Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard ... · 1/18/2017 · Philip Aarons,...
Transcript of Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard ... · 1/18/2017 · Philip Aarons,...
Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau,
Signe Nielsen, Shin-pei Tsay, Mary Valverde, Commissioners
January 18, 2017
CERTIFICATE 26008
RESOLVED That the Design Commission, having considered designs for the installation of
tower lighting, Building 77, Brooklyn Navy Yard Industrial Park, 63 Flushing Avenue, Brooklyn,
submitted by the the Brooklyn Navy Yard Development Corporation, represented by exhibits
6063-JQ, JR & JS of record in this matter, hereby gives to the same unanimous preliminary
and final approval with the understanding that (1) this approval should not be misconstrued as
a tacit approval of the same orange color for use throughout the Navy Yard; (2) the Navy Yard
will submit a comprehensive environmental graphics proposal for review by September 2017;
and (3) depending on the graphics proposal, the Commission may request that the tower be
repainted a different color.
Final approval is conditioned upon commencement of work before January 18, 2019, and
submission of comprehensive photographic documentation of the completed project
consisting of 8” x 10” archival-quality color photographs.
A true copy of resolution adopted by
the Design Commission at its meeting
on January 18, 2017.
Justin Garrett Moore
Executive Director
Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau,
Signe Nielsen, Shin-pei Tsay, Mary Valverde, Commissioners
January 18, 2017
CERTIFICATE 26009
RESOLVED That the Design Commission, having considered a proposal for the installation of
Luminescence by Nobuho Nagasawa, The Peninsula, Hunter’s Point South Waterfront Park,
54th Avenue, Center Boulevard, 55th Avenue, and the East River, Long Island City, Queens,
submitted by the the Department of Cultural Affairs’ Percent for Art Program and the Economic
Development Corporation, represented by exhibits 6544-BG, BH, BI, BJ & BK of record in this
matter, hereby gives to the same unanimous preliminary approval.
Preliminary approval is conditioned upon commencement of work before January 18, 2019,
and submission of this project for final review and approval.
A true copy of resolution adopted by
the Design Commission at its meeting
on January 18, 2017.
Justin Garrett Moore
Executive Director
Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau,
Signe Nielsen, Shin-pei Tsay, Mary Valverde, Commissioners
January 18, 2017
CERTIFICATE 26010
RESOLVED That the Design Commission, having considered designs for the installation of a
containment fill box and stairs, Fire Academy Building 10, 7 Cammarata Avenue, Randall’s
Island, Manhattan, submitted by the the Department of Design and Construction, represented
by exhibits 6242-AE, AF, AG & AH of record in this matter, hereby gives to the same
unanimous preliminary and final approval.
Final approval is conditioned upon commencement of work before January 18, 2019, and
submission of comprehensive photographic documentation of the completed project
consisting of 8” x 10” archival-quality color photographs.
A true copy of resolution adopted by
the Design Commission at its meeting
on January 18, 2017.
Justin Garrett Moore
Executive Director
Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau,
Signe Nielsen, Shin-pei Tsay, Mary Valverde, Commissioners
January 18, 2017
CERTIFICATE 26011
RESOLVED That the Design Commission, having considered designs for the reconstruction of
the spillway channel walls, Amawalk Dam, Amawalk Road and Lake Road, Somers,
Westchester County, submitted by the the Department of Environmental Protection,
represented by exhibits 5740-V, W, X & Y of record in this matter, hereby gives to the same
unanimous preliminary approval.
Preliminary approval is conditioned upon submission of this project for final review and
approval before January 18, 2019.
A true copy of resolution adopted by
the Design Commission at its meeting
on January 18, 2017.
Justin Garrett Moore
Executive Director
Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau,
Signe Nielsen, Shin-pei Tsay, Mary Valverde, Commissioners
January 18, 2017
CERTIFICATE 26012
RESOLVED That the Design Commission, having considered designs for the installation of light
fixtures, Pine Hill Wastewater Treatment Plant, Shandanken, Ulster County, submitted by the
the Department of Environmental Protection, represented by exhibits 7272-A, B & C of record
in this matter, hereby gives to the same unanimous preliminary and final approval.
Final approval is conditioned upon commencement of work before January 18, 2019, and
submission of comprehensive photographic documentation of the completed project
consisting of 8” x 10” archival-quality color photographs.
A true copy of resolution adopted by
the Design Commission at its meeting
on January 18, 2017.
Justin Garrett Moore
Executive Director
Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau,
Signe Nielsen, Shin-pei Tsay, Mary Valverde, Commissioners
January 18, 2017
CERTIFICATE 26013
RESOLVED That the Design Commission, having considered designs for the installation of
rooftop mechanical equipment and light fixtures, Grand Gorge Wastewater Treatment Plant,
Grand Gorge, Roxbury, Delaware County, submitted by the the Department of Environmental
Protection, represented by exhibits 1322-K, L & M of record in this matter, hereby gives to the
same unanimous preliminary and final approval.
