PRE QUALIFICATION PROFILE PBR TECHNOLOGY SRL

Transcript of PBR TECHNOLOGY SRL · 2021. 3. 25. · - 13 - ACCREDITATION Iso - Eurosoa - Inet PBR TECHNOLOGY...

Page 1: PBR TECHNOLOGY SRL · 2021. 3. 25. · - 13 - ACCREDITATION Iso - Eurosoa - Inet PBR TECHNOLOGY S.R.L. VIALE DELLA VITTORIA 1 33033 CODROIPO (UD) ITALIA VIA RISORGIMENTO 18 31040

PR

E Q

UA

LIF

ICA

TIO

N P

RO

FIL

E

PBR

TEC

HN

OLO

GY

SR

L

Page 2: PBR TECHNOLOGY SRL · 2021. 3. 25. · - 13 - ACCREDITATION Iso - Eurosoa - Inet PBR TECHNOLOGY S.R.L. VIALE DELLA VITTORIA 1 33033 CODROIPO (UD) ITALIA VIA RISORGIMENTO 18 31040
Page 3: PBR TECHNOLOGY SRL · 2021. 3. 25. · - 13 - ACCREDITATION Iso - Eurosoa - Inet PBR TECHNOLOGY S.R.L. VIALE DELLA VITTORIA 1 33033 CODROIPO (UD) ITALIA VIA RISORGIMENTO 18 31040

INDEX

Company Profile

Work Methodology Flow Chart

Trade License

Accreditation

Approvals

Quality, HSE & Environment

Projects Gallery

Projects Executed

Page 4: PBR TECHNOLOGY SRL · 2021. 3. 25. · - 13 - ACCREDITATION Iso - Eurosoa - Inet PBR TECHNOLOGY S.R.L. VIALE DELLA VITTORIA 1 33033 CODROIPO (UD) ITALIA VIA RISORGIMENTO 18 31040

- 4 -

INTRODUCTIONPBR TECHNOLOGY S.r.l. operates on national and international markets as a general contractor and sub-contractor for the construction of natural gas, oil, and water pipelines for the most important Italian and overseas petrochemical industries (Snam Rete Gas SpA, ABB Soimi, Agip, Edison, Italgas, Enagas, Gaz de France, Wingas GmbH, RWE GmbH, etc).

Since the immediate post war period, PBR Technology has been operating with diverse Italian and foreign business partners in the field of civil works, excavation works, construction of gas and natural gas pipelines, consolidation of river banks, and creation and management of ecological / restoration systems for quarries.

The partners that set up PBR Technology had previously developed special technical, organizational and managerial expert se in their specific fields of operation. The contribution of each partner enabled PBR Technology to tackle the market equipped with the ISO 9001:2008 quality system certification, SOAcertifications for public works, and the qualification with inclusion in the “Vendors’ List “ of Snam Rete Gas s.p.a., as suppliers for the following classes:

• Civil works for the construction and implementation of plants small scale LNG.• Mechanical works for the realization and implementation of plants small scale LNG.• Building works for the construction and implementation of CNG / L-CNG plants for

autotraction.• Green accommodation and maintenance.• Construction and maintenance of hydraulic defense works.• Minor works of modifications and maintenance of central systems.• High-pressure gas pipelines DN < 350.• Minor building works, assembly / construction of pipelines DN <350 and maintenance

works of pipelines DN ≤ 650.• High pressure gas pipelines 350 < DN < 650.

The company’s fleet of operating machines and its highly qualified management and administrative personnel complete the contribution made by the partners that, in recent years, have become part of the company organization.

Page 5: PBR TECHNOLOGY SRL · 2021. 3. 25. · - 13 - ACCREDITATION Iso - Eurosoa - Inet PBR TECHNOLOGY S.R.L. VIALE DELLA VITTORIA 1 33033 CODROIPO (UD) ITALIA VIA RISORGIMENTO 18 31040

- 5 -

Today PBR Technology operates with the latest routing and excavation equipment, highly qualified personnel, and state-of- the-art equipment for the building and testing of technological systems required for the construction of pressurized pipelines. It also has a high-tech workshop for the maintenance of operating machines, as well as design, modification and setup of special machines and equipment for the execution of any type of work.

BUSINESS AREAS:

The know-how and experience acquired over many years in the pipeline sectorenables the company to execute all the works involved in pipeline construction:

• Pipeline civil works (land surveying using GPS equipment, route staking, route clearance, excavation, backfill, definitive reinstatement work, open-cut or drilled system water crossings, complementary works, etc.);

• Pipeline mechanical works (pipe stringing, pipe bending, welding, sand-blasting and wrapping, pipeline laying, connection of pipeline sections, hydraulic tests, cathodic protection of pipes, etc.);

• General civil and mechanical works (excavation and earth moving work, concrete pouring, backfill, preprefabrication of piping, mechanical assembly, sandblasting and wrapping, de-watering and hydraulic tests, complementary works etc);

• Transportation (inside construction site area and surrounding PBR Technology is equipped for responsive movements and nimble adjusting organization of our construction machines)

• Other operations required for the completion of the works.

• The company’s team of collaborators and specialists (engineers, topographers, surveyors, project managers, foremen, welding technicians, etc) is fully able to guarantee the highest quality standards in terms of execution and technical and project management of the pipeline works.

Page 6: PBR TECHNOLOGY SRL · 2021. 3. 25. · - 13 - ACCREDITATION Iso - Eurosoa - Inet PBR TECHNOLOGY S.R.L. VIALE DELLA VITTORIA 1 33033 CODROIPO (UD) ITALIA VIA RISORGIMENTO 18 31040

- 6 -

PATENT: LARGE PIPE CUTTER®

The pipe cutting machine cold cuts the pi-

pes under control of the operator on whose

excavator it has been applied, after placing

it astride on the pipe at the point of cutting.

The LPC® machine can be used for the re-

moval of pipes of any type and diameter,

after adjusting it according to the diameters

and the materials of the pipes to be remo-

ved.

In the field of pipelines this requirement

for removal of the existing pipes, that are

placed out of service and drained, is due

to ageing or inadequate sizes of the pipes

which are therefore removed and replaced

with new ones.

The disposal of the existing pipe takes pla-

ce through the total decommissioning and

removal of the sections that make it up and

of the secondary lines branching off from

them.

The purpose of this machine is to provide

an innovative type of apparatus that allows

both to cut and, subsequently, to lift the pipe

from the bottom of the excavation where it

is placed, without requiring operators inside

the excavation and/or on the ground.

The machine can be applied on an exca-

vator and controlled by a single operator

who operates the actuators and controls it.

Therefore no cutting team is required inside

the excavation nor special temporary instal-

lation for the safety of the excavation and

the size of the excavation can consequently

be smaller.

PBR TECHNOLOGY has been awarded a

patent for a special pipe cutter “large pipe

cutter” ®, a machine with hydraulic drive

that can cold cut pipes in metal, plastic or

concrete, with diameters from medium to

large (over 50 cm or 20”), without needing

a jig (or other supporting device) inside the

pipe itself, thanks to multiple punches that

work simultaneously without removal of

material.

