PEIR_Vigures Putney Bridge Foreshore Part 2
-
Upload
thamestunnel -
Category
Documents
-
view
218 -
download
0
Transcript of PEIR_Vigures Putney Bridge Foreshore Part 2
-
8/3/2019 PEIR_Vigures Putney Bridge Foreshore Part 2
1/25
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
Putney 5
Putney 4
Putney 3
Putney 2
Putney 1
WA9
WA8
WA7
W9
W10
Vol 10 Figure 4.4.1for PEIR
Putney Bridge ForeshoreAir Quality and Odour -
Air Quality Monitoring Locations
Title:
Map Ref : ........................ .... 1PL03-AQ-10068Date : ............ .................. .... 2011/09/30Projection : ................ .......... British National Grid
Mapping reproduced by permission of Ordnance Survey onbehalf of HMSO. Crown copyright and database right 2011.All rights reser ved.
Ordnance Survey Licence number 100019345
CH2M HILL accept no responsibility for any circumstances,which arise from the reproduction of this map after alteration,amendment or abbreviation or if it issued in part or issued
incomplete in any way.
Area ofmain map
The Point, 7th Floor,
37 North Wharf Road,
Paddington, London W2 1AF
Thames Water Utilities
LegendDraft Limit of Land to be
Acquired or Used
!(Existing Local AuthorityContinuous Monitors
!(Existing Local AuthorityDiffusion Tubes
!(New Diffusion Tubes(Project)
0 50 100 150 20025
Metres
This is a working draft plan which has been produced for the purpose of phase two consultation on the Thames Tunnel project.
The information shown on the plan is illustrative of what will be required for the purpose of constructing and operating the Thames Tunnel project. The information shown on the plan may change as a result of Thames Waters consideration of the responses received to phase two consultation and any further design development that is carried out.
-
8/3/2019 PEIR_Vigures Putney Bridge Foreshore Part 2
2/25
4.2m
RiverThames
Slipway
MeanHighW
ater
Slipway
EMBANKM
ENT
4.3m
5.1m
6.8m
6.5m
StarandGarter
Mansions7.3m
Th
e
1to17
Duke
sH
ead
(PH)
8
10
Constitutional Club
10
RUVIGNYGARDENS
12
11
22
4
20
1
32
Boat Builders
Ruvigny
1to15
1
28
78
28
12
8
1
IEL CLOSE
BEMISH
ROAD
8
2
53
65
7
65
5749
5147
39
ALIOR
ROAD
2
1
37
29
17
1
ElSub Sta
PhelpsHouse
1to29
1to7
T
he
Platt
37
25
13
51 49
1
1to8
Mansions
Warwick
43
37
THAMES
PLACE 3
5a
35
33
31
1to12
12a
14to27UniversityMansions
LockyerHouse1to75
WATER
MAN
STR
EET
101
to
122
Kenilw
orth
Court
PH
32
El Sub Sta
25to3
1
Playground
1to21
1
Mansions
Shingle
1
2
2
1 2
15
LilburnCourt
PrincetonCourt
27
2
10
18
7
1
11
GAY
STREET
KINGSMERE
CLOSE
SandandShingle
20,22
4
51a
28b
Play Area
31
LB
2
31a
6
onst,G
LAslyConst&LB
Bdy
CCLW
Sh
elt
er
10
LOWERRICHMOND
ROAD
1 0
Shingle
1
Shingle
18
27
19
Shelter
Putn
eyBrid
ge
10.7m
10.3m
Dolphin
MOP
Putney Pier
Subway
MOP Dolphin
MOP
.
9.7m
1to24 Hard
War
Camb
ridge
House
Mansions
Meml
PUTNEY
HIGH
STREET
Mount
Court
Richmond
LB
7.1m
WEIM
AR
STR
EET
Shelter
LB
79to
100
MeanHighWater
1t
o9
1to9
Kenilworth Court
Shelter
Posts
4
All Saints' Church
2
4.0m
War Meml
25 to30
RiverWalk
(PH)
4.5m
St Mary's Church
RiverThames
Lodge
13
Shingle
4
16
Fn
8.6m
6.2m
1 2
MeanHighWater
Posts
Deer
26
28
PC
8
31to54
25
55to78
20
6
135to1
46
4.9m
1to1
0
D Fn
Cinema
StarandGarter
(floating)
Shingle
1to
12
1 8
2
123
to1
34
Putney WharfTower
1 to 67
Fn
MLW
Shelter
Posts
Slipway
MLW
Posts
PH
RiversideWalk
RiversideWalk
1t1
32
Church Square
25to
30
16PH
14
BP
BoroC,
BP
CCL
!
!
!
!
#*
#*
")Q
!(
524031,175737
Trawl1
Trawl2
AL2
AL1
SW1
SW2
CS06X
524222,175598
524242,175709
524120,175791
Vol 10 Figure 5.4.1for PEIR
Putney Bridge ForeshoreAquatic Ecology
Sampling Locations
Title:
Map Ref : ......................... ... 1PL03-AE-20001Date : .............................. .... 2011/10/03Projection : ................ .......... British National Grid
0 20 40 6010
Metres
Mapping reproduced by permission of Ordnance Survey onbehalf of HMSO. Crown copyright and database right 2011.
