Phase 1 Existing SCIE I Existing SCIE II Upton Hall.
-
date post
19-Dec-2015 -
Category
Documents
-
view
227 -
download
3
Transcript of Phase 1 Existing SCIE I Existing SCIE II Upton Hall.
Phase 1
Existing SCIE I
Existing SCIE II
Upton Hall
Phase 1 (under construction)- Level 1
Primary Occupants: - Chemistry Stockroom, Instructional labs- Earth Sciences Instructional labs- Shared Computer lab- Shared Microscopy lab
Phase 1 (under construction)- Level 2
Primary Occupants: - Chemistry Instructional labs- Chemistry Research labs and Offices
Phase 1 (under construction)- Level 3
Primary Occupants: -Biology Instructional labs-Biology Research labs and offices-Great Lakes Center
Phase 1 (under construction)- Basement
Primary Occupants: -Imaging Suite:
- NMR- Time Resolved IR/Laser Lab- X-ray Crystallography- Powder XRD- SEM, Confocal Microscopy
Phase 1 (now under construction)
Phase 2A (Science I renovation)
Phase 2B (new build)
Upton Hall
Phase 2A (Science I Renovation)- Level 1
Primary Occupants: - All Department Offices - Shared conference rooms- Shared club rooms- General Classrooms
Phase 2B (New Build)- Level 1
Primary Occupants:-Planetarium-ES Research Labs and Offices-Lecture Halls-Green House
Phase 2A (Science I Renovation)- Level 2
Primary Occupants: - Science and Math Teaching Center- SED faculty offices- Physics Research Labs and Offices
Phase 2B (New Build)- Level 2
Primary Occupants:-Biology Research Labs and Offices-Chemistry Research Labs and Offices-ES Research Labs and Offices
Phase 2A (Science I Renovation)- Level 3
Primary Occupants: - Mathematics (offices and computer labs)- Physics (instructional labs)
Phase 2B (New Build)- Level 3
Primary Occupants:- Biology (Instructional labs)- Physics (1 Instructional lab)
Phase 2A (Science I Renovation)- Basement
Primary Occupants: - Vivarium- Biology Instructional Labs- Earth Sciences Instructional Labs