PDL march 2014 - Karnataka Municipal Data Society · 10 Slum Improvement & Up-gradation 26-27 11...
Transcript of PDL march 2014 - Karnataka Municipal Data Society · 10 Slum Improvement & Up-gradation 26-27 11...
Public Disclosure Schedule
Upto March - 2014
TMC BELUR
Manual on Public Disclosure Schedules – TMC BELUR
CMAK | 2
Content
Sl.no Particulars Page. no
1 Urban planning including town planning 5-6
2 Regulation of Land- use and Construction of Buildings 7-8
3 Planning for Economic and Social development 9
4 Roads and Bridges 10-11
5 Water Supply- Domestic, Industrial and Commercial 12-14
6 Public Health, Sanitation, Conservancy and SWM 15-23
8 Urban forestry, protection of environment and ecology 24-25
10 Slum Improvement & Up-gradation 26-27
11 Urban Poverty Alleviation 28
12 Provision of urban amenities and facilities- parks, gardens and playgrounds 29-30
13 Promotion of cultural, educational, and aesthetic aspects 31
14 Burials and burial grounds, cremations, cremation grounds and electric crematoriums 32
15 Cattle pounds, prevention of cruelty to animals 33
16 Vital Statistics including registration of births and deaths 34-35
17 Public amenities including street lighting, parking lots, bus stops and public conveniences 36-37
18 Regulation of slaughter houses and tanneries 38
Manual on Public Disclosure Schedules – TMC BELUR
CMAK | 3
Formats for Disclosure
Functions under 12th Schedule
1. URBAN PLANNING INCLUDING TOWN PLANNING
Sl.
No
Functions
as per
12th
Schedule
Agency
Responsible
with in their
jurisdiction
Data to be Disclosed Period for which
information has
to be disclosed
Level of
Disclosure
(ULB/Ward)
Frequency of
Disclosure
Reference Rema
rks
1 Urban
Planning
including
town
Planning
1. Town Planning
Authority
2. Urban
Development
Authority (UDA)
3. Municipal
Planning
Authority
(i) Report and Maps of Master
Plans including Zoning
Regulations
Plan in force now ULB 1. Annually
2. To be notified as and
when changes done
Table 1.1
(ii) Maps of Planning
Districts
Plan in force now ULB 1. Annually
2. To be notified as and
when changes done
(iii) Details of provisional and
finally approved layouts
(Survey No, name of owner,
Site details)
Previous three
financial years
including current year
ULB Half Yearly Table.1.2
4. ULB (iv) Report and maps of
Comprehensive Development
Plan (CDP)
Current plan ULB 1. Annually
2. To be notified as and
when changes done
Table 1.1: Report and Maps of Master Plans including Zoning Regulations
Sl.
No
Name of the reports related to Master
Plan, Zoning Regulation and CDP
Enclosure in
Maps related to Master Plan, Zoning
Regulations, Planning District and
CDP
Enclosure in PDF
1 Town Planning Authority Belur Enclosure Town Planning Authority Hassan Enclosure
Manual on Public Disclosure Schedules – TMC BELUR
CMAK | 4
Table 1.2: Number of provisional and final approved layouts
Years Number of provisional layouts Number of approved layouts Details of layout as enclosure
Current year Nil Nil Enclosure as per the format
Current year -1 9 9 Enclosure as per the format
Current year-2 3 3 Enclosure as per the format
Format:
Details of Provisional and final approved layouts
Sl. No Name of
Layout
Whether
provisional/approved
Number of sites in the approved layout Name of the
owner/developer of the
layout 30*40 40*60 Odd sites
1
9
9
17
1
73
1. R.¦.¸ÉÆêÉÄUËqÀ 2. ²ªÉÃUËqÀ 3. ²æêÀÄw gÀeÉñÀéj 4. gÀWÀÄ£ÀAzÀ£ï 5. ²æêÀÄw VÃvÁ 6. J.J¸ï.ªÀ¸ÀAvÀ®Qëöäà 7. R.¦.£ÁUÉñï 8. ©.Vjñï 9. ªÀ¸ÀAvÀ®Qëöä
10. VÃvÁ 11. r.¦. £ÁUÉñï 12. gÀWÀÄ £ÀAzÀ£ï 13. gÀÁeÉñÀéj 14. r.¦. ¸ÉÆêÉÄÃUËqÀ 15. ²ªÉÃUËqÀ 16. f . ±ÁAvÀ PÀĪÀiÁgï 17. ¸ÀPÁðj »jAiÀÄ ¥ÁæxÀ«ÄPÀ ±Á¯É
Manual on Public Disclosure Schedules – TMC BELUR
CMAK | 5
2. REGULATION OF LAND-USE AND CONSTRUCTION OF BUILDINGS
Sl.
No
Functions as
per 12th
Schedule
Agency
Responsible
with in their
jurisdiction
Data to be Disclosed Period for which
information has
to be disclosed
Level of
Disclosure
(ULB/Ward)
Frequency
of Disclosure
Reference Remarks
2 Regulation of
Land- use and
Construction of
Buildings
UDA/ULB (i) Details of Building
Commencement &
Completion Certificate (Total
application received, total
permission granted, location
details)
Previous three years
including current
year
ULB Annually Table 2.1 (a) &
Table.2.1 (b)
(ii) Details of Industries and
commercial complexes
approved (Survey No., Type,
Name of the owner)
Previous three
Financial years
including current
year
ULB Annually Table 2.2
Table 2.1 (a): Details of Building Commencement & Completion Certificate
Total number of application received for building plan
approval from past three years
Total number of License granted from past three years
Upto
Mar-13
Current
FY
Current
FY
Current
FY – 1 Current
FY – 2
Current
FY - 3
Current
FY - 3
Current
FY – 2
Current
FY – 1
Current
FY
Current
FY
Upto
Mar-13
2012-13 2011-12 2010-11 2009-10 2008-09 2008-09 2009-10 2010-11 2011-12 2012-13
19 40 35 95 111 86 64 102 51 23 71 19
Table 2.1 (b): Details of the building plan approval for three years
Manual on Public Disclosure Schedules – TMC BELUR
CMAK | 6
Format for enclosure Ref Table 2.1.b
Table 2.2: Details of approved Industries/Commercial Areas
Current FY year (year to be
displayed in numeric like 2010-11)
Enclosure in the format displayed below
Current FY – 1 (year to be displayed
in numeric like 2009-10)
Enclosure in the format displayed below
Current FY – 2(year to be displayed
in numeric like 2008-09)
Enclosure in the format displayed below
Current FY year (year to be
displayed in numeric like 2010-11)
Enclosure in the format displayed below
Current FY – 1 (year to be displayed
in numeric like 2009-10)
Enclosure in the format displayed below
Current FY – 2(year to be displayed
in numeric like 2008-09)
Enclosure in the format displayed below
Manual on Public Disclosure Schedules – TMC BELUR
CMAK | 7
Details Ward Number Street Name Survey Number Site Area(Sq/feet) Built-up area
(Sq/feet)
Owner name
Cu
rren
t F
Y 1
Cu
rren
t F
Y-1
Cu
rren
t F
Y-2
Cu
rren
t F
Y 1
Cu
rren
t F
Y-1
Cu
rren
t F
Y-2
Cu
rren
t F
Y 1
Cu
rren
t F
Y-1
Cu
rren
t F
Y-2
Cu
rren
t F
Y 1
Cu
rren
t F
Y-1
Cu
rren
t F
Y-2
Cu
rren
t F
Y 1
Cu
rren
t F
Y-1
Cu
rren
t F
Y-2
Cu
rren
t F
Y 1
Cu
rren
t F
Y-1
Cu
rren
t F
Y-2
Details in
enclosure
Mention year
Site area(Sq/feet) Built-up
area(Sq/feet)
Location details
Ward Street name Property Number/ Survey Number
From 2008-09 to 2013-14 April
Ward No Street Name Survey No Site Area (mm) Buildup Area (Sq/ft) Owner Name
8888 ©PÉÆÌÃqÀÄ gÀ¸ÉÛ©PÉÆÌÃqÀÄ gÀ¸ÉÛ©PÉÆÌÃqÀÄ gÀ¸ÉÛ©PÉÆÌÃqÀÄ gÀ¸ÉÛ 1/141/141/141/14 4915491549154915 f.±ÁAvÀ PÀĪÀiÁgïf.±ÁAvÀ PÀĪÀiÁgïf.±ÁAvÀ PÀĪÀiÁgïf.±ÁAvÀ PÀĪÀiÁgï
1111 ºÉƸÀ£ÀUÀgÀºÉƸÀ£ÀUÀgÀºÉƸÀ£ÀUÀgÀºÉƸÀ£ÀUÀgÀ 122/3122/3122/3122/3 9000900090009000 3003003003000000 Dgï.n zÉêÀgÁeÉÃUËqÀDgï.n zÉêÀgÁeÉÃUËqÀDgï.n zÉêÀgÁeÉÃUËqÀDgï.n zÉêÀgÁeÉÃUËqÀ
