PCWA Facilities and Features Land Jurisdictions ... 3...Generator Building French Meadows - Hell...
Transcript of PCWA Facilities and Features Land Jurisdictions ... 3...Generator Building French Meadows - Hell...
FR 96
FR 22
FR 96FR 96FR 43
FR 43
French MeadowsReservoir
11427400
French Meadows - Hell Hole Tunnel
Duncan Creek - Middle Fork Tunnel Intake
Duncan Creek Diversion Dam
Duncan Creek - Middle Fork Tunnel Portal
Duncan Creek - Middle Fork Tunnel Portal Road
French Meadows Dam Outlet Worksand South Leakage Weirs Road
11427750
11427700
French Meadows Damand Outlet Works
French Meadows DamGenerator Building
French Meadows - Hell Hole Tunnel Gatehouse Road
Radio Communications Tower nearFrench Meadows - Hell Hole Tunnel Gatehouse
French Meadows - Hell Hole Tunnel Gatehouse
French Meadows Boat Ramp
French Meadows Picnic Area
French MeadowsCampground
McGuire Group CampgroundPoppy Campground
McGuire Boat Rampand Associated Parking
Lewis Campground
Coyote Group Campground
Gates Group Campground
Ahart Campground
French Meadows Dam Generator Building toFrench Meadows Dam Outlet Works Powerline
French Meadows Dam Generator Building toFrench Meadows Dam Spillway Gates Powerline
French Meadows - Hell Hole Tunnel Intake
French Meadows Dam Staging Area and Spillway West Access Road
Dolly Creek Water Supply
French Meadows CampgroundWater Supply and Trail
French Meadows ReservoirStaff Gage
14N13E 14N14E
15N13E 15N14E
French Meadows Spillway East Access Road
French Meadows Dam North Leakage Weir Road
French Meadows Dump Station
Duncan Creek Diversion Intake Road
DCDT
Duncan Creek - Middle Fork Tunnel
11427500
Date: 9/15/10Projection: Ca. Stateplane, Zone 2
Datum: NAD 83
Placer County Water AgencyMiddle Fork American River Project
0 0.50.25Miles
\\Sacramento-nas\GIS\GIS\Entrix\3116501\map\FacilitiesMaps\PropActionMaps\PCWA_ProjectDesc_LandJuris_17i11i_02_Insets_FrenchMeadows.mxd
11427700
Duncan Creek - Middle Fork Tunnel
Duncan Creek Gage and Weirbelow Diversion Trail
Photovoltaic Poles and Powerline toDuncan Creek Gage above Diversion Dam
Duncan Creek Diversion Pool Road
Duncan Creek Diversion Dam Road
Duncan Creek - Middle Fork Tunnel Intake
Duncan Creek Diversion Dam North Trail
Duncan Creek Diversion Dam South Trail
Duncan Creek Diversion Intake Road
Duncan Creek Diversion Pool
Duncan Creek Diversion Dam
Duncan Creek Gage and Weirabove Diversion Trail
Photovoltaic Poles and Powerline toDuncan Creek Gage above Diversion Dam Trail
11427750
Duncan Creek DiversionSediment Disposal Area
DCDT
Duncan Creek DiversionPrimitive Recreation Site
0 500250 Feet
168
B
B
B
PCWA Facilities and Features
Project Road
TransportationRoad
Tunnel
Recreation Access Road
Gage
Water Supply Line (Buried)
Project Trail
FERC Boundary
Ancillary and Other FacilitiesPowerhouse
Project Power andCommunication Lines:
Penstock
Dam
Gate
Project Recreation FacilitiesPicnic Area
PG & E Transmission Lines:
Boat Ramp
Developed CampgroundScenic Viewpoint
Other Facilities
CommunicationPowerPower (underground)Communication/PowerCommunication/Power (underground)
230 kV60 kV
Access PointPublic Safety Fence
Pipeline
Recreation Facility Water SupplyAccess Road or Trail
Water Supply Line (Above ground)
Reservoir Gage
Trailer Sanitary Station
Land Jurisdictions in the ImmediateVicinity of the Middle Fork Project
Duncan Creek, French Meadows Area
Map 4-2a
* PARCEL DATA SOURCES: Placer County, September 2009,El Dorado County, September 2009,USFS Region 5, April 2010.Some data has been modified to account for known errorsand is to be used for general planning purposes only.
