PEB construction-Mukesh Bhavsar

20
SEMINAR ON PRE ENGINEERED BUILDINGSConcept , Design & Construction BY- Bahadur Guide- Mukesh Bhavsar

description

PEB construction have lot of advantages over conventional RCC structures or other industrial buildings.

Transcript of PEB construction-Mukesh Bhavsar

Page 1: PEB construction-Mukesh Bhavsar

SEMINAR ON “PRE ENGINEERED BUILDINGS”

Concept , Design &Construction

BY- BahadurGuide- Mukesh Bhavsar

Page 2: PEB construction-Mukesh Bhavsar

INTRODUCTION

Pre-Engineered Buildings can be adapted to suit a wide variety of structural applications, the greatest economy will be realized when utilizing standard details. An efficiently designed Pre-Engineered Building can be lighter that the conventional steel buildings by up to 30%.

Tailor made building based on client’s requirement & actual design calculations using tapered sections.

Designing and casting is done in factory, building components are brought to site then fixed/jointed at the site. All connections are bolted.

Page 3: PEB construction-Mukesh Bhavsar

These are the structures basically produced at the factory with high tensile steel material by collecting complete information of the shed/building (viz; Length, Width, Height etc,).

The entire design of column, rafters and other accessories is based on International structural standards and involve high technical welding and quality production.

Video- How drawing is drawn using STRUCAD?

Page 4: PEB construction-Mukesh Bhavsar

Insulation (PEBI) Uniformly textured inorganic glass fibers bonded together

by a non-water soluble and fire-retardant thermosetting resin. It is free from coarse fibers and shot due to its mineral composition.

PEBI is non-toxic and not hazardous to health.

Page 5: PEB construction-Mukesh Bhavsar
Page 6: PEB construction-Mukesh Bhavsar

Design Criteria DESIGN METHOD: Allowable stress design method is

used as per the AISC specifications.

DEFLECTIONS: Unless otherwise specified, the deflections will go to MBMA, AISC criteria and standard industry practices.

PRIMARY FRAMING: Moment resisting frames with pinned or fixed bases.

Page 7: PEB construction-Mukesh Bhavsar

SECONDARY FRAMING: Cold formed Z sections or C sections for purlins or girts designed as continuous beams spanning over rafters and columns with laps.

LONGITUDANAL STABILITY: Wind load on building end walls is transferred through roof purlins to braced bays and carried to the foundations through diagonal bracing.

DESIGN SOFTWARE

The latest software that is used for design is STAAD 2007.

Page 8: PEB construction-Mukesh Bhavsar

ERECTION SYSTEMERECTION SYSTEM

Preparation for ErectionPreparation for Erection1.1. Pre Erection checksPre Erection checks2.2. Receiving Materials at siteReceiving Materials at site3.3. Unloading ContainersUnloading Containers

Erection of the FramingErection of the Framing1.1. Preparation of the First BayPreparation of the First Bay2.2. Main framesMain frames3.3. Mezzanine floorsMezzanine floors4.4. Crane BeamsCrane Beams

Page 9: PEB construction-Mukesh Bhavsar

Sheeting & TrimmingSheeting & Trimming

Sheeting preparationSheeting preparation

Sheeting the wallsSheeting the walls

Sheeting the roofsSheeting the roofs

Miscellaneous trimmingsMiscellaneous trimmings

FasciaFascia

Page 10: PEB construction-Mukesh Bhavsar

Self weight Self weight

30% lighter30% lighter Primary Member is Primary Member is

tapered sectiontapered section Secondary members Secondary members

are light weight rolled are light weight rolled framed “Z” and “C” framed “Z” and “C” sectionsection

Self weightSelf weight

More heavyMore heavy Primary members are Primary members are

Hot rolled “I” sectionHot rolled “I” section Secondary members are Secondary members are

“I” or “C” section “I” or “C” section which are heavy in which are heavy in weight.weight.

Page 11: PEB construction-Mukesh Bhavsar

Delivery – average 6 to 8 Delivery – average 6 to 8 weeksweeks

Foundation-simple design, Foundation-simple design, easy to construct & light easy to construct & light wt.wt.

Erection cost and time- Erection cost and time- accurately knownaccurately known

Delivery- average 20 to Delivery- average 20 to 26 weeks26 weeks

Foundation- expensive, Foundation- expensive, heavy foundation heavy foundation required.required.

Erection cost and time- Erection cost and time- 20% more than PEB20% more than PEB

Page 12: PEB construction-Mukesh Bhavsar

Overall price -30%lowerOverall price -30%lower Architecture-achieved at Architecture-achieved at

low costlow cost Erection process is easy, Erection process is easy,

fast, step by stepfast, step by step

Overall price - Higher Overall price - Higher price per square meter.price per square meter.

Architecture- achieved at Architecture- achieved at higher costhigher cost

Erection process is slow Erection process is slow and extensive field labor and extensive field labor is required.is required.

Page 13: PEB construction-Mukesh Bhavsar

PRE ENGINEERED BUILDING vs CONCRETE BUILDINGS

Page 14: PEB construction-Mukesh Bhavsar

APPLICATIONS

Industrial BuildingsIndustrial Buildings WarehousesWarehouses Commercial ComplexesCommercial Complexes ShowroomsShowrooms OfficesOffices SchoolsSchools Indoor StadiumsIndoor Stadiums Outdoor Stadiums with canopiesOutdoor Stadiums with canopies Gas StationsGas Stations Metro Stations, Bus Terminals, Parking LotsMetro Stations, Bus Terminals, Parking Lots Primary Health Centers, Angan wadi’sPrimary Health Centers, Angan wadi’s And many more…And many more…

Page 15: PEB construction-Mukesh Bhavsar

Industrial Industrial BuildingBuilding

Parking lotsParking lots

Indoor StadiumsIndoor Stadiums

Railway StationRailway Station

Page 16: PEB construction-Mukesh Bhavsar

Aircraft HangarsAircraft Hangars Metro StationMetro Station

Wear houseWear house High rise BuildingHigh rise Building

Page 17: PEB construction-Mukesh Bhavsar

ADVANTAGES

Aesthetic AppealAesthetic Appeal Faster CompletionFaster Completion EconomicalEconomical Seismic ResistanceSeismic Resistance Ease of ExpansionEase of Expansion Maintenance FreeMaintenance Free Large Clear SpansLarge Clear Spans Controlled QualityControlled Quality

Page 18: PEB construction-Mukesh Bhavsar

CONCLUSION

PEB concept has been very successful and well established in North America, Australia and is presently expanding in U.K and European countries. PEB construction is 30 to 40% faster than masonary construction. PEB buildings provide good insulation effect and would be highly suitable for a tropical country like India.

The pre-engineered building calls for very fast construction of buildings and with good aesthetic looks and quality construction. Pre-engineered Buildings can be used extensively for construction of industrial and residential buildings.

Page 19: PEB construction-Mukesh Bhavsar

REFERENCES

Various websites from internet PEB project Vigyan Ashram, Pabal

Page 20: PEB construction-Mukesh Bhavsar

Thank You!