4444 £ÉºÀgÀÄ £ÀUÀgÀ£ÉºÀgÀÄ £ÀUÀgÀ£ÉºÀgÀÄ £ÀUÀgÀ£ÉºÀgÀÄ £ÀUÀgÀ 107/107/5/107/4107/107/5/107/4107/107/5/107/4107/107/5/107/4 31200312003120031200 3000300030003000 CPÀæA ±ÀjÃ¥sïCPÀæA ±ÀjÃ¥sïCPÀæA ±ÀjÃ¥sïCPÀæA ±ÀjÃ¥sï
4444 £ÉºÀgÀÄ £ÀUÀgÀ£ÉºÀgÀÄ £ÀUÀgÀ£ÉºÀgÀÄ £ÀUÀgÀ£ÉºÀgÀÄ £ÀUÀgÀ 4/104/104/104/10 48000480004800048000 ---- ©.«. ²æäªÁ¸ï©.«. ²æäªÁ¸ï©.«. ²æäªÁ¸ï©.«. ²æäªÁ¸ï
2222 £ÉºÀgÀÄ £ÀUÀgÀ£ÉºÀgÀÄ £ÀUÀgÀ£ÉºÀgÀÄ £ÀUÀgÀ£ÉºÀgÀÄ £ÀUÀgÀ 37/237/237/237/2 14157141571415714157 ---- ¹ÃvÀªÀÄä¹ÃvÀªÀÄä¹ÃvÀªÀÄä¹ÃvÀªÀÄä
20202020 ®Qëöä¥ÀÄgÀ®Qëöä¥ÀÄgÀ®Qëöä¥ÀÄgÀ®Qëöä¥ÀÄgÀ 122/6122/6122/6122/6 21600216002160021600 4500450045004500 © .VjÃ±ï© .VjÃ±ï© .VjÃ±ï© .Vjñï
8888 ©PÉÆÌÃqÀÄ gÀ¸ÉÛ©PÉÆÌÃqÀÄ gÀ¸ÉÛ©PÉÆÌÃqÀÄ gÀ¸ÉÛ©PÉÆÌÃqÀÄ gÀ¸ÉÛ 6/26/26/26/2 25000250002500025000 ---- ªÀ¸ÀAvÀ®QëöäªÀ¸ÀAvÀ®QëöäªÀ¸ÀAvÀ®QëöäªÀ¸ÀAvÀ®Qëöä
8888 ©PÉÆÌÃqÀÄ gÀ¸ÉÛ©PÉÆÌÃqÀÄ gÀ¸ÉÛ©PÉÆÌÃqÀÄ gÀ¸ÉÛ©PÉÆÌÃqÀÄ gÀ¸ÉÛ 6/36/36/36/3 17000170001700017000 ---- VÃvÁVÃvÁVÃvÁVÃvÁ
13131313 eÉ.¦ £ÀUÀgÀeÉ.¦ £ÀUÀgÀeÉ.¦ £ÀUÀgÀeÉ.¦ £ÀUÀgÀ 45/545/545/545/5 25000250002500025000 ---- r.¦. £ÁUÉñïr.¦. £ÁUÉñïr.¦. £ÁUÉñïr.¦. £ÁUÉñï
Manual on Public Disclosure Schedules – TMC BELUR
CMAK | 8
2. PLANNING FOR ECONOMIC AND SOCIAL DEVELOPMENT
Sl.N
o
Functions as per
12th Schedule
Agency
Responsible
with in their
jurisdiction
Data to be Disclosed Period for which
information has to
be disclosed
Level of
Disclosure
(ULB/Ward)
Frequency
of
Disclosure
Reference Remar
ks
3 Planning for
Economic and
Social
development
ULB List and brief of the Social and
Economic Development Schemes.-
eg; 18% scheme, Ashraya and such
other Govt. programs
Details of budget allocation and
expenditure of these schemes
Details of Beneficiaries
Previous three
financial years
including current
year
ULB Annually Table 3.1
8888 ©PÉÆÌÃqÀÄ gÀ¸ÉÛ©PÉÆÌÃqÀÄ gÀ¸ÉÛ©PÉÆÌÃqÀÄ gÀ¸ÉÛ©PÉÆÌÃqÀÄ gÀ¸ÉÛ 6/56/56/56/5 25000250002500025000 ---- gÀWÀÄ £ÀAzÀ£ïgÀWÀÄ £ÀAzÀ£ïgÀWÀÄ £ÀAzÀ£ïgÀWÀÄ £ÀAzÀ£ï
8888 ©PÉÆÌÃqÀÄ gÀ¸ÉÛ©PÉÆÌÃqÀÄ gÀ¸ÉÛ©PÉÆÌÃqÀÄ gÀ¸ÉÛ©PÉÆÌÃqÀÄ gÀ¸ÉÛ 6/46/46/46/4 21000210002100021000 ---- gÀÁeÉñÀéjgÀÁeÉñÀéjgÀÁeÉñÀéjgÀÁeÉñÀéj
13131313 eÉ.¦ £ÀUÀgÀeÉ.¦ £ÀUÀgÀeÉ.¦ £ÀUÀgÀeÉ.¦ £ÀUÀgÀ 45/245/245/245/2 10000100001000010000 ---- r.¦. ¸ÉÆêÉÄÃUËqÀr.¦. ¸ÉÆêÉÄÃUËqÀr.¦. ¸ÉÆêÉÄÃUËqÀr.¦. ¸ÉÆêÉÄÃUËqÀ
5555 ºÉÆ¼É ©Ã¢ºÉÆ¼É ©Ã¢ºÉÆ¼É ©Ã¢ºÉÆ¼É ©Ã¢ 190/2J/4190/2J/4190/2J/4190/2J/4 19601196011960119601 ---- ²ªÉÃUËqÀ²ªÉÃUËqÀ²ªÉÃUËqÀ²ªÉÃUËqÀ
13131313 eeeeÉ.¦ £ÀUÀgÀÉ.¦ £ÀUÀgÀÉ.¦ £ÀUÀgÀÉ.¦ £ÀUÀgÀ 54/4 , 51/554/4 , 51/554/4 , 51/554/4 , 51/5 32972329723297232972 ---- f . ±ÁAvÀ PÀĪÀiÁgïf . ±ÁAvÀ PÀĪÀiÁgïf . ±ÁAvÀ PÀĪÀiÁgïf . ±ÁAvÀ PÀĪÀiÁgï
2222 £ÉºÀgÀÄ £ÀUÀgÀ£ÉºÀgÀÄ £ÀUÀgÀ£ÉºÀgÀÄ £ÀUÀgÀ£ÉºÀgÀÄ £ÀUÀgÀ 113113113113 5500550055005500 3500350035003500 ¸ÀPÁðj »jAiÀÄ ¥ÁæxÀ«ÄPÀ ¸ÀPÁðj »jAiÀÄ ¥ÁæxÀ«ÄPÀ ¸ÀPÁðj »jAiÀÄ ¥ÁæxÀ«ÄPÀ ¸ÀPÁðj »jAiÀÄ ¥ÁæxÀ«ÄPÀ
±Á¯É ±Á¯É ±Á¯É ±Á¯É
13131313 eÉ.¦ £ÀUÀgÀeÉ.¦ £ÀUÀgÀeÉ.¦ £ÀUÀgÀeÉ.¦ £ÀUÀgÀ 51/1/151/1/151/1/151/1/1 38000380003800038000 ---- CPÀæA ±ÀjÃ¥sïCPÀæA ±ÀjÃ¥sïCPÀæA ±ÀjÃ¥sïCPÀæA ±ÀjÃ¥sï
16161616 ±ÀAPÀgïzÉêÀgÀ ¥ÉÃmɱÀAPÀgïzÉêÀgÀ ¥ÉÃmɱÀAPÀgïzÉêÀgÀ ¥ÉÃmɱÀAPÀgïzÉêÀgÀ ¥ÉÃmÉ 67/14 , 67/367/14 , 67/367/14 , 67/367/14 , 67/3 4046.804046.804046.804046.80 ---- AiÀıÉÆÃzÀ PÉÆÃA ªÀÄįÉèÃUËqÀAiÀıÉÆÃzÀ PÉÆÃA ªÀÄįÉèÃUËqÀAiÀıÉÆÃzÀ PÉÆÃA ªÀÄįÉèÃUËqÀAiÀıÉÆÃzÀ PÉÆÃA ªÀÄįÉèÃUËqÀ
17171717 ºÀ£ÀĪÀÄAvÀ £ÀUÀºÀ£ÀĪÀÄAvÀ £ÀUÀºÀ£ÀĪÀÄAvÀ £ÀUÀºÀ£ÀĪÀÄAvÀ £ÀUÀgÀgÀgÀgÀ 101/39101/39101/39101/39 1 UÀÄAmÉ1 UÀÄAmÉ1 UÀÄAmÉ1 UÀÄAmÉ ---- ¥ÁgÀévÀªÀÄä PÉÆÃA ¥ÀzÉäÃUËqÀ¥ÁgÀévÀªÀÄä PÉÆÃA ¥ÀzÉäÃUËqÀ¥ÁgÀévÀªÀÄä PÉÆÃA ¥ÀzÉäÃUËqÀ¥ÁgÀévÀªÀÄä PÉÆÃA ¥ÀzÉäÃUËqÀ
6666 ºÉƼɩâºÉƼɩâºÉƼɩâºÉƼɩâ 194/1194/1194/1194/1 27 UÀÄAmÉ27 UÀÄAmÉ27 UÀÄAmÉ27 UÀÄAmÉ ---- ©.eÉ. £ÁUÀgÁdÄ ©£ï ©.eÉ. £ÁUÀgÁdÄ ©£ï ©.eÉ. £ÁUÀgÁdÄ ©£ï ©.eÉ. £ÁUÀgÁdÄ ©£ï
UÀÄvÉÛUËqÀUÀÄvÉÛUËqÀUÀÄvÉÛUËqÀUÀÄvÉÛUËqÀ
Manual on Public Disclosure Schedules – TMC BELUR
CMAK | 9
Table 3.1
List and brief of the social and economic Development Schemes for three years
Current FY 1
Sl. No Name of the Scheme Budget allocated Expenditure List of beneficiaries to be enclosed
1 SJSRY 1212249 1750030 Enclosure
Current FY-1
Sl. No Name of the Scheme Budget allocated Expenditure List of beneficiaries to be enclosed
2 22.75% 13.39 5.12 Enclosure
Current FY-2
Sl. No Name of the Scheme Budget allocated Expenditure List of beneficiaries to be enclosed
3 7.25% 9.97 - Enclosure
4. ROADS & BRIDGES
Sl.
No
Functions as
per 12th
Schedule
Agency
Responsible
with in their
jurisdiction
Data to be Disclosed Period for which
information has
to be disclosed
Level of
Disclosure
(ULB/Ward)
Frequency
of
Disclosure
Reference Remarks
4 Roads and
Bridges
ULBs & UDA (i) Total Road Length
(type of road, its length
and width)
Current status ULB/Ward Annually Table 4.1 MIS
(ii) Details of Roads
proposed & executed for
carpeting/ re-carpeting.
Current year ULB Annually Table 4.2
(a) and 4.2
(b)
(iii) Percentage of
footpath to the total road
length of main roads
current status ULB Annually Table 4.3
Manual on Public Disclosure Schedules – TMC BELUR
CMAK | 10
Table 4.1: Road types
Total existing road length in kms
Water bound macadam
(WBM)
Bituminous Cement Concrete (CC) Mud road Total
9.15 20.65 5.00 5.89 40.69
Table 4.2.a: Abstract of roads approved for carpeting and re-carpeting in current Financial
year (year to be mentioned numeric like 2010-11)
Type of road Total Road length approved and
tendered for carpeting in kms
Total Road length
approved and tendered for
re-carpeting in km
Water bound macadam (WBM) 9.15
Bituminous 20.65
Cement Concrete (CC) 5.00
Mud road 5.89
Total Automatic sum Automatic sum
Manual on Public Disclosure Schedules – TMC BELUR
CMAK | 11
Table 4.2.b: Details of roads approved and tendered for carpeting and recarpeting in current financial
year (year to be mentioned numeric like 2010-11)
Format for enclosure reference table 4.2.b
Road length Approved and tendered for carpeting, WBM,
Bituminous and CC road (newly surfacing of the roads)
Road length Approved and Tendered for re-
carpeting, WBM, Bituminous and CC road
Type of
road
Ward Number Street Name Length of road in Kms Type of
Road
Ward
Number
Street Name Length of road in
Kms
Table 4.3: Footpath coverage to main roads
Total length of the main roads in ULB Jurisdiction: 50.98 kms
Total length of the footpath built against main road: ----- kms
Type of road Total Road length
approved and tendered for
carpeting in kms
Total Road length approved and
tendered for re-carpeting in km
Water bound macadam (WBM) Enclosure as per the format given below
Enclosure as per the format given below
Bituminous Enclosure as per the format given below
Enclosure as per the format given below
Cement Concrete (CC) Enclosure as per the format given below
Enclosure as per the format given below
Mud road Enclosure as per the format given below
Enclosure as per the format given below
Manual on Public Disclosure Schedules – TMC BELUR
CMAK | 12
5. WATER SUPPLY DOMESTIC, COMMERCIAL & INDUSTRIAL
Sl.
