Metrics for New Product Development:
Leveraging the Works of Others
![Page 2: Pdma Product Development Metrics May 2000](https://reader033.fdocuments.net/reader033/viewer/2022060117/5585a354d8b42a7b1a8b4844/html5/thumbnails/2.jpg)
Background• A billion $ company
•The World Leader in Electronic Security•Over 5700 employees worldwide
![Page 3: Pdma Product Development Metrics May 2000](https://reader033.fdocuments.net/reader033/viewer/2022060117/5585a354d8b42a7b1a8b4844/html5/thumbnails/3.jpg)
Growth•Founded in 1966•1976 - 10 million in revenue•1986 - 100 million•1996 - 1 billion
![Page 4: Pdma Product Development Metrics May 2000](https://reader033.fdocuments.net/reader033/viewer/2022060117/5585a354d8b42a7b1a8b4844/html5/thumbnails/4.jpg)
Outgrew Systems & Processes
•Product Development slowed down
•Quality issues rose
![Page 5: Pdma Product Development Metrics May 2000](https://reader033.fdocuments.net/reader033/viewer/2022060117/5585a354d8b42a7b1a8b4844/html5/thumbnails/5.jpg)
•Teams were established •Investments were made in systems
•Positive impact
System & Program Initiatives
![Page 6: Pdma Product Development Metrics May 2000](https://reader033.fdocuments.net/reader033/viewer/2022060117/5585a354d8b42a7b1a8b4844/html5/thumbnails/6.jpg)
But It Wasn’t Enough!
![Page 7: Pdma Product Development Metrics May 2000](https://reader033.fdocuments.net/reader033/viewer/2022060117/5585a354d8b42a7b1a8b4844/html5/thumbnails/7.jpg)
Sensormatic’s Journey To New
Product DevelopmentSuccess!
![Page 8: Pdma Product Development Metrics May 2000](https://reader033.fdocuments.net/reader033/viewer/2022060117/5585a354d8b42a7b1a8b4844/html5/thumbnails/8.jpg)
Roadmap•Borrowing approaches
•Assessment, project selection, implementation
•Key Metrics
•A metrics toolkit
![Page 9: Pdma Product Development Metrics May 2000](https://reader033.fdocuments.net/reader033/viewer/2022060117/5585a354d8b42a7b1a8b4844/html5/thumbnails/9.jpg)
Inspirations & New Goals
![Page 10: Pdma Product Development Metrics May 2000](https://reader033.fdocuments.net/reader033/viewer/2022060117/5585a354d8b42a7b1a8b4844/html5/thumbnails/10.jpg)
TTM Process (structured team-based problem solving)
Motorola’s Six-Sigma Program
Design for Manufacturability Program
Xerox-based Baldridge Award criteria
![Page 11: Pdma Product Development Metrics May 2000](https://reader033.fdocuments.net/reader033/viewer/2022060117/5585a354d8b42a7b1a8b4844/html5/thumbnails/11.jpg)
Assessment[Where are we?]
![Page 12: Pdma Product Development Metrics May 2000](https://reader033.fdocuments.net/reader033/viewer/2022060117/5585a354d8b42a7b1a8b4844/html5/thumbnails/12.jpg)
Self-Assessment of Development Processes
Mechanical CAD Industrial Design
Rapid Prototyping
Electrical Analysis
Technical Communications
![Page 13: Pdma Product Development Metrics May 2000](https://reader033.fdocuments.net/reader033/viewer/2022060117/5585a354d8b42a7b1a8b4844/html5/thumbnails/13.jpg)
Needed Improvement•Integrating advanced manufacturing & procurement into design
•Use metrics to drive everyday activities
•Create a problem management system
•Include more quality metrics
![Page 14: Pdma Product Development Metrics May 2000](https://reader033.fdocuments.net/reader033/viewer/2022060117/5585a354d8b42a7b1a8b4844/html5/thumbnails/14.jpg)
Product Quality Baseline•4% Out-of-box failures•1 in 4 failed final factory tests•8% monthly warranty call rate
![Page 15: Pdma Product Development Metrics May 2000](https://reader033.fdocuments.net/reader033/viewer/2022060117/5585a354d8b42a7b1a8b4844/html5/thumbnails/15.jpg)
Development Cycle Data Gathering
•Development programs overran schedules because they were under-resourced, poorly defined and not schedule-managed.
