PHILIPPINE ENVIRONMENTAL IMPACT SYSTEM by: Mary Kassel T. Blanco

description

Philippine Envaironmental Impact System System. This my presentation in one of my subject Mining 103.. i tried my best just to finish this.. although this report did not cover all the sections in the PEISS.

Transcript of PEISS

Page 1: PEISS

PHILIPPINE ENVIRONMENTAL IMPACT SYSTEM

by:

Mary Kassel T. Blanco

Page 2: PEISS

TERMS• PEISS - Philippine Environmental

Impact Statement System• EIS - Environmental Impact

Statement• EIA - Environmental Impact

Assessment• ECP - Environmentally Critical Project• ECA - Environmentally Critical Area• IEE - Initial Environmental

Examination

Page 3: PEISS

• ECC – Environmental Compliance Certificate

• ERA – Environmental Risk Assessment• EIARC – EIA Review Committee• EMP – Environmental Management Plan• EMF –Environmental Monitoring Fund• DENR – Department of Environment and

Natural Resources• EMB – Environmental Management

Bureau• RED – Regional Executive Director

Page 4: PEISS

EIS• An Environmental Impact Statement is a document prepared to describe the effects for proposed activities on the environment. 

• An EIS describes impacts, as well as ways to "mitigate" impacts. To "mitigate" means to lessen or remove negative impacts.

Page 5: PEISS

The PEISS• Provides legal and procedural

framework for conducting an EIA for projects likely to have significant environmental impact.

• Designed to safeguard the environment and natural resources in the fast growing industrialization and urbanization.

Page 6: PEISS

The PEISS

• Established in 1978 through PD 1586 that designates DENR, EMB and DENR Regional office as the implementing agency.

Page 7: PEISS

Backgrounds(EIA Laws)

• PD 1151 (1977) – Philippine Environmental Policy

• PD 1586 (1978) – Establishment of the Philippine Environmental Impact Statement System (PEISS) w/ the then National Environmental Protection Council (NEPC) as the lead agency

Page 8: PEISS

Backgrounds(EIA Laws)

• Administrative Order 42 (2002) – Rationalizing the Implementation of the Philippine EIS System giving authority, in addition to the DENR Secretary, to the EMB Central and Regional Office Directors to grant or deny issuance of ECCs

Page 9: PEISS

Backgrounds(EIA Laws)

• DENR Administrative Order (DAO) 96-37 - highlights the importance of public participation and social acceptability in the environmental review process.

Page 10: PEISS

Backgrounds(EIA Laws)

• PP 2146 (1981) – Proclaims certain areas and types of projects as environmentally critical & w/in the scope of the Philippine Environmental Impact Statement System (PEISS)

Page 11: PEISS

The System: Coverage and Procedures

• The EIS system requires completion of an EIA and preparation of an EIS report for any environmentally critical project (ECP) or any project located in an environmentally critical area (ECA).

Page 12: PEISS

Environmentally Critical Projects (ECP)

• Heavy Industries• Resource Extractive Industries• Infrastructure Projects• Golf Course Pr0jects• Others

Page 13: PEISS

Environmentally Critical Areas (ECA)

• National parks, watershed, wildlife preserves, and sanctuaries declared by law.

• Tourist Spots• Habitats of endangered or threatened species

• Areas traditionally occupied by IP’s and cultural communities

• Areas classified as prime agricultural lands

• Areas frequently hit by natural calamities

Page 14: PEISS

Projects not covered under the EIS system include:• Projects that are not ECPs or not

located in ECA

• Projects or structures that have been operating or existing since 1982, even if they are ECPs or in an ECA.

Page 15: PEISS

• DENR determines whether a proposal is an ECP or will be implemented in an ECA; if either or both of these conditions apply, then the proposal is required to secure an (ECC)

Page 16: PEISS

Overview of the national EIS system

Page 17: PEISS

Local Government Unit (LGU)

• The LGU should facilitate community participation through public outreach.