No
Functions as
per 12th
Schedule
Agency
Responsible
with in their
jurisdiction
Data to be Disclosed Period for which
information has
to be disclosed
Level of
Disclosure
(ULB/Ward)
Frequency
of
Disclosure
Reference Remarks
5 Water Supply-
Domestic,
Industrial and
Commercial
Water Board/
ULB
(i) Percentage of total
water supply (Surfaced,
Underground and
external source)
current status ULB Level Half yearly Table 5.1 SLB1
(ii)Total number of
connection & percentage
of Coverage (Household/
public stand posts/
Commercial and
Industrial Connection),
quantity of w/s
current status ULB Level Half yearly Table 5.2 SLB
(iii) Frequency and
Timing for Water
Supply.
current status ULB Level Half yearly Table 5.3 SLB
(iv) Quality of Water
Supply (percentage of
samples complied with
the Water Act norms)
current status ULB Level Half yearly Table 5.4 SLB
(v) Cost Recovery in
Water Supply Services
(Revenue Generated per
KL of water/Cost
incurred per KL of
Water Supplied)
Previous three
financial years
including current
year
ULB Level Annually Table 5.5 SLB
(vi) Water tariff Current status ULB Level Annually Table 5.6
1 Service Level benchmarking by DMA, GoK
Manual on Public Disclosure Schedules – TMC BELUR
CMAK | 13
Format 5.1 -Per capita production of water
Water supplied through Surface Source 2.0 in MLD
Water Supplied through Underground Source 0.3 in MLD
Water supplied through external source- Nill in MLD
Format 5.2- Water Supply Coverage
Total Number of Household 3400 in numbers
Number of house holds with direct water supply connection 2186 in numbers
Total number of Public Stand Posts ……… in numbers
Total number of industrial connections Nill in numbers
Format 5.3- frequency & Timings of water supply
Frequency and Timing for Water Supply
Number of days of water supply per week in
Normal season
Number of hours of water supply on any supplied day
(Normal season)
7 days 1 Hours
Format 5.4- Quality of water supply
Total number of water samples collected at the consumer end-2 in Numbers/6 months
Number of water samples that meet potable water standards- 3 in Numbers/6 month
Format 5.5- Cost recovery in water supply (same as in SLB)
Manual on Public Disclosure Schedules – TMC BELUR
CMAK | 14
Format 5.6- Water Tariff
Water Tariff
Present water charges (which ever is applicable)
Flat rate ( mention the rate)
slab Rate (Mention the slab)
45-00
Enclosure
Enclosure
6. PUBLIC HEALTH, SANITATION, CONSERVANCY and SOLID WASTE MANAGEMENT
Expenditure
1 Total contractual (if outsourced) cost for Bore wells, O & M of piped
network, O & M of vented dam/ Impounding structure/ Jack well/ Intake
well, valves, replacement of distribution network, supplying of spare
materials, salaries of Contract labours, vehicles etc)
Curren
t Year
Curren
t FY-1
Current
FY -2
1.5
2 Total expenditure borne by ULB on Bore wells, O & M of piped network, O
& M of vented dam/ Impounding structure/ Jack well/ Intake well, valves,
replacement of distribution network, supplying of spare materials, vehicles
etc
20.00
3 Salaries of employees under water supply (Permanent and Daily wages 9.66
4 Purchase of items (for water treatment, for pumping machinery and spare
parts if any
10.00 0.00 0.0
5 Electricity Bill for water supply (Surface source and Ground water) 37.59 30.42 0.00
Revenue
1 Amount collected out of current year demand 26.00 3.62 8.6
2
Amount collected for providing new connection 0.00 11.5 11.5
Manual on Public Disclosure Schedules – TMC BELUR
CMAK | 15
Sl.
N
o
Functions as
per 12th
Schedule
Agency
Responsible
with in their
jurisdiction
Data to be Disclosed Period for which
information has
to be disclosed
Level of
Disclosure
(ULB/Ward)
Frequency
of
Disclosure
Reference Remarks
6 Public Health,
Sanitation,
Conservancy and
SWM
ULBs/ Water
Board/ UDA
(i) Street Sweeping (road
wise street sweeping
schedule)
Current status as
per action plan
ULB/Ward Half Yearly Table 6.(a).1
& 6.(a).2
SWM
Action Plan
(ii) General statistics on
Solid Waste Management
(Generation quantity,
Details of the Secondary
Collection Points, landfill
location, user fee)
current status ULB Annually Table
6.(a).3.1&
6.(a).3.2
SWM MIB
(iii) Percentage of HH
covered under Door-to-Door
Collection
current status ULB Half Yearly Table
6.(a).4
SLB and
MIB
(iv) Percentage of
households participating in
segregation
current status ULB Half Yearly Table
6.(a).5
(v) Extent of Scientific
treated and Disposal of
MSW (%)
current status ULB Annually Table
6.(a).5
SLB and
MIB
(vi) Cost recovery under
SWM (Revenue generated
per ton of SW/ Expenditure
per ton of SWM (in Rs.))
Previous three
financial years
including current
year
ULB Annually Table
6.(a).6
SLB
Sewerage & Drainage:
(vii) Percentage of coverage
of UGD
current status ULB Annually Table 6.(b).1 SLB
Manual on Public Disclosure Schedules – TMC BELUR
CMAK | 16
(viii) Percentage of Waste
Water Treated
current status ULB Annually Table 6.(b).2 SLB
(ix) Percentage of extent of
reuse and recycle of treated
waste water
current status ULB Annually Table 6.(b).3 SLB
(x) Cost recovery under
UGD (Revenue generated
under UGD/ Expenditure
under UGD (in Rs.))
previous three
financial years
including current
year
ULB Annually Table 6.(b).4 SLB
Storm Water Drains
(xi) Statistics of storm
Water Drains ( location,
length and its cleaning
frequency)
current status ULB Annually Table 6.(c).1
(xii) % age roadside drains
to road length ( Paved and
unpaved)
current status ULB Annually Table 6.(c).2 SLB
(xiii) Incidences of Water
Logging and Flooding (No.s
of cases per year/ total
number of identified points)
current status ULB Annually Table 6.(c).3 SLB
Public Health (if applicable)
(xiv) No of Municipal
Hospitals and its location
details
Current Status ULB Annually Table
6.(d).1.1
And 1.2
(xv) Facilities available &
OPD Timings
Current Status ULB Annually
Manual on Public Disclosure Schedules – TMC BELUR
CMAK | 17
(xvi) Number of cases of
vector Born Diseases per
1000 population
ULB Annually Table 6.(d).2
(xvii) Number of cases of
Water Born Diseases per
1000 population
Annually
Table 6(a).1 Private sector participation details for SWM
Package
Number
Scope of work Name of the
contractor
Contract period (dd/mm/yyyy to
dd/mm/yyyy)
Contract value in
Rs. In lakhs
01 Street Sweeping S.K.Nagesh One year 1.65 Laks/month
Table 6(a).2
Street Sweeping Schedule Source: SWM Action Plan
Ward no 1
Street sweeping schedule for A type Road
Sl
No
.
Road Name To be swept on Length in Km
Mon tue wed thu fri Sat sun
1 Hassan Road ���� ���� ���� ���� ���� ���� ����
0.20
2 Jai Bheem street ���� ���� ���� ���� ���� ���� ����
0.20
total / day 0.40
Street sweeping schedule for B type Road
Sl Road Name To be swept on Length in
Manual on Public Disclosure Schedules – TMC BELUR
CMAK | 18
No. Mon tue wed thu fri Sat sun Km
1 Hosanagara Main road ����
����
����
1.25
2 Hosanagara 1st Cross ���� � � � � ����
0.15
3 Hosanagara 2nd Cross ���� � � � � ����
0.15
Street sweeping schedule for C type Road
Sl
No Road Name
To be swept on Length in
Km Mon tue wed thu fri Sat sun
1 Hosanagara 3rd cross ���� ���� 0.15
2 Hosanagara 2nd Main road ���� ���� 0.25
3 Hosanagara 3rd Main road ���� ���� 0.25
4 Hosanagara 4th Main road ���� ���� 0.25
Ward no 2
Street sweeping schedule for A type Road
Sl
No Road Name
To be swept on Length
in Km Mon tue wed thu fri Sat sun
1 Hoysala 1st cross ���� ���� ���� ���� ���� ���� ���� 0.15
2 Halebidu road ���� ���� ���� ���� ���� ���� ���� 0.45
3 CKM Road ���� ���� ���� ���� ���� ���� ���� 0.25
total 0.85
Manual on Public Disclosure Schedules – TMC BELUR
CMAK | 19
Street sweeping schedule for B type Road
Sl
No
.
Road Name To be swept on Length in
Km
Mon tue wed thu fri Sat sun
1 Jai Bheem Nagara road ����
����
����
0.25
2 Hoysala 2nd cross ���� � � � � ����
0.15
3 Hoysala layout road ���� � � � � ����
0.60
4 Police Quatres road ���� � � � � ����
0.30
Street sweeping schedule for C type Road
Sl
No. Road Name
To be swept on Length in
Km
Mon tue wed thu fri Sat sun
1 0.00
Ward no 3
Street sweeping schedule for A type Road
Sl
No Road Name
To be swept on Length in
Km Mon tue wed thu fri Sat sun
1 M.V.S.B Road ���� ���� ���� ���� ���� ���� ���� 0.50
2 Holy Cross Road ���� ���� ���� ���� ���� ���� ���� 0.15
3 M.V.S. Road ���� ���� ���� ���� ���� ���� ���� 0.15
4 Chikkamagalore Road ���� ���� ���� ���� ���� ���� ���� 0.25
5 B.M. Road ���� ���� ���� ���� ���� ���� ���� 0.20
total 1.25
Manual on Public Disclosure Schedules – TMC BELUR
CMAK | 20
Street sweeping schedule for B type Road
Sl
No Road Name
To be swept on Length in
Km Mon tue wed thu fri Sat sun
1 Pyare Jaan Galli ����
����
����
0.20
2 Shivajyothi pana Main road ���� � � � � ����
0.25
3 Shivajyothi pana 1st cross road ���� � � � � ����
0.15
total 0.60
Street sweeping schedule for C type Road
Sl
No
.
Road Name To be swept on Length
in Km
Mon tue wed thu fri Sat sun
1 Shivajyothi pana 3rd cross road ���� ���� 0.15
2 Shivajyothi pana 4th cross road ���� ���� 0.15
total 0.30
Ward no 4
Street sweeping schedule for A type Road
Sl
No
.
Road Name To be swept on Length
in Km
Mon tue wed thu fri Sat sun
1 B.M.Road ���� ���� ���� ���� ���� ���� ���� 0.20
2 B.M.Road 1st cross ���� ���� ���� ���� ���� ���� ���� 0.25
total 0.45
Manual on Public Disclosure Schedules – TMC BELUR
CMAK | 21
Street sweeping schedule for B type Road
Sl
No
.
Road Name To be swept on Length in
Km Mon tue wed thu fri Sat sun
1 Shivajyothi pana road ����
����
���� 0.15
2 Shivajyothi pana 1st cross road ���� � � � � ����
0.12
3 Shivajyothi pana 2nd cross road ���� � � � � ����
0.12
4 Shivajyothi pana 3rd cross road ���� � � � � ����
0.12
5 Amir mohalla road ���� � � � � ����
0.15
Street sweeping schedule for C type Road
Sl
No
.