•A team was formed
•We were not learning from our mistakes
![Page 16: Pdma Product Development Metrics May 2000](https://reader033.fdocuments.net/reader033/viewer/2022060117/5585a354d8b42a7b1a8b4844/html5/thumbnails/16.jpg)
Selection Criteria[What Do We Tackle First?]
![Page 17: Pdma Product Development Metrics May 2000](https://reader033.fdocuments.net/reader033/viewer/2022060117/5585a354d8b42a7b1a8b4844/html5/thumbnails/17.jpg)
ChampionsProduct Delivery Council (PDC)
Continuous Improvement Advisory Council (CIAC)
![Page 18: Pdma Product Development Metrics May 2000](https://reader033.fdocuments.net/reader033/viewer/2022060117/5585a354d8b42a7b1a8b4844/html5/thumbnails/18.jpg)
Few Programs Selected
![Page 19: Pdma Product Development Metrics May 2000](https://reader033.fdocuments.net/reader033/viewer/2022060117/5585a354d8b42a7b1a8b4844/html5/thumbnails/19.jpg)
•Self-Assessment score
Criteria Included:
•Cycle time reduction
•Product quality•Cost of implementation•Resources/skills available•Ease of implementation•Timeframe
![Page 20: Pdma Product Development Metrics May 2000](https://reader033.fdocuments.net/reader033/viewer/2022060117/5585a354d8b42a7b1a8b4844/html5/thumbnails/20.jpg)
Implementation
![Page 21: Pdma Product Development Metrics May 2000](https://reader033.fdocuments.net/reader033/viewer/2022060117/5585a354d8b42a7b1a8b4844/html5/thumbnails/21.jpg)
Organizational Changes
•Product Delivery Teams were created
•Combined core team members
![Page 22: Pdma Product Development Metrics May 2000](https://reader033.fdocuments.net/reader033/viewer/2022060117/5585a354d8b42a7b1a8b4844/html5/thumbnails/22.jpg)
Temporary Teams Formed
•Rapid Action Teams (RAT’s)•Continuous Improvement Teams (CIT)
![Page 23: Pdma Product Development Metrics May 2000](https://reader033.fdocuments.net/reader033/viewer/2022060117/5585a354d8b42a7b1a8b4844/html5/thumbnails/23.jpg)
Requirements for both RAT’s & CIT’s
•Charters (including ROI)
•Executive Sponsor
•Trained, independent facilitator
![Page 24: Pdma Product Development Metrics May 2000](https://reader033.fdocuments.net/reader033/viewer/2022060117/5585a354d8b42a7b1a8b4844/html5/thumbnails/24.jpg)
Recognition & Reward of team efforts
•Badge pins and promotional items
•Quest competition
•Trips and more!