Land Jurisdictions / Ownership*Eldorado National ForestTahoe National Forest
Lone Star TimberPCWA
Sierra Pacific Industries**Other Private (Blank)** Includes former properties ofR.H. Emmerson & Son, LLC
14N43
FR 2
14N09
FR 21
Hell HoleReservoir
11428700
French Meadows - Hell Hole Tunnel
Hell Hole - Middle Fork Tunnel Gatehouse
Hell Hole - Middle Fork Tunnel Gatehouse Road
Hell Hole Damand Outlet WorksOperator Cottages and Shop
Dormitory Facility
Dormitory and CottagesWater Supply Tank
Hell Hole Campground
Hell Hole Vista
Big Meadows Campground
French Meadows - Hell Hole Tunnel Portal Road
French Meadows Powerhouse Road
Hell Hole Substation
French Meadows Powerhouse and Switchyard
French Meadows Powerhouse Penstock and Butterfly Valve HouseFrench Meadows Powerhouse to French Meadows Powerhouse Penstock
and Butterfly Valve House Communication Line / Powerline
French Meadows Powerhouse and Switchyard to Hell Hole - Middle Fork Tunnel Gatehouse,Dormitory Facility, Operator Cottages and Hell Hole Powerhouse Communication Line / Powerline
Hell Hole - M iddle Fork Tunnel
Hell Hole - Middle Fork Tunnel Intake
11427200
Hell Hole Dam SpillwayDischarge Channel Road
Hell Hole Dam and Powerhouse Road
Hell HolePowerhouse
French Meadows - Hell Hole Tunnel Removable Section
Dormitory and CottagesWater Supply Tank Powerline
FR 2
Big Meadows Campground Water Supply and Trail
Hell Hole Reservoir Staff Gage
15N14E 15N15E
14N14E 14N15E
GRANITE CHIEFWILDERNESS
HHDS
11428800
Date: 9/15/10Projection: Ca. Stateplane, Zone 2
Datum: NAD 83
Placer County Water AgencyMiddle Fork American River Project
0 0.50.25Miles
Z:\GIS\Entrix\3116501\map\FacilitiesMaps\PropActionMaps\PCWA_ProjectDesc_LandJuris_17i11i_02_Insets_HellHole.mxd
11428800
Hell Hole Boat Ramp Parking Area
Hell Hole Dam Spillway Northern Access Point Road
Hell Hole Boat Ramp
Hell HoleGeneral Parking Area
DormitoryFacility
Hell Hole Dam General Parking Area Barrier Fence
Hell Hole Staging AreasHell Hole Staging Areas
Dormitory Facility Barrier Fence
Hell Hole Powerhouse
Hell Hole Dam Leakage Weir Road
Hell Hole Dam and Powerhouse Road
Rubicon River Gage and Weirbelow Hell Hole Dam Road
Hell Hole Dam and Outlet Works
Hell Hole Dam Spillway Discharge Channel RoadSpur to Com / Powerline
Hell Hole Powerhouse to Rubicon River Gageand Weir below Hell Hole Dam
Communication Line / Powerline
Dormitory Facility Road
Hell Hole Dam SpillwayDischarge Channel Road
Dormitory and CottagesWater Supply Tank Powerline
Operator Cottages and Shop
Dormitory and CottagesWater Supply Tank
Spur on North Side ofOperator Cottages and Shop
Operator Cottages and Shop Road
Spur on South Side ofOperator Cottages and Shop
Hell Hole Reservoir Staff Gage
HHDS
Hell Hole Dam Spillway Crest Gates Control Building
Hell Hole Dam Spillway Crest Gates Control BuildingCommunication Line / Powerline
Hell Hole Dam Spillway Gates Road
0 1,000500 Feet
168
B
B
B
PCWA Facilities and Features
Project Road
TransportationRoad
Tunnel
Recreation Access Road
Gage
Water Supply Line (Buried)
Project Trail
FERC Boundary
Ancillary and Other FacilitiesPowerhouse
Project Power andCommunication Lines:
Penstock
Dam
Gate
Project Recreation FacilitiesPicnic Area
PG & E Transmission Lines:
Boat Ramp
Developed CampgroundScenic Viewpoint
Other Facilities
CommunicationPowerPower (underground)Communication/PowerCommunication/Power (underground)
230 kV60 kV
Access PointPublic Safety Fence
Pipeline
Recreation Facility Water SupplyAccess Road or Trail
Water Supply Line (Above ground)
Reservoir Gage
Trailer Sanitary Station
* PARCEL DATA SOURCES: Placer County, September 2009,El Dorado County, September 2009,USFS Region 5, April 2010.Some data has been modified to account for known errorsand is to be used for general planning purposes only.