Road Name To be swept on Length in
Km
Mo n tue wed thu fri Sat sun
1 Shivajyothi pana 4th cross road ���� ���� 0.12
2 Shivajyothi pana 5th cross road ���� ���� 0.12
3 Janatha colony road ���� ���� 0.15
total 0.39
Ward no 5
Street sweeping schedule for A type Road
Sl
No Road Name
To be swept on Length in
Km Mo
n tue wed thu fri Sat sun
1 Panduranga Temple Road ���� ���� ���� ���� ���� ���� ���� 0.20
2 River Road ���� ���� ���� ���� ���� ���� ���� 0.25
Manual on Public Disclosure Schedules – TMC BELUR
CMAK | 22
3 Kannikaparameshwari Temple Road ���� ���� ���� ���� ���� ���� ���� 0.20
4 Pump House Road
���� ���� ���� ���� ���� ���� ���� 0.20
Street sweeping schedule for B type Road
Sl
No
.
Road Name To be swept on Length in
Km
Mon tue wed thu fri Sat sun
1 Kumbaragundi road ����
����
���� 0.30
total 0.30
Street sweeping schedule for C type Road
Sl
No
.
Road Name To be swept on Length in
Km
Mon tue wed thu fri Sat sun
1 0.00
Ward no 6
Street sweeping schedule for A type Road
Sl
No
.
Road Name To be swept on Length
in Km
Mon tue wed thu fri Sat sun
1 River Road ���� ���� ���� ���� ���� ���� ���� 0.25
2 Narasegowdara
Compound Road ���� ���� ���� ���� ���� ���� ����
0.20
3 Thimmabhovi Compound Road
���� ���� ���� ���� ���� ���� ���� 0.20
Manual on Public Disclosure Schedules – TMC BELUR
CMAK | 23
Street sweeping schedule for B type Road
Sl
No
.
Road Name To be swept on Length in
Km
Mon tue wed thu fri Sat sun
1 Gurappagowda Road ����
����
����
0.40
2 Gurappagowda Rice mill Road ����
����
����
0.30
3 Narasegowd Compound 1st Corss ����
����
���� 0.075
4 Narasegowd Compound 2st Corss ����
����
���� 0.075
5 Narasegowd Compound 3st Corss ����
����
���� 0.050
6 Basaveshwara Road ����
���� ���� 0.20
total 0.92
Street sweeping schedule for C type Road
Sl
No
.
Road Name To be swept on Length in
Km
Mon tue wed thu fri Sat sun
1 0.00
total 0.00
Ward no 7
Street sweeping schedule for A type Road
Sl
No
.
Road Name To be swept on Length in
Km
Mon tue wed thu fri Sat sun
1 Channakeshvagowda Road ���� ���� ���� ���� ���� ���� ���� 0.45
Manual on Public Disclosure Schedules – TMC BELUR
CMAK | 24
total 0.45
Street sweeping schedule for B type Road
Sl
No
.
Road Name To be swept on Length
in Km
Mon tue wed thu fri Sat sun
1 Channkeshvagowda Road 1st Corss ����
����
����
0.15
2 Channkeshvagowda Road 2st Corss ����
����
����
0.30
3 Kariyamma Temple Road ����
����
����
0.20
total 0.65
Street sweeping schedule for C type Road
Sl
No
.
Road Name To be swept on Length in
Km
Mon tue wed thu fri Sat sun
1 0.00
total 0.00
Ward no 8
Street sweeping schedule for A type Road
Sl
No
.
Road Name
To be swept on Leng
th in
Km Mo
n tue
w
ed thu fri Sat
su
n
1 Kempegowda Road ���� ���� ���� ���� ���� ���� ���� 0.50
total 0.50
Manual on Public Disclosure Schedules – TMC BELUR
CMAK | 25
Street sweeping schedule for B type Road
Sl
No
.
Road Name To be swept on Length in
Km
Mon tue wed thu fri Sat sun
1 GUrappagowda Road ����
����
����
0.25 0.40
2 Temle Road ����
����
����
0.35
3 Kempegowda Road 1st Corss ����
����
���� 0.27
total 0.10
Street sweeping schedule for C type Road
Sl
No
.
Road Name To be swept on Length in
Km
Mon tue wed thu fri Sat sun
1 Ykunta Road ���� ���� 0.20
total 0.20
Ward no 9
Street sweeping schedule for A type Road
Sl
No
.
Road Name To be swept on Length in
Km
Mon tue wed thu fri Sat sun
1 Ykunta Road ���� ���� ���� ���� ���� ���� ���� 0.35
2 Tank Road ���� ���� ���� ���� ���� ���� ���� 0.55
total 0.90
Manual on Public Disclosure Schedules – TMC BELUR
CMAK | 26
Street sweeping schedule for B type Road
Sl
No
.
Road Name To be swept on Length in Km
Mon tue wed thu fri Sat sun
1 Temple East Side Road ����
����
���� 0.25 0.20
2 Ramarayara Road 1th Corss ����
����
����
0.20
total 0.40
Street sweeping schedule for C type Road
Sl
No. Road Name
To be swept on Length in
Km Mo n tue wed thu fri Sat sun
1 0.00
total 0.00
Ward no 10
Street sweeping schedule for A type Road
Sl
No
.
Road Name
To be swept on Leng
th in
Km Mo
n tue
w
ed thu fri Sat
su
n
1 0.00
total 0.00
Street sweeping schedule for B type Road
Manual on Public Disclosure Schedules – TMC BELUR
CMAK | 27
Sl
No
.
Road Name
To be swept on Lengt
h in
Km Mo
n
tu
e
we
d thu fri Sat sun
1 Durganagar Karodigere Road ����
����
����
0.20
2 Kavadigere Road ����
����
���� 0.55
total 0.75
Street sweeping schedule for C type Road
Sl
No
.
Road Name To be swept on Lengt
h in
Km Mon tue wed thu fri Sat sun
1 Durgamma Temle Road 1st Corss ����
����
0.20
2 Durgamma Temle Road 1st Corss ���� ���� 0.20
0.40
Ward no 11
Street sweeping schedule for A type Road
Sl
No
.
Road Name To be swept on Length in
Km
Mon tue wed thu fri Sat sun
1 0.00
total 0.00
Street sweeping schedule for B type Road
Sl Road Name To be swept on Length in
Manual on Public Disclosure Schedules – TMC BELUR
CMAK | 28
No
. Mon tue wed thu fri Sat sun
Km
1 Kotnegere Road ����
����
���� 0.30
2 Ragavendra Matada Road ����
����
����
0.25
3 Chennnayakana ����
����
����
0.20
total 0.75
Street sweeping schedule for C type Road
Sl
No
.
Road Name
To be swept on Lengt
h in
Km Mo
n tue
w
ed thu fri Sat
su
n
1 Byadarageri Road ����
����
0.20
0.20
Ward no 12
Street sweeping schedule for A type Road
Sl
No
.
Road Name To be swept on Length in Km
Mo n tue wed thu fri Sat sun
1 J.P. Nagar Masidi Road ���� ���� ���� ���� ���� ���� ���� 0.35
total 0.35
Street sweeping schedule for B type Road
Sl Road Name To be swept on Length in Km
Manual on Public Disclosure Schedules – TMC BELUR
CMAK | 29
No
. Mo n tue wed thu fri Sat sun
1 O.H.T Mudigere Road ����
����
���� 0.40
2 J.P. Nagar 1st Corss ����
����
����
0.20
total 0.60
Street sweeping schedule for C type Road
Sl
No
.
Road Name To be swept on Length in
Km Mo n tue wed thu fri Sat sun
1 J.P.Nagar 2nd Corss ����
����
0.05
2 J.P.Nagar 3nd Corss ����
����
0.10
3 J.P.Nagar 4nd Corss ����
����
0.05
total 0.20
Ward no 13
Street sweeping schedule for A type Road
Sl
No
.
Road Name To be swept on Length in
Km
Mo n tue wed thu fri Sat sun
1 0.00
total 0.00
Street sweeping schedule for B type Road
Sl
No
.
Road Name
To be swept on Length in
Km Mo
n
tu
e
we
d thu fri Sat sun
Manual on Public Disclosure Schedules – TMC BELUR
CMAK | 30
1 J.pi.Nagar Hastel Road ����
����
����
0.20
2 J.p.Nagar Hostel 2nd Corss Road ����
����
����
0.15
total 0.35
Street sweeping schedule for C type Road
Sl
No
.
Road Name To be swept on Length in
Km Mo n tue wed thu fri Sat sun
1 Shivajyothi2nd Corss ����
����
0.15
2 Old Mudigere Road ����
����
0.35
3 Old Mudigere Road 1st Corss ����
����
0.50
4 J.P.Nagar School Road ����
����
0.35
total 0.13
Ward no 14
Street sweeping schedule for A type Road
Sl
No
.
Road Name
To be swept on Leng
th in
Km Mo
n tue
w
ed thu fri Sat
su
n
1 0.00
total 0.00
Street sweeping schedule for B type Road
Sl
No
.
Road Name To be swept on Length in
Km
Mo n tue wed thu fri Sat sun
Manual on Public Disclosure Schedules – TMC BELUR
CMAK | 31
1 Rotari School Road ����
����
����
0.12
2 Olagada Keri ����
����
����
0.15
3 HUnasemarada Street ����
����
����
0.20
total 0.47
Street sweeping schedule for C type Road
Sl
No
.
Road Name
To be swept on Length
in Km Mo
n tue
w
ed thu fri Sat
su
n
1 Temple Bock Road & Left Side Road ����
����
0.25
2 Gunikeri Street ����
����
0.20
3 Channkeshvegowdara Street ����
����
0.15
4 Damayanthi Hondada Road ����
����
0.35
total 0.95
Ward no 15
Street sweeping schedule for A type Road
Sl
No
.
Road Name
To be swept on Leng
th in
Km Mo
n tue
w
ed thu fri Sat
su
n
1 Temple Main Road ���� ���� ���� ���� ���� ���� ���� 10.00
2 Siddheshwara Street ���� ���� ���� ���� ���� ���� ���� 0.15
total 10.15
Manual on Public Disclosure Schedules – TMC BELUR
CMAK | 32
Street sweeping schedule for B type Road
Sl
No
.
Road Name
To be swept on Lengt
h in
Km Mo
n
tu
e
we
d thu fri Sat sun
1 Gunikeri Street ����
����
���� 0.20
2 Hunesemarada
Street
����
����
���� 0.15
total 0.35
Street sweeping schedule for C type Road
Sl
No
.
Road Name
To be swept on Lengt
h in
Km Mo
n tue
w
ed thu fri Sat
su
n
1 Chennegowdara Oni ����
����
0.15
2 Okkaligara
Samudaya Road
����
����
0.25
3 Mudigere Road ����
����
10.00
total 10.40
Ward no 16
Street sweeping schedule for A type Road
Sl
No
.
Road Name
To be swept on Leng
th in
Km Mo
n tue
w
ed thu fri Sat
su
n
1 0.00
Manual on Public Disclosure Schedules – TMC BELUR
CMAK | 33
Street sweeping schedule for B type Road
Sl
No
.
Road Name
To be swept on Lengt
h in
Km Mo
n
tu
e
we
d thu fri Sat sun
1 Kuri PuttegoBadavane left Road ����
����
���� 0.25
total 0.25
Street sweeping schedule for C type Road
Sl
No
.