![Page 25: Pdma Product Development Metrics May 2000](https://reader033.fdocuments.net/reader033/viewer/2022060117/5585a354d8b42a7b1a8b4844/html5/thumbnails/25.jpg)
Our New Toolkit•Product Quality Data & Benchmarking
•New Product DFM•Development Process Self-Assessment
•TTM 7-step Continuous Improvement Process
![Page 26: Pdma Product Development Metrics May 2000](https://reader033.fdocuments.net/reader033/viewer/2022060117/5585a354d8b42a7b1a8b4844/html5/thumbnails/26.jpg)
Product Quality Data & Benchmarking
We needed measurable and justifiable
targets for new product quality
![Page 27: Pdma Product Development Metrics May 2000](https://reader033.fdocuments.net/reader033/viewer/2022060117/5585a354d8b42a7b1a8b4844/html5/thumbnails/27.jpg)
TDPU
.027
95%
90%
97.3%**
Industry AverageTarget Range -Old Products
100%
PLANT FPY*
Source: Industry Week 1998 World Class Performance Metrics
Best in ClassTarget Range - New Products
Below Industry Average
0
.05
.1
Plant Benchmark
*First pass yield**True BIC=99.7% Median BIC= 97.3%
![Page 28: Pdma Product Development Metrics May 2000](https://reader033.fdocuments.net/reader033/viewer/2022060117/5585a354d8b42a7b1a8b4844/html5/thumbnails/28.jpg)
2.6K
14.9K
1K
Industry Average
PPM
Out of Box Benchmarks
Source: Industry Week 1997 Benchmark Electronic Equipment companies over 1000 employees
Best in Class
Target Old Products
Target New Products
![Page 29: Pdma Product Development Metrics May 2000](https://reader033.fdocuments.net/reader033/viewer/2022060117/5585a354d8b42a7b1a8b4844/html5/thumbnails/29.jpg)
15K
4.2K
Industry Average
Target - New Products
MTBF = 5 Years(18% Annual failure rate)
MTBF = 20 Years(5% Annual failure rate)
Warranty Benchmarks
Monthly PPM
Best in Class
![Page 30: Pdma Product Development Metrics May 2000](https://reader033.fdocuments.net/reader033/viewer/2022060117/5585a354d8b42a7b1a8b4844/html5/thumbnails/30.jpg)
95%
90%
97.3%
100%
PLANT FPY*
Best in ClassTarget Range - New Products
TDPU
0
.027
.05
.1
1 YEAR
Plant Benchmark — New Product Introductions
*First pass yield
![Page 31: Pdma Product Development Metrics May 2000](https://reader033.fdocuments.net/reader033/viewer/2022060117/5585a354d8b42a7b1a8b4844/html5/thumbnails/31.jpg)
2600
1K
Best In Class
PPM
Out of Box Targets — New Product Introductions*
Target New Products3939 34% Reduction
6 Months *NPI curve developed by Dell
![Page 32: Pdma Product Development Metrics May 2000](https://reader033.fdocuments.net/reader033/viewer/2022060117/5585a354d8b42a7b1a8b4844/html5/thumbnails/32.jpg)
4.2K
1K
PPM
Target New Products5.6K 25% Reduction
Warranty Targets — New Product Introductions
6 Months
Best In Class
![Page 33: Pdma Product Development Metrics May 2000](https://reader033.fdocuments.net/reader033/viewer/2022060117/5585a354d8b42a7b1a8b4844/html5/thumbnails/33.jpg)
New Product DFM…(Preferred fastener set)
Number of total fasteners in the system 4000Number of fasteners active in the system 1200
Number of fasteners in original Preferred Set 74
Date Preferred Set was implemented July 1, 1998Number of additions to the Set 2
Number of one-time exemptions to the Set 14
![Page 34: Pdma Product Development Metrics May 2000](https://reader033.fdocuments.net/reader033/viewer/2022060117/5585a354d8b42a7b1a8b4844/html5/thumbnails/34.jpg)
Development Process Self-Assessment
![Page 35: Pdma Product Development Metrics May 2000](https://reader033.fdocuments.net/reader033/viewer/2022060117/5585a354d8b42a7b1a8b4844/html5/thumbnails/35.jpg)
Rating Results Approach Pervasiveness
1 Anecdotal or generalizationor guess
Anecdotal, no system evidentor documented
Anecdotal, isolated, may notbe true at all levels
2 Sporadic trends Sloppy or over bureaucratic Theory not practice
3 Some positive trends insome of the areas deployed
Beginnings of systematicprevention basis (or process)
Some core areas of business management or employees
work the problem Process is being used where
it’s supposed to be
4 Positive trends in mostmajor areas
Evidence that some resultsare caused by approach(achieving desired results)
Measuring (metrics)Success criteria established(measurements can includesurveys)
Sound, systematic preventionthat includes evaluation /improvement cycles
Some evidence of integrationinto management process
Core areas of business Management or employees
work the problem Closed loop process is
universally used. Some evidence that results
are linked to rewards
5 Good in major areas Positive trends from some to
many areas Evidence that most results
are caused by approach
Sound, systematic preventionbasis with some evidence ofrefinement through evaluationor improvement cycles(Process not stagnate,continuos improvement)
Sound evidence of integrationinto management process
Core areas of business, plussome support areas
6 Good to excellent in majorareas
Clear evidence that mostresults are caused byapproach
Good integration (withsuppliers, customers, stakeholders).