Final approval is conditioned upon commencement of work before January 18, 2019, and
submission of comprehensive photographic documentation of the completed project
consisting of 8” x 10” archival-quality color photographs.
A true copy of resolution adopted by
the Design Commission at its meeting
on January 18, 2017.
Justin Garrett Moore
Executive Director
Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau,
Signe Nielsen, Shin-pei Tsay, Mary Valverde, Commissioners
January 18, 2017
CERTIFICATE 26014
RESOLVED That the Design Commission, having considered designs for the installation of
rooftop mechanical equipment and light fixtures, Tannersville Wastewater Treatment Plant,
Hunter, Greene County, submitted by the the Department of Environmental Protection,
represented by exhibits 1323-CU, CV & CW of record in this matter, hereby gives to the same
unanimous preliminary and final approval.
Final approval is conditioned upon commencement of work before January 18, 2019, and
submission of comprehensive photographic documentation of the completed project
consisting of 8” x 10” archival-quality color photographs.
A true copy of resolution adopted by
the Design Commission at its meeting
on January 18, 2017.
Justin Garrett Moore
Executive Director
Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau,
Signe Nielsen, Shin-pei Tsay, Mary Valverde, Commissioners
January 18, 2017
CERTIFICATE 26015
RESOLVED That the Design Commission, having considered designs for the installation of
photovoltaic panels, Brooklyn New School, J.H.S. 142, 610 Henry Street, Brooklyn, submitted
by the the Department of Education, represented by exhibits 1164-X, Y & Z of record in this
matter, hereby gives to the same unanimous preliminary and final approval.
Final approval is conditioned upon commencement of work before January 18, 2019, and
submission of comprehensive photographic documentation of the completed project
consisting of 8” x 10” archival-quality color photographs.
A true copy of resolution adopted by
the Design Commission at its meeting
on January 18, 2017.
Justin Garrett Moore
Executive Director
Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau,
Signe Nielsen, Shin-pei Tsay, Mary Valverde, Commissioners
January 18, 2017
CERTIFICATE 26016
RESOLVED That the Design Commission, having considered designs for the installation of
pole-top antennae, battery packs, and access point devices for Con Edison, Bronx, Brooklyn,
Queens, submitted by the the Department of Transportation and the Department of
Information, Technology & Telecommunications, represented by exhibits 7273-A, B, C & D of
record in this matter, hereby gives to the same unanimous preliminary and final approval with
the understanding that (1) no more than 2500 devices will be installed citywide; (2) the devices
will not be installed on intersection, signal, or distinctive lightpoles; and (3) no additional
devices will be installed on the same poles as these devices.
Final approval is conditioned upon commencement of work before January 18, 2019, and
submission of comprehensive photographic documentation of the completed project
consisting of 8” x 10” archival-quality color photographs.
A true copy of resolution adopted by
the Design Commission at its meeting
on January 18, 2017.
Justin Garrett Moore
Executive Director
Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau,
Signe Nielsen, Shin-pei Tsay, Mary Valverde, Commissioners
January 18, 2017
CERTIFICATE 26017
RESOLVED That the Design Commission, having considered designs for the reconstruction of
a playground and athletic courts, Dutch Kills Playground, Crescent Street and 36th Avenue,
Long Island City, Queens, submitted by the the Department of Parks & Recreation, represented
by exhibits 2843-G, H, I & J of record in this matter, hereby gives to the same unanimous
preliminary approval with the understanding that when this project is submitted for final, (1) the
entrances to the play areas will be revised to be a continuation of the concrete pavers instead
of a mix of safety surface and concrete and (2) the entrance to the picnic area west of the
comfort station will be moved slightly south to align with the material change from safety
surface to asphalt.
Preliminary approval is conditioned upon submission of this project for final review and
approval before January 18, 2019.
A true copy of resolution adopted by
the Design Commission at its meeting
on January 18, 2017.
Justin Garrett Moore
Executive Director
Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau,
Signe Nielsen, Shin-pei Tsay, Mary Valverde, Commissioners
January 18, 2017
CERTIFICATE 26018
RESOLVED That the Design Commission, having considered designs for the reconstruction of
a playground and construction of two entrance plazas, Friends Field Park, East 4th Street,
Avenue L, McDonald Avenue, and Avenue M, Brooklyn, submitted by the the Department of
Parks & Recreation, represented by exhibits 4198-W, X & Y of record in this matter, hereby
gives to the same unanimous preliminary approval with the understanding that the bollards will
be removed from the plaza at the intersection of East 4th Street and Avenue L.
