PECAN ACRES RESETTLEMENT AUDUBON ESTATES LA. HIGHWAY 10 / HERON WAY POINTE COUPEE PARISH, LOUISIANA DESIGN PRESENTATION FEBRUARY 10, 2020

Transcript of PECAN ACRES RESETTLEMENTd2se92fabdh4cm.cloudfront.net/wp-content/uploads/2020/05/08142… · pointe...

Page 1: PECAN ACRES RESETTLEMENTd2se92fabdh4cm.cloudfront.net/wp-content/uploads/2020/05/08142… · pointe coupee parish, louisiana exterior elevation design diagram fortified roof approved

PECAN ACRES RESETTLEMENTAUDUBON ESTATES

LA. HIGHWAY 10 / HERON WAY

POINTE COUPEE PARISH, LOUISIANA

DESIGN PRESENTATION

FEBRUARY 10, 2020

Page 2: PECAN ACRES RESETTLEMENTd2se92fabdh4cm.cloudfront.net/wp-content/uploads/2020/05/08142… · pointe coupee parish, louisiana exterior elevation design diagram fortified roof approved

PECAN ACRES RESETTLEMENTPOINTE COUPEE PARISH, LOUISIANA

DESIGN CHARRETTE / RESIDENT FEEDBACKSeptember 11, 2019

Page 3: PECAN ACRES RESETTLEMENTd2se92fabdh4cm.cloudfront.net/wp-content/uploads/2020/05/08142… · pointe coupee parish, louisiana exterior elevation design diagram fortified roof approved

PECAN ACRES RESETTLEMENTPOINTE COUPEE PARISH, LOUISIANA

OPTION A - 1454 SQUARE FEET OPTION B - 1456 SQUARE FEET

FLOOR PLAN - 3 BEDROOM/2 BATH

BEDROOM11’-0” X 10’-1”

BEDROOM11’-5” X 10’-1”

BEDROOM13’-0” X 14’-3”

PORCH21’-0” X 6’-0”

DINING/LIVING20’-3” X 13’-6”

BATH

HALL UTILITY

KITCHEN

BATH

CLOS.CLO.

LIN.CLO.

CLOS.

CLOS.LIN.

AC

PAN.

WH

CARPORT13’-0” X 21’-0”

BEDROOM11’-5” X 12’-11”

BEDROOM13’-0” X 13’-9”

DINING/LIVING20’-3” X 13’-0”

PORCH21’-0” X 6’-0”

BEDROOM12’-6” X 10’-1”

CARPORT13’-0” X 21’-0”

UTILITY

KITCHEN

HALL

BATH

LIN.

LIN. CLO.

CLOS.

CLOS.

AC WH

PAN.

CLO.

CLOS.

LIN.

BATH

RAMP(AS REQ’D.)

RAMP(AS REQ’D.)

Page 4: PECAN ACRES RESETTLEMENTd2se92fabdh4cm.cloudfront.net/wp-content/uploads/2020/05/08142… · pointe coupee parish, louisiana exterior elevation design diagram fortified roof approved

PECAN ACRES RESETTLEMENTPOINTE COUPEE PARISH, LOUISIANA

OPTION A - 1589 SQUARE FEET OPTION B - 1637 SQUARE FEET

FLOOR PLAN - 4 BEDROOM/2 BATH

BEDROOM11’-0” X 10’-1”

BEDROOM11’-5” X 10’-1”

BEDROOM13’-0” X 14’-3”

PORCH21’-0” X 6’-0”

DINING/LIVING20’-3” X 13’-6”

HALL UTILITY

KITCHEN

CLOS.CLO.

CLOS.

CLOS.LIN.

CARPORT13’-0” X 21’-0”

AC

PAN.

WH

BEDROOM12’-6” X 10’-1”

BATH

LIN.CLO.

BEDROOM11’-5” X 12’-11”

BEDROOM13’-0” X 13’-9”

CLOS.

CLOS.

LIN.

BATH

DINING/LIVING20’-3” X 13’-0”

PORCH21’-0” X 6’-0”

CARPORT13’-0” X 21’-0”

KITCHEN

AC WH

HALL

BATH

LIN.

CLO.

CLO. CLO.

UTILITY BEDROOM10’-1” X 11’-0”

BEDROOM10’-1” X 11’-0”

RAMP(AS REQ’D.)

RAMP(AS REQ’D.)

