MANSFIELD MANSFIELD ELECTRICAL LTD ELECTRICAL LTD Job Name: Braintree Retirement Home. Job Address: Juniper Court, Meadow Park, Braintree, Essex, CM7 1TD Main Contractor: Colson & Colson Ltd. Working on behalf: Trilectric Ltd. Start Date: July 2008. Completion Date: March 2009 Job Value: Labour only £ 195000.00 + Vat. Job Description: The job consists of 107 apartments 1 & 2 bedrooms, landlords area i.e. corridors and seating areas, Main kitchen & storage area, main LV supplies, main dining area, Hair salon, Office areas, all external lighting i.e. lamp posts etc, managers living quarters & electric wheel chair charging area. The work carried out consists of twin & earth cabling for all lighting & and small power, all sub-mains cabling consists of SWA cabling laid on metal galvanised tray suspended on brackets above the false corridor ceilings. The building consists of a Ground floor, First floor, Second floor & third floor loft areas. 3 Oudle Lane Much Hadham Hertfordshire SG10 6DQ Tel: 01279 841151 Fax: 01279 843376 E.mail: [email protected]

Transcript of photos & job descriptions

Page 1: photos & job descriptions

MANSFIELDMANSFIELDELECTRICAL LTDELECTRICAL LTD

Job Name: Braintree Retirement Home.

Job Address: Juniper Court, Meadow Park, Braintree, Essex, CM7 1TD

Main Contractor: Colson & Colson Ltd.

Working on behalf: Trilectric Ltd.

Start Date: July 2008.

Completion Date: March 2009

Job Value: Labour only £ 195000.00 + Vat.

Job Description: The job consists of 107 apartments 1 & 2 bedrooms, landlords area i.e. corridors and seating areas, Main kitchen & storage area, main LV supplies, main dining area, Hair salon, Office areas, all external lighting i.e. lamp posts etc, managers living quarters & electric wheel chair charging area.

The work carried out consists of twin & earth cabling for all lighting & and small power, all sub-mains cabling consists of SWA cabling laid on metal galvanised tray suspended on brackets above the false corridor ceilings.

The building consists of a Ground floor, First floor, Second floor & third floor loft areas.

3 Oudle Lane Much Hadham Hertfordshire SG10 6DQTel: 01279 841151 Fax: 01279 843376

E.mail: [email protected]

Page 2: photos & job descriptions

MANSFIELDMANSFIELDELECTRICAL LTDELECTRICAL LTD

Front Left Hand Side

Job Name: London Bridge Tooley Street.

Job Address: London Bridge, 160 Tooley Street, London.

Main Contractor: ISG

Working on behalf: Trilectric Ltd.

Start Date: November 2009.

Completion Date: June 2009

Job Value: Labour only £ 60000.00 + Vat.

Job Description: This contract was based on a fit out contract of which we installed the under floor electrak, SWA cabling to electrak, 450mm galvanised tray for IT & the adaption of the main distribution board trunking & cabling.

The building consists of ground floor, first floor, second floor, third floor, fourth floor & fifth floor.

3 Oudle Lane Much Hadham Hertfordshire SG10 6DQTel: 01279 841151 Fax: 01279 843376

E.mail: [email protected]

Page 3: photos & job descriptions

MANSFIELDMANSFIELDELECTRICAL LTDELECTRICAL LTD

Installation carried out on the right hand side 4th floor

Job Name: New FA Head Quarters.

Job Address: Wembley Stadium Wembley London

Main Contractor: BW Interiors.

Working on behalf: Trilectric Ltd.

Start Date: January 2009.

Completion Date: July 2009

Job Value: Labour only £ 17000.00 + Vat.

Job Description: This contract was based on a fit out contract of which we installed the under floor electrak, SWA cabling to electrak the installation of the main distribution board trunking & cabling & the bonding to the false floor.

3 Oudle Lane Much Hadham Hertfordshire SG10 6DQTel: 01279 841151 Fax: 01279 843376

E.mail: [email protected]

Page 4: photos & job descriptions

MANSFIELDMANSFIELDELECTRICAL LTDELECTRICAL LTD

Job Name: GPS House.

Job Address: GPS House, Great Portland Street, London

Main Contractor: Knight Harwood.

Working on behalf: Trilectric Ltd.

Start Date: May 2008.

Completion Date: January 2009

Job Value: Labour only £ 180000.00 + Vat.

Job Description: The contract consisted of a shell & core contract, which we installed the main lighting, lighting dimmer control, all sub-main cabling & distribution boards to all floors, the installation of the main L.V panel, main riser containment for IT, fire alarm, car park lighting & testing & commissioning.

3 Oudle Lane Much Hadham Hertfordshire SG10 6DQTel: 01279 841151 Fax: 01279 843376

E.mail: [email protected]

Page 5: photos & job descriptions

MANSFIELDMANSFIELDELECTRICAL LTDELECTRICAL LTD

Job Name: Chatham Historic Dock Yard Museum.

Job Address: Chatham Dock Yard

Main Contractor: Mace.

Working on behalf: MJ Lonsdale Ltd.

Start Date: February 2010.

Completion Date: August 2010

Job Value: Labour only £ 155000.00 + Vat.

Job Description: The contract consisted of a part installation due to the main contractor going in to liquidation.The project consisted of lighting control, general power and containment for lighting, power and data.

3 Oudle Lane Much Hadham Hertfordshire SG10 6DQTel: 01279 841151 Fax: 01279 843376

E.mail: [email protected]

Page 6: photos & job descriptions

MANSFIELDMANSFIELDELECTRICAL LTDELECTRICAL LTD

1. Mary hare Grammar School Arlington Manor Newbury Berkshire (direct to customer).

2. Harris Academy Norwood Junction South London (working with EMCOR).

3. Stratford Eye project, Stratford (working with EMCOR).

4. 54 Chepstow villas, Portabella road (working with Trielectric).

5. Croydon Home office (working with Rotary Southern).

6. Bethnal Green Cudworth Street London flats (working with H & C building services Ltd).

7. Aquila House Soho Square London (working for Maxwell Stewart).

8. I have carried out smaller projects in Woolwich barracks, Kensington Barracks, St. Johns Wood Barracks and others. Cost range from).

9. Regents quarters Jahn Court Kings Cross (Working with Maxwell Stewart).

10. HSBC Bank shop, re-fit Harrow (working for Maxwell Stewart).

11. Bank of America Trading desk re-fit London near Leadenhall Street Market (working for Lorne Stewart Plc).

12. Stock Exchange working on fit out of new trade floor, London (Working for Lorne Stewart Plc).

13. Anderson accountants fit out of new building (Desks), Arundel Great Anderson accountants fit out of new building (Desks), Arundel Great CourtCourt London (working with Maxwell Stewart Plc).

14. Feltham Barracks, re-fit of printing and photo area (working for Maxwell Stewart)

15. Woolwich Barracks, installation of new lighting on the new emergency stairs case on dorm areas (working with Cityline Construction Ltd).

16. St John’s Wood Barracks Remedial works (working with Cityline Construction Ltd).

17. Knightsbridge Barrack, installing new supplies for new fridges in canteen area (Mansfield Electrical)

3 Oudle Lane Much Hadham Hertfordshire SG10 6DQTel: 01279 841151 Fax: 01279 843376

E.mail: [email protected]

Page 7: photos & job descriptions

MANSFIELDMANSFIELDELECTRICAL LTDELECTRICAL LTD

I have more; all different from smaller to larger projects if you need more examples please let me know.