Road Name
To be swept on Length in
Km Mo
n tue wed thu fri Sat
su
n
1 Kuri PuttegoBadavane right sied Road
����
����
0.30
2 Shankardevarapete Main Road ����
����
0.50
3 Shankardevarapete 1st Corss ����
����
0.10
4 Shankardevarapete 2nd Corss ����
����
0.13
5 Shankardevarapete Ashraya House Road ����
����
0.50
6 Hanumanth Nagara Main Road ����
����
0.30
7 Hanumanth Nagara Corss Road ����
����
0.30
Ward no 17
Street sweeping schedule for A type Road
Sl
No
.
Road Name
To be swept on Leng
th in
Km Mo
n tue
w
ed thu fri Sat
su
n
Manual on Public Disclosure Schedules – TMC BELUR
CMAK | 34
1 Pump house Road 1st corss 2nd main ���� ���� ���� ���� ���� ���� ���� 015
total 0.15
Street sweeping schedule for B type Road
Sl
No
.
Road Name
To be swept on Lengt
h in
Km Mo
n
tu
e
we
d thu fri Sat sun
1 Janral Hastel Road ����
����
����
0.20
2 D// Ambedkar Nagara 1st corss ����
����
���� 0.30
total 0.50
Street sweeping schedule for C type Road
Sl
No
.
Road Name
To be swept on Lengt
h in
Km Mo
n tue
w
ed thu fri Sat
su
n
1 D//Ambedkar Nagara 2nd corss ����
����
0.25
2 Pump house Road 3rd corss ����
����
0.40
3 Pump house 2nd corss ����
����
0.03
4 Pump house Road 1st corss 1st main ����
����
0.15
total 0.21
Ward no 18
Street sweeping schedule for A type Road
Sl Road Name To be swept on Leng
Manual on Public Disclosure Schedules – TMC BELUR
CMAK | 35
No
.
Mo
n tue
w
ed thu fri Sat
su
n
th in
Km
1 Pump house Road ���� ���� ���� ���� ���� ���� ���� 0.35
total 0.15
Street sweeping schedule for B type Road
Sl
No
.
Road Name
To be swept on Lengt
h in
Km Mo
n
tu
e
we
d thu fri Sat sun
1 Pump house Road Right side corss 1st corss ����
����
����
0.10
total 0.10
Street sweeping schedule for C type Road
Sl
No
.
Road Name
To be swept on Lengt
h in
Km Mo
n tue
w
ed thu fri Sat
su
n
1 Pump house Road right side Road corss ����
����
0.10
2 Urdhu School Right side Road ����
����
0.15
3 Anganavadi Pakkada Road ����
����
0.15
4 Lakshmipura Badavane Road ����
����
0.20
total 0.60
Ward no 19
Street sweeping schedule for A type Road
Sl Road Name To be swept on Leng
Manual on Public Disclosure Schedules – TMC BELUR
CMAK | 36
No
.
Mo
n tue
w
ed thu fri Sat
su
n
th in
Km
1 N.G.O Road ���� ���� ���� ���� ���� ���� ���� 0.15
2 P.W.D Cowtres Road ���� ���� ���� ���� ���� ���� ���� 0.15
total 0.30
Street sweeping schedule for B type Road
Sl
No
.
Road Name
To be swept on Lengt
h in
Km Mo
n
tu
e
we
d thu fri Sat sun
1
0.00
total 0.00
Street sweeping schedule for C type Road
Sl
No
.
Road Name
To be swept on Lengt
h in
Km Mo
n tue
w
ed thu fri Sat
su
n
1 Kumbageri Street ����
����
0.15
2 Lakshmipura 1st corss ����
����
0.15
3 Channegowdara Street ����
����
0.25
4 Prabhakar mane mumbhaga Road ����
����
0.20
5 Lakshmipura 2nd corss ����
����
0.20
total 0.95
Ward no 20
Street sweeping schedule for A type Road
Manual on Public Disclosure Schedules – TMC BELUR
CMAK | 37
Sl
No
.
Road Name To be swept on Length in
Km
Mo n tue wed thu fri Sat sun
1 Devanga Street Main Road to Vasavi school ���� ���� ���� ���� ���� ���� ���� 0.40
total 0.40
Street sweeping schedule for B type Road
Sl
No
.
Road Name
To be swept on Lengt
h in
Km Mo
n
tu
e
we
d thu fri Sat sun
1 Lakshmipura 5th corss ����
����
���� 0.20
2
2nd corss to 3rd corss link
and 3rd corss to 5th corss
link road
����
���� ����
0.15
total 0.35
Street sweeping schedule for C type Road
Sl
No
.
Road Name
To be swept on Lengt
h in
Km Mo
n tue
w
ed thu fri Sat
su
n
1 Lakshmipura 3rd corss ����
����
0.25
2 Lakshmipura 4rd corss ����
����
0.20
total 0.45
Ward no 21
Street sweeping schedule for A type Road
Manual on Public Disclosure Schedules – TMC BELUR
CMAK | 38
Sl
No
.
Road Name
To be swept on Length in
Km Mo
n tue
w
ed thu fri Sat
su
n
1 Main Road B.M. Road ���� ���� ���� ���� ���� ���� ���� 0.30
2 Ganigara Street (Shivajyothi pana Street ) ���� ���� ���� ���� ���� ���� ���� 0.20
total 0.50
Street sweeping schedule for B type Road
Sl
No
.
Road Name
To be swept on Lengt
h in
Km Mo
n
tu
e
we
d thu fri Sat sun
1 Devanga Street ����
����
���� 0.15
total 0.35
Street sweeping schedule for C type Road
Sl
No
.
Road Name
To be swept on Lengt
h in
Km Mo
n tue
w
ed thu fri Sat
su
n
1 Masidi Street & Masidi fournt Road ����
����
0.25
2 Fish Market Road ����
����
0.15
total 0.40
Ward no 22
Street sweeping schedule for A type Road
Sl Road Name To be swept on Leng
Manual on Public Disclosure Schedules – TMC BELUR
CMAK | 39
No
. Mo n tue wed thu fri Sat
su
n
th in
Km
1 Mustafa Street ���� ���� ���� ���� ���� ���� ���� 0.25
total 0.25
Street sweeping schedule for B type Road
Sl
No
.
Road Name To be swept on Length in Km
Mo n tue wed thu fri Sat sun
1 Mustafa Street 1st corss ����
����
���� 0.20
total 0.35
Street sweeping schedule for C type Road
Sl
No
.
Road Name To be swept on Lengt
h in
Km Mo n tue wed thu fri Sat sun
1 Mustafa Street 2nd corss ����
����
0.50
2 Mavina thopu Road ����
����
0.20
total 0.70
Ward no 23
Street sweeping schedule for A type Road
Sl
No
.
Road Name To be swept on Leng
th in
Km Mo n tue wed thu fri Sat sun
1 0.00
Manual on Public Disclosure Schedules – TMC BELUR
CMAK | 40
Street sweeping schedule for B type Road
Sl
No
.
Road Name To be swept on Length in Km
Mo n tue wed thu fri Sat sun
1 Puribhatti Street ����
����
���� 0.30
2 Amanulla Street ����
����
���� 0.25
total 0.55
Street sweeping schedule for C type Road
Sl
No
.
Road Name To be swept on Length in
Km Mo n tue wed thu fri Sat sun
1 Davud saab Street 1st corss ����
����
0.70
2 matan Market Road ����
����
0.10
3 Masidi Road ����
����
0.20
total 0.10
Table 6(a).3.1
Details Handled by
SHG (No.s)
Handled by Service Provider,
if applicable (No.s)
Handled by ULB
(No.s)
Handled by
RWA/NGO (No.s)
Non slum Household’s 2753
- - -
Slum Household’s 2659 - - -
Manual on Public Disclosure Schedules – TMC BELUR
CMAK | 41
commercial establishments 373 Shopes - - -
Bulk generators 3894 Kgs -- - --
Expected User fee generation
(demand)
2753
- - -
Table.6 (a) 3.2
General statistics on Solid Waste Management
Total Quantity of waste
generated in the city
per day(TPD)
Total Quantity of waste
Collected (TPD)
User fee Slab details
enclosed
Resolution date
passed from
Council
Land fill location Number of
secondary
transportation
vehicles under
SWM
6-7 Tons/Day 5-6 Tons/day - - Sanysihally Su.No:
30/2
5.16 Ares
Secondary storage
containers Location
Map
Enclosure
Source: SWM Action Plan
Table 6(a).4
Number of Households participating in segregation ---
Manual on Public Disclosure Schedules – TMC BELUR
CMAK | 42
Table 6(a).5 Scientific Disposal of MSW
Total waste collected & transported to disposal sites 6-7 in tones/day
Total waste processed in scientific manner 0 in tones/day
Table 6(a).6 Cost recovery under SWM in Rs Lakhs
Expenditure 2012-13 2011-12 2010-11 2009-2010
1. Salary of the employees under SWM
0.00 0.00 0.00 0.00
2 Total Contractual cost if outsourced under
MSWM for hiring services, vehicles or
equipments, O& M of vehicles, fuel cost, labour
cost etc.
0 28 19.44 19
3 Total expenditure borne by ULB on SWM for O
&M of vehicles, purchase of tools and
equipments, insurance cost for vehicles, landfill
management cost like tipping fee etc.
0 5 1.84 1-2
Revenue
1 Total Revenue generated under SWM
0.00 0.00 0.00 0.00
Manual on Public Disclosure Schedules – TMC BELUR
CMAK | 43
Sewerage
Table.6 (b) 1. UGD Coverage
Total Number of households with direct UGD Connections 2500 in Numbers
Table.6 (b) 2 Percentage Waste Water treated
Total waste water collected at sewage treatment plant 1.8 in MLD
Quantity of waste water treated 1.8 .in MLD
Table.6 (b) 3 extent of reuse and recycle of waste water
Quantity of waste water recycled & reused out of treated waste water… Nill…..in MLD (when mouse is moved on
MLD then it should show “million Liters per day”)
Table.6 (b) 4 Cost recovery under UGD (Input screen)
Expenditure
1. Electricity bill for sewage treatment plant Nill…
2 Total salaries of ULB employees working in STP & UGD system Nill…
3 Total O& M Contractual cost (if Outsourced) under UGD and STP (purchase of
items, repair and replacement of spares, labour cost etc.)
Nill…
Total O& M cost born by ULB under UGD and STP (purchase of items, repair and
replacement of spares etc.)
Nill…
Revenue
Manual on Public Disclosure Schedules – TMC BELUR
CMAK | 44
1 Total revenue collected from UGD Nill…
Storm Water Drains
Table.6(c).1
Statistics of storm water drains
Name of major storm water drains Length in kms Cleaning frequency per annum
Table.6 (c) 2
Length of road side drains
Nill…
Table.6 (c) 3
Number of water logging and flooding cases per year……in numbers Nill…
Total number of identified points….in Numbers Nill…
Public Health to be filled by the ULBs if they are managing this function
Table 6 (d).1.1
Public Health
Name of the Municipal
hospitals
Location details Detail of facilities
Number of
beds
Number of
staff
OPD2
Timings of
the OPD
Lab Facility
(yes/No)
Others if any
Nill… Nill… Nill… Nill… Nill… Nill… Nill…
2 Out Patient department
Manual on Public Disclosure Schedules – TMC BELUR
CMAK | 45
Table 6(d). 1.2
Number of vector borne disease cases per 1000 population Number of water borne disease cases per 1000
population
Nill… Nill…
Function 7 is not managed by ULB in Karnataka State hence the details are not mentioned
8. URBAN FORESTRY, PROTECTION OF ENVIRONMENT AND ECOLOGY
Sl.