Page 5: PECAN ACRES RESETTLEMENTd2se92fabdh4cm.cloudfront.net/wp-content/uploads/2020/05/08142… · pointe coupee parish, louisiana exterior elevation design diagram fortified roof approved

PECAN ACRES RESETTLEMENTPOINTE COUPEE PARISH, LOUISIANA

INTERIOR COLOR SCHEME RENDERINGS

OFF WHITE / MEDIUM GRANITE SCHEME TAUPE / LIGHT GRANITE SCHEME WHITE / DARK GRANITE SCHEME

Page 6: PECAN ACRES RESETTLEMENTd2se92fabdh4cm.cloudfront.net/wp-content/uploads/2020/05/08142… · pointe coupee parish, louisiana exterior elevation design diagram fortified roof approved

PECAN ACRES RESETTLEMENTPOINTE COUPEE PARISH, LOUISIANA

EXTERIOR ELEVATION DESIGN DIAGRAM

Page 7: PECAN ACRES RESETTLEMENTd2se92fabdh4cm.cloudfront.net/wp-content/uploads/2020/05/08142… · pointe coupee parish, louisiana exterior elevation design diagram fortified roof approved

PECAN ACRES RESETTLEMENTPOINTE COUPEE PARISH, LOUISIANA

EXTERIOR ELEVATION DESIGN DIAGRAM FINISH FLOOR SETABOVE MINIMUMELEVATION

MASONRY PIERS

Page 8: PECAN ACRES RESETTLEMENTd2se92fabdh4cm.cloudfront.net/wp-content/uploads/2020/05/08142… · pointe coupee parish, louisiana exterior elevation design diagram fortified roof approved

PECAN ACRES RESETTLEMENTPOINTE COUPEE PARISH, LOUISIANA

EXTERIOR ELEVATION DESIGN DIAGRAM

FIBER CEMENT SIDING, TRIM & COLUMNS

FINISH FLOOR SETABOVE MINIMUMELEVATION

MASONRY PIERS

BRICK PIERS ATPORCH / CARPORT

Page 9: PECAN ACRES RESETTLEMENTd2se92fabdh4cm.cloudfront.net/wp-content/uploads/2020/05/08142… · pointe coupee parish, louisiana exterior elevation design diagram fortified roof approved

PECAN ACRES RESETTLEMENTPOINTE COUPEE PARISH, LOUISIANA

EXTERIOR ELEVATION DESIGN DIAGRAM

FORTIFIED ROOFAPPROVED ASPHALT SHINGLE ROOFINGSYSTEM

ENERGY STAR APPROVEDINSULATED, VINYLWINDOWS

FINISH FLOOR SETABOVE MINIMUMELEVATION

MASONRY PIERS

FIBER CEMENT SIDING, TRIM & COLUMNS

BRICK PIERS ATPORCH / CARPORT

Page 10: PECAN ACRES RESETTLEMENTd2se92fabdh4cm.cloudfront.net/wp-content/uploads/2020/05/08142… · pointe coupee parish, louisiana exterior elevation design diagram fortified roof approved

PECAN ACRES RESETTLEMENTPOINTE COUPEE PARISH, LOUISIANA

EXTERIOR ELEVATION DESIGN DIAGRAM

FORTIFIED ROOFAPPROVED ASPHALT SHINGLE ROOFINGSYSTEM

FIBERGLASS DOORWITH INSULATED GLASS

ENERGY STAR APPROVEDINSULATED, VINYLWINDOWS

CELLULAR PVCRAILING

FINISH FLOOR SETABOVE MINIMUMELEVATION

MASONRY PIERS

FIBER CEMENT SIDING, TRIM & COLUMNS

BRICK PIERS ATPORCH / CARPORT

Page 11: PECAN ACRES RESETTLEMENTd2se92fabdh4cm.cloudfront.net/wp-content/uploads/2020/05/08142… · pointe coupee parish, louisiana exterior elevation design diagram fortified roof approved

PECAN ACRES RESETTLEMENTPOINTE COUPEE PARISH, LOUISIANA

EXTERIOR ELEVATION DESIGN DIAGRAM

FORTIFIED ROOFAPPROVED ASPHALT SHINGLE ROOFINGSYSTEM

CELLULAR PVC DECORATIVE ELEMENTS

VINYL LATTICEENCLOSURE

ENERGY STAR APPROVEDINSULATED, VINYLWINDOWS

CELLULAR PVCRAILING

FINISH FLOOR SETABOVE MINIMUMELEVATION

MASONRY PIERS

FIBER CEMENT SIDING, TRIM & COLUMNS

BRICK PIERS ATPORCH / CARPORT

FIBERGLASS DOORWITH INSULATED GLASS

Page 12: PECAN ACRES RESETTLEMENTd2se92fabdh4cm.cloudfront.net/wp-content/uploads/2020/05/08142… · pointe coupee parish, louisiana exterior elevation design diagram fortified roof approved

PECAN ACRES RESETTLEMENTPOINTE COUPEE PARISH, LOUISIANA

EXTERIOR ELEVATION DESIGN DIAGRAM

FORTIFIED ROOFAPPROVED ASPHALT SHINGLE ROOFINGSYSTEM

CELLULAR PVC DECORATIVE ELEMENTS

VINYL LATTICEENCLOSURE

ENERGY STAR APPROVEDINSULATED, VINYLWINDOWS

CELLULAR PVCRAILING

FINISH FLOOR SETABOVE MINIMUMELEVATION

MASONRY PIERS

FIBER CEMENT SIDING, TRIM & COLUMNS

BRICK PIERS ATPORCH / CARPORT

DURABLE

LOW MAINTENANCE

ENERGY EFFICIENT

FIBERGLASS DOORWITH INSULATED GLASS

Page 13: PECAN ACRES RESETTLEMENTd2se92fabdh4cm.cloudfront.net/wp-content/uploads/2020/05/08142… · pointe coupee parish, louisiana exterior elevation design diagram fortified roof approved

