PERMIT APPLICATION REQUIREMENTS 5-7 Business Day Review Time WE DO NOT OFFER ANY KIND OF EXPEDITING WE ARE NOW ACCEPTING ELECTRONIC SUBMITTAL THROUGH EMAIL. ALL DOCUMENTS SHOULD BE IN .PDF FORMAT. Please submit all required items below to [email protected]. Application Form All items must be completed and the application must be signed. Affirmation of Notification – Must be completed and signed. If approval from the HOA has already been given, please include a copy of that approval. Submittal Checklist – All items must be fully completed. Site Plan (8 ½”x11” or 11”x17”) – Must show the location and dimensions of the pool you are proposing and the distances from the pool and patio/deck to property lines. This can be done by just using a copy of the plot plan/mortgage survey, or you may draw this plan yourself. Pool Construction Plans & Specifications (8 ½”x11” or 11”x17”) Above-Ground Pools: Specific pool model brochure/literature and installation instructions. In-Ground Pools: Complete construction plans showing dimensions, location of outlets, inlets, patio, pool equipment, drains, stairs, ladders, diving equipment, slide, play equipment (Basketball Goal, Volleyball Nets, etc.) and water depths. Please also include specifications on the pump(s) & heater, including electrical requirements. Wood Deck Included: If a wood deck is proposed, a full set of fully dimensioned deck plans showing footings, framing, and handrail construction. (See attached samples.) If a wood deck is being don eat the same time as the pool, no separate deck permit will be required. If the wood deck is done at a later date, you will need to file a separate deck permit application prior to construction. NO FEES ARE DUE OR WILL BE ACCEPTED AT TIME OF APPLICATION FEES DUE AT TIME OF PERMIT ISSUANCE Residential Pool, Above-Ground or In-Ground $150 RESIDENTIAL SWIMMING POOLS Community Development Services City of Greenwood 300 South Madison Avenue Greenwood, IN 46142 317.887.5230 www.greenwood.in.gov

Transcript of PERMIT APPLICATION REQUIREMENTS - Greenwood, IN

Page 1: PERMIT APPLICATION REQUIREMENTS - Greenwood, IN

PERMIT APPLICATION REQUIREMENTS 5-7 Business Day Review Time

WE DO NOT OFFER ANY KIND OF EXPEDITING

WE ARE NOW ACCEPTING ELECTRONIC SUBMITTAL THROUGH EMAIL.

ALL DOCUMENTS SHOULD BE IN .PDF FORMAT.

Please submit all required items below to [email protected].

☐ Application Form – All items must be completed and the application must be signed.

☐ Affirmation of Notification – Must be completed and signed. If approval from the HOA has already been

given, please include a copy of that approval.

☐ Submittal Checklist – All items must be fully completed.

☐ Site Plan (8 ½”x11” or 11”x17”) – Must show the location and dimensions of the pool you are proposing and

the distances from the pool and patio/deck to property lines. This can be done by just using a copy of the plot plan/mortgage survey, or you may draw this plan yourself.

☐ Pool Construction Plans & Specifications (8 ½”x11” or 11”x17”)

Above-Ground Pools: Specific pool model brochure/literature and installation instructions.

In-Ground Pools: Complete construction plans showing dimensions, location of outlets, inlets, patio, pool equipment, drains, stairs, ladders, diving equipment, slide, play equipment (Basketball Goal, Volleyball Nets, etc.) and water depths. Please also include specifications on the pump(s) & heater, including electrical requirements.

Wood Deck Included: If a wood deck is proposed, a full set of fully dimensioned deck plans showing footings, framing, and handrail construction. (See attached samples.) If a wood deck is being don eat the same time as the pool, no separate deck permit will be required. If the wood deck is done at a later date, you will need to file a separate deck permit application prior to construction.