• It is the best interest of the stakeholders to design or choose the best development and mitigation options or to encourage DENR to deny an ECC if the project does not meet environmental standards.

Page 18: PEISS

Review process for environmentally critical projects

• Proponents of projects classified as ECPs are required to conduct an EIA study and to submit an EIS report to DENR’s EMB. The following are basic steps in the EIA process for these types of projects.

Page 19: PEISS
Page 20: PEISS

EIA scoping: Ensuring stakeholder participation.

• Scoping helps all parties understand the level of analysis required, specify the alternatives to be evaluated, identify potential impacts, and suggest possible mitigation and monitoring measures that should be addressed

Page 21: PEISS

Assessing environmental and socioeconomic impacts.

• The EIA should include evaluation of the proposed project’s environmental and socioeconomic impacts and should identify alternatives (including the no-action alternative) and mitigation measures to reduce project impact.

Page 22: PEISS

Reporting and planning

• The proponent or consultants certified by DENR accomplish the required studies and prepare the Environmental Impact Statement (EIS)

Page 23: PEISS

Review

• The EIS is submitted to DENR’s EMB, which then forwards it to the EIA Review Committee (EIARC) for evaluation. The EMB will not accept an EIS document for review if it is incomplete or not adequately organized.

Page 24: PEISS

Outline of the EIS Document

• EIS Summary• Project Description• Summary of Scoping Agreements• Baseline Environmental Conditions• Impact Assessment and Analysis• Environmental Management Program/Plan

• Supporting Documents• Proposals for Environmental Monitoring and Guarantee fund

• Accountability Statement

Page 25: PEISS

ECC• certifies that the project proponent has complied with the procedures of the EIS System. For ECPs, the EIS together with the Committee’s report is sent to the Director of the EMB, who in turn forwards documents and recommendations to the Secretary of DENR within 15 days.

Page 26: PEISS

Monitoring

• Monitoring is usually initiated before construction starts and continues through project construction and project operation.

Page 27: PEISS

Review Process for projects in ECA

• The review of the proposal development is conducted through DENR offices and consist of the following steps.

Page 28: PEISS

Steps and timetable for review of projects in ECAs

Page 29: PEISS

Initial environmental examination. (IEE)

• The IEE contains a brief project description, expected impacts, and measures to be undertaken to control, manage, or minimize impacts on the environment.

Page 30: PEISS

• The EIS for a project in ECA’s is subjected to similar review as an EIS prepared for ECP, but at the regional level.

• The RED determines whether an ECC will be granted or denied.

Page 31: PEISS

Social acceptability and public participationThe EIS System has provisions for

public involvement and consultation.

• Public consultation• Public hearings• Alternative dispute or conflict

resolution• Public information

Page 32: PEISS

LGU involvement• At the local level, the following steps should be followed by the LGU to assess impacts of proposed projects:

• Screening• Scoping• Analysis and EIA report• EIS and project decisions• ECC and environmental management plan• Environmental monitoring and compliance

Page 33: PEISS

Considerations in the Analysis of ENVIRONMENTAL IMPACTS

• DIRECT IMPACTS

• INDIRECT (including Induced) IMPACTS

• CUMULATIVE IMPACTS

Page 34: PEISS

INDIRECT AND INDUCED IMPACTS AS A RESULT OF CASCADE OF EFFECTS

Land Clearing

Soil Erosion

loss of farm

products

sediment delivery

turbidity

siltation of

reservoir

damage to fisheries

nutrient depletion

nutrients in run-off

aquatic weeds grow and die

Lowered dissolved oxygen

Page 35: PEISS

• References:– http://www.emb.gov.ph/portal/Porta

ls/13/LAWS%20PDF/PD1586.pdf– http://www.emb.gov.ph/portal/Porta

ls/13/LAWS%20PDF/PD1586.pdf– http://web.ead.anl.gov/uranium/eis/

whatiseis/index.cfm– http://oneocean.org/overseas/

200203/the_philippine_environment_impact_statement_system_and_what_it_entails.html