PECAN ACRES RESETTLEMENTPOINTE COUPEE PARISH, LOUISIANA

EXTERIOR ELEVATIONS – OPTION 1

PLAN A NEUTRAL SCHEME COLOR SCHEME

PLAN B NEUTRAL SCHEME COLOR SCHEME

Page 14: PECAN ACRES RESETTLEMENTd2se92fabdh4cm.cloudfront.net/wp-content/uploads/2020/05/08142… · pointe coupee parish, louisiana exterior elevation design diagram fortified roof approved

PECAN ACRES RESETTLEMENTPOINTE COUPEE PARISH, LOUISIANA

EXTERIOR ELEVATIONS – OPTION 2

PLAN A NEUTRAL SCHEME COLOR SCHEME

PLAN B NEUTRAL SCHEME COLOR SCHEME

Page 15: PECAN ACRES RESETTLEMENTd2se92fabdh4cm.cloudfront.net/wp-content/uploads/2020/05/08142… · pointe coupee parish, louisiana exterior elevation design diagram fortified roof approved

PECAN ACRES RESETTLEMENTPOINTE COUPEE PARISH, LOUISIANA

EXTERIOR ELEVATIONS – OPTION 3

PLAN A NEUTRAL SCHEME COLOR SCHEME

PLAN B NEUTRAL SCHEME COLOR SCHEME

Page 16: PECAN ACRES RESETTLEMENTd2se92fabdh4cm.cloudfront.net/wp-content/uploads/2020/05/08142… · pointe coupee parish, louisiana exterior elevation design diagram fortified roof approved

PECAN ACRES RESETTLEMENTPOINTE COUPEE PARISH, LOUISIANA

EXTERIOR ELEVATIONS – OPTION 4

PLAN A NEUTRAL SCHEME COLOR SCHEME

PLAN B NEUTRAL SCHEME COLOR SCHEME

Page 17: PECAN ACRES RESETTLEMENTd2se92fabdh4cm.cloudfront.net/wp-content/uploads/2020/05/08142… · pointe coupee parish, louisiana exterior elevation design diagram fortified roof approved

PECAN ACRES RESETTLEMENTPOINTE COUPEE PARISH, LOUISIANA

EXTERIOR ELEVATIONS – OPTION 5

PLAN A NEUTRAL SCHEME COLOR SCHEME

PLAN B NEUTRAL SCHEME COLOR SCHEME

Page 18: PECAN ACRES RESETTLEMENTd2se92fabdh4cm.cloudfront.net/wp-content/uploads/2020/05/08142… · pointe coupee parish, louisiana exterior elevation design diagram fortified roof approved

PECAN ACRES RESETTLEMENTPOINTE COUPEE PARISH, LOUISIANA

EXTERIOR ELEVATIONS – 20 DIFFERENT OPTIONS

Page 19: PECAN ACRES RESETTLEMENTd2se92fabdh4cm.cloudfront.net/wp-content/uploads/2020/05/08142… · pointe coupee parish, louisiana exterior elevation design diagram fortified roof approved

PECAN ACRES RESETTLEMENTPOINTE COUPEE PARISH, LOUISIANA

AERIAL RENDERING FROM DESIGN CHARRETTE

Page 20: PECAN ACRES RESETTLEMENTd2se92fabdh4cm.cloudfront.net/wp-content/uploads/2020/05/08142… · pointe coupee parish, louisiana exterior elevation design diagram fortified roof approved

PECAN ACRES RESETTLEMENTPOINTE COUPEE PARISH, LOUISIANA

SITE PLAN

WILDFLOWER

MEADOWWILDFLOWER

MEADOW

STORM WATER

MANAGEMENT

POND

THE GROVE THE GREENHERON WAY THE POND

WALKING

PATH

THE GROVE THE GREENHERON WAY THE POND

WALKING

PATH

Page 21: PECAN ACRES RESETTLEMENTd2se92fabdh4cm.cloudfront.net/wp-content/uploads/2020/05/08142… · pointe coupee parish, louisiana exterior elevation design diagram fortified roof approved

PECAN ACRES RESETTLEMENTPOINTE COUPEE PARISH, LOUISIANA

VIEW LOOKING AT THE GROVE AND HERON WAY

Page 22: PECAN ACRES RESETTLEMENTd2se92fabdh4cm.cloudfront.net/wp-content/uploads/2020/05/08142… · pointe coupee parish, louisiana exterior elevation design diagram fortified roof approved

PECAN ACRES RESETTLEMENTPOINTE COUPEE PARISH, LOUISIANA

VIEW LOOKING DOWN HERON WAY FROM LA 10 ENTRY

Page 23: PECAN ACRES RESETTLEMENTd2se92fabdh4cm.cloudfront.net/wp-content/uploads/2020/05/08142… · pointe coupee parish, louisiana exterior elevation design diagram fortified roof approved