NO FEES ARE DUE OR WILL BE ACCEPTED AT TIME OF APPLICATION

FEES DUE AT TIME OF PERMIT ISSUANCE

Residential Pool, Above-Ground or In-Ground $150

RESIDENTIAL

SWIMMING POOLS

Community Development Services City of Greenwood

300 South Madison Avenue Greenwood, IN 46142

317.887.5230 www.greenwood.in.gov

Page 2: PERMIT APPLICATION REQUIREMENTS - Greenwood, IN

PERMIT NO.:____________________

Application is hereby made for a permit to improve premises as described herein as shown in the accompanying plans and specifications, which improvement is to be located as shown on the accompanying plot plan. The information which follows and the accompanying plans, specifications and other information with the representations therein contained, are made a part of this application in reliance upon which the Planning Commission of the City of Greenwood is requested to issue a location improvement permit. It is understood and agreed by this Applicant that any error, misstatement or misrepresentation of material fact, either with or without intention on the part of this Applicant, such as might or would operate to cause refusal of this application, or conditional approval thereof, or any material alteration or change in the accompanying plans, specifications or improvements subsequent to the issuance of a permit in accordance with the application, without the approval of the Planning Commission shall constitute sufficient ground for the revocation of this permit. All building construction work, alterations, repairs, or mechanical installations and appliances connected therewith and other work necessary to complete the following improvement, shall comply with the State Building Rules and Regulations, local ordinances and such other statutory provisions pertaining to this class of work, and such rules, regulations, ordinances and provisions shall be considered a part of specifications, whether specified herein or not.

1) Date of Application ____________ Date Approved ____________ Date Issued_______________

2) Name of Applicant _________________________________________ Phone ___________________

3) Address of Location to be Improved ______________________________________________________ Lot Number ________________ in ____________________________________________ Subdivision Email _________________________________________

4) Kind of Building Permit - SWIMR – Residential Pool 5) Information about Pool Inground with Auto Cover Above Ground with min 5’ above ground level Or Or Fence that is 4’ min for residential or minimum 4 foot fence 6’ min for public 6) Size: Round _______ ft. Or Rectangle/Square ________ TOTAL sq. ft. 7) Pump Information: Make/Model ___________________ Horse Power_______ Voltage________

8) Approximate Price of Project $_______________ 9) Name, address, and phone number of contractor (If applicable):

____________________________________________________________________________________ 10) Contact Person (if different that applicant: _____________________ Phone: ____________________ Email: __________________________________________________

The undersigned represents that such work shall start within 90 days and will be completed without delay; that said improvements will be finished in a good workmanlike manner. Should said work not start in good faith within 90 days, the undersigned understands this application will be void and of no force or effect whatever. The above information, to my knowledge and belief, is true and correct: SIGNATURE OF APPLICANT:__________________________________________________________________ SIGNATURE OF BUILDING COMMISSIONER:___________________________________________________ (or designated representative)

APPLICATION FOR BUILDING PERMIT

Staff Use PERMIT FEE $___________

TECH FEE (1) $10.00 TOTAL FEE $___________

Community Development Services Planning Division City of Greenwood

300 South Madison Avenue Greenwood, IN 46142

317.887.5230 main www.greenwood.in.gov

Page 3: PERMIT APPLICATION REQUIREMENTS - Greenwood, IN

Submittal Checklist Residential Swimming Pools Community Development Services, City of Greenwood

In-Ground

Above-Ground Is your pool in-ground or above-ground? (Pool Design References A, B, C, D, I, J, M & N)

Yes No Will you have a Fence? (Pool Design Reference K)

Yes No Will you have a Pool Cover? (Pool Design Reference L)

Yes No Will your pool have a deck? (Pool Design Reference E)

Yes No Will your pool have a patio? (Pool Design References C&F)

Yes No Will your pool, deck or patio have stairs? (Pool Design Reference G)

Yes No Will your pool include a slide or play equipment (Basketball Goal, Volleyball Net,

etc.)? (Pool Design References C, D, E, P)

Yes No Will your pool include a diving board? (Pool Design References C, D, O)

Yes No Will your deck or patio include a ramp? (Pool Design Reference H)

deerp
Typewritten Text
Page 4: PERMIT APPLICATION REQUIREMENTS - Greenwood, IN

AFFIRMATION OF NOTIFICATION

Homeowner’s Association and/or Architectural Control Committee

The City of Greenwood Municipal Code, Chapter 10, Article 8, Sec. 10-130 Improvement

Location Permits, Subsection 8.03.05 Subdivision Covenants, states:

“The City of Greenwood shall not be a part of, nor be responsible for enforcement of, subdivision

covenants, excepting the following requirements:

C. Before issuing a permit for construction the Building Commissioner shall require the applicant to

affirm in writing that the proper “Architectural Control Committee” for the subdivision in which

the proposed dwelling or accessory building is to be built has been sent notice of the development

proposal.

D. Final Authority for issuing a permit shall, in all cases, rest with the Building Commissioner.”

Name of Subdivision: __________________________________

Please check one:

A Homeowner’s Association and/or Architectural Control Committee does not

exist for this subdivision.

The Homeowner’s Association and/or Architectural Control Committee for this

subdivision is inactive or is no longer in existence.

The Homeowner’s Association and/or Architectural Control Committee for this

subdivision has been notified and has approved the construction plans I am

submitting for building permit approval.

