Pedestrian and Bicycle Master Plan Update Ad Hoc Advisory Committee May 14, 2015

Transcript of Pedestrian and Bicycle Master Plan Update · Master Plan Update Ad Hoc Advisory Committee May 14,...

Page 1: Pedestrian and Bicycle Master Plan Update · Master Plan Update Ad Hoc Advisory Committee May 14, 2015 . Agenda 2 . 1. Welcome and Introductions ... Draft Bicycle Network – Public

Pedestrian and Bicycle Master Plan Update Ad Hoc Advisory Committee May 14, 2015

Page 2: Pedestrian and Bicycle Master Plan Update · Master Plan Update Ad Hoc Advisory Committee May 14, 2015 . Agenda 2 . 1. Welcome and Introductions ... Draft Bicycle Network – Public

Agenda

2

1. Welcome and Introductions 2. Project Schedule Overview 3. Prioritization Follow Up 4. Draft Bicycle Network: East Alexandria 5. Pedestrian Case Studies Update 6. Public Comment 7. Committee Member Updates 8. Next Steps

Page 3: Pedestrian and Bicycle Master Plan Update · Master Plan Update Ad Hoc Advisory Committee May 14, 2015 . Agenda 2 . 1. Welcome and Introductions ... Draft Bicycle Network – Public

Project Schedule Overview

3

Page 4: Pedestrian and Bicycle Master Plan Update · Master Plan Update Ad Hoc Advisory Committee May 14, 2015 . Agenda 2 . 1. Welcome and Introductions ... Draft Bicycle Network – Public

Project Milestones/Tasks

Complete

Underway

Future Steps

Pedestrian Case Study Analysis

Data Collection

Existing Conditions

Issues/Needs

Policy Review

Connectivity Analysis

Develop Networks

Bike Share Analysis

Pedestrian Case Studies

Project evaluation criteria

Identify projects

Develop strategies

Prioritize projects/strategies

Develop costs/funding strategy

Update Master Plan chapter

Technical Appendices

Page 5: Pedestrian and Bicycle Master Plan Update · Master Plan Update Ad Hoc Advisory Committee May 14, 2015 . Agenda 2 . 1. Welcome and Introductions ... Draft Bicycle Network – Public

Project Milestones/Tasks

Pedestrian Case Study Analysis

Data Collection

Existing Conditions

Issues/Needs

Policy Review

Connectivity Analysis

Develop Networks

Bike Share Analysis

Pedestrian Case Studies

Project evaluation criteria

Identify projects

Develop strategies

Prioritize projects/strategies

Develop costs/funding strategy

Update Master Plan chapter

Technical Appendices

Ad Hoc Discussion, 5/14

Ad Hoc Discussion, 5/14

Page 6: Pedestrian and Bicycle Master Plan Update · Master Plan Update Ad Hoc Advisory Committee May 14, 2015 . Agenda 2 . 1. Welcome and Introductions ... Draft Bicycle Network – Public

Project Prioritization: Follow up

6

Page 7: Pedestrian and Bicycle Master Plan Update · Master Plan Update Ad Hoc Advisory Committee May 14, 2015 . Agenda 2 . 1. Welcome and Introductions ... Draft Bicycle Network – Public

Why Prioritize?

• Represents community values

• Lots of needs, but limited resources

• Need to make wise choices about how resources are used

• Need to communicate choices to others

• Need to build public/political support for action

• May be required for funding purposes

Page 8: Pedestrian and Bicycle Master Plan Update · Master Plan Update Ad Hoc Advisory Committee May 14, 2015 . Agenda 2 . 1. Welcome and Introductions ... Draft Bicycle Network – Public

Committee Input from 4/16 Meeting

Committee Input Changes Made A. Don’t over-emphasize

crash data

A. Included more safety variables besides crashes (diminishes the influence of crash data)

B. Rethink overlap in variables between Connectivity and Demand – may double count some data

B. Refined variables to eliminate overlap

C. Geography is important: plan must provide balance between east and west.

C. Increased weight of geography factor for west side. Will also review results and make changes as needed to ensure geographic balance.

D. Demand analysis should consider future growth areas.

D. Added projected (2040) population and employment as a variable.

Page 9: Pedestrian and Bicycle Master Plan Update · Master Plan Update Ad Hoc Advisory Committee May 14, 2015 . Agenda 2 . 1. Welcome and Introductions ... Draft Bicycle Network – Public

Weighting the Factors

Revised Weights: Factors Weight

1. Safety (places with existing safety issues/concerns)

5

2. Demand (current and future trip origins/destinations)

3

3. Geography (ensure projects in west side of city)

3

4. Connectivity (connections to existing bike lanes and paved trails)

2

Page 10: Pedestrian and Bicycle Master Plan Update · Master Plan Update Ad Hoc Advisory Committee May 14, 2015 . Agenda 2 . 1. Welcome and Introductions ... Draft Bicycle Network – Public

