PERMIT FEE SCHEDULE (Ord. 98-11-40, Res.-R98-11-64, Res ...

22
PERMIT FEE SCHEDULE (Ord. 98-11-40, Res.- R98-11-64, Res.- R99-01-04, Res.- R99-09-58, Res.- R2000-09-47, Ord. 2001-09-31, R2002-04-17, R2003-06-56, R2003-06, R2003-08-73, R2005-11-159; R2010-08-86; R2012-10-99; R2013-01-08; R2013-12-117 UNIVERSAL ENFORCEMENT AND ADMINISTRATION FEES 1. Florida Buildina Code Enforcement Surcharae (F.S. 553.721) and Buildina Code Administration and Inspection Fee (F.S. 468.631, EFFECTIVE October 1, 2010 a. Surcharqe on all buildinq permits, mechanical, electrical, and plumbinq permits, etc. 3% of permit fee b. Minimum fee per permit 4.00 BUILDING PERMIT FEES 1. Up front fees a. Upon initial application of new Single Family Residence or duplex 250.00 b. Upon initial application of new commercial 500.00 c. All other based on value of cost 100.00 max. 50.00 min d. Revision prior to issuance of approved plans 50.00 each time e. Fee is not refundable, but shall be credited toward the final building permit fee (a, b & c only) f. Master model not for permit 300.00 2. New buildings and/or additions a. Impact fee for new and/or increased footage of existing habitable structure: Residential Non Residential Police Protection 0.47 0.38 Parks & Recreation 2.17 0.00 Public Works 0.10 0.10 TOTAL 2.74 0.48 b. For each 100 sq. ft. up to 1,000 sq.ft. or fractional part of floor area 60.00 per 100 sq.ft. c. For each additional sq.ft. over 1,000 sq.ft. .28 Per sq. ft. 3. Security iron work a. For the first $1,000 or fraction thereof 80.00 1

Transcript of PERMIT FEE SCHEDULE (Ord. 98-11-40, Res.-R98-11-64, Res ...

PERMIT FEE SCHEDULE (Ord. 98-11-40, Res.- R98-11-64, Res.- R99-01-04, Res.- R99-09-58, Res.- R2000-09-47, Ord. 2001-09-31, R2002-04-17,

R2003-06-56, R2003-06, R2003-08-73, R2005-11-159; R2010-08-86; R2012-10-99; R2013-01-08; R2013-12-117

UNIVERSAL ENFORCEMENT AND ADMINISTRATION FEES 1. Florida Buildina Code Enforcement Surcharae (F.S. 553.721) and Buildina Code Administration and Inspection Fee (F.S. 468.631, EFFECTIVE October 1, 2010

a. Surcharqe on all buildinq permits, mechanical, electrical, and plumbinq permits, etc. 3% of permit fee b. Minimum fee per permit 4.00

BUILDING PERMIT FEES 1. Up front fees

a. Upon initial application of new Single Family Residence or duplex 250.00 b. Upon initial application of new commercial 500.00 c. All other based on value of cost 100.00 max. 50.00 min d. Revision prior to issuance of approved plans 50.00 each time e. Fee is not refundable, but shall be credited toward the final building permit fee (a, b & c only) f. Master model not for permit 300.00

2. New buildings and/or additions a. Impact fee for new and/or increased footage of existing habitable structure:

Residential Non Residential

Police Protection 0.47 0.38 Parks & Recreation 2.17 0.00 Public Works 0.10 0.10 TOTAL 2.74 0.48

b. For each 100 sq. ft. up to 1,000 sq.ft. or fractional part of floor area 60.00 per 100 sq.ft. c. For each additional sq.ft. over 1,000 sq.ft. .28 Per sq. ft.