The Homeowner’s Association and/or Architectural Control Committee for this

subdivision has been notified, but has not yet approved the construction plans I

am submitting for building permit approval.

The Homeowner’s Association and/or Architectural Control Committee for this

subdivision has been notified and has denied approval for this project.

Signature: __________________________________ Date: _____________________

Printed Name: _______________________________

Community Development Services City of Greenwood

300 South Madison Avenue Greenwood, IN 46142

317.887.5230 www.greenwood.in.gov

Page 5: PERMIT APPLICATION REQUIREMENTS - Greenwood, IN

Structural Design References Residential Swimming Pools Community Development Services, City of Greenwood

Unless otherwise specified, all referenced code sections, tables, and chapters are from the:

Indiana Residential Code 2005 Edition

(2003 International Residential Code with Indiana Amendments)

Page 1 of 2

A. In-Ground Pools shall comply with 2003 International Residential Code & Indiana Amendments, and

the Indiana Residential Pool Code (675 IAC 14-4.3-270 to 675 IAC 14-4.3-296 Swimming Pools).

Inspections Needed: Bonding trench & underslab inspection for plumbing, patio level bonding

inspection, and final inspection once completed.

B. Above-Ground Pools shall comply with 2003 International Residential Code & Indiana Amendments,

and the Indiana Residential Pool Code (675 IAC 14-4.3-270 to 675 IAC 14-4.3-296 Swimming Pools).

Inspections Needed: Electrical/Bonding inspection and final inspection once completed.

C. Bonding requirements per Section E4104: All pumps, pool heaters, gas lines, waterproof lighting, pool

walls each panel, surrounding concrete patios, all couplings for handrails, basketball, volleyball, rebar in

patio will require a bonding inspection.

D. Electrical requirements per Section S4221.1 and/or 2008 National Electric Code & Indiana Amendments

Sections 680 and 680.26: General – Sections E3504.2.2, E3703, E3802.3; In-Use Box, GFI Receptacles

Sections E4103.1.1, E4103.1.3, E4106.2, E4106.3; Pex Tubing wiring chase prohibited per Sections

E3702.3.2, E3702.3.3, Section E3703, E4102.1 & Table E4102.1, E4103.6; Hard-wired pump or plug-in

pump, pool cover pump GFI connection required per Section E4102.2 #3; and, overhead power

conductor/wire 10 feet minimum clearance above swimming and wading pools, diving structures,

observation stands, towers and platforms per Section E4103.5.

E. Pool Deck and Deck Equipment Requirements per the Indiana Residential Pool Code Sections S4212.3,

S4212.14, S4212.15, S4212.16, S4213.3. The foundation footing must bear below the frost line on

undisturbed natural soils or engineered fill. Deck footings can be structural pre-cast if the deck is less

than 400 sf and not within 6’-0” of dwelling or attached to the house and no roof overhead per Sections

R403.1, R403.1.1, R403.1.4, R403.1.4.1, R309.5.1. Deck joists, girders and beam sizes shall be within

allowable support spans and meet minimum bearing requirements per Sections R502.3, R502.3.2,

R502.3.3, R502.5, R502.6, R502.6.1, R502.6.2. Deck framing within 18 inches of grade and girders

within 12 inches of grade must be constructed with approved pressure-treated wood per Sections R319.1,

R319.1.1, R319.1.3, R319.1.4, R319.3. Decks or stairs that are greater than 30 inches above floor or

grade shall be provided with railings per Section R312. All deck connections shall be made to resist

uplift and lateral loads on the deck assembly per Sections R319.3, R407.3, R502.2.1, Table R602.3(1).

Deck roof and ceiling framing should be constructed to comply with Sections R802.2, R802.3, R802.3.1,

R802.3.2, R802.4, R802.5, R802.5.1, R802.6, R802.10, R802.11, R803.1, R902.1, R903.1, R903.2,

R903.2.1, Section R904 & Section R905.

F. Concrete Pool Deck/Patio shall comply with Sections S4212.1, S4212.3, S4212.14, S4212.5 to S4212.16,

S4213.2, S4213.3.

Page 6: PERMIT APPLICATION REQUIREMENTS - Greenwood, IN

Structural Design References Residential Swimming Pools Community Development Services, City of Greenwood

Unless otherwise specified, all referenced code sections, tables, and chapters are from the:

Indiana Residential Code 2005 Edition

(2003 International Residential Code with Indiana Amendments)

Page 2 of 2

G. When stairs are constructed for the pool, deck or patio, they should comply with Sections R311.5.3,

R312 and Indiana Residential Pool Code Sections S4212.2, S4212.4, S4214.1, S4214.5, S4214.6,

S4214.9, S4214.10.