Land Jurisdictions / Ownership*Eldorado National ForestTahoe National Forest
Lone Star TimberPCWA
Sierra Pacific Industries**Other Private (Blank)** Includes former properties ofR.H. Emmerson & Son, LLC Land Jurisdictions in the Immediate
Vicinity of the Middle Fork ProjectHell Hole Area
Map 4-2b
FR 2
South Fork Long CanyonDiversion Dam
North Fork Long CanyonDiversion Dam
Middle MeadowsGroup Campground
North Fork Long Canyon Crossing Removable Section
North Fork Long Canyon CrossingRemovable Section South Road
North Fork Long Canyon Crossing Removable SectionNorth Road and Parking Area
FR 23
North Fork Long Canyon CrossingSediment Disposal Area
North Fork Long Canyon CrossingRemovable Section Barrier Fence
FR 2
FR 2
FR 2 2
FR 25
Middle Meadows Group CampgroundWater Supply and Trail
14N13E 14N14E
13N13E 13N14E
NFLCCSFLCC
Hell Hole - Middle Fork Tunnel
1143308511433080
1143306511433060
Date: 9/15/10Projection: Ca. Stateplane, Zone 2
Datum: NAD 83
Placer County Water AgencyMiddle Fork American River Project
0 0.50.25Miles
Z:\GIS\Entrix\3116501\map\FacilitiesMaps\PropActionMaps\PCWA_ProjectDesc_LandJuris_17i11i_02_Insets_LongCanyon.mxd
1143306011433065
South Fork Long Canyon DiversionDrop Inlet
South Fork Long Canyon Diversion andDrop Inlet Road
South Fork Long Canyon Diversion Pipe
South Fork Long Canyon Diversion Damand Pool
Middle Meadows Group Campground
South Fork Long Canyon Diversion andDrop Inlet Cutoff Road
South Fork Long Canyon DiversionDrop Inlet Access Road
SFLCCSouth Fork Long Canyon CreekGage below Diversion Dam Trail
1143308011433085
North Fork Long Canyon DiversionNorth Road
North Fork Long Canyon DiversionSouth Road
North Fork Long Canyon DiversionDrop Inlet Road
North Fork Long Canyon DiversionDrop Inlet
North Fork Long CanyonDiversion Pipe
North Fork Long CanyonDiversion Dam and Pool
NFLCC
North Fork Long Canyon Creek Gagebelow Diversion Dam Trail
0 1,000500 Feet
0 500250 Feet
168
B
B
B
PCWA Facilities and Features
Project Road
TransportationRoad
Tunnel
Recreation Access Road
Gage
Water Supply Line (Buried)
Project Trail
FERC Boundary
Ancillary and Other FacilitiesPowerhouse
Project Power andCommunication Lines:
Penstock
Dam
Gate
Project Recreation FacilitiesPicnic Area
PG & E Transmission Lines:
Boat Ramp
Developed CampgroundScenic Viewpoint
Other Facilities
CommunicationPowerPower (underground)Communication/PowerCommunication/Power (underground)
230 kV60 kV
Access PointPublic Safety Fence
Pipeline
Recreation Facility Water SupplyAccess Road or Trail
Water Supply Line (Above ground)
Reservoir Gage
Trailer Sanitary Station
Land Jurisdictions in the ImmediateVicinity of the Middle Fork Project
Long Canyon Area
Map 4-2c
* PARCEL DATA SOURCES: Placer County, September 2009,El Dorado County, September 2009,USFS Region 5, April 2010.Some data has been modified to account for known errorsand is to be used for general planning purposes only.