3. Security iron work a. For the first $1,000 or fraction thereof 80.00

1

b. For each additional $1,000 15.00

4. Service station under-ground storage tank a. Minimum fee 125.00

5. Water Towers, Pylons, Bulkheads, Free Standing Rigid Canopies, Marquees, and similar construction. Radio and TV Antennas and Communications Devices. a. For each $1,000 of estimated cost or fractional part 6.00 b. Minimum permit 100.00

6. Shed a. Up to 1 O' x 1 O' Minimum Fee 100.00 b. Persq.ft.over100 .28 per sq. ft.

7. Concrete structural slabs (other than paving) where separate installation not covered by prior permit a. For first 1,000 sq.ft. or fractional part of area 70.00 b. For each additional 1,000 sq.ft. or fractional part of area 5.00 c. Non structural - for first 1,000 sq.ft. 60.00 d. For each additional 1,000 sq.ft. or fractional part of area 5.00

8. Paving a. For first 2,000 sq.ft. 100.00 b. For each additional 1,000 sq.ft. 6.00 c. Reseal and stripping 50.00 + 2.50 per 1,000 sq. ft. over

9. Roofing (including re-roofing) a. For first 2,000 sq.ft. or fractional part of area (Minimum)

i. BUR, Flat, etc. 125.00 ii. Shingle 125.00

b. Residential 125.00

2

c. For every square over 20 fill 3.00 d. Tile all 25.00 + .10 per sq.ft. e. All others (metal, foam etc.) 25.00 + o.10 per sq.ft.

10. Awnings, canopies and residential patio covers, screen enclosures, trailer additions a. For the first 500 sq.ft. or fractional part w/ structural slab 100.00 b. Without structural 5 slab 7.00 c. For each additional 100 sq.ft. or fractional part thereof 20.00

11. Swimming pools, spas and hot tubs a. One cost for swimming pools, spas and hot tubs (for first 20,000 gallons and .0 1 per gallon over)

i. Commercial 200.00 ii. Residential 150.00

12. Temporary platforms and temporary bleachers to be used for public assembly a. For each 100 sq.ft. or fractional part of platform area 60.00 b. For each 100 lineal feet or fractional part of seats 2.50

13. Demolition of building a. For first 1,000 sq.ft. or fractional part of floor area 150.00 b. For each additional 1,000 sq.ft. or fractional part of floor area 6.00

14. Demolition of signs, fences and/or walls and structural other than above Minimum Fee 75.00

15. Agricultural "U-Pick" permit a. Per field, Minimum fee and Annual Renewal 60.00 b. Well inspection, Annual per well 6.00

16. Re-inspection fees: a permit holder shall be entitled to an initial and follow-up inspection for each mandatory inspection Fee applied when extra inspection trips are necessary due to: i.e.; wrong address being given; prior rejections;

3

work not being ready for inspection; failure to call for final or other inspections; required corrections not completed. The re-inspection fee required shall be applicable to all divisions in the Development Services Department. Further inspections or permits shall be refused until payment is made for re-inspection fees, a. 3rd Reinspection 75.00 b. 4th Reinspection and each subsequent reinspection 100.00

17. Alterations and repairs to building and other structures a. Up to $1,000 of estimated cost or fractional part 1.25 per 100.00 (Min. fee 200.00) b. For each additional $1,000 of estimated cost or fractional part 3.00 per 100 sq. ft. or fraction

18. Fence permits a. Chain link 0-250

i. Residential fee 75.00 ii Commercial fee 100.00

b. Chain link 251-1000' i. Residential fee 125.00 ii Commercial fee 150.00

c. Over 1,000' based on value .05 per ft., 75.00 minimum d. Wood, Aluminum & PVC .65 per ft., 75.00 minimum e. Concrete 1.15 per ft., 75.00 minimum f. Minimum Fee - Gates, short section, etc. 60.00

19. Installation of curtain walls including windows and doors therein and the alteration or replacement of store front similar fixed class a. For the first 10 Jin. ft. or fraction thereof 125.00 b. For each additional 10 lin. ft. or fraction thereof 5.00