Page 7: PBR TECHNOLOGY SRL · 2021. 3. 25. · - 13 - ACCREDITATION Iso - Eurosoa - Inet PBR TECHNOLOGY S.R.L. VIALE DELLA VITTORIA 1 33033 CODROIPO (UD) ITALIA VIA RISORGIMENTO 18 31040

- 7 -

This is an innovative type of equipment that

effectively replaces the traditional oxy-hy-

drogen torch and eradicates any risk of fire

or explosion: the eradication concerns - on

one hand - all risks associated with the pre-

sence of flammable residues of gas or fuel

previously transported by the pipe (and we

here remind that the high flammability of

gases or liquids in the pipeline - though pre-

viously drained - has often been the cause

of accidents with serious consequences)

and - on the other hand - the risks related to

the operations of removal of the polyethy-

lene coating which is generally positioned

all around the pipeline as anticorrosive pro-

tection. This type of protection is in fact

made of combustible material and is there-

fore clear that its prior removal is essential

as a matter of safety against the risk of fire

and explosion before torch cutting. With the

use of the LPC ®, the removal of the corro-

sion protection is no longer necessary on

account of the cold cutting technique, with

considerable saving in operating times and

costs, as well as with the fundamental gua-

rantee of safety, and protection of the en-

vironment (the removal of the coating also

involves a problem of waste management).

With the use of LPC ®, the risks due to

explosive atmospheres and fire are practi-

cally zeroed and firefighting teams need no

longer to be permanently in attendance du-

ring all the phases of the operation.

Page 8: PBR TECHNOLOGY SRL · 2021. 3. 25. · - 13 - ACCREDITATION Iso - Eurosoa - Inet PBR TECHNOLOGY S.R.L. VIALE DELLA VITTORIA 1 33033 CODROIPO (UD) ITALIA VIA RISORGIMENTO 18 31040

- 8 -

WORK METHODOLOGY FLOW CHART

Page 9: PBR TECHNOLOGY SRL · 2021. 3. 25. · - 13 - ACCREDITATION Iso - Eurosoa - Inet PBR TECHNOLOGY S.R.L. VIALE DELLA VITTORIA 1 33033 CODROIPO (UD) ITALIA VIA RISORGIMENTO 18 31040

- 9 -

STRUCTURE OF ORGANIZATION FOREIGN COUNTRIES

Company Director

Organizationstructure for Italy andInternational projects

Branch Manager

HSE Department

Contracts Engineer Project Engineer Quality Engineer

Project Manager Quality manager

Secratary of Direction Account DepartmentResident Manager

Page 10: PBR TECHNOLOGY SRL · 2021. 3. 25. · - 13 - ACCREDITATION Iso - Eurosoa - Inet PBR TECHNOLOGY S.R.L. VIALE DELLA VITTORIA 1 33033 CODROIPO (UD) ITALIA VIA RISORGIMENTO 18 31040

- 10 -

OUR MACHINES AND EQUIPMENTS IN ITALY

Page 11: PBR TECHNOLOGY SRL · 2021. 3. 25. · - 13 - ACCREDITATION Iso - Eurosoa - Inet PBR TECHNOLOGY S.R.L. VIALE DELLA VITTORIA 1 33033 CODROIPO (UD) ITALIA VIA RISORGIMENTO 18 31040

- 11 -

TRADE LICENSE

Page 12: PBR TECHNOLOGY SRL · 2021. 3. 25. · - 13 - ACCREDITATION Iso - Eurosoa - Inet PBR TECHNOLOGY S.R.L. VIALE DELLA VITTORIA 1 33033 CODROIPO (UD) ITALIA VIA RISORGIMENTO 18 31040

- 12 -

CERTIFICATIONSUAE

Page 13: PBR TECHNOLOGY SRL · 2021. 3. 25. · - 13 - ACCREDITATION Iso - Eurosoa - Inet PBR TECHNOLOGY S.R.L. VIALE DELLA VITTORIA 1 33033 CODROIPO (UD) ITALIA VIA RISORGIMENTO 18 31040

- 13 -

ACCREDITATIONIso - Eurosoa - Inet

PBR TECHNOLOGY S.R.L.VIALE DELLA VITTORIA 1 33033 CODROIPO (UD) ITALIA

VIA RISORGIMENTO 18 31040 GORGO AL MONTICANO (TV) ITALIA E CANTIERI OPERATIVI

ISO 14001:2004

CISQ/RINA

for the following field of activities

in the following operative units

has implemented and maintains a

CONSTRUCTION AND INSTALLATION OF PIPELINES FOR GAS, WATER AND ASSOCIATED PLANTS. CONSTRUCTION OF RIVER WORKS,CROSS-DRAINAGE STRUCTURES, HYDRAULIC WORKS AND STABILISATION ON EMBANKMENT SLOPES. EARTH-MOVING WORKS.

Environmental Management Systemwhich fulfills the requirements of the following standard

IT-88718

IQNet and

hereby certify that the organisation

First Issue : Current Issue :2012-12-21 2015-12-19 Expiry Date : 2018-09-15

Registration Number:

The status of validity of the certificate can be verified at http://www.cisq.com or by e-mail to [email protected]

CERTIFICATO N. CERTIFICATE No.

21555/10/S

SI CERTIFICA CHE IL SISTEMA DI GESTIONE PER LA QUALITÀ DI

IT IS HEREBY CERTIFIED THA T THE QUAUTY MANAGEMENT SYSTEM OF

PBR TECHNOLOGY S.R.L. VIALE DELLA VITTORIA 1 33033 Codroipo (UD) ITALIA

NELLE SEGUENTI UNITÀ OPERATIVE / IN THE FOLLOWING OPERA T/ONAL UNITS

VIA RISORGIMENTO 18 31040 Gorgo Al Monticano (TV) ITALIA E CANTIERI OPERATIVI

È CONFORME ALLA NORMA / IS IN COMPLIANCE WITH THE STANDARD

ISO 9001 :2015 E VALUTATO SECONDO LE PRESCRIZIONI DEL REGOLAMENTO TECNICO RT-05, APPLICABILE IN ITALIA

PER I SEGUENTI CAMPI DI ATTIVITÀ/ FOR THE FOLLOWING FIELD(S) OF ACTIVITIES

- CISQ is a member of

l(:)Net * * THE INTtnAATIONAL ccnTiflCAllON Nl!T\\'011.K www.iqnet-certification.com

-IQNec,. the associa rlon of the world 's ffrsr cfass

certification bodies, ìs tn� /argest provi"der of mctnagement

System Certlflcfltfon Jn the world, IQNet is camposed of mare than 30 badies ;md ca un ts

ovcr 150 subsfdlarles all 011er Uw g!obe,

Per informazioni sulla validità del certificato, visitare il sito

www.rina.org

For information conceming validity of the certificate, you

can visi/ the site www.rina.org

Per i requisiti della norma non applicabili al campo di applicazione

del sistema di gestione dell'organizzazione, riferirsi alle

informazioni documentate relative.

Reference is to be made to the relevant documented information

for the requirements of the standard that cannot be app/ied to

the Organization's management system scope

APPLICABILE IN ITALIA: La presente certificazione si

intende riferita agli aspetti gestionali dell'impresa nel suo

complesso ed è utilizzabile ai fini della qualificazione delle imprese

di costruzione ai sensi dell'articolo 84 del D.Lgs.