Evidence of benchmarkingworld class processes at othercompanies
From some to many supportareas
7 Excellent (world class)results in major areas
Good to excellent in supportareas
Sustained result (2-5 years)
Sound, systematic preventionbasis refined throughevaluation/improvement cycles
Excellent integration Use of lessons learned Continuous benchmarking
world class processes
Core areas and support areas Full deployment (fully
integrated into SRMbusiness processes)
Management, employees andcustomers work the problem
![Page 36: Pdma Product Development Metrics May 2000](https://reader033.fdocuments.net/reader033/viewer/2022060117/5585a354d8b42a7b1a8b4844/html5/thumbnails/36.jpg)
TTM 7-Step Continuous Improvement Process
![Page 37: Pdma Product Development Metrics May 2000](https://reader033.fdocuments.net/reader033/viewer/2022060117/5585a354d8b42a7b1a8b4844/html5/thumbnails/37.jpg)
![Page 38: Pdma Product Development Metrics May 2000](https://reader033.fdocuments.net/reader033/viewer/2022060117/5585a354d8b42a7b1a8b4844/html5/thumbnails/38.jpg)
![Page 39: Pdma Product Development Metrics May 2000](https://reader033.fdocuments.net/reader033/viewer/2022060117/5585a354d8b42a7b1a8b4844/html5/thumbnails/39.jpg)
Our Metrics Roadmap
•Existing Product Quality•New Product DFM•Development Process Self-Assessment•Development Cycle Time•New Products Released•Financial (% of revenue from new products)
![Page 40: Pdma Product Development Metrics May 2000](https://reader033.fdocuments.net/reader033/viewer/2022060117/5585a354d8b42a7b1a8b4844/html5/thumbnails/40.jpg)
Existing Product QualityJune 1997 actual
June 1999 goal
Targeted % reduction
June 1999 actual
January 2000 actual
January 2000 % reduction
Warranty 83 dpm 37 dpm 58 28.8 dpm 11.2 dpm 87%Out-of-Box 41 dpm 4 dpm 90% 25.3 dpm 6.8 dpm 83%Factory .242 dpu .037 dpu 90% .070 dpm .048 dpm 80%
![Page 41: Pdma Product Development Metrics May 2000](https://reader033.fdocuments.net/reader033/viewer/2022060117/5585a354d8b42a7b1a8b4844/html5/thumbnails/41.jpg)
New Product DFM
Design for Manufacturability
SpeedDome SpeedDomeUltra
Mechanical parts 59 20Cables 9 5Fasteners 63 9Adjustments 5 1
Standalone UltraPostMechanical parts 69 18Cables 28 5Fasteners 214 24Miscellaneous 83 27
![Page 42: Pdma Product Development Metrics May 2000](https://reader033.fdocuments.net/reader033/viewer/2022060117/5585a354d8b42a7b1a8b4844/html5/thumbnails/42.jpg)
Development Process Self-Assessment
•November 1998: 53 development tools and processes resulted in a score of .42 [The average US company score is .40]
•July 1999: our assessment improved 10% to .46 [US BIC is .60]
![Page 43: Pdma Product Development Metrics May 2000](https://reader033.fdocuments.net/reader033/viewer/2022060117/5585a354d8b42a7b1a8b4844/html5/thumbnails/43.jpg)
Development Cycle Time
Average cycle time(calendar days)
FY97 FY98 FY99 FY2000Concept phase 166 146 103 64Development 448 264 244 205
![Page 44: Pdma Product Development Metrics May 2000](https://reader033.fdocuments.net/reader033/viewer/2022060117/5585a354d8b42a7b1a8b4844/html5/thumbnails/44.jpg)
New Products Released
Number of new products released
FY97 FY98 FY99 FY2000 FY2001Concept phase 8 17 20 35 TBDDevelopment 5 10 28 31 34
![Page 45: Pdma Product Development Metrics May 2000](https://reader033.fdocuments.net/reader033/viewer/2022060117/5585a354d8b42a7b1a8b4844/html5/thumbnails/45.jpg)