Land Jurisdictions / Ownership*Eldorado National ForestTahoe National Forest
Lone Star TimberPCWA
Sierra Pacific Industries**Other Private (Blank)** Includes former properties ofR.H. Emmerson & Son, LLC
14N55 14N56
11427760
FR 96
11427770
Middle Fork Interbay Dam Road
Passive Microwave Reflector Stationabove Middle Fork Interbay
Middle Fork Interbay Damand Outlet Works
Middle Fork - Ralston TunnelIntake and Gatehouse
Middle Fork Powerhouseand Upper and Lower Switchyards
Middle Fork Powerhouse Penstock and Butterfly Valve House Road
Middle Fork Powerhouse Penstock and Butterfly Valve House
Middle Fork PowerhouseButterfly Valve House Road
Middle Fork Powerhouse to Middle Fork PowerhouseButterfly Valve House Communication Line / Powerline
Middle Fork Powerhouse Butterfly Valve House to Radio Repeater nearHell Hole - Middle Fork Tunnel Surge Tank (underground) Communication Line / Powerline
Hell Hole - Middle Fork TunnelSurge Shaft and Tank
Radio Communications Tower and Repeater nearHell Hole - Middle Fork Tunnel Surge Shaft and Tank
Middle Fork - Ralston Tunnel
Middle Fork InterbaySediment Disposal Area
Hell Hole-Middle Fork Tunnel
Passive Microwave Reflector Stationabove Middle Fork Interbay Trail
11428600
Hell Hole - Middle Fork Tunnel Removable Section
Middle Fork - Ralston Tunnel
Brushy Canyon Adit
Brushy Canyon Adit Road
14N3114N30
FR 2513N12E 13N13E
14N12E 14N13E
MFARIB
Mosquito Ridg e Road
FR 96
Hell Hole - Middle Fork Tunnel
Middle ForkInterbay
Date: 9/14/10Projection: Ca. Stateplane, Zone 2
Datum: NAD 83
Placer County Water AgencyMiddle Fork American River Project
0 0.50.25Miles
Z:\GIS\Entrix\3116501\map\FacilitiesMaps\PropActionMaps\PCWA_ProjectDesc_LandJuris_17i11i_02_Insets_Interbay.mxd
11427770
Middle Fork InterbayDam Road
Middle Fork Powerhouse Upper Switchyard Road
Middle Fork Powerhouse to Middle Fork American RiverGage above Middle Fork Powerhouse
Communication Line / Powerline
Middle Fork Powerhouse to Middle Fork - Ralston Tunnel Intakeand Gatehouse Communication Line / Powerline
Middle Fork American River Gageabove Middle Fork Powerhouse Trail
11427760
11428600Middle Fork Interbay Damand Outlet Works
Middle Fork Powerhouse andUpper and Lower Switchyards
Middle Fork - Ralston TunnelIntake and Gatehouse
Middle Fork - Ralston Tunnel
Middle Fork Powerhouse Penstockand Butterfly Valve House Road
Middle Fork Powerhouse toMiddle Fork Powerhouse
Butterfly Valve HouseCommunication Line / Powerline
Middle Fork Interbay Damto Powerhouse Road
MFARIB
Middle Fork American RiverGage below Interbay Dam Trail
Middle Fork InterbaySediment Augmentation Areas
0 1,000500 Feet
168
B
B
B
PCWA Facilities and Features
Project Road
TransportationRoad
Tunnel
Recreation Access Road
Gage
Water Supply Line (Buried)
Project Trail
FERC Boundary
Ancillary and Other FacilitiesPowerhouse
Project Power andCommunication Lines:
Penstock
Dam
Gate
Project Recreation FacilitiesPicnic Area
PG & E Transmission Lines:
Boat Ramp
Developed CampgroundScenic Viewpoint
Other Facilities
CommunicationPowerPower (underground)Communication/PowerCommunication/Power (underground)
230 kV60 kV
Access PointPublic Safety Fence
Pipeline
Recreation Facility Water SupplyAccess Road or Trail
Water Supply Line (Above ground)
Reservoir Gage
Trailer Sanitary Station
Land Jurisdictions in the ImmediateVicinity of the Middle Fork Project
Middle Fork Interbay Area
Map 4-2d
* PARCEL DATA SOURCES: Placer County, September 2009,El Dorado County, September 2009,USFS Region 5, April 2010.Some data has been modified to account for known errorsand is to be used for general planning purposes only.