20. Moving building or other structures a. Per building or structure (Minimum) 200.00 b. For each 100 sq.ft. or fractional part thereof (does not include cost of new foundation or repairs to building

or structure) 10.00

4

21. Temporary use a. Trailers approved for Temporary Occupancy during construction of a residence 150.00

(after Public Hearing Approval) with maximum time set by public hearing b. Trailer approved for commercial purposes or development projects including 100.00

Watchman's quarters (after Public Hearing Approval) with maximum time set by public hearing plus bond c. Office use or construction (developing) 100.00 d. Trailers in trailer parks 150.00

22. All other permits which could not be calculated by square footage a. First $1,000.00 est. 75.00 b. Each additional $1,000.00 thereafter 20.00

23. Shutters for group Single Family Residence and duplex a. 10 openings or less min. fee 100.00 b. Over 10 each opening 3.00 ea.

24. Shutters for commercial a. 8 openings or less min. fee 100.00 b. Over 8 each openings 3.00 ea.

25. Billboards annual-fee 475.00

26. Tents a. 10' x 12' minimum (exclude recreational) 50.00 b. Over minimum and under 500 sq.ft. 15.00 additional c. Over 500 sq.ft. 30.00 additional

27. Railings and guards per linear foot a. First 1,000 ft. 100.00

5

b. Over 1,000 ft. 25 per ft. additional

28. Windows and doors (installations, removal and replacements) a. Minimum fee per *ten openings 100.00 b. Additional openings 3.00 each

29. Initial and subsequent inspections for issuance of business tax receipt for electrical, plumbing, mechanical, and building, per trade 35.00

Any omission (including square footage) or false information on the original application will be charged double the minimum fee plus the permit fee.

MISCELLANEOUS FEES

1. Plan review processing fee a. Residential 150.00 b. Commercial 200.00

2. Building information letters 50.00

3. Change of contractor 100.00

4. 40 Year building re-certification 250.00 a. Each 10 years after 40 150.00

5. Report inspection per trade 75.00

6. Inquiry inspection (per project) 75.00

7. Permit application requested by mail 4.00

6

8. Permit card replacement 35.00

9. Permit extension within 180 days 100.00

10. Permit renewal over 180 days initial permit fees apply

11. Revision per page 25.00 a. As- built, etc. Minimum fee and structural fee if required 50.00

12. Certificate of Occupancy a. Commercial 150.00 b. Residential 50.00

13. Certificate of Completion a. Commercial 150.00 b. Residential per dwelling unit (S.F.R townhouse, condo etc) 50.00

14. Temp. Certificate of Occupancy/Completion a. Commercial 150.00 b. Residential per dwelling unit (S.F.R townhouse, condo etc) 50.00

15. Copies per page, records readily available .20 per page

16. Research fee per hour a. Commercial 200.00 b. Residential 50.00

17. Certified letter 20.00

18. Microfilm: (If available)

7

a. Commercial 200.00 b. Residential 35.00

19. lost Plans fee: (if copied) 200.00

20. Expert Witness Fee per hour 75.00

21. Shop drawing review per sheet 25.00

22. Revisions to existing plans. Reviewing after approval - per sheet, minimum fee 25.00

23. Double Fees a. Work commenced prior to obtaining a permit

I. Applicant is required to pay a double permit fee, plus, 100.00 II. Minimum 150.00

b. Second offense - work without a permit twice the permit fee, plus 200.00 c. Each offense thereafter - twice the double permit fee, plus 500.00

24. Dade County Code Compliance Fee (based on County) .60 per$ 1,000 est. cost

25. Dade County Educational Fee 1.00 per first $1,000 a. For each additional $1,000 .50

26. lake Excavation per acre 1,000.00

27. Contractor Renewal Fee a. Fee per fiscal year. 35.00 b. Homestead contractors with valid business license that have business tax receipt, are exempt.