Example of Project Prioritization: Phoenix Bicycle Master Plan

• Started with 13 corridors, 190 projects • Identified factors, weights and variables based on

project goals

10

(5) (7)

Page 11: Pedestrian and Bicycle Master Plan Update · Master Plan Update Ad Hoc Advisory Committee May 14, 2015 . Agenda 2 . 1. Welcome and Introductions ... Draft Bicycle Network – Public

11

Example of Project Prioritization: Phoenix Bicycle Master Plan

Page 12: Pedestrian and Bicycle Master Plan Update · Master Plan Update Ad Hoc Advisory Committee May 14, 2015 . Agenda 2 . 1. Welcome and Introductions ... Draft Bicycle Network – Public

Draft Bicycle Network

12

Page 13: Pedestrian and Bicycle Master Plan Update · Master Plan Update Ad Hoc Advisory Committee May 14, 2015 . Agenda 2 . 1. Welcome and Introductions ... Draft Bicycle Network – Public

Draft Bicycle Network – Public Outreach and Planning Process

13

• Online survey and crowdsourcing map (over 800 responses) • Seven community meetings • Network shows connectivity, not specifically design projects,

planning level tool • Comments on the west side of the draft network (from 4/16 Ad

Hoc meeting) are being incorporated/addressed • High priority elements within network examined more closely, to

be included in the draft plan • Strategies to be reviewed by Ad Hoc Group Summer 2015

Page 14: Pedestrian and Bicycle Master Plan Update · Master Plan Update Ad Hoc Advisory Committee May 14, 2015 . Agenda 2 . 1. Welcome and Introductions ... Draft Bicycle Network – Public

Draft Bicycle Network

14

Bicycle Vision Statement: …The City provides a network of facilities that link important destinations and appeal to bicycle riders of different ages and abilities… Bicycle Facility Groups

• Enhanced Bicycle Corridor

• Shared Roadway • Trails

Specific designs will be determined case-by-case for future projects.

Page 15: Pedestrian and Bicycle Master Plan Update · Master Plan Update Ad Hoc Advisory Committee May 14, 2015 . Agenda 2 . 1. Welcome and Introductions ... Draft Bicycle Network – Public

Enhanced Bicycle Corridor

Buffered Bike Lanes 1-way Separated Bicycle Lane

2-way Separated Bicycle Lane

Sidepath

Page 16: Pedestrian and Bicycle Master Plan Update · Master Plan Update Ad Hoc Advisory Committee May 14, 2015 . Agenda 2 . 1. Welcome and Introductions ... Draft Bicycle Network – Public

Enhanced Bicycle Corridor

16

Standard Bicycle Lane

Painted Bike Lanes Advisory Bike Lane

Page 17: Pedestrian and Bicycle Master Plan Update · Master Plan Update Ad Hoc Advisory Committee May 14, 2015 . Agenda 2 . 1. Welcome and Introductions ... Draft Bicycle Network – Public

Shared Roadway

17

Shared Roadway Signed Route on Shared Roadway

Shared Lane Markings

Priority Shared Lane Markings

labikas.wordpress.com

Neighborhood Bikeway

Page 18: Pedestrian and Bicycle Master Plan Update · Master Plan Update Ad Hoc Advisory Committee May 14, 2015 . Agenda 2 . 1. Welcome and Introductions ... Draft Bicycle Network – Public

Trails

18

Page 19: Pedestrian and Bicycle Master Plan Update · Master Plan Update Ad Hoc Advisory Committee May 14, 2015 . Agenda 2 . 1. Welcome and Introductions ... Draft Bicycle Network – Public
Page 20: Pedestrian and Bicycle Master Plan Update · Master Plan Update Ad Hoc Advisory Committee May 14, 2015 . Agenda 2 . 1. Welcome and Introductions ... Draft Bicycle Network – Public

DRAFT

Page 21: Pedestrian and Bicycle Master Plan Update · Master Plan Update Ad Hoc Advisory Committee May 14, 2015 . Agenda 2 . 1. Welcome and Introductions ... Draft Bicycle Network – Public

21 Exis

tin

g B

icyc

le

Faci

litie

s: E

aste

rn

Ale

xan

dri

a

Page 22: Pedestrian and Bicycle Master Plan Update · Master Plan Update Ad Hoc Advisory Committee May 14, 2015 . Agenda 2 . 1. Welcome and Introductions ... Draft Bicycle Network – Public

22 Cit

y A

pp

rove

d P

lan

R

ecom

men

ded

Bic

ycle

Fa

cilit

ies:

Eas

tern

A

lexa

nd

ria

Page 23: Pedestrian and Bicycle Master Plan Update · Master Plan Update Ad Hoc Advisory Committee May 14, 2015 . Agenda 2 . 1. Welcome and Introductions ... Draft Bicycle Network – Public

