Pedestrian crossing Stanley/Ballarat St - NZ Transport Agency · PDF file Subject: RE:...

Click here to load reader

  • date post

    18-Jun-2020
  • Category

    Documents

  • view

    0
  • download

    0

Embed Size (px)

Transcript of Pedestrian crossing Stanley/Ballarat St - NZ Transport Agency · PDF file Subject: RE:...

  • 1

    From: Vanessa van Uden Sent: Tuesday, 15 September 2015 9:15 p.m. To: Tony Sizemore Subject: RE: Pedestrian crossing Stanley/Ballarat St Attachments: image001.jpg; image002.jpg; image003.jpg; image004.jpg

    Awesome ‐ than you for update.  Will have a think about media and will come back to you.  Cheers  V  ________________________________________  From: Tony Sizemore [Tony.Sizemore@nzta.govt.nz]  Sent: Tuesday, 15 September 2015 7:36 p.m.  To: Vanessa van Uden  Cc: Ian Duncan; Roy Johnston; Frances Adank; Michele Poole; Denis Mander  Subject: RE: Pedestrian crossing Stanley/Ballarat St    Hi Vanessa    Good news! The funding for the proposed signals at the Stanley/Ballarat St intersection has been approved by our  National Office safety team. Attached is the concept plan showing the proposed layout.    As discussed last week I have talked to  to let him know what we are  proposing. I had a very positive conversation with him and he is pleased that we have responded to    in  such a timely  manner. He supports the proposed improvements and has offered to help us with the comms,  particularly with the media. I have asked him not to talk to the media just yet until we have worked out a comms  strategy, which he has agreed to do. We will need to keep him in the loop though as his support will be helpful in  getting it across the line with the community. We have engaged Abley to undertake some further modelling which  can produce an animated video output which will also be helpful.    I think we should probably have an initial media release fairly soon; we just need to think about how we incorporate  the possibility of Shotover/Stanley intersection at the same time, although the funding for this is still not confirmed.  We will also need to consider the Camp/Ballarat intersection that Denis is working on. Let me know what you think  about timing of a media release.    Regards  Tony  __________________________________________________________    Tony Sizemore / Transport Planning Manager, Otago/Southland Highway & Network Operations DDI 64 3 955 2944 /  M 021 599 376 E tony.sizemore@nzta.govt.nz / W  nzta.govt.nz  Dunedin Office / Level 2, AA Centre  450 Moray Place, PO Box 5245, Dunedin 9058, New Zealand  __________________________________________________________    [cid:image001.jpg@01CF9D0D.2D7AEC40]                              [cid:image002.jpg@01CF9D0D.2D7AEC40]    [cid:image003.jpg@01CF9D0D.2D7AEC40]   

    carolr Typewritten Text 9(2)(a)

  • 2

    [cid:image004.jpg@01CF9D0D.2D7AEC40]           Find the latest transport news, information, and advice on our website:  http://scanmail.trustwave.com/?c=2838&d=puH31fzhHAcfQg‐b‐ j0R5CbZsmZKbKC39r_AVzRgCA&u=http%3a%2f%2fwww%2enzta%2egovt%2enz ________________________________  This email is only intended to be read by the named recipient.  It may contain information which is confidential,  proprietary or the subject of legal privilege.  If you are not the intended recipient you must delete this email and  may not use any information contained in it.  Legal privilege is not waived because you have read this email.  ________________________________