28. Sign Permit (flat wall signs, painted or mounted murals, pole mounted signs and temporary signs (except banners, political signs, and special promotional signs))

8

a. 1 - 50 sq.ft. (minimum fee) 60.00 b. over 50 sq.ft. (per sq.ft.) .35 additional

29. Commercial Advertising a. Minimum fee up to 50 sq. ft. 75.00 b .15 per square foot over 50 sq. ft. .20 additional c. Renewable annually 10.00

30. Political Signs a. Bond required, minimum fee 200.00

31. Special Promotional Signs a. Thirty (30) day permit 30.00 b. Renewable every ninety (90) days 10.00

32. Temporary signs (Banners maximum size 32 sq ft.) a. Thirty (30) days only maximum twice per year 60.00 b. Authorized Miami Motorsports sponsors (20 banners per race) 50.00 each

additional banners No Charge c. Waivers for certain temporary banner signs associated with promotional contests for the No Charge

Homestead-Miami Speedway NASCAR Championship Race

33. Landscaping a. First 1,000 square feet 75.00 b. Each sq. ft. over 1,000 5.00 additional

34. Paint Permit for non residential structure a. Single story 35.00 b. Two story 70.00 c. Condo and apartment(three story) 105.00

9

Any omission (including square footage) or false information on the original application will be charged double the minimum fee plus the permit fee. <·1

35. Donation Drop Box or Trailer a. Application Fee 25.00 b. Renewal Fee 10.00

36. Public Safetll Radio Communications {Buildings over 40,000 SF} a. Initial A1212lication Fee and Certification Fee 50.00 b. Document Review Fees 65.00 12er hour c. Annual Testing and Certification Fee 50.00

WATER SUPPLY AND FIRE ENGINEERING FEES

1. New Building or Additions a. For each 100 sq. ft. or fraction of floor area 0.95 Except that for buildings for storage and industrial uses of the Group E and F. Occupancies as defined in the Florida Building Code, the fee shall be: b. For each 100 sq.ft. or fractional part of floor area up to 20,000 sq.ft. 0.95 Except that for greenhouses and buildings for agricultural uses (nonresidential) when located on the premises so used, screen enclosures and trailer additions: c. For each 100 sq.ft. or fractional part of floor area 0.95

2. New construction other than as specified herein: Water towers, pylons, bulk storage-tank foundations, seawalls, bulkheads, unusual limited-use building, freestanding rigid canopies, marquees and similar construction, pools, paving For each $1,000 of estimated cost or fractional part (except for each service station underground storage tank and each approved fallout §.helter which conforms to the specifications established by the Civil Defense and Mobilization agency and the South Florida Building Code) 9.50

3. Alterations and repairs to buildings and other structures

10

a. Up to $1,000 of estimated cost or fractional part 4.75 b. For each additional $1,000 of estimated cost or fractional part 0.95

4. Fire Wells 140.00

5. Acceptance tests for sprinkler systems 140.00

6. Acceptance tests for stand pipes 140.00

7. Hydrant Use Permits a. Construction meters 47.00 b. Pest Control, lawn spraying, etc. (fees are annual and per meter) 93.00

8. Hydrant Flow Test, unless in conjunction with item #6 140.00

9. Fire Alarm for sprinkler 150.00

10. Re-inspection Fee (see page 3 section 16) 50.00

Any omission of items (including square footage) or false information on the original application will be charged double fee plus $100.00 per the F.B.C. PLUMBING PERMIT FEES

1. Minimum Plumbing Fee per permit a. This minimum does not apply to permits issued as supplementary to current outstanding

permits for the same job. 100.00 b. Minimum permit fee for $500 or less total value, i.e. fixture or

device replacement, safety permits, etc. 75.00

2. Roughing-in or plugged outlets for: dentists, doctors, bathtubs, closets, and hospital sterilizers, autoclaves, autopsy tables and other fixtures, appurtenances or other appliances having water supply of waste outlets, or both drinking fountains, fixtures

11

discharging into traps or safe waste pipes, floor drains, laundry tubs, lavatories, safe waste pipes, showers, sinks, slop sinks, urinals: Including hot water heaters. a. First roughing-in or plugged outlet 9.00 L Each additional outlet 9.00 IL Fixtures set on new roughing-in or plugged outlets or replaced on old roughing in 9.00 11 L First fixture 9.00 IV. Each additional fixture 9.00

