Pilot Plant Testing of Piperazine with High T Regeneration Gary T. Rochelle (PI) & Eric Chen The University of Texas at Austin Katherine Dombrowski (PM), URS Andrew Sexton (TE), Trimeric Bruce Lani, DOE PM 1

Transcript of Pilot Plant Testing of Piperazine with High T … Library/Events/2012/CO2...Pilot Plant Testing of...

Page 1: Pilot Plant Testing of Piperazine with High T … Library/Events/2012/CO2...Pilot Plant Testing of Piperazine with High T Regeneration Gary T. Rochelle (PI) & Eric Chen The University

Pilot Plant Testing of Piperazine with High T Regeneration

Gary T. Rochelle (PI) & Eric Chen The University of Texas at Austin

Katherine Dombrowski (PM), URS

Andrew Sexton (TE), Trimeric

Bruce Lani, DOE PM

1

Page 2: Pilot Plant Testing of Piperazine with High T … Library/Events/2012/CO2...Pilot Plant Testing of Piperazine with High T Regeneration Gary T. Rochelle (PI) & Eric Chen The University

Outline

• Project Overview • Features of the piperazine (PZ) process • 2011 pilot campaign – High T Flash • Future Work on aerosol formation • Hot piperazine, a competitive alternative

2

Page 3: Pilot Plant Testing of Piperazine with High T … Library/Events/2012/CO2...Pilot Plant Testing of Piperazine with High T Regeneration Gary T. Rochelle (PI) & Eric Chen The University

Project Objectives • Primary:

– Quantify robustness of PZ in an integrated system with 150oC regeneration

• Secondary: – Optimize equipment design & energy

performance of the heated two-stage flash – Identify & resolve issues with process control,

foaming, solids precipitation – Evaluate technical & economic feasibility of

full-scale implementation 3

Page 4: Pilot Plant Testing of Piperazine with High T … Library/Events/2012/CO2...Pilot Plant Testing of Piperazine with High T Regeneration Gary T. Rochelle (PI) & Eric Chen The University

Project Funding Summary • DOE funded $3 million

– Started 10/2010 – 2-phase project

• $876k shared by UT CO2 Capture Pilot Plant Project

– EPRI – Luminant, Southern, LG&E-KU – B&W, Chevron

4

Page 5: Pilot Plant Testing of Piperazine with High T … Library/Events/2012/CO2...Pilot Plant Testing of Piperazine with High T Regeneration Gary T. Rochelle (PI) & Eric Chen The University

Pilot Plant Testing

• UT Separations Research Program (SRP) – 0.1 MW air – 10/2011, 3 week operation

• (CSIRO- Tarong, dropped from DOE scope) – 0.1 MW coal – 2012, 6 months

• DOE National Carbon Capture Center – 0.5 MW coal – 2014, 3 months

5

Page 6: Pilot Plant Testing of Piperazine with High T … Library/Events/2012/CO2...Pilot Plant Testing of Piperazine with High T Regeneration Gary T. Rochelle (PI) & Eric Chen The University

Piperazine: Superior for Energy

6

Amine m kg'avg*1e7 capacity -∆Habs Tmax Pmax

mol/s∙Pa∙m2 mol/kg kJ/mol C barPZ 8 8.5 0.75 73 163 20.2

AMP/PZ 4_2 8.6 0.80 77 127 5.7MEA 7 4.3 0.62 77 121 4.0SarK 6 5 0.27 64 121 2.4

Page 7: Pilot Plant Testing of Piperazine with High T … Library/Events/2012/CO2...Pilot Plant Testing of Piperazine with High T Regeneration Gary T. Rochelle (PI) & Eric Chen The University

PZ: Superior for Solvent Management

7

• PZ is resistant to oxidation. • At absorber conditions (mM/hr)

PZ<0.15 MEA – 2 • Reacts with dissolved/entrained O2 at >130oC

• PZ volatility is just right. • At lean abs conditions (ppm) PZ – 8 MEA - 30 • Nonvolatile impurities removed by thermal

reclaiming • Condenses on aerosols in the absorber

• Nitrosamines should be manageable.

