TRAFFIC OPERATIONS
Traffic Counts were obtained on April 2 & 3, 2013.
• Miovision Cameras • Vehicle Queue Counts
Vehicle Queue Counts used for calibration of Synchro Analysis Software.
CALIBRATION PROCEDURE
Used Field Observed Values • Green Times
• Cycle Lengths Adjusted Synchro Values • Decision Making Location
• Lane Utilizations
OBERVATIONS / FINDINGS
EB K-18 Ramp & K-113 • Southbound Left-Turn Volume • Vehicles Begin Positioning North of
Southwind
Rosencutter Intersection • Westbound Left-Turn Movement (211 vph) • Outside Westbound Thru Queue • Not Enough Green Time for Eastbound
Thru Traffic • NB/SB Approaches along with Heavy WB
Left Reduces Eastbound Green Time • Consider Improvements at Rosencutter
ALTERNATIVE EVALUATION
Best performance with the greatest acceptance at a reasonable cost.
Defendable Decisions Document
K18 & K113 SPECULATION &
SCREENING
1 Close access to north leg of Rosencutter R1 68 increase lane widths over 12' R72 Do nothing S 69 decrease lane widths S3 double roundabouts (on south side) S 70 build another power cat into pavement R84 double roundabout (ramp terminals) S 71 full intersection at stagg and rosencutter S5 roundabout at Rosencutter S 72 parrallel routes or bipasses R86 interchange at Rosencutter R3 73 inclusion of bus terminal R57 modify/optimize signal timings S 74 side by side left turns in interchange S8 RI/RO norht leg of Rosencutter S 75 signal at north ramps S9 RIRO south leg of Rosencutter S 76 construct all at once S
10 Two lane roundabout S 77 construct all in phases S11 one lane roundabout R2 78 I-70 fiber S12 no left turns at rosencutter S 79 utility corridor along K-18 S13 no connection of allison to interchange S 80 loop ramps with roundabout R714 close south leg of Rosencutter completey R5 81 EB K-18 onramp metering during peak hour S15 T Stagg hill into Rosencutter S 82 go back to the way it was R416 T rosencutter intto Stagg Hill S 83 two lane exit WB K-18 S17 diverging diamond S 84 reconstruct Rosencutter with bridge placement S18 signalize north terminal S 85 underpass at Rosencutter R1 & 719 dual lefts K-113 SB to K-18 EB S 86 elevated roundabout @ rosencutter R1 & 720 dual lefts at rosencutter WB to SB S 87 close EB onramp with improvements to Stagg Hill Road S21 RIRO at Poliska Lane S 88 close WB offramp R2 & 422 widen bridges at Wildcat Creek S 89 close EB off ramp R2 & 423 pedestrian sidwalk from westwood to Target S 90 close WB on ramp R2 & 424 pedestrian sidwalk from Sheridan to LEC S 91 split diamond R325 bike lanes on stagg hill S 92 light rail to fort riley and base R826 5' sidewalks S 93 cul-de-sac south leg of rosencutter R527 10' multi use path S 94 cul-de-sac north leg of rosencutter R128 ped tunnel under ramps S 95 include park and ride to fort riley R829 ped bridge over ramps R2 96 K-18 ramp traffic under rosencutter R330 at grade crosswalks S 97 flyover on ramp over rosencutter R331 sidewalk in KDOT r/w S 98 retrofit DDI S32 large roundabout including south terminal and Allison S 99 brand new DDI S33 large roundabout under bridges R2 100 restricting left turns during peak hours S34 fully directional interchange at K-18 & 113 R3 101 split diamond with texas turnarounds R335 at grade intersection at K-18 & K-113 R1-4 102 high occupancy vehicle lanes R736 Trumpet interchange S 103 dedicated thru lanes thru rosencutter R637 fly over SB to EB R2-3 104 michigan left for EB rosencutter R238 tunnel under from SB to EB R2-3 105 michigan left for WB rosencutter R239 SPUI S 106 jughandles for Rosencutter R2 & 340 loop ramp SB to EB S 107 multi directional lanes using ITS R241 closing north leg of rosencutter and create frontage