Photo Album for Pierce Job 32638 Woodinville, WA Custom Arrow XT Chassis Tiller Wk 5 Production ending February 15, 2019 • The pump has been painted and will continue with assembly. • The tiller cab has been painted the final color this week. • The body sections have arrived to the 41 assembly plant to begin the paint process next. • The cab is moving down the cab assembly line this week.