Phase 3: Scheduling and Cost Estimate
Provide the following:1. Detailed Project Schedule: Bar Chart2. Cost Estimate3. List of Trades
Construction Process
![Page 2: Phase 3: Scheduling and Cost Estimate Provide the following: 1.Detailed Project Schedule: Bar Chart 2.Cost Estimate 3.List of Trades Construction Process.](https://reader035.fdocuments.net/reader035/viewer/2022072017/56649f055503460f94c19a69/html5/thumbnails/2.jpg)
Scheduling and Cost Estimate Process:
Task
Task
Scope of Work
(Drawings and RFP)
a. Identify all scope of work items for the Project (Design work, Site preparation, Removals, Installation, etc)
b. Identify all construction activities (Task) for each item
![Page 3: Phase 3: Scheduling and Cost Estimate Provide the following: 1.Detailed Project Schedule: Bar Chart 2.Cost Estimate 3.List of Trades Construction Process.](https://reader035.fdocuments.net/reader035/viewer/2022072017/56649f055503460f94c19a69/html5/thumbnails/3.jpg)
Scheduling and Cost Estimate Process (cont’d):
Labor
Mate-rials
Line Item
c. Break Tasks into more specific Line Itemsd. Identify materials and labor needed for each iteme. Determine material costs and labor wagesf. Determine Construction expenses (Profit, Professional Fees, etc)g. Bring the information together:
a. Summary of all costsb. Schedule for all tasks
Task
Line Item
Line Item
![Page 4: Phase 3: Scheduling and Cost Estimate Provide the following: 1.Detailed Project Schedule: Bar Chart 2.Cost Estimate 3.List of Trades Construction Process.](https://reader035.fdocuments.net/reader035/viewer/2022072017/56649f055503460f94c19a69/html5/thumbnails/4.jpg)
CSI Divisions: Master Format
• Minimum:– General Requirements– Metals– Openings– Finishes
• arch tool box
![Page 5: Phase 3: Scheduling and Cost Estimate Provide the following: 1.Detailed Project Schedule: Bar Chart 2.Cost Estimate 3.List of Trades Construction Process.](https://reader035.fdocuments.net/reader035/viewer/2022072017/56649f055503460f94c19a69/html5/thumbnails/5.jpg)
Detailed Bar Chart: Project Schedule
• CPM (Critical Path Method)- Project network logic diagram, calculates the longest path and the latest/earliest start dates– List all activities required to complete the project– Time or duration the activity will take to complete– Dependencies between activities
![Page 6: Phase 3: Scheduling and Cost Estimate Provide the following: 1.Detailed Project Schedule: Bar Chart 2.Cost Estimate 3.List of Trades Construction Process.](https://reader035.fdocuments.net/reader035/viewer/2022072017/56649f055503460f94c19a69/html5/thumbnails/6.jpg)
Detailed Bar Chart: Project Schedule
• Ghant Chart– Scope of work
• CSI Divisions• Hierarchy
– Duration– Start and Finish dates– Relationship between
work items
![Page 7: Phase 3: Scheduling and Cost Estimate Provide the following: 1.Detailed Project Schedule: Bar Chart 2.Cost Estimate 3.List of Trades Construction Process.](https://reader035.fdocuments.net/reader035/viewer/2022072017/56649f055503460f94c19a69/html5/thumbnails/7.jpg)
Cost Estimate• Scope of Work (CSI Division Format)• Units• Materials• Labor• Allowances• Equipment
![Page 8: Phase 3: Scheduling and Cost Estimate Provide the following: 1.Detailed Project Schedule: Bar Chart 2.Cost Estimate 3.List of Trades Construction Process.](https://reader035.fdocuments.net/reader035/viewer/2022072017/56649f055503460f94c19a69/html5/thumbnails/8.jpg)
Cost Estimate
• Summary• Professional Expenses• General Conditions• Overhead & Profit • Totals
*Use CSI Division Format*
![Page 9: Phase 3: Scheduling and Cost Estimate Provide the following: 1.Detailed Project Schedule: Bar Chart 2.Cost Estimate 3.List of Trades Construction Process.](https://reader035.fdocuments.net/reader035/viewer/2022072017/56649f055503460f94c19a69/html5/thumbnails/9.jpg)
List of Trades
• Wage Determinations– Department of Labor– WageDeterminationsOnLine.GOV
![Page 10: Phase 3: Scheduling and Cost Estimate Provide the following: 1.Detailed Project Schedule: Bar Chart 2.Cost Estimate 3.List of Trades Construction Process.](https://reader035.fdocuments.net/reader035/viewer/2022072017/56649f055503460f94c19a69/html5/thumbnails/10.jpg)
Cite all Sources!
• MLA Format– In-Text Citations– Footnotes– Works Cited Page
Cite all Sources!Cite all Sources!