50/2016 e Linee Guida ANAC applicabili

COSTRUZIONE ED INSTALLAZIONE DI CONDOTTE PER IL TRASPORTO DI GAS, ACQUA ED IMPIANTI ASSOCIATI. IAF:28 COSTRUZIONE DI OPERE FLUVIALI, DI CONSOLIDAMENTO DEGLI ALVEI DEI FIUMI E DI DIFESA NONCHE' DI OPERE DI

SISTEMAZIONE IDRAULICA. LAVORI DI MOVIMENTO TERRA.

CONSTRUCTION ANO INSTALLA TION OF PIPELINES FOR GAS, WATER ANO ASSOCIA TEO PLANTS. CONSTRUCTION OF RIVER WORKS, CROSS-DRAINAGE STRUCTURES, HYDRAUUC WORKS ANO STABIUSA T/ON OF EMBANKMENT SLOPES.

EARTH-MOVING WORKS.

La validità del presente certificato è subordinata a sorveglianza periodica annuale / semestrale ed al riesame completo del sistema di gestione con periodicità triennale The validity of this certificate is dependent on an annua/ I six monthfy audi/ and on a complete review, every three years, of the management system

L'uso e la validità del presente certificato sono soggetti al rispetto del documento RINA: Regolamento per la Certificazione di Sistemi di Gestione per la Qualità The use and vafidity of this certificate are subject to compliance with the RINA document: Rufes tor the certification of Quality Management Systems

Prima emissione First lssue Data scadenza Expiry Date

12.07.2010

10.07.2022

SGQ N° 002 A

Membro degli Accordi di Mutuo Riconoscimento EA, IAF e ILAC

Signatory of EA, IAF and ILAC Mutuai Recogn;t;on Agreements

Data decisione di rinnovo Renewal decision date Data revisione Revision date

10.07.2019

10.07.2019

Gianni De Lillo

Verona&Venice Management System Certification, Head

RINA Services S.p.A. Via Corsica 12 - 16128 Genova ltaly

www.clsq.com

CISQ è la Federazione Italiana di Organismi di Certificazione dei sistemi di gestione aziendale

C/SQ is the ltalian Federation of management system Certification Bodies

EMS-4814/S

PBR TECHNOLOGY S.R.L.VIALE DELLA VITTORIA 1 33033 Codroipo (UD) ITALIA

VIA RISORGIMENTO 18 31040 Gorgo Al Monticano (TV) ITALIA E CANTIERI OPERATIVI

CONSTRUCTION AND INSTALLATION OF PIPELINES FOR GAS, WATER AND ASSOCIATED PLANTS.CONSTRUCTION OF RIVER WORKS, CROSS-DRAINAGE STRUCTURES, HYDRAULIC WORKS AND STABILISATION

ON EMBANKMENT SLOPES. EARTH-MOVING WORKS.

COSTRUZIONE ED INSTALLAZIONE DI CONDOTTE PER IL TRASPORTO DI GAS, ACQUA ED IMPIANTI ASSOCIATI.COSTRUZIONE DI OPERE FLUVIALI, D CONSOLIDAMENTO DEGLI ALVEI DEI FIUMI E DI DIFESA NONCHE' DI

OPERE DI SISTEMAZIONE IDRAULICA. LAVORI DI MOVIMENTO TERRA.

Per informazioni sulla validitàdel certificato, visitare il sito

www.rina.org

For information concerningvalidity of the certificate, you

can visit the sitewww.rina.org

CCEERRTTIIFFIICCAATTEE NNoo..

CERTIFICATO N.

SI CERTIFICA CHE IL SISTEMA DI GESTIONE AMBIENTALE DI

IT IS HEREBY CERTIFIED THAT THE ENVIRONMENTAL MANAGEMENT SYSTEM OF

PER I SEGUENTI CAMPI DI ATTIVITÀ / FOR THE FOLLOWING FIELD(S) OF ACTIVITIES

NELLE SEGUENTI UNITÀ OPERATIVE / IN THE FOLLOWING OPERATIONAL UNITS

È CONFORME ALLA NORMA / IS IN COMPLIANCE WITH THE STANDARD IAF:28

ISO 14001:2015E AL REGOLAMENTO TECNICO ACCREDIA RT-09

21.12.2012

14.09.2018

CISQ è la Federazione Italiana di Organismi diCertificazione dei sistemi di gestione aziendale

CISQ is the Italian Federation ofmanagement system Certification Bodies

Prima emissioneFirst Issue

Data revisioneRevision date

RINA Services S.p.A.

Data scadenzaExpiry Date 18.12.2021

Via Corsica 12 - 16128 Genova Italy

Data decisione di rinnovoRenewal decision date 14.09.2018

L'uso e la validità del presente certificato sono soggetti al rispetto del documento RINA: Regolamento per la Certificazione di Sistemi di Gestione Ambientale

The use and the validity of this certificate are subject to compliance with the RINA document: Rules for the Certification of Environmental Management Systems

La validità del presente certificato è subordinata a sorveglianza periodica annuale / semestrale ed al riesame completo del sistema di gestione con periodicità triennale

The validity of this certificate is dependent on an annual / six monthly audit and on a complete review, every three years, of the management system

Enrico Cusinato

Venice Management SystemCertification, Head

Membro degli Accordi di MutuoRiconoscimento EA, IAF e ILAC

Signatory of EA, IAF and ILACMutual Recognition Agreements

SGA N° 002 D

UD

UD

OG 1

OG 3

OG 4

OG 6

OG 8

OS 23

OS 25

OS 35

III

I

III-BIS

VI

IV

IV

IV-BIS

III-BIS

Direttore Tecnico

OHS-2538

PBR TECHNOLOGY S.R.L.VIALE DELLA VITTORIA 1 33033 Codroipo (UD) ITALIA

VIA RISORGIMENTO 18 31040 Gorgo Al Monticano (TV) ITALIA E CANTIERI OPERATIVI

BS OHSAS 18001:2007

CONSTRUCTION AND INSTALLATION OF PIPELINES FOR GAS, WATER AND ASSOCIATED PLANTS.CONSTRUCTION OF RIVER WORKS, CROSS -DRAINAGE STRUTTURES, HYDRAULIC WORKS AND

STABILISISATION OF EMBANKEMENT SLOPES. EARTH - MOVING WORKS.

COSTRUZIONE ED INSTALLAZIONE DI CONDOTTE PER IL TRASPORTO DI GAS, ACQUA ED IMPIANTI ASSOCIATI.COSTRUZIONE DI OPERE FLUVIALI, DI CONSOLIDAMENTO DEGLI ALVEI DEI FIUMI E DI DIFESA NONCHE' DI

OPERE DI SISTEMAZIONE IDRAULICA. LAVORI DI MOVIMENTO TERRA.

Per informazioni sulla validitàdel certificato, visitare il sito

www.rina.org

For information concerningvalidity of the certificate, you

can visit the sitewww.rina.org

CCEERRTTIIFFIICCAATTEE NNoo..

CERTIFICATO N.