roads to east R3 108 ITS signage S42 closing north leg of rosencutter and create frontage roads to west S 109 use drivable shoulder during peak hours R743 closing north leg of rosencutter and create frontage roads to north R1&3 110 improve johnson valley drainage issues R844 closing south leg of rosencutter and create frontage roads to east R5 111 detention/retention in between ramps R845 three lanes on Stagg hill S 112 improve signage into community S46 6 lane section for K-18 (widen inside) S 113 signage for way finding S47 6 lane section for K-18 (widen outside) S 114 widen interchange bridges R548 double left at rosencutter EB to NB R7 115 improve pavement markings S49 3/4 access at Rosencutter (with signal) S 116 reconstruct all pavements R3 & 450 3/4 access at Rosencutter (without signal) R5 117 salvage all reusable pavement S51 DDI with no connection to Allision S 118 shoulder rumble strips R452 ITS optimizing S 119 add center rumble strips R453 Directional reversing roundabout S - PETER 120 improve K-18 lighting S54 sync all signals S 121 interconnect rosencutter with ITS system S55 DDI with roundabout at allision R2 122 interconnect south terminal with ITS system S56 double lanes for EB on ramp S 123 reverse frontage roads from dunbar R157 single lane for EB on ramp S 124 Stagg hill and rosencutter roundabout S58 K-18 EB three lane section east of roesencutter S 125 Two-way stop at Rosencutter R2 & 459 three lane section NB to eliminate weave R8 126 K-18 over Rosencutter with no access S60 connect linear trail to shopping aera S 127 Multi level roundabout S - PETER61 put sidewalk in stagg hill r/w S
Speculation
127 IDEAS Rejection ReasoningR1 Violates ConstraintR2 Not FeasibleR3 Too ExpensiveR4 Low Public AcceptanceR5 Combine with other optionsR6 Duplicate IdeaR7 High Cost/Low BenefitR8 Outside Scope/Beyond Study Area
ALTERNATIVE COMPARISON
Dual Lefts Roundabouts DDI Continuous Flow
Performance 5th 3rd 4th 1st 2nd
Acceptance 3rd 1st 4th 2nd 5th
Cost 1st 4th 3rd 4th 2nd
Average Ranking 3rd 2nd 4th 1st 3rd
No Build
ROSENCUTTER / RICHARDS DRIVE
• Significant congestion is occurring • Overall intersection Level of
Service E • Eastbound thru movement
operates with a Level of Service F • Eastbound vehicle backup 25
vehicles • Multiple alternatives considered • Future improvements to Wildcat Creek
Bridges will impact the intersection
SPECULATION OF ALTERNATIVES FOR ROSENCUTTER / RICHARDS DRIVE
• Roundabouts • Overpass
• Widen Bridges at Wildcat Creek
• Dual Lefts • 6 lanes on K-18
• ITS optimization • Reduce speed on K-18
• Interchange at Rosencutter • Full access intersection
• Flyover ramp over Rosencutter
• Split diamond • Frontage roads
• K-18 under Rosencutter • Right in/Right outs • ¾ access
PROPOSAL DEVELOPMENT DDI and ¾ Access • Rosencutter/Richards
• ¾ Access • K-113
• DDI • Traffic Control at Allison
• Constructing Cost: $3.1 Million
PROPOSAL DEVELOPMENT Dual Left Turns and ¾ Access • Rosencutter/Richards
• ¾ Access
• K-113 • Dual Lefts for eastbound and southbound traffic • Maximum 7 lane section between ramps • 6 Lanes north of north ramp • Signals at both ramps
• Traffic Control at Allison
• Construction cost: $3.5 Million
Public Involvement
Methods • In-Touch • Post Cards • Community Voice • Phone Calls • E-mails
Themes • Bicycles and
Pedestrians in the Design
• Residential Access to K-18
• Roundabouts • Seth Childs and K-18 • Other
WHERE ARE WE NOW?
Diverging Diamond Interchange • No Rosencutter Modifications • Currently in Design Phase • Looking at potential cost savings Est. Construction Costs have increased • Clearance Issues for Southbound Lane • Lower the Road Profile