and infrastructure secured,

Distance to nearest harbour is less than 250 km (Rijeka - Croatia),

Distance to major Central - European cities is less than 500 km.

Our project location

Page 3: Photovoltaic power plants Niksic mill, Niksic, Montenegro April,  2014

Project locationBosnia and HerzegovinaBosanski Petrovac

Lot 1 Lot 2

Lot 3

Lot 4

Lot 5Lot 6

Lot 8Lot 9

Lot 10

Lot 11Lot 12

Lot 13

Lot 7

Page 4: Photovoltaic power plants Niksic mill, Niksic, Montenegro April,  2014

Investment: INCREASE OF PRODUCTION CAPACITY

Wood Pellets Factory Yearly capacity: 15.000 T

Yearly capacity after investment:30.000 T

Page 5: Photovoltaic power plants Niksic mill, Niksic, Montenegro April,  2014

Why should You invest with us?

• Income Tax 10 %• Capital Gain Tax 0,0 %• Income Tax is 0% (if more than 30% of income is made by export of the goods)

Investment possibilities:

•Creation of production capacities for further development of wood processing production,

•Start up Cogeneration plant,

•Start up Solar power plant.

1. New Shareholder buy-in for the 50% of shares,

2. Investment in the increase of production capacity to 4t/h.

Investment objectives:

Page 6: Photovoltaic power plants Niksic mill, Niksic, Montenegro April,  2014

Amadint Ltd Cazin101. MUKBR bb77 220 CazinBosnia and Herzegovina

+387 37 511 531+387 61 195 252+387 61 201 275

[email protected]

Contact information:

Investment Value<Wood Pellet Factory>

CAPEX: 3.206.534 €OPEX: 777.173 €Total Investment: 3.983.707 €

Funds neccessary for the projectimplementation: 3.983.707 €

Investment Payback period: 5 years and 5 months

ROI: 25,23 %