All rights reserved.Ordnance Survey Licence number 100019345
CH2M HILL accept no responsibility for any circumstances,which arise from the reproduction of this map after alteration,amendment or abbreviation or if it issued in part or issuedincomplete in any way.
Area ofmain map
The Point,7thFloor,
37NorthWharf Road,Paddington, London W2 1AF
Thames Water Utilities
Legend
Draft Limit of Land to beAquired or Used
!( CSO (Directly Controlled)
Airlift
")Q Quadrat
#* Sweep/Kick Sample
! Coordinates of Sampling Area
Boat Fish Trawl
Sampling Area for Fish andBenthic Invertebrates
This is a working draft plan which has been produced for the purpose of phase two consultation on the Thames Tunnel project.The information shown on the plan is illustrative of what will be required for the purpose of constructing and operating the Thames Tunnel project. The information shown on the plan may change as a result of Thames Waters consideration of the responses received to phase two consultation and any further design development that is carried out.
-
8/3/2019 PEIR_Vigures Putney Bridge Foreshore Part 2
3/25
-
8/3/2019 PEIR_Vigures Putney Bridge Foreshore Part 2
4/25
-
8/3/2019 PEIR_Vigures Putney Bridge Foreshore Part 2
5/25
18
65
8
14
12
13
117
1
2 3
9
4
10
15
16
17
Vol 10 Figure 8.4.1for PEIR
Putney Bridge ForeshoreLand Quality
Contaminative Land Uses
Title:
0 30 60 90 12015
Metres
Mapping reproduced by permission of Ordnance Survey onbehalf of HMSO. Crown copyright and database right 2011.All rights reser ved.
Ordnance Survey Licence number 100019345
CH2M HILL accept no responsibility for any circumstances,which arise from the reproduction of this map after alteration,
amendment or abbreviation or if it issued in part or issuedincomplete in any way.
Area ofmain map
The Point, 7thFloor,
37NorthWharf Road,Paddington,LondonW21AF
Thames Water Utilities
Legend
Draft Limit of Land to be Acquired
or Used
Draft Limit of Land 250m Buffer
Past & present potentialcontamination sources
This is a working draft plan which has been produced for the purpose of phase two consultation on the Thames Tunnel project.The information shown on the plan is illustrative of what will be required for the purpose of constructing and operating the Thames Tunnel project. The information shown on the plan may change as a result of Thames Waters consideration of the responses received to phase two consultation and any further design development that is carried out.
Map Ref : ....................... ..... 1PL03-LQ-30006Date : .......................... ........ 2011/10/07Projection : ............... ........... British National Grid
Ref Item Inferred Date of
Operation
1 Putney Brewery c1896-1969
2 Smithy c1896
3 Wharves southern
bank of River
Thames
c1896-1988
4 Wharves northern
bank of River
Thames
C1896-present
5 Soap Works c1896
6 Sawing and
Planing Mills
c1896
7 Omnibus Garages c1916
8 Garage c1916
9 Blind and Shelter
Works
c1951-1952
10 Electrical
Substation
c1951-1966
11 Sports Equipment
Factory
c1951-1983
12 Engineering Works c1951-1983
13 Motor Engineering
Works
c1951
14 Corporation Yard c1951-1966
15 Tank c1951
16 Electrical
Substation
c1966-present
17 Electrical
Substation
c1966-present
18 Works c1962
On-site
None
Off-site
-
8/3/2019 PEIR_Vigures Putney Bridge Foreshore Part 2
6/25
!.
!.
!.
!.
!.
!.4057
SA6210
SA6211
SA6212
SR2083
SR1112
Vol 10 Figure 8.4.2for PEIR
Putney Bridge ForeshoreLand Quality
Proposed Borehole Locations
Title:
Map Ref : ........................ .... 1PL03-LQ-30050Date : .......................... ........ 2011/10/07Projection : ............... ........... British National Grid
0 25 50 75 10012.5
Metres
Mapping reproduced by permission of Ordnance Survey onbehalf of HMSO. Crown copyright and database right 2011.All rights reser ved.
Ordnance Survey Licence number 100019345
CH2M HILL accept no responsibility for any circumstances,which arise from the reproduction of this map after alteration,
amendment or abbreviation or if it issued in part or issuedincomplete in any way.
Area ofmain map
The Point, 7thFloor,
37NorthWharf Road,Paddington,LondonW21AF
Thames Water Utilities
Legend
LTT 2011 GI Proposed Boreholes
!. Land
LTT 2009 GI Drilled Boreholes
!. Land
!. Marine
Draft Limit of Land to be Acquiredor Used
Draft Limit of Land 250m Buffer
This is a working draft plan which has been produced for the purpose of phase two consultation on the Thames Tunnel project.The information shown on the plan is illustrative of what will be required for the purpose of constructing and operating the Thames Tunnel project. The information shown on the plan may change as a result of Thames Waters consideration of the responses received to phase two consultation and any further design development that is carried out.
