Boiler
PeerlessGas
PipingDiagrams
Combi 160
As an ENERGY STAR® Partner, PB Heat, LLC has determined that this product meets the ENERGY STAR guidelines for energy efficiency.
Peerless Combi 160Suggested Piping Diagrams
IndexInstantaneous DHW and heating by primary/secondary loop. Zone valves are controlled by TACO ZVC40x Switches. (Hydronic schematic) ...............................................Page 1
Instantaneous DHW and heating by primary/secondary loop. Zone valves are controlled by TACO ZVC40x Switches. (Electrical schematic) ...............................................Page 2
Storage water heater. Heating side note used .....................................................................................................Page 3
Indirect water heater and recirculating line. Heating side is not used..............................................................Page 4
Multiple boilers installation for instantaneous DHW and heating. Boilers are controlled by its temperature control................................................................................................Page 5
Multiple boilers installation for instantaneous DHW production only. Boilers are controlled by own temperature control.............................................................................................Page 6
Instantaneous DHW and heating by zone pumps that are controlled by TACO SR506 Switches. (Hydronic schematic)..............................................................................................................................................Page 7
Instantaneous DHW and heating by zone pumps that are controlled by TACO SR506 Switches. (Electrical schematic) .............................................................................................................................................Page 8
Heating by zone pumps that are controlled by TACO SR506 Switches (Hydronic schematic) .......................Page 9
Heating by zone pumps that are controlled by TACO SR506 Switches (Electrical schematic) ....................Page 10
Storage water heater and recirculating line. Heating side is not used ...........................................................Page 11
Instantaneous DHW with single zone and air handler..................................................................................... Page 12
DHW by indirect water heater and Central Heating by primary/secondary loop. Pumps are controlled by TACO SR 506 switches (Hydronic schematic).........................................................Page 13
DHW by indirect water heater and Central Heating by primary/secondary loop. Pumps are controlled by TACO SR 506 switches (Electrical schematic) ........................................................Page 14
DHW by indirect water heater and Central Heating by primary/secondary loop. Secondary is for floor radiant heating system (low temperature) ...................................................................Page 15
Junction board electrical connections for condensing boiler .........................................................................Page 16
This manual is a supplement to the Peerless Combi 160 Installation, Operation and Maintenance Manual (IOM),PC8000. The installer must read the IOM manual and this supplement before piping the boiler system.
WARNING
The drawings in this manual are concept drawings, not engineered drawings. It is not intended to describe a com-plete system, nor any particular system. It is up to the system designer to determine the necessary components forand configuration of the particular system being designed, including additional equipment and any safety deviceswhich in the judgement of the designer are appropriate in order to properly size, configure and design that systemand to ensure compliance with building and safety code requirements.
NOTICE
1
Inst
anta
neo
us
DH
W a
nd
Hea
tin
g b
y P
rim
ary/
Sec
on
dar
y L
oo
p. Z
on
e V
alve
s ar
e C
on
tro
lled
by
TAC
O Z
VC
40x
Sw
itch
es.
(Hyd
ron
ic S
chem
atic
)
2
Inst
anta
neo
us
DH
W a
nd
Hea
tin
g b
y P
rim
ary/
Sec
on
dar
y L
oo
p. Z
on
e V
alve
s ar
e C
on
tro
lled
by
TAC
O Z
VC
40x
Sw
itch
es.
(Ele
ctri
cal S
chem
atic
)
3
Sto
rag
e W
ater
Hea
ter
Hea
tin
g S
ide
No
t U
sed
4
Ind
irec
t Wat
er H
eate
r an
d R
ecir
cula
tin
g L
ine
– H
eati
ng
Sid
e is
no
t U
sed
.
5
Mu
ltip
le B
oile
rs In
stal
lati
on
fo
r In
stan
tan
eou
s D
HW
an
d H
eati
ng
. Bo
ilers
are
Co
ntr
olle
d b
y it
s Te
mp
erat
ure
Co
ntr
ols
.
6
Mu
ltip
le B
oile
rs In
stal
lati
on
fo
r In
stan
tan
eou
s D
HW
Pro
du
ctio
n O
nly
. Bo
ilers
are
Co
ntr
olle
d b
y o
wn
Tem
per
atu
re C
on
tro
l.
7
Inst
anta
neo
us
DH
W a
nd
Hea
tin
g b
y Z
on
e P
um
ps
that
are
Co
ntr
olle
d b
y TA
CO
SR
506
Sw
itch
es. (
Hyd
ron
ic S
chem
atic
)
8
Inst
anta
neo
us
DH
W a
nd
Hea
tin
g b
y Z
on
e P
um
ps
that
are
Co
ntr
olle
d b
y TA
CO
SR
506
Sw
itch
es. (
Ele
ctri
cal S
chem
atic
)
9
Hea
tin
g b
y Z
on
e P
um
ps
that
are
Co
ntr
olle
d b
y TA
CO
SR
506
Sw
itch
es. (
Hyd
ron
ic S
chem
atic
)
10
Hea
tin
g b
y Z
on
e P
um
ps
that
are
Co
ntr
olle
d b
y TA
CO
SR
506
Sw
itch
es. (
Ele
ctri
cal S
chem
atic
)
11
Sto
rag
e W
ater
Hea
ter
and
Rec
ircu
lati
ng
Lin
e –
Hea
tin
g S
ide
is n
ot
Use
d.
12
Inst
anta
neo
us
DH
W w
ith
Sin
gle
Zo
ne
and
Air
Han
dle
r
13
DH
W b
y In
dir
ect W
ater
Hea
ter
and
Cen
tral
Hea
tin
g b
y P
rim
ary/
Sec
on
dar
y L
oo
p. P
um
ps
are
Co
ntr
olle
d b
y TA
CO
SR
506
Sw
itch
es.
(Hyd
ron
ic S
chem
atic
)
14
DH
W b
y In
dir
ect W
ater
Hea
ter
and
Cen
tral
Hea
tin
g b
y P
rim
ary/
Sec
on
dar
y L
oo
p. P
um
ps
are
Co
ntr
olle
d b
y TA
CO
SR
506
Sw
itch
es.
(Ele
ctri
cal S
chem
atic
)
15
DH
W b
y In
dir
ect W
ater
Hea
ter
and
Cen
tral
Hea
tin
g b
y P
rim
ary/
Sec
on
dar
y L
oo
p. S
eco
nd
ary
is f
or
Flo
or
Rad
ian
t H
eati
ng
Sys
tem
. (L
ow
Tem
per
atu
re)
16
Jun
ctio
n B
oar
d C
on
nec
tio
ns
for
Co
nd
ensi
ng
Bo
iler
Boiler
PeerlessGas
Piping Diagrams
TO THE INSTALLER:This manual is the property of the owner and mustbe affixed near the boiler for future reference.
TO THE OWNER:This boiler should be inspected annually by aQualified Service Agency.
PC8001 R0 (8/10-1M)Printed in U.S.A.©2010
PB HEAT, LLC131 S. CHURCH STREET • BALLY, PA 19503
Combi 160
ASMEcertified