23 20

08

Ped

estr

ian

Bic

ycle

M

obili

ty P

lan

R

ecom

men

ded

Bic

ycle

Fa

cilit

ies:

Eas

tern

A

lexa

nd

ria

Page 24: Pedestrian and Bicycle Master Plan Update · Master Plan Update Ad Hoc Advisory Committee May 14, 2015 . Agenda 2 . 1. Welcome and Introductions ... Draft Bicycle Network – Public

24 DR

AFT

Rec

omm

end

ed

Bic

ycle

Net

wor

k: E

aste

rn

Ale

xan

dri

a

Page 25: Pedestrian and Bicycle Master Plan Update · Master Plan Update Ad Hoc Advisory Committee May 14, 2015 . Agenda 2 . 1. Welcome and Introductions ... Draft Bicycle Network – Public

Committee Discussion: 1) East side: Are there areas or

destinations with missing connections?

25

Page 26: Pedestrian and Bicycle Master Plan Update · Master Plan Update Ad Hoc Advisory Committee May 14, 2015 . Agenda 2 . 1. Welcome and Introductions ... Draft Bicycle Network – Public

Pedestrian Case Studies Update

26

Page 27: Pedestrian and Bicycle Master Plan Update · Master Plan Update Ad Hoc Advisory Committee May 14, 2015 . Agenda 2 . 1. Welcome and Introductions ... Draft Bicycle Network – Public

Pedestrian Case Studies Areas

Page 28: Pedestrian and Bicycle Master Plan Update · Master Plan Update Ad Hoc Advisory Committee May 14, 2015 . Agenda 2 . 1. Welcome and Introductions ... Draft Bicycle Network – Public

Pedestrian Case Studies

CASE STUDIES: I-395 and Landmark

Mall

Hammond Middle

School Area

Duke Street Corridor

Mount Vernon Ave/

Four Mile Run

King Street Station

THEM

ES /

CH

ALL

ENG

ES

Major Barriers/Freeway Interchanges

Schools and Neighborhoods

Transit Access and Integration

Neighborhood Main Streets

Suburban Commercial Connectors

Trail/Roadway Transitions

Lack of connectivity around large apartment complexes/ commercial buildings Curb ramps/ADA upgrades

Maintenance of sidewalks

Sidewalk gaps and narrow sidewalks Conflicts between people walking and people biking

Page 29: Pedestrian and Bicycle Master Plan Update · Master Plan Update Ad Hoc Advisory Committee May 14, 2015 . Agenda 2 . 1. Welcome and Introductions ... Draft Bicycle Network – Public

Pedestrian Case Studies: Sample Map of Key Challenges/Issues

SAMPLE MAP

Page 30: Pedestrian and Bicycle Master Plan Update · Master Plan Update Ad Hoc Advisory Committee May 14, 2015 . Agenda 2 . 1. Welcome and Introductions ... Draft Bicycle Network – Public

SAMPLE MAP

Pedestrian Case Studies: Sample Map of Pedestrian Recommendations

Pedestrian Case Study

Recommendations

Page 31: Pedestrian and Bicycle Master Plan Update · Master Plan Update Ad Hoc Advisory Committee May 14, 2015 . Agenda 2 . 1. Welcome and Introductions ... Draft Bicycle Network – Public

Public Comment

31

Page 32: Pedestrian and Bicycle Master Plan Update · Master Plan Update Ad Hoc Advisory Committee May 14, 2015 . Agenda 2 . 1. Welcome and Introductions ... Draft Bicycle Network – Public

Committee Member Updates

32

Page 33: Pedestrian and Bicycle Master Plan Update · Master Plan Update Ad Hoc Advisory Committee May 14, 2015 . Agenda 2 . 1. Welcome and Introductions ... Draft Bicycle Network – Public

Next Steps

33

Late May 2014: Project Launch

June - Sept: Existing Conditions Analysis, Public Meeting #1

Early Spring 2015: Ad Hoc Meeting #5

Early Fall 2015: Public Meeting #2

Winter 2015: Completion

Sept - Dec: Needs Assessment, Goals & Objectives

Jan – June 2015: Strategies, Network, Focus Areas

Summer 2015: Draft Plan and Guidelines

Mid Spring 2015: Ad Hoc Meeting #6

Fall 2015: Ad Hoc Meeting #9

Early Summer 2015: Ad Hoc Meeting #7 / #8

Page 34: Pedestrian and Bicycle Master Plan Update · Master Plan Update Ad Hoc Advisory Committee May 14, 2015 . Agenda 2 . 1. Welcome and Introductions ... Draft Bicycle Network – Public

34

Thank You!

www.alexandriava.gov/pedbikeplan