-
8/3/2019 PEIR_Vigures Putney Bridge Foreshore Part 2
7/25
")
")
")
")
&:&:
&:
&:
&:
&:
__
___
_
___
Vol 10 Figure 8.4.3for PEIR
Putney Bridge ForeshoreLand Quality - Environmental
Records and Waste Sites
Title:
Map Ref : ........................ .... 1PL03-LQ-30028Date : .......................... ........ 2011/10/07Projection : ............... ........... British National Grid
0 25 50 75 10012.5
Metres
Mapping reproduced by permission of Ordnance Survey onbehalf of HMSO. Crown copyright and database right 2011.All rights reser ved.
Ordnance Survey Licence number 100019345
CH2M HILL accept no responsibility for any circumstances,which arise from the reproduction of this map after alteration,
amendment or abbreviation or if it issued in part or issuedincomplete in any way.
Area ofmain map
The Point, 7thFloor,
37NorthWharf Road,Paddington,LondonW21AF
Thames Water Utilities
LegendDraft Limit of Land to be Acquired or Used
Draft Limit of Land 250m Buffer
Waste
_ Past Potential Contaminated Industrial UsesHazards
&: Pollution Incidents to Controlled Waters
") LA Pollution Prevention & Controls
_ Past Potentially Contaminated Industrial Uses
This is a working draft plan which has been produced for the purpose of phase two consultation on the Thames Tunnel project.The information shown on the plan is illustrative of what will be required for the purpose of constructing and operating the Thames Tunnel project. The information shown on the plan may change as a result of Thames Waters consideration of the responses received to phase two consultation and any further design development that is carried out.
-
8/3/2019 PEIR_Vigures Putney Bridge Foreshore Part 2
8/25
i
-
8/3/2019 PEIR_Vigures Putney Bridge Foreshore Part 2
9/25
!(
l
ett
e
13
32
TT
21
u
L52
1
143
3
37
30
9
24
19
treet
.
3.
Slipw
ay
4.9m
il
S
House
Boat
ndShingle
1
1
64
13
1
25
23
B
ENDEMEERROAD
41
.
LOWERRICHMONDROAD
Posts
56
62
2
12
22
32
34
46
58
Rane
lagh
Sailing
Club
Westm
inster
Scho
ol
BoatHo
use
Crabtre
e
Boat
Club
HSBC
Bank
Rowing
Club
54
50
2
12
22
32
40
7
5
3.9m
Slipw
ay
4.2m
Posts
MHW
RiverThames
Slipway
MeanHighW
ater
Slipway
EMBANKMEN
T
4.3m
5.1m
6.8m
6.5m
StarandGarter
Mansions7.3m
The
1to17
Duk
esH
ead
7
(PH)
8
10
Constitutional Club
10
RUVIGNYGARDENS
12
11
22
34
20
1
32
Boat Builders
Ruvigny
1to15
1
4
33
23
28
a
28
GLENDARVON
STREET
21
36
48
1
13
8.2m
WEIS
SR
OAD
1
13
25
35
100
88
78
28
12
23
17
16
9
8
1
ARDSHIEL CLOSE
BEMISHROAD
8
2
53
79
81
65
85
2
14
26
36
102
104
FELSHAMROAD
9.3m
1
1t
o8
Grevill
e
Hou
se
17
25to32
ouse
BIG
G'S
ROW
YllHouse
25to32
17to24
1
HalfMoon
(PH)
Hotel
93
1
31
43
3
41
CHARLWOODROAD
.3m
56
66
78
2
14
28 3
5
23 R
E D G R A V E
R O A D
13
1
73
65
5749
5147
39
20
G W
A L I O R
R O A D
O l i
v e t
t e
2
7
1
37
15
29
17
2
8
9
1
15
11
El
Sub Sta
PhelpsHouse
1to29
1to7
The
P l a
t t
37
25
13
51 49
1
1to8
Mansions
Warwick
4337
THAMES
PLACE 35a
35
33
31
1to12
12a
14to27UniversityMansions
LockyerHouse1to75
WATER
MAN
STR
EET
101
to
122
Kenilw
orth
Court
PH
32
El Sub Sta
25to3
1
Playground
1to21
12
Mansions
Shingle
Shingle
1
2
2
6
12
15
LilburnCourt
Princeton
Court
27
2
10
18
7
1
11
GAY
STREET
KINGSMERE
CLOSE
Sprin
gPassage
S t r
e e t
1
SandandShingle
SandandS
hingle
20,22
4
51a
TCB
28b
King
sColl
ege
Scho
ol
Boat
Hou
se
Lond
on
Ro
wing
Club
Dulwich
Colle
ge
Boat
Hou
se
l
Play Area
31
Pillar
LB
2b
2
3
106
2
31a
T
6
33
BoroConst,GLAslyConst&
LBBdy
CCLW
H ll1
54
1112
STE
EPLE
CLOSE
4.3m
i
Almshouses
Graveyard910
10
1
Shelter
10
LOWERRICHMONDROAD
1to
15
10
Shingle
20
10
Shingle
18
27
Vicarage
19
SwanbankCourt
WILLOWBA
Shelter
Ros
eland
Putn
eyBridge
10.7m
10.3m
PC
Dolphin
MOP
PutneyPier
Subway
4.3m
M O P D o lp h in
MOP
5.1m
9.7m
SwanWharf
CHUR
CHGAT
1to24
Garden
42
10
Hard
War
Cambrid
geHouse
Mansions
Meml
PUTNEYHIGH
STREET
Mount
Court
Richmond
LB