Financial Results
Percent of Revenue fromNew Products
30%
40%
50%
60%
FY98
FY99
FY00
![Page 46: Pdma Product Development Metrics May 2000](https://reader033.fdocuments.net/reader033/viewer/2022060117/5585a354d8b42a7b1a8b4844/html5/thumbnails/46.jpg)
Financial Results
Percent of Revenuefrom New Platforms
0%
5%
10%
15%
20%
25%
30%
FY99
FY00
![Page 47: Pdma Product Development Metrics May 2000](https://reader033.fdocuments.net/reader033/viewer/2022060117/5585a354d8b42a7b1a8b4844/html5/thumbnails/47.jpg)
Stock Price
Financial Results Stock Price By Quarter
0
5
10
15
20
25
Price
![Page 48: Pdma Product Development Metrics May 2000](https://reader033.fdocuments.net/reader033/viewer/2022060117/5585a354d8b42a7b1a8b4844/html5/thumbnails/48.jpg)
Financial Results
Earnings Per Share
Earnings Per Share By Quarter
-0.1-0.05
00.05
0.1
0.150.2
0.250.3
EPS
![Page 49: Pdma Product Development Metrics May 2000](https://reader033.fdocuments.net/reader033/viewer/2022060117/5585a354d8b42a7b1a8b4844/html5/thumbnails/49.jpg)
What did we learn…What do we still have to do?
![Page 50: Pdma Product Development Metrics May 2000](https://reader033.fdocuments.net/reader033/viewer/2022060117/5585a354d8b42a7b1a8b4844/html5/thumbnails/50.jpg)
Lessons Learned•The easy targets are easy to fix, yet minimal impact
•Make teams accountable, reward them
•Impossible to get accurate date
•Take advantage of a crisis and/or senior management advocates in other areas•Establish & stick to justifiable selection criteria
•Select your quality, proactive people, reward them
![Page 51: Pdma Product Development Metrics May 2000](https://reader033.fdocuments.net/reader033/viewer/2022060117/5585a354d8b42a7b1a8b4844/html5/thumbnails/51.jpg)
To go to the next level
![Page 52: Pdma Product Development Metrics May 2000](https://reader033.fdocuments.net/reader033/viewer/2022060117/5585a354d8b42a7b1a8b4844/html5/thumbnails/52.jpg)
Product Launch Process Must Improve
•Requires confidence in our ability to meet development schedule
•Requires confidence in our ability to deliver first-out product quality
•Need a next-gen metric - first year audit performance to plan
![Page 53: Pdma Product Development Metrics May 2000](https://reader033.fdocuments.net/reader033/viewer/2022060117/5585a354d8b42a7b1a8b4844/html5/thumbnails/53.jpg)
Eliminate NVA Time (sign-offs, logistics)
•Shipping & logistics constitute 10-25% of total development cycle time•Total supplier cost management•Web-enabled processes•Alignment of non-core team members
![Page 54: Pdma Product Development Metrics May 2000](https://reader033.fdocuments.net/reader033/viewer/2022060117/5585a354d8b42a7b1a8b4844/html5/thumbnails/54.jpg)
Better, Smarter, Faster Testing
•Field testing constitutes 45% of the total development cycle time•Fund, involve, develop customers
•Accelerate testing in-house
![Page 55: Pdma Product Development Metrics May 2000](https://reader033.fdocuments.net/reader033/viewer/2022060117/5585a354d8b42a7b1a8b4844/html5/thumbnails/55.jpg)
Expanded DFM•Eliminate of non-preferred fasteners in older designs•Design for Build-to-Install
•Expansion of Preferred Set to electrical components
![Page 56: Pdma Product Development Metrics May 2000](https://reader033.fdocuments.net/reader033/viewer/2022060117/5585a354d8b42a7b1a8b4844/html5/thumbnails/56.jpg)
Our Goal
Double Our Revenue In The Next 3 Years!