3. Septic tanks, settling tanks, gas and oil interceptors, grease traps and soakage pits (including drain tile for same). There are 7.5 US gallons in 1 cu.ft.

a. 1200 gallon capacity or less 75.00 b. Over 1200 gallon capacity 100.00 c. Drain tile relay - first 200 sq.ft 50.00 d. Drain tile relay - each additional 200 sq.ft 15.00 additional

e. Tank abandonment (where being abandoned) 50.00

4. Each building storm sewer a. Each building sewer where connection is made to a septic tank, to a collector line or to an existing sewer or to a city sewer

or soakage pit or to a building drain outside a building 40.00

b. Sewer capping per fixture 12.00

5. Rain roof inlet and outlet first inlet 25.00

6. Drainage - Area, yard, sidewalk or rainwater drain for which no other fee is provided: a. First surface inlet 15.00 b. Each additional inlet 25.00 c. Each soakage pit (first 200 cu.ft.) 30.00 d. Each additional cu.ft. added 15.00 additional

7. Condensate Drain (Air Conditioning) Per outlet. Rough & set 18.00

12

8. Water Service Connection to a Municipal or Private Water Supply System a. For first meter on each lot (water service) 15.00 b. Each additional meter on same lot 15.00 c. Water connection or outlets for appliance or installations not covered by 10.00

fixtures or other permits d. Irrigation system and underground sprinkler system under 25. 60.00 + 1.00 per head e. Per head over 25 1.00 f. Fire sprinkler system connection to City water 60.00 + 1.00 per head g. Per foot, water service lines or replace water line 1.00 per ft. h. Detection check installation inspection under 2" 75.00 i. Detection check installation inspection over 2" 125.00 j. collection of rain water 12 per dollar value

9.Fire control system, including standpipe Siamese connections and pumps a. Each standpipe 20.00 b. Each hose rack or each Siamese conn. 20.00 c. Sprinkler heads 1.00 d. Standby for emergency potable water supply outlet 10.00 e. Solar water heater installations or repairs 125.00 f. Solar water heater booster connection 75.00 g. Swimming pool piping installations not including wells or water supply 75.00 h. Any repairs, alterations or renovations . 12 per dollar

10. Wells -a. All Wells 100.00 b. Minimum fee 100.00

11. Natural Gas & Liquefied Petroleum Minimum fee (This minimum does not apply to permits issued as supplementary to current outstanding permits for the same job) 100.00 a. Except vented space heaters 18.00

13

b. Rough out 9.00

c. Set appliance 9.00

d. For each additional outlet 9.00

e. For each additional appliance or replacement 25.00

f. For change from a master to an individual meter 25.00

g. For first meter 25.00

h. For each additional meter 12.00

I For major repairs to gas pipe where no fixture or appliance installation is involved .12 per 1.00

j Underground and above ground L.P. GasTanks 50.00 k. Change of company (no additional appliances or outlets) 50.00

12. Water treatment plants, Plumbing station, Sewage Treatment Plant and lift station a. Water treatment plant (interior plant piping) 200.00

b. Sewage treatment plant (interior plant piping) 200.00

c. Lift Station (interior stations piping) 200.00 d. Water and gas mains: on private property and other than public utility easements

i. Up to 100 feet 50.00

ii. Over 100 feet (each foot) 75.00

13. Storm and sanitary and/or collector and water distribution lines (on public or private property)

a. Each 50 feet per ft 1.50

i. In addition - each manhole or catch basin 50.00

ii. Minimum fee per job 100.00

14. Toilets - Temporary Toilets - water borne a. For first installation 50.00

b. For each additional 25.00

15. Chemical toilets a. For first installation 50.00

14

b. For each additional 25.00

16. Miscellaneous a. Hose bib 9.00 b. Heat recovery 75.00 c. Dental vacuum system, each 75.00 d. Additional inspections 75.00 e. Pool piping, commercial, each 125.00

17. Siphon breakers on old installation required when repair or unapproved water closet is made 18.00 each

18. All other permits which cannot be calculated shall be priced at .12 per$ value

Any omission of items (including square footage) or false information on the original application will be charged at double the minimum fee plus the permit fee.