7.1m
WEIM
AR
STREET
1
Shelter
Hous
e
LB
RiverWalk
79to
100
MeanHighWater
1t
o9
1to9
Kenilworth Court
Shelter
Posts
4
8
All Saints'Church
2
4.0m
War Meml
25to 30
RiverWalk
6.2m
(PH)
4.5m
StMary's Church
RiverThames
Lodge
13
7
Shingle
4
16
Fn
PUTNEYBRID
GE
APPROACH
SirWilliam
Pow
ell's
Alm
shouses
8.6m
6.2m
12
TCB
7
6
Hard
MeanHighWater
2
Posts
Deer
Hard
15
26
28
WarMemorial
PC
Shelte
21
8
31to54
25
55to78
20
6
135to1
46
4.9m
1t
o1
0
4.6m
D Fn
Cinema
StarandGarter
(floating)
Shingle
1to
12
15
18
2
123t
o13
4
3 3
6.9m
r'
Pl
c
Pol
Sta
ANE
7
23
1
2
Putney Wharf Tower
1 to 67
l
Fn
MLW
Shelter
Posts
Slipway
MLW
Posts
3
2
1
rfTerrace
5
PH
RiversideWalk
RiversideWalk
16to19
24
32
Church Square
13
25to
30
IsherwoodPassage
1
3
16PH
14
7
BP
BoroConst, GLAslyConst&LBBdy
BP
CCLW
8
9
8
7
6
5
4
3
2
1
12
11
10
CS06X
Vol 10 Figure 10.4.1for PEIR
Putney Bridge ForeshoreSocio-Economic - Context Plan
Title:
Map Ref : ......................... ... 1PL03-SE-20004Date : .............................. .... 2011/10/04Projection : ................ .......... British National Grid
0 20 40 60 80 10010
Metres
Mapping reproduced by permission of Ordnance Survey onbehalf of HMSO. Crown copyright and database right 2011.
All rights reserved.Ordnance Survey Licence number 100019345
CH2M HILL accept no responsibility for any circumstances,which arise from the reproduction of this map after alteration,
amendment or abbreviation or if it issued in part or issuedincomplete in any way.
Area ofmain map
The Point,7thFloor,
37NorthWharf Road,Paddington, London W2 1AF
Thames Water Utilities
Legend
Draft Limit of Land to beAcquired or Used
!( CSO (Directly Controlled)
Site Context Features
This is a working draft plan which has been produced for the purpose of phase two consultation on the Thames Tunnel project.The information shown on the plan is illustrative of what will be required for the purpose of constructing and operating the Thames Tunnel project. The information shown on the plan may change as a result of Thames Waters consideration of the responses received to phase two consultation and any further design development that is carried out.
Site Context Features1. Waterman's Green2. Bishops Park/Fulham Palace Gardens3. Private Open Space4. River Foreshore Space5. Slipway (Public Draw Dock)6. Thames Path7. National Cycle Route 48. Residential9. Retail and Services Businesses10. Thai Square11. Star and Garter12. Putney Pier
-
8/3/2019 PEIR_Vigures Putney Bridge Foreshore Part 2
10/25
RICHMOND
UPON THAMES
HAMMERSMITH & FULHAM
WANDSWORTH
Vol 10 Figure 11.4.1for PEIR
Putney Bridge ForeshoreTownscape and VisualDevelopment Pattern
and Scale
Title:
Map Ref : ........................ .... 1PL03-TS-40014Date : ............. ................. .... 2011/10/04Projection : ................. ......... British National Grid
0 50 100 150 20025
Metres
Mapping reproduced by permission of Ordnance Survey onbehalf of HMSO. Crown copyright and database right 2011.All rights reserved.Ordnance Survey Licence number 100019345
CH2M HILL accept no responsibility f or any circumstances,which arise from the reproduction of this map after alteration,
amendment or abbreviation or if it issued i n part or issuedincomplete in any way.
Area ofmain map
The Point, 7th Floor,
37 North Wharf Road,
Paddington, London W2 1AF
Thames Water Utilities
This is a working draft plan which has been produced for the purpose of phase two consultation on the Thames Tunnel project.The information shown on the plan i s illustrative of what will be required for the purpose of constructing and operating the Thames Tunnel project. The information shown on the plan may change as a result of Thames Waters consideration of the responses received to phase two consultation and any further design development that is carried out.
