PennState Health – Milton S. Hershey Medical CenterCentral Plant Optimization
Kevin Kanoff, CEM – Campus Energy Engineer, Milton S. Hershey Medical CenterJesse Ohm, PE, CEM, LEED AP – Senior Operations Engineer, Optimum Energy
October 05, 2017
Copyright © 2016 Optimum Energy LLC. All Rights Reserved. Proprietary & Confidential
VFDs added to 375 HP of primary chilled water pumps VFDs added to 1000 HP of secondary chilled water
pumps VFDs added to 750 HP of condenser water pumps Power Monitoring for all chillers and auxiliary
equipment Distribution Flow Meter and Temperature Sensors Deploy Optimum Energy Optimization Control
Algorithms and Monitoring Platform
Optimization Foundation - Scope of Work
2
Copyright © 2016 Optimum Energy LLC. All Rights Reserved. Proprietary & Confidential
The Challenge – Multi Plant Campus with Thermal Storage
3
Copyright © 2016 Optimum Energy LLC. All Rights Reserved. Proprietary & Confidential
Plant Layout – Satellite Plant 1
4
Copyright © 2016 Optimum Energy LLC. All Rights Reserved. Proprietary & Confidential
Plant Layout – Satellite Plant 2
5
Copyright © 2016 Optimum Energy LLC. All Rights Reserved. Proprietary & Confidential
Plant Layout – CUP (Commissioned mid-June 2016)
6
Copyright © 2016 Optimum Energy LLC. All Rights Reserved. Proprietary & Confidential
Optimize Through – Demand Based Relational Controls
Cooling Tower Fan Speed
Condenser Pump Speed
Chiller Vane & Speed
Chilled Water Pump Speed
Air Handler Fan Speed
Total System Cooling Output
Total System Energy Input
Total System Schematic
VFD’s
Copyright © 2016 Optimum Energy LLC. All Rights Reserved. Proprietary & Confidential
Optimize Through – “Sweet Spot” Multi-Plant Loading
8
Copyright © 2016 Optimum Energy LLC. All Rights Reserved. Proprietary & Confidential
TES Must Remain available for Demand Response• Strategy Included hybrid mode of Optimization and
Manual Demand Response Action.
SAT plants elevation created negative return pressure conditions at high SAT plant flows.• Resolved through adjusting TES transition sequence
changes and limiting SAT plant range
Changing the Mindset • Shift from constant primary flow to variable primary flow• Variable chilled water temperatures• Variable distributions pressures• Variable condenser water flow through chillers• Wide range of tower water temperatures
Other Operational Requirements
9
Copyright © 2016 Optimum Energy LLC. All Rights Reserved. Proprietary & Confidential
Efficiency Results – Prior to Optimization (2014)
10
Copyright © 2016 Optimum Energy LLC. All Rights Reserved. Proprietary & Confidential
Efficiency – Simulation during Analysis Phase
11
Copyright © 2016 Optimum Energy LLC. All Rights Reserved. Proprietary & Confidential
Projected Savings – Electrical (kWh)
Total annual projected savings of 3,406,502 kWh for 201612
Chiller Plant Efficiency Scale – Current and Projected
Average annual chilled water plant efficiency in kW/ton. Input includes: chillers, tower fans, condenser pumps, and chilled water pumping.
.828Current
.691Projected
16.5% Efficiency Improvement
Copyright © 2016 Optimum Energy LLC. All Rights Reserved. Proprietary & Confidential
Efficiency – Prior to Optimization (2014)
13
Copyright © 2016 Optimum Energy LLC. All Rights Reserved. Proprietary & Confidential
Efficiency – Post Optimization (2016) - 0.709 kW/Ton
14
Total annual savings of 4,047,952 kWh (2016)
Copyright © 2016 Optimum Energy LLC. All Rights Reserved. Proprietary & Confidential
Efficiency – Post Optimization (2017) - 0.675 kW/Ton
15
Total year to date savings of 3,623,706 kWh (through 09/2017)
Copyright © 2016 Optimum Energy LLC. All Rights Reserved. Proprietary & Confidential
Site Efficiency – Post Optimization (2017)
16
Copyright © 2016 Optimum Energy LLC. All Rights Reserved. Proprietary & Confidential
Utility Efficiency Analysis – Pre/Post (2016)
17
Utility verified savings of 4,156,991 kWh for 2016
• $415,699 Utility Incentive
Thank you. Engineered. Deployed. Proven.
Copyright © 2016 Optimum Energy LLC. All Rights Reserved. Proprietary & Confidential. Information contained in this presentation and otherwise disclosed orally by Optimum Energy, LLC contains confidential information which is subject to the obligations of the confidentiality Agreement between Optimum Energy, LLC and you (“the NDA”). You agree to treat the information as donfidential in accordance with the NDA.