H. When Ramps are constructed for the deck or patio they should comply with Sections R311.6, R312 and

Indiana Residential Pool Code Section S4212.2.

I. Erosion Control Requirements: no dirt or stockpiling of materials on streets.

J. Sidewalks must be protected from heavy traffic and cracked or damaged sidewalk sections must be

replaced.

K. Pool Fencing requirements are per the Indiana Residential Pool Code and The City of Greenwood

Municipal Code Chapter 10, Sec. 6.05.03 & S4226.3, A-C.

L. Pool Cover requirements are per the Indiana Residential Pool Code Section S4226.3, D.

M. In regards to site location on the proposed pool, deck and/or patio, they cannot be placed in a Drainage

Utility Easement without permission from the Board of Public Works and Safety.

N. Safety Equipment must be provided with a minimum of a ring or throwing buoy, 12 foot pole and access

to a telephone. More may be required depending on pool construction per Section S4226.

O. If the pool installation includes a diving board, it must comply with Section E4104 and/or 2008 National

Electric Code & Indiana Amendments Section 680, 680.26, plus Indiana Residential Pool Code Sections

S4208.3-S4208.5 S2409, S4210, S4214.5, S4215, S4226.

P. If the pool installation includes a slide or play equipment, it shall comply with Section E4104 and/or

2008 National Electric Code & Indiana Amendments Sections 680, 680.26, plus Indiana Residential

Pool Code Sections S4216, S4226.

Page 7: PERMIT APPLICATION REQUIREMENTS - Greenwood, IN

SAMPLE ONLY

SAMPLE ONLY

SAMPLE ONLYLO

NG

ITUD

INA

L SECTIO

N

DR

AW

ING

NO

TES:FO

R IN

-GR

OU

ND

POO

LS YO

UW

ILL NEED

TO PR

OV

IDE TH

ISPLA

N V

IEW, TH

ESE SECTIO

NS

AN

D A

TYPIC

AL W

ALL

SECTIO

N FO

R Y

OU

R SPEC

IFICPO

OL C

ON

STRU

CTIO

N. TH

ISD

RA

WIN

G IS B

ASED

ON

THE

FIGU

RES A

ND

CO

DES FO

UN

DIN

THE IN

DIA

NA

AM

END

MEN

TS TO TH

E 2013IN

TERN

ATIO

NA

LR

ESIDEN

TIAL C

OD

ES,SEC

TION

S4210SPEC

IFICA

LLY. A

LSO W

ILLN

EED TO

PRO

VID

E AN

YA

DD

ITION

AL IN

FOR

MA

TION

FRO

M TH

E MA

NU

FAC

TUR

ERA

ND

INSTA

LLATIO

N/

CO

NSTR

UC

TION

DO

CU

MEN

TATIO

N. A

LSOIN

CLU

DE A

NY

AD

DITIO

NA

LEQ

UIPM

ENT B

EING

INSTA

LLED, LIK

EB

ASK

ETBA

LL GO

ALS,

VO

LLEYB

ALL N

ETS, SLIDES,

ETC.

D1

Pt A

Pt B

Pt C

Pt D

D2

D3

D4

Diving B

d.

Deep End

ShallowEnd

L1L2

L3L4

6'-0"M

in.

11° Max.

11° Max.

Overall Length

71

Max.

31

Max.

Pt A

Pt B

Pt C

Pt D

W1

W2

W3

W4

Diving B

d.

PLAN

VIEW

CL

CR

OSS SEC

TION

(S)

D1-4

W1-4

D5

W5

Page 8: PERMIT APPLICATION REQUIREMENTS - Greenwood, IN
Page 9: PERMIT APPLICATION REQUIREMENTS - Greenwood, IN

Erosion and Sediment Control Requirements

1. Sediment and erosion control devices shall be installed and functioning priorto beginning any project earth disturbing activities.

2. All sediment and erosion controls shall be inspected until construction iscomplete, the site is permanently stabilized.

3. All erosion control devices shall be properly maintained during all phases ofconstruction until the completion of all construction activities and all disturbedareas have been permanently stabilized. Additional control devices may berequired during construction in order to control erosion and/or offsitesedimentation. All temporary control devices shall be removed onceconstruction is complete and the site is permanently stabilized.

4. All sediment and erosion control devices shall be inspected once every seven(7) calendar days. Damaged, ineffective, or incorrectly installed devices shallbe repaired or replaced, as necessary, within 48 hours of identification.