LegendDraft Limit of Land tobe Acquired or Used
Local Authority Boundary
Building Heights
(mts)
0 - 20m
20 - 40m
40 - 60m
60 - 80m
80 - 100m
>100m
-
8/3/2019 PEIR_Vigures Putney Bridge Foreshore Part 2
11/25
-
8/3/2019 PEIR_Vigures Putney Bridge Foreshore Part 2
12/25
Barn ElmsSports Ground
Bishops Park
Fulham Palace Allotments
All SaintsChurchyard
Prior GardensBank
Hurlingham GardensAmenity Space
Ranelagh GardensAmenity Space
Hurlingham Park
Hurlingham Gardens
Wandsworth Park
South RiverBank
HAMMERSMITH & FULHAM
WANDSWORTH
RICHMOND UPON THAMES
South River
Bank
Leaders Gardens
Vol 10 Figure 11.4.3for PEIR
Putney Bridge ForeshoreTownscape and Visual
Open SpaceDistribution and Type
Title:
Map Ref : ........................ .... 1PL03-ES-40126Date : ............................. ..... 2011/10/06Projection : .................. ........ British National Grid
0 50 100 150 20025
Metres
Mapping reproduced by permission of Ordnance Survey onbehalf of HMSO. Crown copyright and database right 2011.All rights reserved.Ordnance Survey Licence number 100019345
CH2M HILL accept no responsibility f or any circumstances,which arise from the reproduction of this map after alteration,
amendment or abbreviation or if it issued i n part or issuedincomplete in any way.
Area ofmain map
The Point, 7th Floor,
37 North Wharf Road,
Paddington, London W2 1AF
Thames Water Utilities
This is a working draft plan which has been produced for the purpose of phase two consultation on the Thames Tunnel project.The information shown on the plan is illustrative of what will be required for the purpose of constructing and operating the Thames Tunnel project. The information shown on the plan may change as a result of Thames Waters consideration of the responses received to phase two consultation and any further design development that is carried out.
LegendDraft Limit of Land tobe Acquired or Used
Local Authority Boundary
Metropolitan Open Land
Historic Parkand Gardens
Designated Public OpenSpace (LBR UDP)
Designated Other LargerProtected Open Space(LBW UDP)
Public Open Space
Private Open Space
EMBAN
KMEN
T
LOWERRICHMONDROAD
FULHAMPALACE
NEWKIN
GSROAD
DEODARROAD
PUTNEYBRIDGEAPPROACH
-
8/3/2019 PEIR_Vigures Putney Bridge Foreshore Part 2
13/25
WANDSWORTH
RICHMOND UPON THAMES
HAMMERSMITH & FULHAM
Vol 10 Figure 11.4.4for PEIR
Putney Bridge ForeshoreTownscape and Visual
Transport Network
Title:
Map Ref : ........................ .... 1PL03-TS-40081Date : ............................. ..... 2011/10/05Projection : .................. ........ British National Grid
0 50 100 150 20025
Metres
Mapping reproduced by permission of Ordnance Survey onbehalf of HMSO. Crown copyright and database right 2011.All rights reserved.Ordnance Survey Licence number 100019345
CH2M HILL accept no responsibility f or any circumstances,which arise from the reproduction of this map after alteration,
amendment or abbreviation or if it issued i n part or issuedincomplete in any way.
Area ofmain map
The Point, 7th Floor,
37 North Wharf Road,
Paddington, London W2 1AF
Thames Water Utilities
This is a working draft plan which has been produced for the purpose of phase two consultation on the Thames Tunnel project.The information shown on the plan is illustrative of what will be required for the purpose of constructing and operating the Thames Tunnel project. The information shown on the plan may change as a result of Thames Waters consideration of the responses received to phase two consultation and any further design development that is carried out.
Legend
Draft Limit of Land tobe Acquired or Used
Local Authority Boundary
!(
London NationalRail Stations
Rail
London UndergroundStations
Thames Path
London Cycle Routes
A Road
EMBAN
KMEN
T
LOWERRICHMONDROAD
FULHAMPALACE
NEWKIN
GSRO
AD
DEODARROAD
PUTNEYBRIDGEAPPROACH
-
8/3/2019 PEIR_Vigures Putney Bridge Foreshore Part 2
14/25
WANDSWORTH
RICHMOND UPON THAMES
HAMMERSMITH & FULHAM
Hurlingham and Fulham Residential
Hurlingham Park
Fulham HighStreetRetail
Wandsworth Park
River Thames - Fulhamand Barn Elms Reach
Barn Elms
Leaders Gardens
FulhamFootball Club
River Thames - Wandsworthand Sands End Reach
River Thames - Putney and Fulham Palace Re ach
Putney Residential
Bishops Park/ Fulham Palace Greenspace
Putney Residential
Putney High Street
Fulham Palace Allotments
Oxford Road conservation Area
Ranelagh GardensResidential
Putney Embankment Conservation Area
Putney Bridge Conservation Area
Deodar Road Conservation Area
Vol 10 Figure 11.4.5foe PEIR
Putney Bridge ForeshoreTownscape and VisualTownscape Character
Areas
Title:
Map Ref : ........................ .... 1PL03-TS-40158Date : ............................. ..... 2011/10/18Projection : .................. ........ British National Grid
0 50 100 150 20025
Metres
Mapping reproduced by permission of Ordnance Survey onbehalf of HMSO. Crown copyright and database right 2011.All rights reserved.Ordnance Survey Licence number 100019345
CH2M HILL accept no responsibility f or any circumstances,which arise from the reproduction of this map after alteration,
amendment or abbreviation or if it issued i n part or issuedincomplete in any way.
Area ofmain map
The Point, 7th Floor,
37 North Wharf Road,
Paddington, London W2 1AF
Thames Water Utilities
This is a working draft plan which has been produced for the purpose of phase two consultation on the Thames Tunnel project.The information shown on the plan is illustrative of what will be required for the purpose of constructing and operating the Thames Tunnel project. The information shown on the plan may change as a result of Thames Waters consideration of the responses received to phase two consultation and any further design development that is carried out.
