Perspective of supply chain optimization
Tokyo University of Marine Science and Technology
Mikio Kubo
Agenda
• Supply Chain and Analytic IT
• Mathematical Programming Solver Gurobi with Python language
• Constrained Programming Solver SCOP
• Scheduling Solver OptSeq
What’s the Supply Chain?
IT(Information Technology)+ Logistics = Supply Chain
配送計画
スケジューリングロットサイズ決定
安全在庫配置在庫方策
ロジスティクス・ネットワーク設計
需要予測収益管理
Logistics Network Design
Safety Stock Allocation
Vehicle Routing/Scheduling
ForecastingRevenue Management
Lot-SizingScheduling
Logistic System, Transactional IT, Analytic IT
実 シ ス テ ム
IT処 理 的
IT解 析 的
Logistic System=Truck, Ship, Plant, Product, Machine, …
Transactional ITPOS, ERP, MRP, DRP…Automatic Information Flow
Analytic ITModel + Algorithm=Decision Support System
brain
muscle
nerve
Levels of Decision Making
Strategic LevelStrategic Level
Tactical LevelTactical Level
Operational LevelOperational Level
A year to several years; long-term decision making
A week to several months; mid-term decision making
Real time to several days; short-term decision making
Transactional IT
Analytic IT
Models in Analytic IT
Logistics Network Design
Inventory
Safety stock allocationInventory policy
optimization
Production
Lot-sizingScheduling
TransportationDelivery
Vehicle Routing
Multi-period Logistics Network Design
Strategic
Tactical
Operational
Plant DCSupplier Retailer
How to Solve Real SC Optimization Problems Quickly
• Mixed Integer Programming (MIP) SolverGurobi =>Logistics Network Design, Lot-Sizing
• Constraint Programming (CP) Solver SCOP =>Lot-Sizing, Staff Scheduling
• Scheduling Solver OptSeq =>Scheduling• Vehicle Routing Solver • Inventory Policy Optimization Solver
... using Python Language
Why Python?
• We can do anything by importing some modules
• Optimization import gurobipy (MIP)import SCOP (CP)
• Draw graphsimport networkX
• Also fly! import antigravity ?
http://xkcd.com/353/
What’s Gurobi?
MIP solver Developed by: Zonghao Gu, Edward Rothberg , Robert Bixby
Free academic license
Introduction to Gurobi (1)
• Create a model objectmodel = Model("Wine Blending")
• Add variable objectsx1 = model.addVar(name="x1")x2 = model.addVar(name="x2")x3 = model.addVar(name="x3")
• Model update (needed before adding constraints; lazy update!)model.update()
Introduction to Gurobi (2)
Introduction to Gurobi (3)
• Set the objectivemodel.setObjective(15*x1 + 18*x2 + 30*x3, GRB.MAXIMIZE)
• Add constraints model.addConstr(2*x1 + x2 + x3 <= 60)model.addConstr(x1 + 2*x2 + x3 <= 60)model.addConstr(x3 <= 30)
• Optimizemodel.optimize()
Mr. Python is too lazy. His room is always mess.He asked to the God of Python.“How can I tide up my toys?”
The God replied from the heaven.“Use the list. The charm is “Abracadabra [ ].”Mr. Python said “L=[ ].”What a miracle! Some boxes were fallen from the heaven.The God said. “Tide up the toys using these boxes.”
OK. Everything is packed into the list.To pick up “Teddy”, just say “L[3].”
To sort the toys in alphabetical order, just say “L.sort().”
Note that L is a list object and sort() is a function definedin the object called “method.”
Modeling with Lists
• Add variable objects into list x=[] for i in range(3): var=model.addVar(name=“x[%s]”%i) x.append(var)
• Add constraint “x1 + x2 + x3 <= 2”model.addConstr( sum(x) <= 2 ) or model.addConstr( quicksum(x) <= 2 )
Mr. Python is impatient, too. He complained to the God. “I’d like to pick my toys immediately.” The God replied from the heaven again. “Use the dictionary. The charm is “Abracadabra {}.”
Using lists and dictionaries, Mr. Python could manage his toysefficiently and lived happily ever after.