Si certifica che il Sistema di Gestione della Sicurezza e della Salute sul luogo di lavoro di

It is hereby certified that the Occupational Health and Safety Management System of

per le seguenti attività / for the following activities

nelle seguenti unità operative / in the following operational units

La validità del presente certificato è subordinata a sorveglianza periodica annuale / semestrale ed al riesame completo del sistema di gestione con periodicità triennale

The validity of this certificate is dependent on an annual / six monthly audit and on a complete review, every three years, of the management system

è conforme alla norma / is in compliance with the standard

IAF:28

The use and validity of this certificate are subject to compliance with the RINA document: Rules for the Certification of Occupational Health and Safety Management Systems

L’uso e la validità del presente certificato è soggetto al rispetto del documento RINA: Regolamento per la Certificazione dei Sistemi di Gestione della Sicurezza e Salute sul luogo di lavoro

23.12.2015

29.04.2020

CISQ è la Federazione Italiana di Organismi diCertificazione dei sistemi di gestione aziendale

CISQ is the Italian Federation ofmanagement system Certification Bodies

Prima emissioneFirst Issue

Data revisioneRevision date

RINA Services S.p.A.

Data scadenzaExpiry Date 30.09.2021

Via Corsica 12 - 16128 Genova Italy

Data decisione di rinnovoRenewal decision date 11.12.2018

Gianni De Lillo

Verona&Venice Management SystemCertification, Head

Membro degli Accordi di MutuoRiconoscimento EA, IAF e ILAC

Signatory of EA, IAF and ILACMutual Recognition Agreements

SCR N° 003 F

IT IS HEREBY CERTIFIED THAT THE QUALITY MANAGEMENT SYSTEM OF

EA:28

21555/10/S

PBR TECHNOLOGY S.R.L.

VIALE DELLA VITTORIA 1 33033 CODROIPO (UD) ITALIA

VIA RISORGIMENTO 18 31040 GORGO AL MONTICANO (TV) ITALIA E CANTIERI OPERATIVI

CONSTRUCTION AND INSTALLATION OF PIPELINES FOR GAS, WATER AND ASSOCIATED PLANTS.CONSTRUCTION OF RIVER WORKS, CROSS-DRAINAGE STRUCTURES, HYDRAULIC WORKS AND STABILISATION

OF EMBANKMENT SLOPES. EARTH-MOVING WORKS.

COSTRUZIONE ED INSTALLAZIONE DI CONDOTTE PER IL TRASPORTO DI GAS, ACQUA ED IMPIANTI ASSOCIATI.COSTRUZIONE DI OPERE FLUVIALI, DI CONSOLIDAMENTO DEGLI ALVEI DEI FIUMI E DI DIFESA NONCHE' DI

OPERE DI SISTEMAZIONE IDRAULICA. LAVORI DI MOVIMENTO TERRA.

12.07.2010

11.07.2016

Per informazioni sulla validitàdel certificato, visitare il sito

www.rina.org

For information concerningvalidity of the certificate, you

can visit the sitewww.rina.org

CISQ è la Federazione Italiana di Organismi diCertificazione dei sistemi di gestione aziendale

CISQ is the Italian Federation ofmanagement system Certification Bodies

CERTIFICATE No.

CERTIFICATO N.

SI CERTIFICA CHE IL SISTEMA DI GESTIONE PER LA QUALITÀ DI

PER I SEGUENTI CAMPI DI ATTIVITÀ / FOR THE FOLLOWING FIELD(S) OF ACTIVITIES

NELLE SEGUENTI UNITÀ OPERATIVE / IN THE FOLLOWING OPERATIONAL UNITS

L'uso e la validità del presente certificato sono soggetti al rispetto del documento RINA: Regolamento per la Certificazione di Sistemi di Gestione per la Qualità

La validità del presente certificato è subordinata a sorveglianza periodica annuale / semestrale ed al riesame completo del sistema di gestione con periodicità triennale

The validity of this certificate is dependent on an annual / six monthly audit and on a complete review, every three years, of the management system

Prima emissioneFirst Issue

Emissione correnteCurrent Issue

RINA Services S.p.A.

È CONFORME ALLA NORMA / IS IN COMPLIANCE WITH THE STANDARD

Riferirsi al Manuale della Qualitàper i dettagli delle esclusioni ai

requisiti della norma

Data scadenzaExpiry Date 15.09.2018

Luigi Fiato

Manager, Venezia (Marghera) Certification

Reference is to be made to theQuality Manual for details

regarding the exemptions from therequirements of the standard

E VALUTATO SECONDO LE PRESCRIZIONI DEL REGOLAMENTO TECNICO RT-05ISO 9001:2008

Membro degli Accordi di MutuoRiconoscimento EA, IAF e ILAC

Signatory of EA, IAF and ILAC MutualRecognition Agreements

La presente certificazione si intenderiferita agli aspetti gestionali dell'impresanel suo complesso ed è utilizzabile ai fini

della qualificazione delle imprese dicostruzione ai sensi dell'articolo 40 della

legge 163 del 12 aprile 2006 esuccessive modificazioni e del DPR. 5

ottobre 2010 n. 207

The use and validity of this certificate are subject to compliance with the RINA document : Rules for the certification of Quality Management Systems

Via Corsica 12 - 16128 Genova Italy

SGQ N° 002 A SSI N° 001 GSGA N° 002 D DAP N° 001 HPRD N° 002 B PRS N° 066 CSCR N° 003 F LAB N° 0832SGE N° 008 M ISP N° 069E

Page 14: PBR TECHNOLOGY SRL · 2021. 3. 25. · - 13 - ACCREDITATION Iso - Eurosoa - Inet PBR TECHNOLOGY S.R.L. VIALE DELLA VITTORIA 1 33033 CODROIPO (UD) ITALIA VIA RISORGIMENTO 18 31040

- 14 -

APPRECIATION LETTER

Page 15: PBR TECHNOLOGY SRL · 2021. 3. 25. · - 13 - ACCREDITATION Iso - Eurosoa - Inet PBR TECHNOLOGY S.R.L. VIALE DELLA VITTORIA 1 33033 CODROIPO (UD) ITALIA VIA RISORGIMENTO 18 31040

- 15 -

QUALITY, HSE & ENVIRONMENTQUALITY POLICYPBR TECHNOLOGY S.r.l. is committed to constantly pursue the following four objectives:QUALITYCompetence in respecting the contractual technical requisites based on the results of the tests carried out during the execution of the works and assurance that the works are delivered according to the contract stipulations.RELIABILITYCompetence in strictly meeting the delivery terms within the established time.BEHAVIOUR AND SUPERVISIONCompetence in establishing and carrying out effective cooperation before, during and after the termination of any contract as well as managing the employees, collaborators and sub-contractors.COMPETITIVENESSCompetence in achieving customer satisfaction due to the fact that PBR Technology is able to provide the best cost-effective solutions to be found on the market.ENVIRONMENTAL PROTECTION AND CONSERVATION POLICYPBR TECHNOLOGY S.r.l. is aware of the importance of environmental protection and conservation, including the sustainable use and development of natural resources such as to ensure the prevention or reduction of pollution. It is therefore committed to complying with the pertinent national legislation and regulations in force as well as to applying the best practices in order to fully satisfy the customers’ specific requirements.PBR TECHNOLOGY S.r.l. provides the workers with adequate information, training and awareness regarding the Policy, the implementation of all the precautionary measures, and the proper Health Security and Emergency Plans. It assesses the risks involved for the environment due to the work activities, identifies the preventative and protection measures to be implemented including the appropriate measures to guarantee over time the reduction of pollution level caused by the work. During the execution of the works every worker must apply his best efforts to respect and safeguard the surrounding environment, applying all his personal experience or the information received from collaborators, partners, customers and the pertinent supervisory organizations as well as the inhabitants and communities in the vicinity of the areas where the projects are executed.PERSONNEL WORK SAFETY AND HEALTH POLICYPBR TECHNOLOGY S.r.l. is committed to the safety and health of its workers, thus it implements an effective safety and Health Program for its workers, collaborators as well as its partners, whose aim is to prevent accidents and injuries in compliance with its own standards and the standards of its customers, national legislations, and the applicable rules.