• PZ + NO2/NO2- → mononitrosopiperazine (MNPZ)

• Decomposes at 150oC to leave 1 mM MNPZ

Page 8: Pilot Plant Testing of Piperazine with High T … Library/Events/2012/CO2...Pilot Plant Testing of Piperazine with High T Regeneration Gary T. Rochelle (PI) & Eric Chen The University

Innovative Stripper Features

150⁰C 14 bar

8 m PZ Rich

150⁰C 7 bar

Cross Exchangers

8

Lean

Cold/Warm Rich Bypass lower Qloss in vapor no PZ solids in CO2

150oC regen at 7-14 bar lower Wcomp & Qreb

2-St Flash w conv stm heat lower comp & reboiler Cost

Page 9: Pilot Plant Testing of Piperazine with High T … Library/Events/2012/CO2...Pilot Plant Testing of Piperazine with High T Regeneration Gary T. Rochelle (PI) & Eric Chen The University

9

Solvent Cooler

CO2 Makeup

Gas Out

CO2 Recycle

High Lean Loading & L/GP*

CO2 = 0.005 barFrom Fast CO2 Rate

Storage

Spray Recycle Intercoolingmore cooling & area

70o Packing, 350 m2/m3

less ∆P,more area

Rich

Lean

Innovative Absorber Features

Page 10: Pilot Plant Testing of Piperazine with High T … Library/Events/2012/CO2...Pilot Plant Testing of Piperazine with High T Regeneration Gary T. Rochelle (PI) & Eric Chen The University

Results of SRP Campaign

October 2011

12 steady-state conditions 3 weeks of operation

10

Page 11: Pilot Plant Testing of Piperazine with High T … Library/Events/2012/CO2...Pilot Plant Testing of Piperazine with High T Regeneration Gary T. Rochelle (PI) & Eric Chen The University

Absorber 16.8-inch ID Packing ht = 6.1m (6.7) 350 m2/m3,70o

11 CO2 Makeup

Gas Out

Air350 cfm

CO2 Recycle

12% CO2

92% Removal [CO2]T=1.90 (1.96) mol/kg

[PZ]=7.5 (7.0) m40°C

[CO2]T=2.65 (2.75)

L/G = 4.5 mol/mol

40 °CValues from Model

Page 12: Pilot Plant Testing of Piperazine with High T … Library/Events/2012/CO2...Pilot Plant Testing of Piperazine with High T Regeneration Gary T. Rochelle (PI) & Eric Chen The University

Spray Intercooling increases CO2 removal Lean Ldg = 0.24-0.25, L/G = 4

IC Spray Gas

(acfm) CO2

Removal ΔCO2

Removal

OFF 350 85 -

ON 91 6

OFF 475 80 -

ON 88 8 12

Page 13: Pilot Plant Testing of Piperazine with High T … Library/Events/2012/CO2...Pilot Plant Testing of Piperazine with High T Regeneration Gary T. Rochelle (PI) & Eric Chen The University

2.5

3.5

4.5

5.5

6.5

7.5

0.2 0.22 0.24 0.26 0.28 0.3

L/G

(mol

/mol

)

Lean Loading (mol/tot alk)

RSP250 Intercooled

Energy use in 10/2011 was high because the absorber was ineffective.

RSP250

350Z Intercooled

88-92% CO2 removal 350 cfm, 8 m PZ

13 solvent degradation or poor packing.

Page 14: Pilot Plant Testing of Piperazine with High T … Library/Events/2012/CO2...Pilot Plant Testing of Piperazine with High T Regeneration Gary T. Rochelle (PI) & Eric Chen The University

SRP Pilot Plant 16.8-inch ID flash tanks 2.2 min at 150oC

150⁰C 14 bar

10% Warm rich bypass

75% of CO2 132oC

8 m PZ, 12.5 gpm

25% of CO2

148⁰C 7 bar

HP Flash 5.2 bar stm

LP Flash 6.3 bar stm

∆T=7.6oC

∆T<3.2oC Cross Exchangers

14

High fidelity model.