Modeling with Dictionaries
• Dictionary that maps keys (“Dry”, “Medium”, “Sweet”) to variable objects x={} x[“Dry”]= model.addVar(name=“Dry”) x[“Medium”]= model.addVar(name=“Medium”) x[“Sweet”]= model.addVar(name=“Sweet”)
• Add constraintmodel.addConstr( 2*x[“Dry”]+ x[“Medium”] +x[“Sweet”] <=30 )
Wine Blending with Dictionaries (1)
Blends, Profit = multidictmultidict({"Dry":15, "Medium":18, "Sweet":30})
=> Blends=["Dry", "Medium“, "Sweet“] List of Keys Profit[“Dry”]=15, Profit[“Medium”]=18, ...
Grapes, Inventory = multidict({"Alfrocheiro":60, "Baga":60, "Castelao":30})
Use = { ("Alfrocheiro","Dry"):2, ("Alfrocheiro","Medium"):1, ("Alfrocheiro","Sweet"):1, ("Baga","Dry"):1, .... }
Wine Blending with Dictionaries (2)
x = {}
for j in Blends:
x[j] = model.addVar(vtype="C", name="x[%s]"%j)
model.update()
model.setObjective(quicksum(Profit[j]*x[j] for j in Blends), GRB.MAXIMIZE)
for i in Grapes:
model.addConstr(quicksum(Use[i,j]*x[j] for j in Blends) <= Inventory[i], name="use[%s]"%i)
model.optimize()
k-median problem• A facility location problem with min-sum
object
• Number of customers n=200, number of facilities selected from customer sites k=20
• Euclidian distance , coordinates are random
Formulation
weak formulation
Python Code ( 1 )from gurobipy import *
model = Model("k-median")
x, y = {}, {} # empty dictionaries
Key“Hanako”,
(1,2)
Value“127cm”
Variable ObjectMapping
Dictionary Data Structure
I=range(n)J=range(n)for j in J:
y[j] = model.addVar(vtype="B", name="y[%s]"%j)
for i in I:
x[i,j] = model.addVar( vtype="B",name="x[%s,%s]"%(i,j))
model.update()
Python Code (2)
model.setObjective(quicksum(c[i,j]*x[i,j] for i in I for j in J))
Add variable objects“B” means binary variable or GRB.BINARY
Set the objective
Python Code (3) for i in I:
model.addConstr(quicksum(x[i,j] for j in J) = = 1, "Assign[%s]"%i)
for j in J:
model.addConstr(x[i,j] <= y[j], "Strong[%s,%s]"%(i,j))
model.addConstr(quicksum(y[j] for j in J) = = k, "k_median")
Optimize a model with 401 Rows, 40200 Columns and 80400 NonZeros
…
Explored 1445 nodes (63581 simplex iterations) in 67.08 seconds
Thread count was 2 (of 2 available processors)
Optimal solution found (tolerance 1.00e-04)
Best objective 1.0180195861e+01, best bound 1.0179189780e+01, gap 0.0099%
Opt.value= 10.1801958607
Weak formulation (result)n=200,k=20
Upper and lower bounds (Weak Formulation)
0
2
4
6
8
10
12
14
16
18
0 10 20 30 40 50 60 70
CPU
Obj
. Fun
c. V
alue
Optimize a model with 40401 Rows, 40200 Columns and 160400 NonZeros
…
Explored 0 nodes (1697 simplex iterations) in 3.33 seconds(No branching !)
Thread count was 2 (of 2 available processors)
Optimal solution found (tolerance 1.00e-04)
Best objective 1.0180195861e+01, best bound 1.0180195861e+01, gap 0.0%
Opt.value= 10.1801958607
Strong formulation (result)
k-center problem
• A facility location problem with min-max object
• 100 customers , 10 facilities
k-center (n=30,k=3) k-median (n=30,k=3)
Upper and lower bounds
(n=100,k=10)
0
0.2
0.4
0.6
0.8
1
1.2
0 50 100 150 200 250 300 350 400
CPU Time
Obj
. Fun
. Val
ue
k-Covering Problem
=1 if customer is not covered
# of uncovered customers
parameter that is =1 if distance is less than or equal to θ
k-Covering+Binary Search
Upper and Lower Bounds UB , LB
while UB – LB >ε: θ= (UB+LB)/2 if opt. val. of k-covering is 0 then
UB = θ else LB = θ
Computational Experiments
Traveling salesman problem
• Find a minimum cost (distance) Hamiltonian circuit
• World record 85,900 nodes (symmetric instance) -> We try to solve asymmetric ones.