Page 16: PBR TECHNOLOGY SRL · 2021. 3. 25. · - 13 - ACCREDITATION Iso - Eurosoa - Inet PBR TECHNOLOGY S.R.L. VIALE DELLA VITTORIA 1 33033 CODROIPO (UD) ITALIA VIA RISORGIMENTO 18 31040

- 16 -

BUSINESS AREAS: Emergency response servicePBR TECHNOLOGY S.r.l. is able to gua-rantee a prompt and effective service for emergency situations and disaster re-sponse. This is a support service to public bodies and private organizations in order to solve emergency situations due to na-tural events and disasters, negligence or intentional offences involving territories particularly subject to risk, towns and inhabited areas, infrastructures and bu-ildings, utilities, companies, and various types of networks. The work is carried out for public health and safety requirements, protection of public and private services and, more in general, to guarantee the im-mediate return to normal conditions.We have a specific experience develo-ped in emergency and disaster response situations which enables us to intervene with the required equipment and machi-nes. The jobs can entail the following:

01. Landslides and rockslides that thre-aten built-up areas and manufacturing areas;

02. Roads interrupted by landslides, rockslides, water erosion, or due to the collapse or damage to bridges, with the ensuing situation of towns or inhabited areas being cut off or running the risk of being cut off;

03. Protection work for seriously dama-ged essential infrastructures such as wa-ter systems, sewage systems, wastewa-

ter purification plants and energy supply networks;

04. Troubleshooting, identification and eli-mination of spills and/or faults in the gas distribution system (natural gas pipelines); 05. Works to reinstate safety after rocksli-des, soil erosion, collapse or damage to bridges;

06. Flood defence works for the safety of built-up urban areas and/or rural areas threatened by serious flooding. The work includes removal of gravel, debris and obstacles that impede the regular flow of water;

07. Works to maintain correct river flow and/or reinstatement works on water-courses following serious flooding to towns and infrastructures.

08. Work following earthquakes, landsli-

Page 17: PBR TECHNOLOGY SRL · 2021. 3. 25. · - 13 - ACCREDITATION Iso - Eurosoa - Inet PBR TECHNOLOGY S.R.L. VIALE DELLA VITTORIA 1 33033 CODROIPO (UD) ITALIA VIA RISORGIMENTO 18 31040

- 17 -

des, sea storms, floods or severe wea-ther, natural events and disasters;

09. Reinstatement of flood defence wor-ks on watercourses;

10. Reinstatement of roadways, clearing

of sewer pipes, clearing and renovation of waterways, channels, and irrigation di-tches;

11. Response work in situations of water emergency or serious risk of water emer-gency due to drought, interruption of wa-ter supply, or pollution in water pipelines or following any natural events and disasters;

12. Response work in situations of pollu-tion or serious risk of pollution of aquifers or watercourses following the release of pollutants after natural events or disa-sters, or accidents involving industrial plants, rubbish dumps, sewage systems, or vehicles transporting toxic or harmful substances.

PBR TECHNOLOGY S.r.l.Emergency Equipment List

GENERATORSGenerators up to 800 KWA

ROAD TRACTORS4 heavy-duty truck heavy-duty truck rr road tractors with lowbeds for the transport of earth moving equipment

MOTOR PUMPS 70 DN 150 Varisco motor pumps

BRIDGES3 bridges for up to 20 m waterway crossings

DRAINAGE PUMPS DN 4505 DN 450 drainage pumps with 350 HP and 480 HP motorcapacity: 1000 L/sec.

CRANESCranes up to 45 ton

DRAINAGE PUMPS DN 7002 DN 700 drainage pumps with 1200 HP motor capacity: 4000 L/sec.

DEMOLITION EXCAVATORS Equipped with shear and crusher jaw

LONG-REACH BOOM EXCAVATORS5 with up to 25m booms

We also have earth-moving machines and equipment for various types of situations. Visit our site: www.dametto.it

Page 18: PBR TECHNOLOGY SRL · 2021. 3. 25. · - 13 - ACCREDITATION Iso - Eurosoa - Inet PBR TECHNOLOGY S.R.L. VIALE DELLA VITTORIA 1 33033 CODROIPO (UD) ITALIA VIA RISORGIMENTO 18 31040

- 18 -

BUSINESS AREAS: PipelinePBR TECHNOLOGY S.r.l. operates on national and international markets as a general contractor and sub-contractor for the construction of natural gas, oil, and water pipelines for the most important Italian and overseas petrochemical indu-stries (Snam Rete Gas SpA, ABB Soimi, Agip, Edison, Italgas, Enagas, Gaz de France, Wingas GmbH, RWE GmbH, etc).

The know-how and experience acquired over many years in the pipeline sector enables the company to execute all the works involved in pipeline construction:

• Pipeline civil works (land surveying using GPS equipment, route staking, rou-te clearance, excavation, backfill, definiti-ve reinstatement work, open-cut or drilled system water crossings, complementary works etc.);

• Pipeline mechanical works (pipe strin-ging, pipe bending, welding, sand-bla-sting and wrapping, pipeline laying, con-nection of pipeline sections, hydraulic tests, cathodic protection of pipes, etc.);

• General civil and mechanical wor-ks (excavation and earth moving work, concrete pouring, backfill, pre-prefabri-cation of piping, mechanical assembly, sand-blasting and wrapping, de-watering and hydraulic tests, complementary wor-ks etc);

• Other operations required for the com-pletion of the works.

The company’s team of collaborators and specialists (engineers, topographers, surveyors, project managers, foremen, welding technicians, etc) is fully able to guarantee the highest quality standards in terms of execution and technical and project management of the pipeline wor-ks.

The company is renowned on the Ita-lian and international markets for its professionalism, credibility, fairness in competition, specialized workforce and production resources, partnership in im-portant joint ventures and consortia in the field of construction of utility networks and pipelines, and investment programs for the acquisition of new equipment.

Page 19: PBR TECHNOLOGY SRL · 2021. 3. 25. · - 13 - ACCREDITATION Iso - Eurosoa - Inet PBR TECHNOLOGY S.R.L. VIALE DELLA VITTORIA 1 33033 CODROIPO (UD) ITALIA VIA RISORGIMENTO 18 31040

- 19 -

BUSINESS AREAS: Earthwork and hydraulic worksHYDRAULIC WORKSSea and river works, riverbank recon-struction and flood defence works. Thanks to its powerful heavy-duty equip-ment and machines equipped with spe-cific applications for these works, as well as the know-how and technical experti-se of its workers, PBR Technology can carry out all types of open-cut crossings of rivers and large, high capacity water courses, excavation and sea works, lon-gitudinal flood defence works (emban-kments, gabions, mattresses, retaining walls, foundations and slope linings etc.) and transversal flood defence works (concrete checkwalls, various types of gabions, cross barriers, and other types of barriers etc.).