No
Functions as
per 12th
Schedule
Agency
Responsibl
e with in
their
jurisdictio
n
Data to be Disclosed Period for
which
informatio
n has to be
disclosed
Level of
Disclosure
(ULB/Ward)
Frequency
of Disclosure
Reference Remarks
8 Urban
forestry,
protection of
environment
and ecology
TMC
Belur
Trees (if applicable)
(i) Number of tree
cut/uprooted to the number
of existing trees
current
status
ULB Half Yearly Table 8.1
(ii) Number of sapling
planted to the number of
trees cut/uprooted to the
number of existing trees
Current
year
ULB Half Yearly
Water bodies (if applicable)
(iii) Existing number, New
Proposals for Revival of
water bodies, budget and
expenditure
current
status
ULB Annual Table 8.2
Manual on Public Disclosure Schedules – TMC BELUR
CMAK | 46
Table.8.1 (To be filled by the ULBs if they are managing this function)
Urban forestry
Total Number of existing trees Total Number of trees
cut/uprooted
Total Number of new saplings planted
Nill… Nill… Nill…
Table.8.2
Protection of Environment and Ecology
Sl. No Name existing water bodies
like lake, tanks, pond etc.
Proposed for revival in Yes/No Amount budgeted for revival in
Rs. in lakhs
Expenditure
met in Rs. in
Lakhs
Function 9 is not managed by ULB in Karnataka State hence the details are not mentioned
10. SLUM IMPROVEMENT & UP-GRADATION
Sl.
No
Functions as
per 12th
Schedule
Agency
Responsible
with in their
jurisdiction
Data to be Disclosed Period for
which
information
has to be
disclosed
Level of
Disclosure
(ULB/Ward)
Frequency
of
Disclosure
Reference Remarks
10 Slum
Improvement &
Up-gradation
ULB/UDA (i) Details on
declared and undeclared
slums (numbers,
location, number of
households, population,
area)
current status ULB/Ward Half
yearly
Table 10.1
Manual on Public Disclosure Schedules – TMC BELUR
CMAK | 47
(ii) Details of slum
improvement schemes
(schemes, slums
benefited, budget and
expenditure)
Previous three
financial years
including
current year
ULB/Ward Half
yearly
Table 10.2.
(iii) Beneficiary list
under each scheme
current status ULB/Ward Half
yearly
Table 10.2
(iv) Status of Basic
Services in Slums
(a) No of connections -
Water Supply &
sanitation (% coverage)
(b) Length of Roads and
drains (paved and
unpaved)
(c) No and % of houses
(pacca and katcha
houses)
current status ULB/Ward Half
yearly
Table 10.3
Table 10.1 Details on declared and undeclared slums (Input Screen & Output screen are same)
Details of declared slums Enclosure as per the format given Below Details of un declared slums Enclosure as per the format given Below
Manual on Public Disclosure Schedules – TMC BELUR
CMAK | 48
Format for enclosure as mentioned in table 10.1
Details of declared and undeclared slums
Name of the slum Declared/
Undeclared
Extent in Sq. mt Population Number of Households
Laxmipura 16 0.13 114 114
Shankaradevarapete 0.05 67 67
Bikkodu road 0.086 52 52
Laxmi Sawmill ( Back side
Byadarakeri)
0.13 38 38
Hole beedi 0.05 299 388
Nehru Nagar ( Harijana Colony) 0.043 99 99
Jayaprakash Nagar ( JP Nagar) 0.13 267 267
Neharu Nagar (Vaddara Colony) 0.09 74 74
Puribhatti 0.27 289 289
Kote Nagar ( Siddeshwara beedhi) 0.21 103 103
Kavadigere 0.21 111 111
Shivajyothi pana beedi 0.09 282 282
Kotnageri 0.12 101 101
Laxmipura ( Harijana Colony) 0.014 140 140
Ambedkar nagar 0.17 153 153
Puribhatti II Stage 0.05 175 175
Table.10.2 Details of slum improvement Schemes (Input & Output Screen are same)
Manual on Public Disclosure Schedules – TMC BELUR
CMAK | 49
Current Year Name of the slum
Improvement Schemes Total Number of Budget and under
each Scheme (in Rs Lakhs)
Expenditure met under each scheme( in Rs Lakhs)
Beneficiary list as enclosure Slums Beneficiaries
- - - - enclosure
Current Year - 1
Name of the slum Improvement Schemes
Total Number of Budget and under each Scheme (in Rs Lakhs)
Expenditure met under each scheme( in Rs Lakhs)
Beneficiary list as enclosure
Slums Beneficiaries - - - - enclosure Current Year - 2
Name of the slum Improvement Schemes
Total Number of Budget and under each Scheme (in Rs Lakhs)
Expenditure met under each scheme( in Rs Lakhs)
Beneficiary list as enclosure
Slums Beneficiaries - - - - enclosure
Table 10.3 Basic Service status in Slums
Status of Basic services in Slums
Total number of
households with
direct water supply
connections
(numeric)
Total number of
public taps/mini
water cisterns
(numeric)
Total length of
roads paved
and unpaved
in Kms
Total
households
connected to
UGD
(numeric)
Total
length of
road side
drains in
Kms
Total number
of HH with
individual
toilets
(numeric)
Number of
Functional
Community
Toilets
(numeric)
Total number of
pacca/kaccha
houses
(numeric)
2100
188
188
998
2500
565
0
3550
Note: ULBs needs to disclose information under table 10.2, 10.3 and 10.4 with a note that “All the information in this table are the works
undertaken by ULB” (plz Insert this without fail)
Manual on Public Disclosure Schedules – TMC BELUR
CMAK | 50
11. URBAN POVERTY ALLEVIATION
Sl.
No
Functions as
per 12th
Schedule
Agency
Responsible
with in their
jurisdiction
Data to be Disclosed Period for which
information has
to be disclosed
Level of
Disclosure
(ULB/Ward)
Frequency
of
Disclosure
Reference Remarks
11 Urban Poverty
Alleviation
ULBs
/DMA/UDA
(i) Details of the
Urban Poverty
Alleviation Schemes (eg.
Components of SJSRY )