Miller-Tucker-Zemlin formulation
Upper and lower bounds( 80 nodes , Euclid TSP )
0
5
10
15
20
25
30
35
40
45
0 50 100 150 200 250 300 350 400
CPU
Obj
. Fun
c. V
alue
Non-lifted MTZ constraints-> Out of memoryafter running 1 day
Result
Optimize a model with 6480 Rows, 6400 Columns and 37762 NonZeros
…
Cutting planes:
Gomory: 62
Implied bound: 470
MIR: 299
Zero half: 34
Explored 125799 nodes (2799697 simplex iterations) in 359.01 seconds
Optimal solution found (tolerance 1.00e-04)
Best objective 7.4532855108e+00, best bound 7.4525704995e+00, gap 0.0096%
Opt.value= 7.45328551084
Graph coloring problem
• An example that has symmetric structure of solutions
• Number of nodes n=40 , maximum number of colors Kmax=10
• Random graph G(n,p=0.5)
Formulation
Weak formulation
n=40 , Kmax=10
0
2
4
6
8
10
12
0 200 400 600 800 1000 1200 1400
CPU Time
Obj
. Fun
c. V
alue
Optimize a model with 3820 Rows, 410 Columns and 11740 NonZeros
Explored 17149 nodes (3425130 simplex iterations) in 1321.63 seconds
Improvement of the formulation
Avoid symmetric variables
SOS: Special Ordered Set ) Type 1
model.addSOS(1,list of var.s)
Avoid symmetric variables
0
2
4
6
8
10
12
0 50 100 150 200 250 300 350 400 450
CPU
Obj
. Fun
c. V
alue
Optimize a model with 3829 Rows, 410 Columns and 11758 NonZeros
Explored 4399 nodes (1013290 simplex iterations) in 384.53 seconds
MIPFocus=2 ( priority=proving the optimality) 67secMIPFocus=3 (priority=lower bound) 70 sec.
+SOS constraints
Optimize a model with 3829 Rows, 410 Columns and 11758 NonZerosExplored 109 nodes (58792 simplex iterations) in 22.02 seconds
MIPFocus=2 65 sec. , MIPFocus=3 126 sec.
0
2
4
6
8
10
12
0 5 10 15 20 25
CPU
Obj
. Fun
c. V
al.
Fixed-K approach
If the end vertices of an edge have the same color, the edge is called bad, and the corresponding variable z is equal to 1
Number of “bad” edges
Fixed-K Approach +Binary Search
UB, LB := Upper and lower bounds of K
while UB – LB >1: K= [ (UB+LB)/2 ] [ ] : Gauss notation
if obj. fun. of Fixd-K model = 0 then
UB = K else LB = K
Fixed-K Approach +Binary Search
Improved Formulation
SCOP
Solver for COnstraint Programming
Log Opt Co., Ltd.
Agenda
• Introduction
• SCOP Interfaces
• Demonstration
• Benchmark
• Case Study
What’s Constraint ProgrammingConstraint Programming is a paradigm to solve
combinatorial problems efficiently
• Constraint Satisfaction Problem (CSP) – seeks an assignment of values to variables
such that all the given constraints are satisfied
Constraint Satisfaction ProblemConstraint satisfaction problem consists of:
• variable: variable chooses a value from its domain.
• domain: a finite set of values for each variable.
• constraint: a logical relation among several variables.
Weighted Constraint Satisfaction Problem (WCSP)
• WCSP is an enhanced framework of CSP • Not just seeks an assignment that satisfies all of the
constraints but to minimize the weighted sum of infeasibility of constraints (called penalties): – Hard Constraint
weight is infinity, i.e., constraint must be satisfied– Soft Constraint
weight is a positive integer, i.e., constraint may be violated by paying penalty
• The goal is to minimize the total penalties =>optimization model.