LegendDraft Limit of Land tobe Acquired or Used
Local Authority Boundary
Townscape CharacterArea Boundary
Conservation Areas
-
8/3/2019 PEIR_Vigures Putney Bridge Foreshore Part 2
15/25
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
9A.1
RICHMOND UPON THAMES
HAMMERSMITH & FULHAM
WANDSWORTH
2.2
2.7
2.1
1.2
2.5
2.9
2.6
2.4
2.3
2.2
3.1
1.1
2.8
2.15
2.14
2.13
2.12
2.11
2.10
Vol 10 Figure 11.4.6for PEIR
Putney Bridge ForeshoreTownscape and Visual
Viewpoint Locations
Title:
Map Ref : ......................... ... 1PL03-TS-40097Date : .............................. .... 2011/10/06Projection : ................ .......... British National Grid
0 50 100 150 20025
Metres
Mapping reproduced by permission of Ordnance Survey on
behalf of HMSO. Crown copyright and database right 2011.All rights reserv ed.
Ordnance Survey Licence number 100019345
CH2M HILL accept no responsibility for any circumstances,which arise from the reproduction of this map after alteration,
amendment or abbreviation or if it issued in part or issuedincomplete in any way.
Area ofmain map
Legend
Draft Limit of Land tobe Acquired or Used
Local Authority Boundary
. Viewpoints
Zone of TheoreticalVisibility
LVMF London Panoramaand Linear Views
VerifiablePhotomontage Locations
The Point,7thFloor,
37NorthWharf Road,
Paddington, London W2 1AF
Thames Water Utilities
This is a working draft plan which has been produced for the purpose of phase two consultation on the Thames Tunnel project.
The information shown on the plan is illustrative of what will be required for the purpose of constructing and operating the Thames Tunnel project. The information shown on the plan may change as a result of Thames Waters consideration of the responses received to phase two consultation and any further design development that is carried out.
LVMF Linear Views
9A.1 - King Henry VIII's Mound,Richmond to St Paul's Cathedral
Viewpoint Locations:
1.X - Residential receptors2.X - Recreational receptors
3.X - Transport receptors
4.X - Employment receptors
-
8/3/2019 PEIR_Vigures Putney Bridge Foreshore Part 2
16/25
kk
kk
Putney BridgeForeshore
Putney High Street
Lower Richmond Road
A219
A205
Putney Bridge Road
A219
A205
Embankment
WANDSWORTH
HAMMERSMITH & FULHAM
Title:
Map Ref : ........................ .... 1PL03-TT-50140Date : .......................... ........ 2011/10/05Projection : ............... ........... British National Grid
0 50 100 150 20025
Metres
Mapping reproduced by permission of Ordnance Survey onbehalf of HMSO. Crown copyright and database right 2011.All rights reser ved.
Ordnance Survey Licence number 100019345
CH2M HILL accept no responsibility for any circumstances,which arise from the reproduction of this map after alteration,
amendment or abbreviation or if it issued in part or issuedincomplete in any way.
Area ofmain map
The Point, 7thFloor,
37NorthWharf Road,Paddington,LondonW21AF
Thames Water Utilities
Legendkk Site Access
Construction Traffic Routes
Primary Route
Secondary Route
Transport for London Road Network
Strategic Road Network (SRN)
London Cycle Routes
Thames Path
Draft Limit of Land to be Acquired or Used
Local Authority Boundary
This is a working draft plan which has been produced for the purpose of phase two consultation on the Thames Tunnel project.The information shown on the plan is illustrative of what will be required for the purpose of constructing and operating the Thames Tunnel project. The information shown on the plan may change as a result of Thames Waters consideration of the responses received to phase two consultation and any further design development that is carried out.
Volume 10 Figure 12.2.1for PEIR
Putney Bridge ForeshoreTransport - Construction
Traffic Routes
-
8/3/2019 PEIR_Vigures Putney Bridge Foreshore Part 2
17/25
!(
Putney BridgeForeshore
14,22,39,74,85,93,220,265,270,424,430
14,39,74,85,93,485,430,270,424,220
A219
22,265,485
PutneyA205
220,270,485
Putney High Street
Lower Richmond Road
A219
WANDSWORTH
HAMMERSMITH & FULHAM
Title:
Map Ref : .................... ........ 1PL03-TT-50118Date : .......................... ........ 2011/10/05Projection : ............... ........... British National Grid
0 30 60 90 12015
Metres
Mapping reproduced by permission of Ordnance Survey onbehalf of HMSO. Crown copyright and database right 2011.All rights reser ved.
Ordnance Survey Licence number 100019345
CH2M HILL accept no responsibility for any circumstances,which arise from the reproduction of this map after alteration,
amendment or abbreviation or if it issued in part or issuedincomplete in any way.