EARTH MOVINGWorks on agricultural land, excavation, ear-th works, and demolition work in general.In the field of earth moving in general, the company is backed by a long and con-solidated experience and a wide range of equipment and machines including trucks, road tractors, semi-trailers, dum-pers, compaction rollers, excavators, bul-ldozers, mini excavators, crawler loaders, wheel loaders, mini loaders, to be used according to specific requirements, work type, and work area.

QUARRY MITIGATION Expertise in the field of quarries that ex-tracted stone for the production of aggre-gate for the building industry. The jobs

include reprofiling of slopes, perforation with hydraulic drilling rigs and/or excava-tors with demolition hammers, crushing, extraction, transport of the material, and final preparation of the slopes by means of covering them with geotextile sheeting suitable for hydro-seeding.

CLEARANCE WORK ON STONYTERRAINPBR TECHNOLOGY S.r.l. executes any clearance and reinstatement work on terrain featuring rocks, stones, and peb-bles of diverse size and shape via remo-val work or via mechanical screening and crushing. For the latter process the com-pany is equipped with grading type vi-brating screens and special mobile stone crushing plants (Kirpy type) mounted on large high-cylinder tractors that process materials with size up to 150 mm. This equipment is ideal for clearing mountain roads, maintenance of ski slopes and the clearance and reinstatement of stony ter-rain. Said equipment is moreover used for the scheduled maintenance of roads and forest areas with very stony terrain, in particular flat or low hilly areas or pasture land, ensuring a surface finish (after one pass or max. two with crusher and stone collector) ready for the roller compaction and reprofiling.

Page 20: PBR TECHNOLOGY SRL · 2021. 3. 25. · - 13 - ACCREDITATION Iso - Eurosoa - Inet PBR TECHNOLOGY S.R.L. VIALE DELLA VITTORIA 1 33033 CODROIPO (UD) ITALIA VIA RISORGIMENTO 18 31040

- 20 -

BUSINESS AREAS: Drilling

In addition to its great excavation experience in open air crossing rivers, PBR has implemented its competence by adopting different technologies for trenchless crossings and sub-soil consolidations:

Drilling with jackingThis technology allows the crossing of natural and man-made obstacles such as roads, existing plants, underground utilities, railroads, and so on. It operates with the prior creation of thrust and arrival workstations, possibly reinforced by metal sheet pile and supported by well point systems. After that, the subsequent execution of drilling using hydraulic jacks which are pushed by the pipe that inside is provided with screw feeders for the excavated material disposal. As part of this technology, PBR has developed an improved methodology that allows to combine the push-tube with the RIG system, which manages the pipe direction through the realization of the pilot hole.

Drilling in H.D.D.PBR Technology is in the process of acquiring organizational structure and human resources to realize an independent and direct way of such technology.The PBR’s know-how coming from its experience in pipeline as a contractor, management and coordinator of works, as well as under professional collaboration with engineers and industry specialists, allows to look with confidence to a rapid obtaining of a specialization and qualification in the HDD execution.This technology allows to run the crossings without making excavations in open air, but instead performing a hole piloted at curved-line trajectory, for pipes with diameters up to 1600 mm, pull lengths of up to 2000 m, and depths up to 20 ml

Microtunnel Drilling PBR Technology is in the process of acquiring organizational structure and human resources to realize an independent and direct way of such technology.The PBR’s know-how coming from its experience in pipeline as a contractor, management and coordinator of works, as well as under professional collaboration

Page 21: PBR TECHNOLOGY SRL · 2021. 3. 25. · - 13 - ACCREDITATION Iso - Eurosoa - Inet PBR TECHNOLOGY S.R.L. VIALE DELLA VITTORIA 1 33033 CODROIPO (UD) ITALIA VIA RISORGIMENTO 18 31040

- 21 -

with engineers and industry specialists, allows to look with confidence to a rapid obtaining of a specialization and qualification to operate with micro-tunnel technology.With the micro-tunnel system you can perform trench-less crossings in loose soils of any nature and consistency, even under the water table, with a controlled tolerance and pushing system guaranteed.This kind of crossing is a valid alternative to the drilling with push-tube and the HDD, in consideration of the size of conduct to be installed, of lengths crossing, and in particular of the nature and the consistency of the material to cross.In micro-tunnel crossing process, thrust and reception chambers has to be made in reinforced concrete, inside the thrust chamber is positioned a remote-controlled milling head with the project diameter wideness, it is pushed into the ground by the same pipe of the pipeline, until the reaching of the finishing pit.The continuous control by laser sighting system to verify the drilling parameters and feed, make the system particularly suitable in river crossings, since it ensures safe and precise execution in each type of soil, in the presence or absence of water.

GalleriesThe technical of crossing through the construction of tunnels is used in cases where the soil has a strongly degraded nature and / or the presence of very hard rock which need the use of explosives.In the process of advancement, the large diameter hole (greater than 2.00 m.) is supported through the laying of ribs, gear-forward, and specially calculated rods steel.

Land consolidationsThis is processing for the consolidation one areas of land, normally inserted in the context of other works of the main pipeline for gas, oil, water, so on, realized in order to. Improving soil stability and work fronts, through the laying of bentonite, diaphragms, and jet-grouting injections.

Page 22: PBR TECHNOLOGY SRL · 2021. 3. 25. · - 13 - ACCREDITATION Iso - Eurosoa - Inet PBR TECHNOLOGY S.R.L. VIALE DELLA VITTORIA 1 33033 CODROIPO (UD) ITALIA VIA RISORGIMENTO 18 31040

- 22 -

BUSINESS AREAS: Special machinesDESIGN AND CREATION OF SPECIAL EQUIPMENTS

LThe company also operates in the field of design and construction of special pro-cess machines and equipment, providing highly innovative, reliable solutions.

In this area PBR TECHNOLOGY S.r.l. operates with a large state-of-the-art workshop staffed with highly specialized personnel, and the consultancy of expert professionals (mechanical engineers, te-chnicians, etc) with a long and consolida-ted experience.

Liebherr 992 Long reach

LARGE PIPE CUTTER®

Liebherr 984 Long reach

Caterpillar D11N Special Ripper

Page 23: PBR TECHNOLOGY SRL · 2021. 3. 25. · - 13 - ACCREDITATION Iso - Eurosoa - Inet PBR TECHNOLOGY S.R.L. VIALE DELLA VITTORIA 1 33033 CODROIPO (UD) ITALIA VIA RISORGIMENTO 18 31040

- 23 -

BUSINESS AREAS: Sale/purchase, rental and storage

BUSINESS AREAS: Transportation

PBR TECHNOLOGY S.r.l. carries out sale/purchase and rental of earth moving machines and yard equipment for third parties.The large storage area holds a vast range of equipment and machines for use in ci-vil works yards.

The company provides transport service for bulky and oversize cargo in complian-ce with the pertinent regulations in force. We moreover are able to provide tran-sport of pipes for stringing operations in pipeline works.Precision, promptness and safety in car-rying out the work, as well as constant updating in order to ensure that the cu-stomer’s needs are fully satisfied at all times. Transport service for third parties, including transport of bulky and oversize cargo.Our fleet includes a great number of vehi-cles for the transport of bulky and oversi-ze cargo of various sizes and weight, as well as highly qualified drivers and escort experts. Objectives: foremost speed and safety.

We also have earth-moving machines for use in various types of situations.