Ldg 0.33 (0.34 )

Lean ldg 0.26 (0.27)

Rich ldg 0.35 (0.37)

Page 15: Pilot Plant Testing of Piperazine with High T … Library/Events/2012/CO2...Pilot Plant Testing of Piperazine with High T Regeneration Gary T. Rochelle (PI) & Eric Chen The University

Total Equivalent Work

15

pumpcompreboilertotal WWWW ++=

5TT5TQ75.0W

flash

sinkflashflashreboiler +

−+=

Page 16: Pilot Plant Testing of Piperazine with High T … Library/Events/2012/CO2...Pilot Plant Testing of Piperazine with High T Regeneration Gary T. Rochelle (PI) & Eric Chen The University

190

200

210

220

230

0.24 0.26 0.28 0.30 0.32 0.34

Equi

vale

nt W

ork

(kW

h/to

n CO

2)

Lean ldg (mol/mol alk)

Stripper Performance at 1500C

Interheated Stripper Short Stripper w bypass

2-stage flash w bypass

8 m PZ 0.4 rich ldg 5oC LMTD Exchanger CO2 compression to 150 bar (Does not include fan work)

Short Stripper

∆ Run 6 0.35 rich ldg

16

Page 17: Pilot Plant Testing of Piperazine with High T … Library/Events/2012/CO2...Pilot Plant Testing of Piperazine with High T Regeneration Gary T. Rochelle (PI) & Eric Chen The University

Energy is approaching a practical limit

17

0

200

400

2000 2004 2008 2012

Equi

vale

nt W

(kW

h/to

nne

CO2)

PZ

MEA

KS-1 (DOE)

Minimum Work

(DOE Ref.)

Page 18: Pilot Plant Testing of Piperazine with High T … Library/Events/2012/CO2...Pilot Plant Testing of Piperazine with High T Regeneration Gary T. Rochelle (PI) & Eric Chen The University

Economic Analysis New Plant, 90% Avoided

Energy (kWh/MT

CO2 removed)

CapEx ($/net kwh)

COE

(¢/kWh)

Increase in COE (%)

DOE No Capture

1650 5.9 0

DOE MEA Case 12

350 2910 10.7 82

PZ short stripper 230 2570 9.6 63

PZ-2 stage flash 230 2520 9.5 61

18

Page 19: Pilot Plant Testing of Piperazine with High T … Library/Events/2012/CO2...Pilot Plant Testing of Piperazine with High T Regeneration Gary T. Rochelle (PI) & Eric Chen The University

Future Work with 150oC PZ • 2012 – Tarong (CSIRO)

– High NOx, Nitrosamine decomposition • Spring 2013 – SRP campaign

– Aerosol characterization & collection – Oxidation management – Absorber intercooling – Reclaiming

• Spring 2014 – NCCC

19

Page 20: Pilot Plant Testing of Piperazine with High T … Library/Events/2012/CO2...Pilot Plant Testing of Piperazine with High T Regeneration Gary T. Rochelle (PI) & Eric Chen The University

Amine Aerosol is a Major Challenge

• Nucleation sites in flue gas – SO3/H2SO4 – Submicron fly ash

• + Droplet growth – Amine/CO2 moves from solvent to aerosol – Water Condensation

• + Poor Droplet collection Water Wash • = Unacceptable amine emissions

20

Page 21: Pilot Plant Testing of Piperazine with High T … Library/Events/2012/CO2...Pilot Plant Testing of Piperazine with High T Regeneration Gary T. Rochelle (PI) & Eric Chen The University

Conclusions • 8 m PZ with 150oC Regen is attractive as a new

baseline technology for CO2 capture – 230 kWh/ton CO2 – 61% Increase in COE – No significant thermal degradation

• Rich bypass reduces work & eliminates PZ solids in CO2 product.

• Interheated stripper uses 6% less energy than 2-stage flash

• Spray recycle increased removal by 6-8% compared to simple intercooling.

21

Page 22: Pilot Plant Testing of Piperazine with High T … Library/Events/2012/CO2...Pilot Plant Testing of Piperazine with High T Regeneration Gary T. Rochelle (PI) & Eric Chen The University

Remaining Challenges • Aerosols increase amine emissions

– test tray in next SRP campaign • Oxidation in regeneration by dissolved O2

– Sparge with N2 or flash at T<100oC • Nitrosamine management with NOx in gas • Thermal reclaiming of degraded solvent

22

Page 23: Pilot Plant Testing of Piperazine with High T … Library/Events/2012/CO2...Pilot Plant Testing of Piperazine with High T Regeneration Gary T. Rochelle (PI) & Eric Chen The University

• Acknowledgement: “This material is based on work supported in part by the Department of Energy under Award Number DE-FE0005654.”

• • Disclaimer: “This report was prepared as an account of work

sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency thereof. The views and opinions of authors expressed herein do not necessarily state or reflect those of the United States Government or any agency thereof.” 23