Area ofmain map
The Point, 7thFloor,
37NorthWharf Road,Paddington,LondonW21AF
Thames Water Utilities
LegendBus Stop
!( London National Rail Stations
Bus Route
Transport for London Road Network
Strategic Road Network (SRN)
London Cycle Routes
Thames Path
Draft Limit of Land to be Acquired or Used
Local Authority Boundary
This is a working draft plan which has been produced for the purpose of phase two consultation on the Thames Tunnel project.The information shown on the plan is illustrative of what will be required for the purpose of constructing and operating the Thames Tunnel project. The information shown on the plan may change as a result of Thames Waters consideration of the responses received to phase two consultation and any further design development that is carried out.
Volume 10 Figure 12.4.1for PEIR
Putney Bridge ForeshoreTransport - Local Site Plan
-
8/3/2019 PEIR_Vigures Putney Bridge Foreshore Part 2
18/25
Vol 10 Figure 15.4.1for PEIR
Putney Bridge ForeshoreFlood Risk
EA Flood Zones
Title:
Map Ref : ........................ .... 1PL03-FL-20001Date : ............. ................. .... 2011/09/30Projection : .................. ........ British National Grid
0 50 100 150 20025
Metres
Mapping reproduced by permission of Ordnance Survey onbehalf of HMSO. Crown copyright and database right 2011.All rights reser ved.
Ordnance Survey Licence number 100019345
CH2M HILL accept no responsibility for any circumstances,which arise from the reproduction of this map after alteration,
amendment or abbreviation or if it issued in part or issuedincomplete in any way.
Area ofmain map
The Point, 7th Floor,
37 North Wharf Road,
Paddington, London W2 1AF
Thames Water Utilities
LegendDraft Limit of Land to be Acquired or Used
Thames Tidal Defences
EA Flood Zone 3
EA Flood Zone 2
This is a working draft plan which has been produced for the purpose of phase two consultation on the Thames Tunnel project.
The information shown on the plan is illustrative of what will be required for the purpose of constructing and operating the Thames Tunnel project. The information shown on the plan may change as a result of Thames Waters consideration of the responses received to phase two consultation and any further design development that is carried out.
-
8/3/2019 PEIR_Vigures Putney Bridge Foreshore Part 2
19/25
-
8/3/2019 PEIR_Vigures Putney Bridge Foreshore Part 2
20/25
!.
!.
!.
!.
!.!. !.!. !.
!.!.!.!.
!.
!.
!.
!.
!H
!H
!H
!H
!H
!H
!H
!H
!H
!H
!H!H
!H
!H
!H
Putney Bridge Foreshore
SR1116 SR1114
SR1112
SR1109
SR1108
SA1115
SA1110
SA1106
SA1105
PR1113
PR1107
SR1103A
SR2086
SR2083
SR2082
WANDSWORTH
HAMMERSMITH & FULHAM
RICHMOND UPON THAMES
Title:
Map Ref : ......................... ... 1PL03-WR-20001Date : .............................. .... 2011/10/05Projection : ................ .......... British National Grid
0 100 200 300 40050
Metres
Mapping reproduced by permission of Ordnance Survey onbehalf of HMSO. Crown copyright and database right 2011.
All rights reserved.Ordnance Survey Licence number 100019345
CH2M HILL accept no responsibility for any circumstances,which arise from the reproduction of this map after alteration,
amendment or abbreviation or if it issued in part or issuedincomplete in any way.
Area ofmain map
The Point,7thFloor,
37NorthWharf Road,
Paddington, London W2 1AF
Thames Water Utilities
LegendDraft Limit of Land to be Acquired or UsedThames Tunnel - Abbey Mills Route
Main Tunnel
Connection Tunnel
Local Authority Boundary (OS)
River Thames
LTT 2009 GI Drilled Boreholes
!H Land
!H Marine
LTT 2011 GI Proposed Boreholes
!. Land
!. Water
Superficial Geology
Head
Alluvium
Kempton Park Gravel Member
Hackney Gravel Member
Boyn Hill Gravel Member
Vol 10 Figure E.1for PEIR
Putney Bridge ForeshoreGroundwater
Superficial GeologyThis is a working draft plan which has been produced for the purpose of phase two consultation on the Thames Tunnel project.
The information shown on the plan is illustrative of what will be required for the purpose of constructing and operating the Thames Tunnel project. The information shown on the plan may change as a result of Thames Waters consideration of the responses received to phase two consultation and any further design development that is carried out.
-
8/3/2019 PEIR_Vigures Putney Bridge Foreshore Part 2
21/25
!.
!.
!.
!.
!.!. !.!. !.
!.!.
!.!.!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.
!.!.
!.
!.
!.
Putney Bridge Foreshore
Putney Bridge Foreshore
WANDSWORTH
HAMMERSMITH & FULHAM
RICHMOND UPON THAMES
SR1116
SR1114
SR1112
SR1109
SR1108
SA1115
SA1110
SA1106
SA1105
PR1107
SR1103A
SR2086
SR2083
SR2082
80
70
Title:
Map Ref : ......................... ... 1PL03-WR-20051Date : .............................. .... 2011/10/05Projection : ................ .......... British National Grid
0 100 200 300 40050
Metres
Mapping reproduced by permission of Ordnance Survey onbehalf of HMSO. Crown copyright and database right 2011.
All rights reserved.Ordnance Survey Licence number 100019345
CH2M HILL accept no responsibility for any circumstances,which arise from the reproduction of this map after alteration,
amendment or abbreviation or if it issued in part or issuedincomplete in any way.