MECHANICAL PERMIT FEES

1. Minimum Fee 100.00 a. Minimum Permit Fee for $500 or less total value, i.e. fixture or device replacement; safety permits, etc. 75.00

2. Air conditioning and refrigeration a. For each ton capacity or fractional part thereof new or replacement 18.00 b. Minimum fee 100.00

.

3. Ductwork a. First $1,000 40.00 b. Every$ 1,000 after first

15.00

4. Strip Heaters each KW (10) or fraction thereof 25.00

15

5. Condensate drains each 9.00

6. Each AC wall unit 35.00 per unit

7. Furnaces and heating equipment a. For the first 12,000 BTU per hour or fractional part 10.00 b. For each additional 12,000 BTU per hour or fractional part 10.00 c. Except for unvented space heater and vented wall heaters (no duct work) 15.00 First such unit 12,000 BTU

8. Bath exhaust 10.00

9. Kitchen Exhaust 12.00

10. Dryer Vent 15.00

11. Fire place 75.00

12. Mechanical Ventilation first $1,000 75.00 a. Then for every $1,000 after first $1,000 25.00

13. Spray Booths first $1,000 150.00 a. Then for every $1,000 after first $1,000 25.00

14. Pressure piping a. First $1,000 100.00 b. Each additional $1,000 25.00

15. Cooling tower a. Up to 10 tons 75.00 b. Per ton after first 1 O 3.00

16

16. Storage tanks for flammable liquids (gas) or diesel per tank 75.00

17. Piping for flammable liquids a. First $1, 000 75.00 b. Each additional $1,000 25.00

18. All other permits which cannot be calculated. 0.12 per dollar value

Any omission of items (including square footage) or false information on the original application will be charged at double the minimum fee plus the permit fee.

BOILERS AND PRESSURE VESSELS

1. Steam boilers each 125.00

2. Hot water boilers 75.00

3. Miniature boilers 60.00

4. Steam driven prime movers each 60.00 a. Steam actuated machinery, each 25.00

5. Unfired pressure vessels each including air 60.00

6. All other permits which cannot be calculated. 0.12 per dollar value

Any omission of items (including square footage) or false information on the original application will be charged at double the minimum fee plus the permit fee.

FIRE SUPPRESSION SYSTEM

17

1. C02 and dry power systems for estimated cost up to $1,000 75.00 a. Plus per head 1.50

Any omission of items (including square footage) or false information on the original application will be charged at double the minimum fee plus the permit fee.

STORAGE TANKS FOR FLAMMABLE LIQUIDS

1. Up to 499 Gallons per tank 125.00 a. 500 gallons to 1999 150.00 b. Over 2000 gallons 200.00

Any omission of items (including square footage) or false information on the original application will be charged at double the minimum fee plus the permit fee.

INTERNAL COMBUSTION ENGINES 1. Stationary

MINIMUM FEE 75.00 a. All permits 12 cents per $ value

Any omission of items (including square footage) or false information on the original application will be charged at double the minimum fee plus the permit fee.

ELECTRICAL PERMIT FEES

1. Minimum electrical permit fee including repair work per permit a. Except as otherwise specified 100.00 b. Minimum permit fee for $500 or less total value,

i.e. fixture or device replacement, safety permits, etc. 75.00

18

2. Permanent service to buildings NEW WORK ONLY

For each 100 amp. or fractional part 15.00

3. Feeders Each Feeder 25.00

4. Agricultural service (permanent) Per Service 100.00

5. Temporary service for construction

Per Service (free standing) 90.00

6. Construction field office service

Per Service (free standing plus trailer) 150.00

7. Mobile home or RV service (residential)

Per Service (trailer & subfeed) 75.00

8. Temporary service for test (commercial only)

a) Equipment and service (30 day limit) per Service 90.00 b) Elevator (180) day limit per elevator 90.00