What’s SCOP
• Based on Metaheuristics by Ibaraki (Kyotyo-University), Nonobe (Hosey-University)
• Trial version (15 variables available ) http://www.logopt.com/scop.htm
• 1. Simple modeling language (text file) • 2. Python interface• 3. Library ( C++, .Visual Basic, C# )
Solver to solve a large combinatorial problems effectively
SCOP is a solver for solving WCSP
SCOP Model
• variable • domain• constraint:
– weight = positive integer ( soft constraint ) inf ( hard constraint )
– type = linear , alldiff, quadratic
Assignment Problem• Assign 5 workers A,B,C,D,E to 3 jobs 0,1,2• Each job (0,1,2) needs at least (1,2,2) workers• Worker A and worker C have to assign to different
jobs• Assignment cost = 0 1 2
A 15 20 30
B 7 15 12
C 25 10 13
D 15 18 3
E 5 12 17
The object is to minimize sum of the
assignment cost
variable A in {0, 1, 2}
variable B in {0, 1, 2}
variable C in {0, 1, 2}
variable D in {0, 1, 2}
variable E in {0, 1, 2}
Variable and domain• Variables are workers A,B,C,D,E• Domain for each variables is set of jobs {0,1,2}
variable var-name in { domain }
domain = value1, value2, value3, ...
constraint0: weight=inf type=linear 1(A,0) 1(B,0) 1(C,0) 1(D,0) 1(E,0) >=1constraint1: weight=inf type=linear 1(A,1) 1(B,1) 1(C,1) 1(D,1) 1(E,1) >=2constraint2: weight=inf type=linear 1(A,2) 1(B,2) 1(C,2) 1(D,2) 1(E,2) >=2
Linear constraint ( 1 )• Each job (0,1,2) needs at least (1,2,2) workers
0 1 2
A 15 20 30
B 7 15 12
C 25 10 13
D 15 18 3
E 5 12 17
Con-name : weight= integer or inf type= linear
coeff1(var-name1,value1) coeff2(var-name2,value2).... <= (>=, =) right hand side
hard constraint
obj: weight=1 type=linear 15 (A, 0) 20(A, 1) 30(A, 2) 7 (B, 0) 15(B, 1) 12(B, 2) 25 (C, 0) 10(C, 1) 13(C, 2) 15 (D, 0) 18(D, 1) 3(D, 2) 5 (E, 0) 12(E, 1) 17(E, 2) <=0
Linear constraint ( 2 )Wright objective function as linear constraint( object value = sum of the penalty cost ) 0 1 2
A 15 20 30
B 7 15 12
C 25 10 13
D 15 18 3
E 5 12 17
hard constraintSum of the assignment cost <=0
quad: weight=100 type=quadratic
1 (A,0) (C,0) 1 (A,1) (C,1) 1 (A,2) (C,2) <=0
Quadratic constraint
Con-name : weight= integer or inf type= quadraticcoeff1(var-name1,value1) (var-name2,value2) coeff2(var-name3,value3) (var-name4,value4) ....
Worker A and worker C have to assign to different jobs
larger than the weitht in objective function
AllDiff: weight= 100 type=alldiff A C ;
Alldifferent constraint
Con-name : weight= integer or inf type= alldiffvar-name1 var-name2 var-name3 .... ;
Worker A and worker C have to assign to different jobs
How to use SCOP solver
• Start with Command Poompt (or Colsole)
• scop < file name
• scop - ( option ) <file name
• scop -help (display all of the SCOP options)
SCOP options-noadjust deactivate weight adjustment mechanism-display # set log display level-iteration # set iteration limit-interval # set log display interval-noimprovement # set iteration limit for no improvement-seed # set random seed-target # set target-time #.# set CPU time limit in second
Result (solved by SCOP)scop <ex3-scop.dat# reading data ... done: 0.00(s)
penalty = 1/52 (hard/soft), time = 0.00(s), iteration = 0
# improving the initial solution greedilypenalty = 0/157 (hard/soft), time = 0.00(s), iteration
= 0# start tabu searchpenalty = 0/60 (hard/soft), time = 0.01(s), iteration =
2penalty = 0/52 (hard/soft), time = 0.01(s), iteration =
8# penalty = 0/52 (hard/soft)# cpu time = 0.01/0.03(s)# iteration = 8/100
[best solution]A: 0
B: 2
C: 1
D: 2
E: 1
penalty: 0/52 (hard/soft)
[Violated constraints]
obj: 52
Obj : 52 =15+12+10+3+12
0 1 2
A 15 20 30
B 7 15 12C 25 10 13
D 15 18 3E 5 12 17
Summary 1. variable & domain
variable var-name in { value1, value2, ... }
2. target ( sum of the penalty ) target = target-value
3. constraintscon-name: weight = interger / inftype = linear / quadratic / alldiff
cnstraint
Steps 1 and 2 have to declare before Step 3 !