Visit our site: www.dametto.it

transport of a Liebherr 992

Page 24: PBR TECHNOLOGY SRL · 2021. 3. 25. · - 13 - ACCREDITATION Iso - Eurosoa - Inet PBR TECHNOLOGY S.R.L. VIALE DELLA VITTORIA 1 33033 CODROIPO (UD) ITALIA VIA RISORGIMENTO 18 31040

- 24 -

BUSINESS AREA: Archeology

As known, Italy has got a great archaeological heritage. Consequently all the earthworks are always supervised and monitored by Italian Authorities under the supervision of the Ministry of the Superintendence of Cultural Heritage.

In recent years, PBR has included in its staff a team of professionals dedicated to the field of archeology, in order to guarantee the highest quality of work to each Client. Through their experience and extensive equipment, PBR can guarantee the preservation of the archaeological heritage without reducing the service provided to the customer.

Offered Services:Historical - topographical land survey.Preventive archaeological research and investigation.Execution of archaeological excavations.Scientific assistance to the excavation.Cataloging of the finds.Geo - archaeological - paleoanthropological analysis.high resolution photoshoot.

Equipment:No 1 Total station Leica mod. TCR 805 Ultra.No. 3 Levels Optical mod. Protek 24x.No. 3 Distance Measuring Leica mod. Disto Plus.

Main ClientsSuperintendence for Archaeological Heritage of Emilia Romagna- Italy

Superintendence for Archaeological Heritage of Southern Etruria-Italy

Archaeological Superintendence of Lombardy -Italy

Regional Superintendence BB.CC.AA. - Catania - Italy

Snam Rete Gas SpA of Padova, Vicenza, Bari and Bologna -Italy

Municipality of Verucchio (RN), Lurago (CO), Tresana (MS), Terlizzi (BA) - Italy.

Page 25: PBR TECHNOLOGY SRL · 2021. 3. 25. · - 13 - ACCREDITATION Iso - Eurosoa - Inet PBR TECHNOLOGY S.R.L. VIALE DELLA VITTORIA 1 33033 CODROIPO (UD) ITALIA VIA RISORGIMENTO 18 31040

- 25 -

Page 26: PBR TECHNOLOGY SRL · 2021. 3. 25. · - 13 - ACCREDITATION Iso - Eurosoa - Inet PBR TECHNOLOGY S.R.L. VIALE DELLA VITTORIA 1 33033 CODROIPO (UD) ITALIA VIA RISORGIMENTO 18 31040

WOR

KS G

ALLE

RY

Some projects carried out and in progress

Page 27: PBR TECHNOLOGY SRL · 2021. 3. 25. · - 13 - ACCREDITATION Iso - Eurosoa - Inet PBR TECHNOLOGY S.R.L. VIALE DELLA VITTORIA 1 33033 CODROIPO (UD) ITALIA VIA RISORGIMENTO 18 31040

- 27 -

Description:

Year:Client:

Location:Project:

2019 - 2020SicilsaldoBulgariaExpansion of the gas

Expansion of the gas transmission infrastructure of Bulgar-transgaz EAD parallel to the north (main) gas pipeline to the Bulgarian-Serbian border.- 102 km – civil work, open cut cross rivers and installation FOC, sub-stages A6 – A7, Balkan Stream.

Amount of works 13.400.000,00 euro.

Description:

Year:Client:

Location:Project:

2020BonattiBulgariaExpansion of the gas

Expansion of the gas transmission infrastructure of Bulgar-transgaz EAD parallel to the north (main) gas pipeline to the Bulgarian-Serbian border.- 52 km – right of way, civil work related to tie-in, backfilling, stringing activities, sub-stages A5 – A4, Balkan Stream.

Amount of works 4.451.950,00 euro.

Page 28: PBR TECHNOLOGY SRL · 2021. 3. 25. · - 13 - ACCREDITATION Iso - Eurosoa - Inet PBR TECHNOLOGY S.R.L. VIALE DELLA VITTORIA 1 33033 CODROIPO (UD) ITALIA VIA RISORGIMENTO 18 31040

- 28 -

Year:Client:

Location:Project:

Description:

2020Max StreicherBulgariaExpansion of the gas

Expansion of the gas transmission infrastructure of Bulgar-transgaz EAD parallel to the north (main) gas pipeline to the Bulgarian-Serbian border.- 43 km – trench excavation, mechanical works, and installa-tion FOC, sub-stage A3, Balkan Stream.

Amount of works 694.691,08 euro.

Page 29: PBR TECHNOLOGY SRL · 2021. 3. 25. · - 13 - ACCREDITATION Iso - Eurosoa - Inet PBR TECHNOLOGY S.R.L. VIALE DELLA VITTORIA 1 33033 CODROIPO (UD) ITALIA VIA RISORGIMENTO 18 31040

- 29 -

Year:Client:

Location:Project:

2020Snam Rete Gas SpARoma - Italyall pipeline construction works

Year:Client:

Location:Project:

2020Snam Rete Gas SpADesio, Biassono (MB) - ItalyAll pipeline construction works

Year:Client:

Location:Project:

2019Snam Rete Gas SpABoltir (BG) - Italyall pipeline construction works

Description:

Description:

Description:

Railway crossing for section Cività – Roma Ovest DN 550 (22”) - FR 4.1, FR 7.1, FR 8.1, FR 10.1 E and related works

Amount of works 861.426,00 euro.

Gas pipeline construction for sector Desio – Bias-sono DN 400 (16”) – DP 12 BAR, related varia-tions and lines.

Amount of works 6.330.000,00 euro.

Development construction in gas pipeline BOLTIE-RE – BERGAMO DN 400 (16’’) and related works

Amount of works 5.000.000 euro.

Page 30: PBR TECHNOLOGY SRL · 2021. 3. 25. · - 13 - ACCREDITATION Iso - Eurosoa - Inet PBR TECHNOLOGY S.R.L. VIALE DELLA VITTORIA 1 33033 CODROIPO (UD) ITALIA VIA RISORGIMENTO 18 31040

- 30 -

Description:

- 30 -

Year:Client:

Location:Project:

2019 - 2020Serse SrlLimena (PD) - ItalyCivil works

Gas pipeline concrete protection DN 1200 interfercing with new building project in Street Magarotto, Limena (Padua)

Amount of works 216.483,00 euro.

Year:Client:

Location:Project:

2020SicilsaldoTermini Imerese, Palermo - Italyall pipeline construction works

Description:

Gas pipeline Gagliano – (Termini Imerese) comple-mentary works and archeology assistance DP 75 BAR- MOP 24 BAR

Amount of works 27.920,00 euro.

Year:Client:

Location:Project:

2019 - 2020SALP SpATreviso - ItalyBulging and assembly for Italian north east pipeline district

Description:

Building and assembly works for the maintenance and construction of pipelines and plants, availability service and building and assembly works inherent with the re-quests for prompt intervention on pipelines and plants with diameter up to dn 1400 (56”) permitted by: north east district - center of Codroipo and detachment of Malborghetto, center of Montebelluna; centrals of Mal-borghetto and Istrana; project nor. building and assem-bly works on pipelines and plants, availability service and assembly works inherent with the requests for immediate intervention on pipelines and systems with diameter from dn 650 (26 “) to dn 1400 (56”) in the ter-ritory of competence of north east district - centers of Marghera, Rovigo, Trento, Verona and Vicenza; Poggio Renatico power plant.

