Petromoc, SA Petróleos de Moçambique · •Pemba – Nacala •Beira - Moatize Mission & Vision...
Transcript of Petromoc, SA Petróleos de Moçambique · •Pemba – Nacala •Beira - Moatize Mission & Vision...
Services
Capacity
Terminals & Capacity - General•Petromoc´s storage facilities - 19 depots and Terminals•Petromoc´s Total Capacity -500.000 m³•Total Operational Capacity - 380.000 m³
•Handles
-Vessels reception and expeditions/Bunkers/Backloads
•Store All products
- GasOil, Mogas, Jet A1 and LPG
•Expeditions through
- By Rail, Road and Sea
•Handles and stores
- all Lubricants, Bulky or branded and bottled.
Terminals
Future Projects
Pemba
The Jetty
Matola Terminal - Jetty
�Capacity /Draft – 25/35 MT
�About 12 m Draft
�About 1.200 m3/h – 12bar
�For LPG – 400 MT/h
�Segregated Lines - Mogas, GasOil, Jet A1, LPG, etc.
The Business
The Company
Lingamo Terminal
The Largest of allEx refinery 40Ha in AreaBonded Warehouse facilityTotal Operational Cap. -320.000 m3
Hostes - a Biodiesel Refinery and an LPG filling plantConnectable to Pipeline
Truck Loading Gantry�Capacity–6–12 Trucks at time�All 3 Products/Top Loading�Upgrade due to #8 Trucks/20 mints
Railwogan Loading Gantry• Rail cars parked –12-Gasoil/Mogas • 8 to 10/hrs
Mission & Vision
The Terminal
The Capacity
The Business
The Company
Beira Terminal
Draft – 25-30 MTDischarge - 800 m3/h –12bar3+ segregated Lines
There are 3 TerminalsPetromoc – 26 Km3 (+18)
INPETRO – 95 Km3
PetroBeira – 77 Km3(+33)
Deliveries- 2 Terminals�Via CPMZ Pipeline
�Railwagon Loading� TruckLoading
Mission & Vision
The Terminal
The Capacity
The Business
The Company
Beira TerminalTruck Loading Gantry�Capacity – 5x45m3/hrs�All 3 Products/Top Loading
Railwogan Loading Gantry• Rail cars parked –12 –
Gasoil/Mogas
At PetroBeiraTop/Bottom LoadingCapacity – 6x45m3/hr
Conection CPMZTo : Feruka and Msasa - ZimbabweCapacity – About 100 Km3/MonthActual Usage - 110%
Mission & Vision
The Terminal
The Capacity
The Business
The Company
Nacala Terminal
Capacity /Draft – 35 MTAbout - 600 m3/h3 segregated Lines
Terminals CapacityTotal – 45.000 m3
Operating – 35.000 Km3
(Gasoil, Mogas, DPK/jet A1)
Deliveries�Railwagon Loading� TruckLoading (2 trucks at the time )� Upgrade project for #4trucks in 20 mints)
Mission & Vision
The Terminal
The Capacity
The Business
The Company
Pemba Terminal
Limited draft Pipeline - 600 m3/h1 Common Line
Terminals CapacityAbout – 10.000 m3
Operating – All(Gasoil, Mogas, DPKDeliveries� Truck Loading (2 trucks )
Mission & Vision
The Terminal
The Capacity
The Business
The Company
Future Projects – Infra-struture
Mining Rigion - MoatizePetrotete – 100.000 m3
Possible Pipeline-From Beira
PembaAdd on - 20.000 m3
PalmaProjection - 100.000 m3
Pipelines•Pemba – Nacala•Beira - Moatize
Mission & Vision
The Terminal
The Capacity
The Business
The Company
Future Projects – Processing
GTL All agregated projects – Pemba /PalmaFetelizes, polymers, LPG, etc.
CTLBased in Moatize, with the Coal Mining Association
Biofuel
Ethanol, Biodiesel, Etc
Mission & Vision
The Terminal
The Capacity