Graph Coloring
Have to assign to different color class!
・・・
Graph Coloring
Graph Coloring Programs
SCOP Gurobi
Test results (Graph Coloring)• Fixed the number of color
*(1) 16 constraint violation after 828 seconds
# of nodes # of edges # of colors SCOP (seconds)
Gurobi (seconds)
30 0.5 7 0.01 0.07
50 0.5 9 0.16 29
100 0.5 15 0.66 - *(1)
500 0.5 54 50.9 -
800 0.5 80 74.45 -
Quadratic Assignment Problem
The number of times who meets each other in one week
3
1 2
- -
Distances between two houses
2km5km
1km
Quadratic Assignment Problem
3
1 2
- -
2km5km
1km
2×2+ 5×1+ 1×3= 12km
- -
Test result (QAP)nodes Gurobi (seconds) SCOP
(seconds)Gaps % (Gurobi/SCOP)
5 0.03 0.01 0
8 12.84 0.23 0
10 1589 1.76 0
20 140 138.2 4.9
25 300 298.2 3.5
30 540 534.4 1.5
Application of SCOP
• Staff scheduling problem• Time tabling problem• Graph partition problem• Maximum stable set problem• Graph coloring problem • Quadric assignment problem • Travelling sails man problem• Multiple knapsack problem• Process Scheduling in Chemical Plants
Scheduling optimization systemOptSeq
http://www.logopt.com/OptSeq/OptSeq.htm
Log Opt Co., Ltd.
What is the scheduling?
• Allocation of activities (jobs, tasks) over time – Resource constraints. For example, machines,
workers, raw material, etc. may be scare resources.
– Precedence (or temporal) relation between activities. For example., some activities cannot start unless other activities finish.
Take off the airplane a.s.a.p. !
You’re a consultant of an airline company. Your job is to find a schedule that takes off the airplane as soon as possible. We need several activities before taking off the airplane. Firstly let the passengers get off and unload their baggage; secondly clean up the cabin; finally let new passengers get on and load their baggage. What is the best (shortest) schedule for taking off the airplane?
PERT• PERT: Program Evaluation and Review Technique that was used to
get a schedule during World War II
22分25分
13分 15分 27分
1作 業
2作 業
3作 業 4作 業
5作 業
ダ ミ ー 作 業
Temporal relation
Activity1 : Get off passengers (13 min.)Activity2 : Unload baggage (25 min.)Activity3 : Clean up the cabin (15 min.)Activity4 : Get on passengers (27 min.)Activity5 : Load baggage (22 min.)
Completion time (make-span) is minimized
Dummy activity(take-off)
Act 1
Act 2
Act 3 Act 4
Act 5
Act sink
Modeling with OptSeq (1)Activity
activity act1 mode duration 13
activity Activity-Name duedate Integer+ mode duration Integer+
Description ofActivity
E.g., to add an activity named act1 with duration (processing time) 13 :
Activity must have at least one mode (the way to execute the activity)
Duedate is optional
Modeling with OptSeq ( 2 )Temporal Constraint
temporal act1 act3
temporal Predecessor Successor Description ofTemporal Constraint
E.g., to define that activity act3 must start after finishing activity act1:
Modeling with OptSeq ( 3 )Objective
activity sink duedate 0
Objective Minimize the latest completion time (makespan)
sink: the dummy activity that must be executed after all activitiesWe minimize the delay time of sink:
activity Activity-Name duedate Integer+Description ofActivity
Optimization and Result
optseq -time 3 < Input-file-nameTime Limit is 3 sec.