Current status ULB Annually Table 11.1
Table 11.1 Details of Urban Poverty Alleviation
Name of Schemes
under urban
poverty alleviation
(multiple entries)
Budget for
the
schemes
Expenditure
met for the
scheme
Number of beneficiaries
under the scheme
list of the beneficiaries to
be enclosed
SJSRY 524000 70000 285 ( Enclosure)
All the information in this table are the works undertaken by ULB” (plz Insert this without fail)
Manual on Public Disclosure Schedules – TMC BELUR
CMAK | 51
12. PROVISION OF URBAN AMENITIES AND FACILITIES-PARKS, GARDENS & PLAY GROUNDS
Sl.
No
Functions as
per 12th
Schedule
Agency
Responsible
with in their
jurisdiction
Data to be Disclosed Period for which
information has
to be disclosed
Level of
Disclosure
(ULB/Ward)
Frequency
of
Disclosure
Reference Remarks
12 Provision of
urban amenities
and facilities-
parks, gardens
and
playgrounds
ULBs/UDAs Playground/ Parks/Gardens
(i) Percentage of area
under parks and
gardens to the total ULB
area
Current status ULB Annually Table 12.1
(ii) Percentage of
developed parks and
gardens (%)
Current status ULB Annually Table 12.1
(iii) Number, Location,
Area, Amenities, details
of the maintaining
agency
Current Status ULB Annually Table 12.2
(a) and 12.2
(b)
Table.12.1. Area reserved under Parks & Gardens
1. Total ULB area 4.02 in Sq.kms
2. Area reserved under Parks & Gardens 11,829.21 in Sq.meters
3. Area of developed parks and gardens 614.78 in sq. mts
Manual on Public Disclosure Schedules – TMC BELUR
CMAK | 52
Table.12.2 (a) Amenities under parks & Gardens
Locations of the
park
Park Area in
sq. mt
Amenities available under each park (yes/no) Contact details of the
Maintaining Agency
Children
play area
Seating
facility
Track for
walking/jogging
Facility for
exercise
Name Contact
number(n
umeric)
1.1.1.1. ºÀƸÀ£ÀUÀgÀ ºÀƸÀ£ÀUÀgÀ ºÀƸÀ£ÀUÀgÀ ºÀƸÀ£ÀUÀgÀ 1175.651175.651175.651175.65 NO NO NO NO ---- ----
2.2.2.2. ºÀƸÀ£ÀUÀgÀ ºÀƸÀ£ÀUÀgÀ ºÀƸÀ£ÀUÀgÀ ºÀƸÀ£ÀUÀgÀ 809.67809.67809.67809.67 NO NO NO NO ---- ----
3.3.3.3. ºÀƸÀ£ÀUÀgÀ ºÀƸÀ£ÀUÀgÀ ºÀƸÀ£ÀUÀgÀ ºÀƸÀ£ÀUÀgÀ 278.81278.81278.81278.81 NO NO NO NO ---- ----
4.4.4.4. ºÁ¸À£À gÀ¸ÉÛ ºÁ¸À£À gÀ¸ÉÛ ºÁ¸À£À gÀ¸ÉÛ ºÁ¸À£À gÀ¸ÉÛ 477.97477.97477.97477.97 NO NO NO NO ---- ----
5.5.5.5. ºÉƼÉéâ ºÉƼÉéâ ºÉƼÉéâ ºÉƼÉéâ 90.9990.9990.9990.99
6.6.6.6. ©lÄæªÀ½î ©lÄæªÀ½î ©lÄæªÀ½î ©lÄæªÀ½î
ZÀ£ÀßPÉñÀªÀ£ÀUÀgÀ ZÀ£ÀßPÉñÀªÀ£ÀUÀgÀ ZÀ£ÀßPÉñÀªÀ£ÀUÀgÀ ZÀ£ÀßPÉñÀªÀ£ÀUÀgÀ
1568.961568.961568.961568.96 NO NO NO NO ---- ----
7.7.7.7. ©lÄæªÀ½î ©lÄæªÀ½î ©lÄæªÀ½î ©lÄæªÀ½î
ZÀ£ÀßPÉñÀªÀ£ÀUÀgÀ ZÀ£ÀßPÉñÀªÀ£ÀUÀgÀ ZÀ£ÀßPÉñÀªÀ£ÀUÀgÀ ZÀ£ÀßPÉñÀªÀ£ÀUÀgÀ
1200120012001200 NO NO NO NO ---- ----
8.8.8.8. eÉ.¦.£ÀUÀgÀ eÉ.¦.£ÀUÀgÀ eÉ.¦.£ÀUÀgÀ eÉ.¦.£ÀUÀgÀ 555544.8944.8944.8944.89 NO NO NO NO ---- ----
9.9.9.9. eÉ.¦£ÀUÀgÀeÉ.¦£ÀUÀgÀeÉ.¦£ÀUÀgÀeÉ.¦£ÀUÀgÀ 1612161216121612 NO NO NO NO ---- ----
10.10.10.10. eÉ.¦.£ÀUÀgÀeÉ.¦.£ÀUÀgÀeÉ.¦.£ÀUÀgÀeÉ.¦.£ÀUÀgÀ 1295129512951295 NO NO NO NO ---- ----
11.11.11.11. «zÁå £ÀUÀgÀ «zÁå £ÀUÀgÀ «zÁå £ÀUÀgÀ «zÁå £ÀUÀgÀ 1363.00 1363.00 1363.00 1363.00 NO NO NO NO ---- ----
12.12.12.12. ±ÀAPÀgÀzÉêÀgÀ¥ÉÃmÉ ±ÀAPÀgÀzÉêÀgÀ¥ÉÃmÉ ±ÀAPÀgÀzÉêÀgÀ¥ÉÃmÉ ±ÀAPÀgÀzÉêÀgÀ¥ÉÃmÉ 404.83404.83404.83404.83 NO NO NO NO ---- ----
13.13.13.13. ¥ÀÄgÀ¸À¨sÉ PÀbÉÃjAiÀÄ ¥ÀÄgÀ¸À¨sÉ PÀbÉÃjAiÀÄ ¥ÀÄgÀ¸À¨sÉ PÀbÉÃjAiÀÄ ¥ÀÄgÀ¸À¨sÉ PÀbÉÃjAiÀÄ
ªÀÄĨsÁAUÀzÀ ªÀÄĨsÁAUÀzÀ ªÀÄĨsÁAUÀzÀ ªÀÄĨsÁAUÀzÀ ¥ÁPÀð ¥ÁPÀð ¥ÁPÀð ¥ÁPÀð
614.78614.78614.78614.78 Yes Yes Yes Yes ---- TMC
Minting
14.14.14.14. eÉeÉeÉeÉ.¦£ÀUÀgÀ .¦£ÀUÀgÀ .¦£ÀUÀgÀ .¦£ÀUÀgÀ 392.66392.66392.66392.66 NO NO NO NO ---- ----
Manual on Public Disclosure Schedules – TMC BELUR
CMAK | 53
Table 12.3.(b) Play ground details
Locations of the
playgrounds
playground Area in sq. mt Contact details of the Maintaining
Agency
Name Contact
number(numeric) 1.1.1.1. ¸ÀPÁðj ¥ÀzÀ«¥ÀƪÀð ¸ÀPÁðj ¥ÀzÀ«¥ÀƪÀð ¸ÀPÁðj ¥ÀzÀ«¥ÀƪÀð ¸ÀPÁðj ¥ÀzÀ«¥ÀƪÀð
PÁ¯ÉÃdÄ ªÀÄÆrUÉgÉ gÀ¸ÉÛ PÁ¯ÉÃdÄ ªÀÄÆrUÉgÉ gÀ¸ÉÛ PÁ¯ÉÃdÄ ªÀÄÆrUÉgÉ gÀ¸ÉÛ PÁ¯ÉÃdÄ ªÀÄÆrUÉgÉ gÀ¸ÉÛ
¨Éî¨Éî¨Éî¨ÉîÆgÀÄÆgÀÄÆgÀÄÆgÀÄ
- ²PÀët E¯ÁSɲPÀët E¯ÁSɲPÀët E¯ÁSɲPÀët E¯ÁSÉ -
2.2.2.2. «±Àé ¥ÀzÀ«¥ÀƪÀð PÁ¯ÉÃdÄ «±Àé ¥ÀzÀ«¥ÀƪÀð PÁ¯ÉÃdÄ «±Àé ¥ÀzÀ«¥ÀƪÀð PÁ¯ÉÃdÄ «±Àé ¥ÀzÀ«¥ÀƪÀð PÁ¯ÉÃdÄ
PÉA¥ÉÃUËqÀgÀ gÀ¸ÉÛ ¨ÉîÆgÀÄPÉA¥ÉÃUËqÀgÀ gÀ¸ÉÛ ¨ÉîÆgÀÄPÉA¥ÉÃUËqÀgÀ gÀ¸ÉÛ ¨ÉîÆgÀÄPÉA¥ÉÃUËqÀgÀ gÀ¸ÉÛ ¨ÉîÆgÀÄ - Dgï.ªÉAPÀmÉñïDgï.ªÉAPÀmÉñïDgï.ªÉAPÀmÉñïDgï.ªÉAPÀmÉñï -
3.3.3.3. ºÀÆAiÀÄì¼À ¥ÀzÀ«¥ÀƪÀð ºÀÆAiÀÄì¼À ¥ÀzÀ«¥ÀƪÀð ºÀÆAiÀÄì¼À ¥ÀzÀ«¥ÀƪÀð ºÀÆAiÀÄì¼À ¥ÀzÀ«¥ÀƪÀð
PÁ¯ÉÃdÄ ºÉƼÉéâ PÁ¯ÉÃdÄ ºÉƼÉéâ PÁ¯ÉÃdÄ ºÉƼÉéâ PÁ¯ÉÃdÄ ºÉƼÉéâ
¨ÉîÆgÀĨÉîÆgÀĨÉîÆgÀĨÉîÆgÀÄ
- ¦.ªÀįÉèñï¦.ªÀįÉèñï¦.ªÀįÉèñï¦.ªÀįÉèñï -
4.4.4.4. «ªÉëªÉëªÉëªÉÃÃPÁ£ÀAzÀ ¥ÀzÀ«¥ÀƪÀð ÃPÁ£ÀAzÀ ¥ÀzÀ«¥ÀƪÀð ÃPÁ£ÀAzÀ ¥ÀzÀ«¥ÀƪÀð ÃPÁ£ÀAzÀ ¥ÀzÀ«¥ÀƪÀð
PÁ¯ÉÃdÄ UÉAqÉúÀ½î gÀ¸ÉÛ PÁ¯ÉÃdÄ UÉAqÉúÀ½î gÀ¸ÉÛ PÁ¯ÉÃdÄ UÉAqÉúÀ½î gÀ¸ÉÛ PÁ¯ÉÃdÄ UÉAqÉúÀ½î gÀ¸ÉÛ
¨ÉîÆgÀĨÉîÆgÀĨÉîÆgÀĨÉîÆgÀÄ
- ²PÀët E¯ÁSɲPÀët E¯ÁSɲPÀët E¯ÁSɲPÀët E¯ÁSÉ -
5.5.5.5. ¸ÀªÉÇÃzÀAiÀÄ PÁ¯ÉøÀªÉÇÃzÀAiÀÄ PÁ¯ÉøÀªÉÇÃzÀAiÀÄ PÁ¯ÉøÀªÉÇÃzÀAiÀÄ PÁ¯ÉÃdÄ ¥ÀA¥ï dÄ ¥ÀA¥ï dÄ ¥ÀA¥ï dÄ ¥ÀA¥ï
gÀ¸ÉÛ ¨ÉîÆgÀÄgÀ¸ÉÛ ¨ÉîÆgÀÄgÀ¸ÉÛ ¨ÉîÆgÀÄgÀ¸ÉÛ ¨ÉîÆgÀÄ - J.f.ªÀįÉèñïUËqÀJ.f.ªÀįÉèñïUËqÀJ.f.ªÀįÉèñïUËqÀJ.f.ªÀįÉèñïUËqÀ -
6.6.6.6. ±ÁAvÁ¼Á ¥ÀzÀ«¥ÀƪÀð ±ÁAvÁ¼Á ¥ÀzÀ«¥ÀƪÀð ±ÁAvÁ¼Á ¥ÀzÀ«¥ÀƪÀð ±ÁAvÁ¼Á ¥ÀzÀ«¥ÀƪÀð
PÁ¯ÉÃdÄ zÉêÀ¸ÁÜ£À gÀ¸ÉÛ PÁ¯ÉÃdÄ zÉêÀ¸ÁÜ£À gÀ¸ÉÛ PÁ¯ÉÃdÄ zÉêÀ¸ÁÜ£À gÀ¸ÉÛ PÁ¯ÉÃdÄ zÉêÀ¸ÁÜ£À gÀ¸ÉÛ
¨ÉîÆgÀĨÉîÆgÀĨÉîÆgÀĨÉîÆgÀÄ
- ªÀÄAeÉÃUËqÀªÀÄAeÉÃUËqÀªÀÄAeÉÃUËqÀªÀÄAeÉÃUËqÀ -
Manual on Public Disclosure Schedules – TMC BELUR
CMAK | 54
13. PROMOTION OF CULTURAL, EDUCATIONAL AND AESTHETIC ASPECTS
Sl.