Preliminary approval is conditioned upon submission of this project for final review and
approval before January 18, 2019.
A true copy of resolution adopted by
the Design Commission at its meeting
on January 18, 2017.
Justin Garrett Moore
Executive Director
Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau,
Shin-pei Tsay, Mary Valverde, Commissioners
January 18, 2017
CERTIFICATE 26019
RESOLVED That the Design Commission, having considered designs for the construction of
two plazas and adjacent site work, Brownsville Recreation Center, 1555 Linden Boulevard,
Brooklyn, submitted by the the Department of Parks & Recreation, represented by exhibits
3068-K, L, M & N of record in this matter, hereby gives to the same unanimous preliminary
approval with the understanding that the team will develop final drawings with the goal of
incorporating the add alternate concrete paving in the base contract. Commissioner Nielsen
recused herself.
Preliminary approval is conditioned upon submission of this project for final review and
approval before January 18, 2019.
A true copy of resolution adopted by
the Design Commission at its meeting
on January 18, 2017.
Justin Garrett Moore
Executive Director
Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau,
Signe Nielsen, Shin-pei Tsay, Mary Valverde, Commissioners
January 18, 2017
CERTIFICATE 26020
RESOLVED That the Design Commission, having considered designs for the reconstruction of
Ennis Playground, 2nd Avenue, 11th Street, 3rd Avenue, and 12th Street, Brooklyn, submitted
by the the Department of Parks & Recreation, represented by exhibits 7274-A, B, C & D of
record in this matter, hereby gives to the same unanimous preliminary approval.
Preliminary approval is conditioned upon submission of this project for final review and
approval before January 18, 2019.
A true copy of resolution adopted by
the Design Commission at its meeting
on January 18, 2017.
Justin Garrett Moore
Executive Director
Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau,
Signe Nielsen, Shin-pei Tsay, Mary Valverde, Commissioners
January 18, 2017
CERTIFICATE 26021
RESOLVED That the Design Commission, having considered designs for the interim
rehabilitation of the 107th Street Pier, 107th Street, and the East River, Manhattan, submitted
by the the Department of Parks & Recreation, represented by exhibits 5053-L & M of record in
this matter, hereby gives to the same unanimous preliminary and final approval with the
understanding that this is an interim project that will reopen part of the pier to the public until
the entire structure can be reconstructed.
Final approval is conditioned upon commencement of work before January 18, 2019, and
submission of comprehensive photographic documentation of the completed project
consisting of 8” x 10” archival-quality color photographs.
A true copy of resolution adopted by
the Design Commission at its meeting
on January 18, 2017.
Justin Garrett Moore
Executive Director
Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau,
Signe Nielsen, Shin-pei Tsay, Mary Valverde, Commissioners
January 18, 2017
CERTIFICATE 26022
RESOLVED That the Design Commission, having considered designs for the reconstruction of
a comfort station, Stapleton Playground, adjacent to P.S./I.S. 78, Tompkins Avenue between
Broad Street and Hill Street, Stapleton, Staten Island, submitted by the the Department of
Parks & Recreation, represented by exhibits 4029-I & J of record in this matter, hereby gives to
the same unanimous preliminary and final approval with the understanding that no other
design-build proposals will be submitted until final sign-off photos are submitted
demonstrating that the pilot was successful.
Final approval is conditioned upon commencement of work before January 18, 2019, and
submission of comprehensive photographic documentation of the completed project
consisting of 8” x 10” archival-quality color photographs.
A true copy of resolution adopted by
the Design Commission at its meeting
on January 18, 2017.
Justin Garrett Moore
Executive Director
Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau,
Signe Nielsen, Shin-pei Tsay, Mary Valverde, Commissioners
January 18, 2017
CERTIFICATE 26023
RESOLVED That the Design Commission, having considered designs for the reconstruction of
athletic fields, Phase I, Red Hook Recreation Area, Lorraine Street, Henry Street, Bay Street,
and Hicks Street, Brooklyn, submitted by the the Department of Parks & Recreation,
represented by exhibits 2081-BN, BO, BP & BQ of record in this matter, hereby gives to the
same unanimous final approval.
Final approval is conditioned upon commencement of work before January 18, 2019, and
submission of comprehensive photographic documentation of the completed project
consisting of 8” x 10” archival-quality color photographs.
A true copy of resolution adopted by
the Design Commission at its meeting
on January 18, 2017.