--- best solution --- source ---: 0 0 dummy source starts and finishes at time 0 sink ---: 55 55 dummy sink starts and finished at time 55 activity[1] ---: 0 0--13 13activity[2] ---: 0 0--25 25activity[3] ---: 13 13--28 28activity[4] ---: 28 28--55 55activity[5] ---: 25 25--47 47
objective value = 55 latest completion time (makespan) is 55cpu time = 0.00/3.00(s) computational time is 0 sec.iteration = 1/62605 number of iteration of tabu search is 1
Result
PERT with Resource Constraint
resource Resource-Name interval Time1 Time2 capacity Integer+ ...
Description ofResource
Period
Time
“Interval 1 3” means period 1, 2
Modeling Resources with OptSeq
resource worker interval 0 inf capacity 1
Resource “worker”can be used from 0 to infinity ( inf )with capacity 1
activity Activity-Name Resource-Name interval Time1 Time2 requirement Integer+ ...
Activity requiresresource
activity act1 mode duration 13 worker interval 0 13 requirement 1
Activity “act1”requires resource“worker” by 1 unit
Optimization and Result
source ---: 0 0sink ---: 102 102activity[1] ---: 47 47--60 60activity[2] ---: 0 0--25 25activity[3] ---: 60 60--75 75activity[4] ---: 75 75--102 102activity[5] ---: 25 25--47 47
objective value = 102cpu time = 0.00/3.00(s)iteration = 0/64983
Result
Optimal solution ( Gantt’s chart )
13分
1作 業15分
3作 業27分
4作 業
25分
2作 業22分
5作 業
時 間0 55
Resource constrained schedule (unit resource upper bound)
15分 3作 業
27分 4作 業
13分
1作 業
25分
2作 業22分
5作 業
時 間0 102
Example 2Minimize the Pit-in time!
You’re a staff of F1 race. There are three pit staffs who have to do some tasks for your F1 car. Find the best schedule that minimizes the pit-in time.
Temporal (Precedence) relation and the processing time
gas
4
4
4
4
2
3
2
2
2
11作業1
作業2
作業3
作業4
作業5
作業6
作業7
作業8
作業9
作業10
秒
秒
秒
秒
秒
秒
秒
秒
秒
秒
3 staffs(resource constraint)
3 sec.
Task
Task
Task
TaskTask
Task Task
Task
Task
Task
11 sec.
2 sec.
2 sec.
2 sec.
2 sec.
4 sec.
4 sec.
4 sec.
4 sec.
Modeling with OptSeq -using a resource with capacity 3-
resource worker interval 0 inf capacity 3
activity prepare mode duration 3 worker interval 0 3 requirement 1...
temporal prepare oiltemporal jackup tire1...
activity sink duedate 0
Define a resource“worker” with capacity 3
Temporal constraints
Minimize themakespan
Optimization by OptSeqand Gantt’s chart
source ---: 0 0sink ---: 14 14prepare ---: 0 0--3 3water ---: 0 0--2 2front ---: 0 0--2 2jackup ---: 2 2--4 4tire1 ---: 8 8--12 12tire2 ---: 4 4--8 8tire3 ---: 8 8--12 12tire4 ---: 4 4--8 8oil ---: 3 3--14 14jackdown ---: 12 12--14 14
objective value = 14cpu time = 0.00/3.00(s)iteration = 0/37644
Another Model - using multiple modes -
1. Convenience Store Mode : Duration (Processing Time) 20 min. requires Money Resource 110 yen and human resource 1
2. Vending Machine Mode : Duration 20 min. requires Money 120 yen and human resource 1
3. Supermarket Mode: Duration 20 min.
requires Money 120 yen, human resource 1 and car resource 1
Mode : The way for processing an activity
Example : Activity “Buy a juice”
Mode (1)
mode Mode-Name duration Processing-Time Resource-Name interval Time1 Time2 requirement Integer+ ...
Description of Mode
activity Activity-Name Mode-Name1 Mode-Name2 ....
