DATA BANGUNAN Luas bangunan LB 4000 Tinggi per lantai(rat H 3.31 m Jumlah lantai N 7 DATA LIFT Jumlah lift 2 Kapasitas lift M 1000 Kecepatan rata2 lift S 0.6 kapasitas lift m 13 BEBAN PUNCAK BP 40 WAKTU TUNGGU WT N KL HC Kapasitas Daya Angkut HC 2 10.4 45.93 M N H S RTT Round trip time RTT 13 7 3.31 0.6 135.87 N RTT WT Waktu tunggu WT 2 135.87 67.93 source: Juwanna, Sistem Bangunan Tinggi
-
Upload
yusuf-prasetyo -
Category
Documents
-
view
261 -
download
10
description
lift
Transcript of Perhitungan Lift
![Page 1: Perhitungan Lift](https://reader036.fdocuments.net/reader036/viewer/2022082401/55cf903e550346703ba43c32/html5/thumbnails/1.jpg)
DATA BANGUNANLuas bangunan LB 4000Tinggi per lantai(rata2) H 3.31 m 4Jumlah lantai N 7 19.2
3.3142857DATA LIFTJumlah lift 2Kapasitas lift M 1000Kecepatan rata2 lift S 0.6kapasitas lift m 13
BEBAN PUNCAK BP 40
WAKTU TUNGGU WTN KL HC unit
Kapasitas Daya Angkut HC 2 10.4 45.93 orangM N H S RTT
Round trip time RTT 13 7 3.31 0.6 135.87 detikN RTT WT
Waktu tunggu WT 2 135.87 67.93 detik
source: Juwanna, Sistem Bangunan Tinggi