Area ofmain map
The Point,7thFloor,
37NorthWharf Road,
Paddington, London W2 1AF
Thames Water Utilities
LegendDraft Limit of Land to be Acquired or Used
Thames Tunnel - Abbey Mills Route
Main Tunnel
Connection Tunnel
Local Authority Boundary (OS)
River Thames
LTT 2009 GI Drilled Boreholes
!. Land
!. Marine
LTT 2011 GI Proposed Boreholes
!. Land
!. Water
EA Chalk Piezometric Level(mATD) - January 2008
Solid Geology
London Clay Formation
Vol 10 Figure E.2for PEIR
Putney Bridge ForeshoreGroundwater - Solid Geology
This is a working draft plan which has been produced for the purpose of phase two consultation on the Thames Tunnel project.The information shown on the plan is illustrative of what will be required for the purpose of constructing and operating the Thames Tunnel project. The information shown on the plan may change as a result of Thames Waters consideration of the responses received to phase two consultation and any further design development that is carried out.
-
8/3/2019 PEIR_Vigures Putney Bridge Foreshore Part 2
22/25
A
D
Putney Bridge Foreshore
PGWU1514
WANDSWORTH
HAMMERSMITH & FULHAM
RICHMOND UPON THAMES
80
70
TQ27-159
Title:
Map Ref : ......................... ... 1PL03-WR-20052Date : .............................. .... 2011/10/05Projection : ................ .......... British National Grid
0 100 200 300 40050
Metres
Mapping reproduced by permission of Ordnance Survey onbehalf of HMSO. Crown copyright and database right 2011.
All rights reserved.Ordnance Survey Licence number 100019345
CH2M HILL accept no responsibility for any circumstances,which arise from the reproduction of this map after alteration,
amendment or abbreviation or if it issued in part or issuedincomplete in any way.
Area ofmain map
The Point,7thFloor,
37NorthWharf Road,
Paddington, London W2 1AF
Thames Water Utilities
LegendDraft Limit of Land to be Acquired or UsedThames Tunnel - Abbey Mills Route
Main Tunnel
Connection Tunnel
Local Authority Boundary (OS)
River Thames
D EA Water Quality Monitoring Locations
EA Groundwater Level Monitoring Locations
A Recent Data AvailableEA Chalk Piezometric Level(mATD) - January 2008
Superficial Geology
Head
Alluvium
Kempton Park Gravel Member
Hackney Gravel Member
Boyn Hill Gravel Member
Solid Geology
London Clay Formation
Vol 10 Figure E.3for PEIR
Putney Bridge ForeshoreGroundwater
EA Monitoring LocationsThis is a working draft plan which has been produced for the purpose of phase two consultation on the Thames Tunnel project.
The information shown on the plan is illustrative of what will be required for the purpose of constructing and operating the Thames Tunnel project. The information shown on the plan may change as a result of Thames Waters consideration of the responses received to phase two consultation and any further design development that is carried out.
-
8/3/2019 PEIR_Vigures Putney Bridge Foreshore Part 2
23/25
:
Putney Bridge Foreshore
158
WANDSWORTH
HAMMERSMITH & FULHAM
RICHMOND UPON THAMES
80
70
Title:
Map Ref : ......................... ... 1PL03-WR-20053Date : .............................. .... 2011/10/05Projection : ................ .......... British National Grid
0 100 200 300 40050
Metres
Mapping reproduced by permission of Ordnance Survey onbehalf of HMSO. Crown copyright and database right 2011.
All rights reserved.Ordnance Survey Licence number 100019345
CH2M HILL accept no responsibility for any circumstances,which arise from the reproduction of this map after alteration,
amendment or abbreviation or if it issued in part or issuedincomplete in any way.
Area ofmain map
The Point,7thFloor,
37NorthWharf Road,
Paddington, London W2 1AF
Thames Water Utilities
LegendDraft Limit of Land to be Acquired or Used
Thames Tunnel - Abbey Mills Route
Main Tunnel
Connection Tunnel
Local Authority Boundary (OS)
River Thames
GSHP Scheme: Chalk
EA Chalk Piezometric Level(mATD) - January 2008
Superficial Geology
Head
Alluvium
Kempton Park Gravel Member
Hackney Gravel Member
Boyn Hill Gravel Member
Solid Geology
London Clay Formation
Vol 10 Figure E.6for PEIR
Putney Bridge ForeshoreGroundwater - GSHP
This is a working draft plan which has been produced for the purpose of phase two consultation on the Thames Tunnel project.The information shown on the plan is illustrative of what will be required for the purpose of constructing and operating the Thames Tunnel project. The information shown on the plan may change as a result of Thames Waters consideration of the responses received to phase two consultation and any further design development that is carried out.
-
8/3/2019 PEIR_Vigures Putney Bridge Foreshore Part 2
24/25
110-RG-ENV-PWH1X-000104
-
8/3/2019 PEIR_Vigures Putney Bridge Foreshore Part 2
25/25
Phase two consultation (Autumn 2011)
For further information see our website:www.thamestunnelconsultation.co.uk
or call us on 0800 0721 086