Add modesto activity
Mode (2)
mode m1 duration 3 worker interval 0 3 requirement 1
mode m2 duration 2 worker interval 0 2 requirement 2
mode m3 duration 1 worker interval 0 1 requirement 3
E.g., an activity has 3 difference modes; m1, m2 and m3 :
activity prepare m1 m2 m3
Add 3 modes to activity “prepare”
Mode Resource
single worker mode
double worker mode
triple worker mode
Result and Gantt’s chart
--- best solution ---source ---: 0 0sink ---: 13 13prepare m3: 0 0--1 1water ---: 1 1--3 3front ---: 11 11--13 13jackup ---: 1 1--3 3tire1 ---: 7 7--11 11tire2 ---: 3 3--7 7tire3 ---: 7 7--11 11tire4 ---: 3 3--7 7oil ---: 1 1--12 12jackdown ---: 11 11--13 13
objective value = 13cpu time = 0.00/3.00(s)iteration = 7/23318
activity “prepare” was done by mode m3, i.e., execute by 3 worker with duration 1
Resource Constrained Project Scheduling
土 台
1 階
内 装
屋 根
完 成 !
時 間 ( 日 )
資 源 量 ( 人 )
30
2
1 worker rests onthe 3rd day
Duration : 2 days 1 worker on the 1st dat 2 workers on the 2nd day
BasementFirst Floor Ceiling
Interior
Workers
Completion!
Modeling with OptSeq (1)
resource worker interval 0 2 capacity 2 interval 2 3 capacity 1 interval 3 inf capacity 2
Time Dependent Resource Capacity
0 2 3
1
Resource Capacity
Modeling with OptSeq (2)
Time DependentResource Usage ofActivity
activity first mode duration 3 worker interval 0 1 requirement 2 worker interval 1 3 requirement 1
Optimal Solution
時 間 ( 日 )
資 源 量 ( 人 )
Resource Constrained Project Scheduling (RCPSP) is a generic model ( job shop and flow shop scheduling problems are special cases.)
Resource Capacity
Critical Path Method (CPM)
Consider “Take off the airplane” again! However, each activity has an emergency mode
Activity1 : Get off passengers (13min.) => Emergency mode (10 min. ) requires 10000 yenActivity2 : Unload baggage (25min.) => Emergency mode (20 min. ) requires 10000 yenActivity3 : Clean up the cabin (15min.) => Emergency mode (10 min. ) requires 10000 yenActivity4 : Get on passengers (27 min.) => Emergency mode (25 min. ) requires 10000 yenActivity5 : Load baggage (22 min.) => Emergency mode (20 min. ) requires 10000 yen
Renewable Resources andNon-renewable Resources
• Renewable resourcescan be used again after the completion of activities; for example, machines and/or workers are renewable
• Non-renewable resourcesare not renewed after the completion of activities; for example, money and/or ingredients are non-renewable
CPM can be modeled using a non-renewable resource
mode m[1][1] duration 13 mode m[1][2] duration 10
activity activity[1] m[1][1] m[1][2]
Modeling with OptSeq (1)
Activity 1 “Get off passengers” takes:13 minutes (normal mode) m[1][1] or10 minutes (emergency mode) m[1][2]
nonrenewable +1 (activity[1],m[1][2]) +1 (activity[2],m[2][2]) +1 (activity[3],m[3][2]) +1 (activity[4],m[4][2]) +1 (activity[5],m[5][2]) <= 4
Modeling with OptSeq (2)
Declaration ofnon-renewableresource
nonrenewable Amount1 (Activity-Name1,Mode-Name1) Amount2 (Activity-Name2,Mode-Name2) ... <= Upper-Bound (or Capacity)
Budget (Capacity of money resource) is 40000 yen.
Note that Amounts and Capacity may be 0 or negative integer.
Results
10分
1作業
13分
1作業
10分
3作業
10分
3作業
25分
4作業
27分
4作業
20分
2作業
25分
2作業
22分
5作業
22分
5作業
時間
時間
0
0
45
13分
1作業15分
3作業27分
4作業
25分
2作業22分
5作業
時間0 55
52
4万円
1万円
0万円
Budget is40000 yen.
Budget is10000 yen.
Budget is 0 yen.
Emergency mode
Type of precedence relation
– =1: Finish ->Start– =2: Finish ->Finish– =3: Start ->Start– =4: Start ->Finish
Predecessor
Successor
Set-up time lower bound
Set-up time upper bound
Finish Start
OptSeq Capability
• OptSeq is a solver for Resource Constrained Project Scheduling Problem with:– Time-Dependent Resource Usage and Capacity
– Non-renewable Resource Constraints
– Generic Temporal Constraints
also it is possible to:
– declare activities are breakable and/or processed in parallel
– add “states” to represents the generic states of the system