Phase 1B Bank Management Areas Pre-Remedial Design Bank Soil Investigation Former DuPont Waynesboro Site, Virginia Area of Concern (AOC) 4 April 5, 2016

Transcript of Phase 1B Bank Management Areas - Amazon S3 · Phase 1B Bank Management Areas Pre-Remedial Design...

Page 1: Phase 1B Bank Management Areas - Amazon S3 · Phase 1B Bank Management Areas Pre-Remedial Design Bank Soil Investigation Former DuPont Waynesboro Site, Virginia Area of Concern (AOC)

Phase 1B Bank Management Areas Pre-Remedial Design Bank Soil Investigation

Former DuPont Waynesboro Site, Virginia

Area of Concern (AOC) 4

April 5, 2016

Page 2: Phase 1B Bank Management Areas - Amazon S3 · Phase 1B Bank Management Areas Pre-Remedial Design Bank Soil Investigation Former DuPont Waynesboro Site, Virginia Area of Concern (AOC)

‒ Background ‒ Objectives ‒ Methodology ‒ Results ‒ Path Forward

Agenda

Phase 1B BMA – Pre-Design Bank Soil Sampling Page 2

Page 3: Phase 1B Bank Management Areas - Amazon S3 · Phase 1B Bank Management Areas Pre-Remedial Design Bank Soil Investigation Former DuPont Waynesboro Site, Virginia Area of Concern (AOC)

Background

Phase 1B BMA – Pre-Design Bank Soil Sampling Page 3

– Phase 1B BMAs include city and private ownership

– Mixture of Primary and Secondary BMAs

– Phase 1A and 1B BMAs, account for ~ 90% of Hg bank loading from RRM 0-2

Page 4: Phase 1B Bank Management Areas - Amazon S3 · Phase 1B Bank Management Areas Pre-Remedial Design Bank Soil Investigation Former DuPont Waynesboro Site, Virginia Area of Concern (AOC)

Objectives – Provide additional data to

refine loading estimates to inform Phase 1B BMA remedial designs

– Horizontal and vertical delineation within potential removal areas

– Close data gaps at Secondary BMAs

Page 4 Phase 1B BMA – Pre-Design Bank Soil Sampling

Page 5: Phase 1B Bank Management Areas - Amazon S3 · Phase 1B Bank Management Areas Pre-Remedial Design Bank Soil Investigation Former DuPont Waynesboro Site, Virginia Area of Concern (AOC)

Methodology – Surficial soil transects – Top of bank cores – Close interval cores – THg analysis by EPA

Method 7471A

– Coordination with JMU for field testing of XRF technology

Page 5 Phase 1B BMA – Pre-Design Bank Soil Sampling

Page 6: Phase 1B Bank Management Areas - Amazon S3 · Phase 1B Bank Management Areas Pre-Remedial Design Bank Soil Investigation Former DuPont Waynesboro Site, Virginia Area of Concern (AOC)

Page 6

Sample Locations – Reach 1

Phase 1B BMA – Pre-Design Bank Soil Sampling

Page 7: Phase 1B Bank Management Areas - Amazon S3 · Phase 1B Bank Management Areas Pre-Remedial Design Bank Soil Investigation Former DuPont Waynesboro Site, Virginia Area of Concern (AOC)

Page 7

Sample Locations – Reach 2

Phase 1B BMA – Pre-Design Bank Soil Sampling

Page 8: Phase 1B Bank Management Areas - Amazon S3 · Phase 1B Bank Management Areas Pre-Remedial Design Bank Soil Investigation Former DuPont Waynesboro Site, Virginia Area of Concern (AOC)

Page 8

Sample Locations – Reach 3

Phase 1B BMA – Pre-Design Bank Soil Sampling

Page 9: Phase 1B Bank Management Areas - Amazon S3 · Phase 1B Bank Management Areas Pre-Remedial Design Bank Soil Investigation Former DuPont Waynesboro Site, Virginia Area of Concern (AOC)

Results – Collected 239 samples to a

maximum depth of 8.5’ BGS

– Data still pending

– Preliminary data review underway • Similar trends as Phase 1A BMAs • THg ranges from ND to >1,400 mg/kg • Maximum THg concentrations

generally found at depth

Page 9 Phase 1B BMA – Pre-Design Bank Soil Sampling

Page 10: Phase 1B Bank Management Areas - Amazon S3 · Phase 1B Bank Management Areas Pre-Remedial Design Bank Soil Investigation Former DuPont Waynesboro Site, Virginia Area of Concern (AOC)

Path Forward – Finalize data review

– Update bank loading model

– Refine Phase 1B BMA boundaries (if necessary)

– Begin Phase 1B remedial design (~ Q3/Q4 2016)

Page 10 Phase 1B BMA – Pre-Design Bank Soil Sampling

Page 11: Phase 1B Bank Management Areas - Amazon S3 · Phase 1B Bank Management Areas Pre-Remedial Design Bank Soil Investigation Former DuPont Waynesboro Site, Virginia Area of Concern (AOC)