Justin Garrett Moore
Executive Director
Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau,
Signe Nielsen, Shin-pei Tsay, Mary Valverde, Commissioners
January 18, 2017
CERTIFICATE 26024
RESOLVED That the Design Commission, having considered designs for the reconstruction of
Lincoln Terrace Playground, Lincoln Terrace Park, East New York Avenue between Rochester
Avenue and Buffalo Avenue, Brooklyn, submitted by the the Department of Parks & Recreation,
represented by exhibits 2043-AC & AD of record in this matter, hereby gives to the same
unanimous final approval.
Final approval is conditioned upon commencement of work before January 18, 2019, and
submission of comprehensive photographic documentation of the completed project
consisting of 8” x 10” archival-quality color photographs.
A true copy of resolution adopted by
the Design Commission at its meeting
on January 18, 2017.
Justin Garrett Moore
Executive Director
Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau,
Signe Nielsen, Shin-pei Tsay, Mary Valverde, Commissioners
January 18, 2017
CERTIFICATE 26025
RESOLVED That the Design Commission, having considered a final report for the replication of
a sword, General Gouverneur Kemble Warren (1893) by Henry Baerer, Grand Army Plaza,
Brooklyn, submitted by the the Department of Parks & Recreation, represented by exhibits
1611-AR, AS & AT of record in this matter, hereby gives to the same unanimous final approval.
A true copy of resolution adopted by
the Design Commission at its meeting
on January 18, 2017.
Justin Garrett Moore
Executive Director
Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau,
Signe Nielsen, Shin-pei Tsay, Mary Valverde, Commissioners
January 18, 2017
CERTIFICATE 26026
RESOLVED That the Design Commission, having considered a final report for the replication of
a sword, General Josiah Porter (1902) by William Clark Noble, Van Cortlandt Park, Bronx,
submitted by the the Department of Parks & Recreation, represented by exhibits 6067-J, K & L
of record in this matter, hereby gives to the same unanimous final approval.
A true copy of resolution adopted by
the Design Commission at its meeting
on January 18, 2017.
Justin Garrett Moore
Executive Director
Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau,
Signe Nielsen, Shin-pei Tsay, Mary Valverde, Commissioners
January 18, 2017
CERTIFICATE 26027
RESOLVED That the Design Commission, having considered designs for the rehabilitation of
the Owen F. Dolen Golden Age Recreation Center, Owen F. Dolen Park, 2551 Westchester
Avenue, Bronx, submitted by the the Department of Parks & Recreation, represented by
exhibits 1396-AH, AI, AJ, AK & AL of record in this matter, hereby gives to the same
unanimous preliminary and final approval with the understanding that DPR will reach out to the
Commission and Conservation Advisory Group (CAG) to schedule a site visit to review samples
of brick, mortar, and cast stone before the work is completed.
Final approval is conditioned upon commencement of work before January 18, 2019, and
submission of comprehensive photographic documentation of the completed project
consisting of 8” x 10” archival-quality color photographs.
A true copy of resolution adopted by
the Design Commission at its meeting
on January 18, 2017.
Justin Garrett Moore
Executive Director
Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau,
Signe Nielsen, Shin-pei Tsay, Mary Valverde, Commissioners
January 18, 2017
CERTIFICATE 26028
RESOLVED That the Design Commission, having considered designs for the construction of an
ADA ramp, canopy, and ticket office, Yankee Stadium, 1 East 161st Street, Bronx, submitted
by the the Department of Parks & Recreation, represented by exhibits 4052-EI, EJ & EK of
record in this matter, hereby gives to the same unanimous preliminary approval with the
understanding that (1) revised drawings that accurately show the Kalwall canopy and structure
will be submitted before the project returns for final review and (2) all metal detectors and
screening tables are temporary and will be installed on the entrance platform during events
only.
Preliminary approval is conditioned upon submission of this project for final review and
approval before January 18, 2019.
A true copy of resolution adopted by
the Design Commission at its meeting
on January 18, 2017.
Justin Garrett Moore
Executive Director
Philip Aarons, Laurie Hawkinson, Manuel Miranda, Richard Moore, Susan Morgenthau,
Signe Nielsen, Shin-pei Tsay, Mary Valverde, Commissioners
January 18, 2017
CERTIFICATE 26029
RESOLVED That the Design Commission, having considered designs for the installation of
rooftop stacks, Emergency Medical Station 32 (EMS 32), 347 Bond Street, Brooklyn, submitted
by the the Fire Department, represented by exhibits 6313-H, I, J & K of record in this matter,
hereby gives to the same unanimous preliminary and final approval.
Final approval is conditioned upon commencement of work before January 18, 2019, and
submission of comprehensive photographic documentation of the completed project
consisting of 8” x 10” archival-quality color photographs.
A true copy of resolution adopted by
the Design Commission at its meeting
on January 18, 2017.
Justin Garrett Moore
Executive Director