Land Jurisdictions / Ownership*Eldorado National ForestTahoe National Forest
Lone Star TimberPCWA
Sierra Pacific Industries**Other Private (Blank)** Includes former properties ofR.H. Emmerson & Son, LLC
RalstonAfterbay
Ralston - Oxbow Tunnel
Oxbow Powerhouse and Switchyard
Ralston Afterbay Damand Outlet Works
Ralston - Oxbow Tunnel Intake toRalston Powerhouse Communication Line
Ralston Powerhouseand Switchyard
Ralston Powerhouse Penstockand Butterfly Valve House
Passive Microwave Reflector Stationabove Ralston Afterbay
Ralston Powerhouse to Ralston PowerhouseButterfly Valve House Communication Line / Powerline
Middle Fork - Ralston TunnelSurge Shaft, Tank and Storage Building
Ralston Powerhouse Butterfly Valve House Road
Ralston Picnic Areaand Cartop Boat Ramp
11433212
Passive Microwave Reflector Stationabove Ralston Afterbay Trail
Ralston Ridge Sediment Disposal Area
Ralston - Oxbow Tunnel Intake
Middle Fork - Ralston TunnelRemovable Section
Brushy Canyon Adit
Brushy Canyon Adit Road
14N30
FR 9614N11E 14N12E
13N11E 13N12E
Ralston Afterbay Sediment RemovalAccess Point Boat Ramp
11433200
OXBPP
Indian Bar Sediment Augmentation Area
Junction Bar Sediment Augmentation Area
Rubicon River Gageabove Ralston Powerhouse Trail
FR 23
Mosquito Ridg e Road
FR 96
Middle Fork - Ralston Tunnel
11433300
11427765
Date: 9/15/10Projection: Ca. Stateplane, Zone 2
Datum: NAD 83
Placer County Water AgencyMiddle Fork American River Project
0 0.50.25Miles
Z:\GIS\Entrix\3116501\map\FacilitiesMaps\PropActionMaps\PCWA_ProjectDesc_LandJuris_17i11i_02_Insets_Ralston.mxd
11433212
Ralston - Oxbow Tunnel Intake Road
Ralston Afterbay Private Boat Ramp Road
Ralston - Oxbow Tunnel Intake
Oxbow Powerhouse toRalston Afterbay Dam Generator Building
Communication Line / Powerline
Oxbow Powerhouse Road
Ralston Afterbay Dam Generator Building
Ralston Afterbay Dam and Access Point Road
Ralston Afterbay Dam Generator Building toRalston - Oxbow Tunnel Intake Communication/Powerline
Indian Bar Rafting Accessand General Parking
Ralston Afterbay Damand Outlet Works
Oxbow Powerhouse and Switchyard
Ralston - Oxbow Tunnel
RalstonAfterbay
Ralston - Oxbow Tunnel Intake toRalston Powerhouse Communication Line
Indian Bar Access Road
Ralston Afterbay DamAccess Road
Indian Bar Sediment Augmentation Area
OXBPP
0 500250Feet
168
B
B
B
PCWA Facilities and Features
Project Road
TransportationRoad
Tunnel
Recreation Access Road
Gage
Water Supply Line (Buried)
Project Trail
FERC Boundary
Ancillary and Other FacilitiesPowerhouse
Project Power andCommunication Lines:
Penstock
Dam
Gate
Project Recreation FacilitiesPicnic Area
PG & E Transmission Lines:
Boat Ramp
Developed CampgroundScenic Viewpoint
Other Facilities
CommunicationPowerPower (underground)Communication/PowerCommunication/Power (underground)
230 kV60 kV
Access PointPublic Safety Fence
Pipeline
Recreation Facility Water SupplyAccess Road or Trail
Water Supply Line (Above ground)
Reservoir Gage
Trailer Sanitary Station
Land Jurisdictions in the ImmediateVicinity of the Middle Fork Project
Ralston - Oxbow Area
Map 4-2e
* PARCEL DATA SOURCES: Placer County, September 2009,El Dorado County, September 2009,USFS Region 5, April 2010.Some data has been modified to account for known errorsand is to be used for general planning purposes only.
Land Jurisdictions / Ownership*Eldorado National ForestTahoe National Forest
Lone Star TimberPCWA
Sierra Pacific Industries**Other Private (Blank)** Includes former properties ofR.H. Emmerson & Son, LLC
Bureau of Land Management