9. Residential wiring

a) Minimum Fee 100.00 b) For new construction and additions for each sq. ft of floor area, under roof 0.12 sq. ft. c) Alterations or repairs per 1.00 estimated cost or fractional part O .10/sq. ft d) Telephone & Television 40.00

10. All other wiring and outlets

a) Includes boxes, receptacles, switches, sign, fractional motor, fans, low voltage outlets, empty outlets for telephone,

19

CA TV; each outlet, 110 volt smoke detectors each outlet box 5.00

b) Special outlets 15.00

c) Commercial equipment (KWA rated) X-Ray Outlets, commercial cooking equipment, Presses, generators, transformers, Permanently connected for each 10 KW or fractional part 15.00

d) Motors (Fractional already converted on general Outlets) install, repair or replace (each motor) 10.00

e) Air conditioning and refrigeration system (new work). Applies to commercial, and residential, agricultural and industrial. Covers related work, except wall or window Units which are covered under special outlets.

I. Per ton or fractional part thereof 10.00

II. Replacement or relocation of existing A/C and Refrigeration units (same size) Per KW or ton 10.00

f) Electrical equipment - replacement (existing facilities) Switchboards, M.C.C., panels, control boards. 20.00 per board

g) Generators by value:

I. up to 5,000 KW 75.00

II. over 5,000 to 10,000 KW 100.00

Ill. over 10,000 to 15,000 KW 150.00

IV. over 15,000 KW 200.00

11. Lighting fixtures: Common areas of Group H includes: corridors, public lounges, elevators, pumps, A/C (public area), lights, outlets, house and emergency service, etc. These areas and commercial wiring shall be subject to the fees below: Includes floodlights, spotlights, parking lights, tennis court lights, fluorescent and incandescent fixtures, etc.

a) Per fixture 2.00

b) Plugmold, light track, neon strips. Each 5 ft or fractional part 7.00

c) Light pole (Group 1) per pole 10.00

d) Light pole (commercial) per pole 15.00

12. Signs & Architectural features (Indoor neons)

a) Per sq. ft. of sign 2.00

b) Minimum fee 85.00

c) Repairs, and reconnection each 75.00

d) Neon strips each 5 ft or fractional part 3.00

13. Fire detection system (Needs category 4 processing) a) Per system (for new and upgrades) 125.00

20

b) Repairs and additions to existing systems per system 60.00 c) Stand alone smoke detector (each) 7.00

14. Master television antenna and radio system a) Master control 50.00 b) Each device 2.00

15. Burglar alarm system a) Installation wiring 50.00 b) Installation devices 50.00 c) Complete system 90.00 d) Repair per system 50.00

16. Intercom system a) Each new system - Group 160.00 b) Other Groups 90.00

c) Repair each system 60.00

17. Energy management system a) Per floor 105.00 b) Repair per floor 60.00

18. Swimming pools, electrical (Fee based on cumulative cost of the following components): a) Residential pool or spa (Group 1) (Includes motor and pool lights) 90.00 b) Residential combination pool/spa (Includes motor and pool lights) 120.00 c) Commercial and multi-family dwelling pool or spa 140.00 d) Commercial, multifamily dwelling combination pool/spa 190.00 e) Repair residential (Group 1) pool 75.00 f) Repair commercial pool 140.00

21

19. Free standing service - New meter and service requires processing - Per Service 90.00

20. Conduit duct bank- per linear foot 2.00

21. Per installations bonding for screen, pools etc. i. Commercial 200.00 ii. Residential 150.00

22. Underground manholes 100.00

23. Additional inspections 75.00

24. Pre-wire each floor 72.00 plus $2.00 each device over 15

25. Each building temp for test 96.00 plus $4.50 per meter set

26. All other permits which cannot be calculated 0.12 per dollar value

Any omission of items (including square footage) or false information on the original application will be charged at double the minimum fee plus the permit fee.