No
Functions as
per 12th
Schedule
Agency
Responsible
with in their
jurisdiction
Data to be Disclosed Period for which
information has
to be disclosed
Level of
Disclosure
(ULB/Ward)
Frequency
of
Disclosure
Reference Remarks
13 Promotion of
cultural,
educational,
and aesthetic
aspects
ULBs (i) Details of
Community halls,
Cultural Centers,
marriage halls,
municipal educational
institutes
Current Status ULB Annually Table 13.1
(a) and
13.1. (b)
(ii) Details of
advertisement
hoardings, rates,
revenue generated
Current Status ULB Annually Table
13.2.1 and
13.2.2
Table 13.1.a Details of cultural Centers
Manual on Public Disclosure Schedules – TMC BELUR
CMAK | 55
Table
13.1 (b) Details of educational institutes (only if applicable)
Name of the Municipal Educational Institutes Number of teachers in each
municipal Educational Institutes(in
numbers)
Name Address Numbers
- - -
Community halls/Auditorium Details
Name Address Booking office
address and
contact details 1.1.1.1. CA¨ÉÃqÀÌgÀ £ÀUÀgÀCA¨ÉÃqÀÌgÀ £ÀUÀgÀCA¨ÉÃqÀÌgÀ £ÀUÀgÀCA¨ÉÃqÀÌgÀ £ÀUÀgÀ CA¨ÉÃqÀÌgÀ £ÀUÀgÀ ¸ÀªÀÄÄzÁAiÀÄ CA¨ÉÃqÀÌgÀ £ÀUÀgÀ ¸ÀªÀÄÄzÁAiÀÄ CA¨ÉÃqÀÌgÀ £ÀUÀgÀ ¸ÀªÀÄÄzÁAiÀÄ CA¨ÉÃqÀÌgÀ £ÀUÀgÀ ¸ÀªÀÄÄzÁAiÀÄ
¨sÀªÀ£À 30*50¨sÀªÀ£À 30*50¨sÀªÀ£À 30*50¨sÀªÀ£À 30*50 ----
2.2.2.2. ZÀ£ÀßPÉñÀªÉà £ÀUÀgÀZÀ£ÀßPÉñÀªÉà £ÀUÀgÀZÀ£ÀßPÉñÀªÉà £ÀUÀgÀZÀ£ÀßPÉñÀªÉà £ÀUÀgÀ ¸ÀªÀÄÄzÁAiÀÄ ¨sÀªÀ£À 35*50¸ÀªÀÄÄzÁAiÀÄ ¨sÀªÀ£À 35*50¸ÀªÀÄÄzÁAiÀÄ ¨sÀªÀ£À 35*50¸ÀªÀÄÄzÁAiÀÄ ¨sÀªÀ£À 35*50 ---- 3.3.3.3. ºÉƸÀ £ÀUÀgÀºÉƸÀ £ÀUÀgÀºÉƸÀ £ÀUÀgÀºÉƸÀ £ÀUÀgÀ ¸ÀªÀÄÄzÁAiÀÄ ¨sÀª¸ÀªÀÄÄzÁAiÀÄ ¨sÀª¸ÀªÀÄÄzÁAiÀÄ ¨sÀª¸ÀªÀÄÄzÁAiÀÄ ¨sÀªÀ£À 40*60À£À 40*60À£À 40*60À£À 40*60 ---- 4.4.4.4. ºÀÆAiÀÄì¼À £ÀUÀgÀ ºÀ½Ã©ÃqÀÄ gÀ¸ÉÛºÀÆAiÀÄì¼À £ÀUÀgÀ ºÀ½Ã©ÃqÀÄ gÀ¸ÉÛºÀÆAiÀÄì¼À £ÀUÀgÀ ºÀ½Ã©ÃqÀÄ gÀ¸ÉÛºÀÆAiÀÄì¼À £ÀUÀgÀ ºÀ½Ã©ÃqÀÄ gÀ¸ÉÛ ¸ÀªÀÄÄzÁAiÀÄ ¨sÀªÀ£À 30*60¸ÀªÀÄÄzÁAiÀÄ ¨sÀªÀ£À 30*60¸ÀªÀÄÄzÁAiÀÄ ¨sÀªÀ£À 30*60¸ÀªÀÄÄzÁAiÀÄ ¨sÀªÀ£À 30*60 ---- 5.5.5.5. ¥ÀÄj¨sÀnÖ ©Ã¢¥ÀÄj¨sÀnÖ ©Ã¢¥ÀÄj¨sÀnÖ ©Ã¢¥ÀÄj¨sÀnÖ ©Ã¢ ¸ÀªÀÄÄzÁAiÀÄ ¨sÀªÀ£À 50*60¸ÀªÀÄÄzÁAiÀÄ ¨sÀªÀ£À 50*60¸ÀªÀÄÄzÁAiÀÄ ¨sÀªÀ£À 50*60¸ÀªÀÄÄzÁAiÀÄ ¨sÀªÀ£À 50*60 ----
Manual on Public Disclosure Schedules – TMC BELUR
CMAK | 56
Table13.2.1 Details of Advertisement Hoardings (Input & Output screens are same)
Details of Advertisement hoardings
Number of Hoardings Slab rates for advertisement
(As Enclosure)
Advertisement tax demand
for the current year in Rs. in
lakhs
Advertisement tax collected
in the current year in Rs. in
lakhs
14. BURIALS AND BURIAL GROUNDS, CREMATIONS, CREMATION GROUNDS AND ELECTRIC CREMATORIUMS
Sl.N
o
Functions as
per 12th
Schedule
Agency
Responsibl
e with in
their
jurisdictio
n
Data to be Disclosed Period for which
information has
to be disclosed
Level of
Disclosure
(ULB/Ward)
Frequency
of
Disclosure
Reference Remarks
14 Burials and
burial grounds,
cremations,
cremation
grounds and
electric
crematoriums
ULBs (i) Numbers, type,
Location of burial
grounds and cremation
facilities available, fee
charged if any
Current Status ULB Annually Table 14.1
(a). and
14.1(b)
(ii) Details of facility of
“Herse/ Corpse
Vehicles”(number and
contact details)
Current Status ULB Annually Table 14.2
Manual on Public Disclosure Schedules – TMC BELUR
CMAK | 57
Table.14.1 (a) Details of Burial grounds, cremation grounds & electric crematoriums
Details of Burial grounds, cremation grounds & electric crematoriums
Name of the
Community burial
ground with
locations
Name and
location of
the
Crematoriu
ms/Burial
ground
Facilities available in the Crematoriums ( Yes / No)
Electri
c
Burning Burial Availabi
lity of
wood
Water
facilit
y
Cleanin
g
facility
Others
if any
Maintaining
agency
Name Contact
details
Multiple (entries) - Yes Yes Jungle Yes Yes - - -
Table 14.1 (b) Fee slab for each crematorium (Input and Out put screens are same)
Fee slab for each crematoriums and burial grounds Enclosure
Table 14.2: Details of Hearse Vehicles
Hearse/Corpse vehicle details
Number of hearse vehicles
available
Fee details for the vehicle(
in Rs)
Contact details
to hire the
vehicle
Maintaining agency
Contact Number Name Contact
Number
Manual on Public Disclosure Schedules – TMC BELUR
CMAK | 58
15. CATTLE PONDS, PREVENTION OF CRUELTY TO ANIMALS
Sl.
No
Functions as
per 12th
Schedule
Agency
Responsible
with in their
jurisdiction
Data to be Disclosed Period for which
information has
to be disclosed
Level of
Disclosure
(ULB/Ward)
Frequency
of
Disclosure
Reference Remarks
15 Cattle ponds,
prevention of
cruelty to
animals
ULBs (i) Numbers of stray
animals, vaccinated
Current Status ULB Annually Table 15.1
(a) and 15.1
(b)
(ii) List of ‘Kanji House’
(care centers for stray
animals).
Current Status ULB Annually Table 15.1
(a)
Table.15.1.1 Details of stray animals (input & output screen are same)
Number of stray animals Number of stray dogs
vaccinated
Location of Kanji House
(care centers for Stray
animals) if applicable Dogs Cows Pig Others if applicable
1050 10 18 - - -
Table 15.1.2 Details of Veterinary & Animal Welfare Centers (input & output screen are same)
List of location of Veterinary hospitals Govt veterinary Hospital
List of Animal Welfare Association (if available) As Enclosure
Name and location of NGOs working for animal
welfare( if available)
As Enclosure
Manual on Public Disclosure Schedules – TMC BELUR
CMAK | 59
16. VITAL STATISTICS INCLUDING REGISTRATION OF BIRTHS AND DEATHS
Sl.
No
Functions as
per 12th
Schedule
Agency
Responsible
with in their
jurisdiction
Data to be Disclosed Period for which
information has
to be disclosed
Level of
Disclosure
(ULB/Ward)
Frequency
of
Disclosure
Reference Remarks
16 Vital Statistics
including
registration of
births and
deaths
ULBs (i) General information
pertaining to city
(population, area,
households etc.)
Current Status
and recent
census details
ULB Annually Table 16.1 City
website
(ii) List of citizen service
centers with location
Current status ULB Annually Table 16.2
(iii) Total Births and
Deaths recorded along
with Birth and Death
rates.
Current status ULB Half
Yearly
Table 16.3
(iv) Citizen Charter to
be published
Current status ULB Annually Table 16.4
Table 16.1: City General information as per recent census details (should be added in their respective ULB website
City General information
Present
population
Present area
in sq.km
Total
number of
households
Population
density
Total male
population
Total female
population
Total SC/ST
Population
Total Slum
population
Literac
y rate
22.228 5.04km 5442 - 10347 9881 2873 10.358 87.7%
Manual on Public Disclosure Schedules – TMC BELUR
CMAK | 60
Table 16.2: List of Citizen Service centers
Sl. No Address of the Citizen Service centers if applicable
TMC, Belur
Table 16.3: Details of Birth & Death
Total births recorded Total deaths recorded
989 820
Table 16.4 Citizen Charter (ULBs who have already maintaining the Charter can enclose the same, other ULBs can follow the below format
Service Details Period of catering the
service
Procedure to
Apply
Officer incharge
Designation Contact Number
Birth Certificate 7 Days Application HI 08177-222221
Death certificate 7 Days Application HI 08177-222221
Manual on Public Disclosure Schedules – TMC BELUR
CMAK | 61
17. PUBLIC AMENITIES INCLUDING STREETLIGHTING, PARKING LOTS, BUS STOPS AND PUBLIC
CONVENIENCES
Sl.
No
Functions as
per 12th
Schedule
Agency
Responsible
with in their
jurisdiction
Data to be Disclosed Period for which
information has
to be disclosed
Level of
Disclosure
(ULB/Ward)
Frequency
of
Disclosure
Reference Remarks
17 Public
amenities
including street
lighting,
parking lots,
bus stops and
public
conveniences
ULBs (i) number of street
lights
Current status ULB Annually Table 17.1 SLB
(ii) No. of Street Lights/
Km of Road Length
(No.s)
Current status ULB Annually Table 17.1 SLB
(iv) Details of agency
maintaining street lights
(name and contact
details)
Current status ULB Annually Table 17.2
(v) List of Authorized
Parking Areas along
with parking capacities
and fee
Current status ULB Annually Table 17.3
(vi) Number and
locations of bus stops
and public toilets
(Community and
commercial) with its
user charge.
Current status ULB Annually Table 17.4
Table.17.1: Details of streetlights
Manual on Public Disclosure Schedules – TMC BELUR
CMAK | 62
Total number of streetlights Types of streetlights with number
Tube light High Mast Incandescent Mercury vapor Sodium vapor
2212 831 09 50 50 1272
Table 17.2: Details of Agency Maintaining Streetlight
Package Number Wards Covered details of the agency Maintaining the streetlights
Name Phone Number
06 23 Shiva Jyothi Electricals
Hassan
-------------
Table.17.3: Details of Parking Lots
Details of parking lots
Enclosure as per the format
Format
Parking lot location Parking Capacity Fee Slab
Two wheeler Four wheeler Two wheeler Four wheeler
- - - - -
Table.17.4 Details of toilets
Manual on Public Disclosure Schedules – TMC BELUR
CMAK | 63
Table17.5: Details of Bus stop
Public toilets Community Toilets
Location Fee slab Location Fee slab
Bustand , Old market,
Tourism Cottage
Near by Temple
Urinal Free
Toilet Both 2 /
per head
- -
Location of Bus stop( As Enclosure)
Area Address
2 Sq.mm Old Mudigere
Road Belur
Manual on Public Disclosure Schedules – TMC BELUR
CMAK | 64
18. REGULATION OF SLAUGHTER HOUSES AND TANNERIES
Table.18.1(a): list of Slaughter houses
Location of Public toilets User charges for Pay and Use toilets in Rs.
Pay and use toilets Community based
Toilets
Pay and use toilets Community based Toilets
04 - 3.00 per /Head
Sl.
No
Functions as
per 12th
Schedule
Agency
Responsibl
e with in
their
jurisdictio
n
Data to be Disclosed Period for
which
informatio
n has to be
disclosed
Level of
Disclosure
(ULB/Ward)
Frequency
of
Disclosure
Reference Remar
ks
18 Regulation of
slaughter
houses and
tanneries
ULBs (i) Number, Location of
Slaughter House /
Tanneries along with
facilities available and
capacity
Current
status
ULB Annually Table
18.1(a) and
(b)
Number of Slaughter
Houses Functional
Number of slaughter
houses Non functional
1 1
Manual on Public Disclosure Schedules – TMC BELUR
CMAK | 65
Table 18.1 (b): Details of Slaughter House
Location of
the
slaughter
House
Whether the
Slaughter
house is been
regulated by
KSCB
(Yes/No)
Capacity Number of
animals
slaughtered
per week
Facilities
Washing Medical
Examination
Removal
of Waste
Others
if any
Pump House
Street Belur
Yes 10 7 Yes - 14kg -