Amount of works 1.177.836,00 euro.

Page 31: PBR TECHNOLOGY SRL · 2021. 3. 25. · - 13 - ACCREDITATION Iso - Eurosoa - Inet PBR TECHNOLOGY S.R.L. VIALE DELLA VITTORIA 1 33033 CODROIPO (UD) ITALIA VIA RISORGIMENTO 18 31040

- 31 -- 31 -

Year:Client:

Location:Project:

2019Festa SpAAbruzzo - ItalyMechanical works

Description:

Gas pipeline connection to Abruzzo Energia Gissi: Drilling variation and execution of hydraulic works for Cena Torrent, L=0,760 KM, DN 500 MM (20”), DP 75 BAR, related works and decommissioning related lines”.

Amount of works 182.346,00 euro.

Year:Client:

Location:Project:

2019ITALCOL SpACerreto Guidi, Firenze - ItalyDemolition works

Description:

Arno river bridge demolition in Cerreto Guidi mu-

nicipality.

Amount of works 34.000,00 euro.

Year:Client:

Location:Project:

Description:

2019Costruzioni Cicuttin SrlLignano Sabbiadoro (UD) - ItalyMaintenance works for river bottom and sand management

Sand Shore restoration in Lignano Sabbiadoro.

Amount of works 160.730,00 euro.

Page 32: PBR TECHNOLOGY SRL · 2021. 3. 25. · - 13 - ACCREDITATION Iso - Eurosoa - Inet PBR TECHNOLOGY S.R.L. VIALE DELLA VITTORIA 1 33033 CODROIPO (UD) ITALIA VIA RISORGIMENTO 18 31040

- 32 -

Year:Client:

Location:Project:

2019Trentin ghiaia SrlArcade (TV) - ItalyVegetal material redistribution for environmental reinstatement and limo smoothing

Description:

Limo smoothing in quarry, arcade (TV) municipality.

Amount of works 52.772,50 euro.

- 32 -

Year:Client:

Location:Project:

2018 - 2019Festa SpAMonte San Biagio (LT) - ItalyMechanical works

Description:

Variant In Toc Met. Benevento-Cisterna DN 500 (20”),loc. Monte San Biagio Latina

Amount of works 195.000,00 euro.

Page 33: PBR TECHNOLOGY SRL · 2021. 3. 25. · - 13 - ACCREDITATION Iso - Eurosoa - Inet PBR TECHNOLOGY S.R.L. VIALE DELLA VITTORIA 1 33033 CODROIPO (UD) ITALIA VIA RISORGIMENTO 18 31040

- 33 -- 33 -

Year:Client:

Location:Project:

2018Snam Rete Gas SpATorino - Italy Hydraulic and geological works around the Pellice Torrent (TO)

Description:

Hydraulic and geological works around pellicetorrent.

Amount of works 406.7190,35 euro.

- 33 -

Year:Client:

Location:Project:

2018C.I.I. Guatelli SpaNoventa di Piave (VE) - ItalyStreet crossing

Description:

Oil pipe Marghera – Portogruaro DN 400 (16”) - Re-location conducted for expansion of the commer-cial area “outlet” - viaduct crossing provincial road n.55 in Noventa di Piave (VE).

Amount of works 70.000,00 euro.

Page 34: PBR TECHNOLOGY SRL · 2021. 3. 25. · - 13 - ACCREDITATION Iso - Eurosoa - Inet PBR TECHNOLOGY S.R.L. VIALE DELLA VITTORIA 1 33033 CODROIPO (UD) ITALIA VIA RISORGIMENTO 18 31040

- 34 -

Description:

Description:

Year:Client:

Location:Project:

Year:Client:

Location:Project:

2018Snam Rete Gas SpARimini - ItalyAll pipeline construction worksRimini - San Leo (RN)

2018C.I.I. Guatelli SpaPiemonte - ItalyGasdotto Trecate-Chivasso DN 10” - fiume Dora Baltea

Rimini-Sansepolcro methane pipeline DN 650 (26“),variation DN 650 (26”) in the municipality ofSan Leo (RN)

Amount of works 800.708,81 euro.

Pipeline Trecate-Chivasso Dn 10 “- variation to the route on the fiume Dora Baltea. Civil works for the opening of the work track, excavations, creation of areas for gunitatura and prefabrication of the pipe.- Creation of access from raised embankments and conservation of their material;- Digging in the riverbed- Backfilling with material from the excavations- Leveling gravels in the riverbed- Reshaping of the riverbed as originally and of the embankments

Amount of works 444.690,00 euro.

Page 35: PBR TECHNOLOGY SRL · 2021. 3. 25. · - 13 - ACCREDITATION Iso - Eurosoa - Inet PBR TECHNOLOGY S.R.L. VIALE DELLA VITTORIA 1 33033 CODROIPO (UD) ITALIA VIA RISORGIMENTO 18 31040

- 35 -

Description:

2017- 2020Snam Rete GasVicenza - ItalyMaintenance installations

2017- 2020STOGITSabioncello (FE) ItalyGas Storage Central

Maintennance of all installations oil and gas by Snam Rete Gas Province of Vicenza - Italy, for three consecutive years from January, 1st of 2017.

Annual amount of works 5 millions euro.

Description:Substitution of number two gas storage tanks (triethylene glycol), and the plant of nitrogen production.

Annual amount of works 8 millions euro.

Year:Client:

Location:Project:

Year:Client:

Location:Project:

Page 36: PBR TECHNOLOGY SRL · 2021. 3. 25. · - 13 - ACCREDITATION Iso - Eurosoa - Inet PBR TECHNOLOGY S.R.L. VIALE DELLA VITTORIA 1 33033 CODROIPO (UD) ITALIA VIA RISORGIMENTO 18 31040

- 36 -

Year:Client:

Location:Project:

Description:

2017 - 2019Snam Rete GasCremona, Mestre, Ravenna - ItalyPipeline Cremona – Mestre DN 400 (16”)and DN 550 (22”)

Construction of the line variants on gas pipeline “Cremona – Mestre” DN 400 (16 “), DP 64 bar and related works, to be carried out in the Province of Vicenza – Italy.

Amount of works 5,6 millions euro.

Page 37: PBR TECHNOLOGY SRL · 2021. 3. 25. · - 13 - ACCREDITATION Iso - Eurosoa - Inet PBR TECHNOLOGY S.R.L. VIALE DELLA VITTORIA 1 33033 CODROIPO (UD) ITALIA VIA RISORGIMENTO 18 31040

Year:Client:

Location:Project:

Description:

2017 - 2018Snam Rete Gas SpAFalconara - ItalyAll pipeline construction works - Falconara

Doubling and connecting agip Falconara wells to RA/CH - installation of traps and filters.

Amount of works 2.460.000,00 euro.

- 37 -

Page 38: PBR TECHNOLOGY SRL · 2021. 3. 25. · - 13 - ACCREDITATION Iso - Eurosoa - Inet PBR TECHNOLOGY S.R.L. VIALE DELLA VITTORIA 1 33033 CODROIPO (UD) ITALIA VIA RISORGIMENTO 18 31040

- 38 -

Year:Client:

Location:

Project:

Description:

2017 - 2018Snam Rete Gas SpABordolano, Minerbio, Sabbioncello, Alfonsine, Cortemaggiore - ItalyAll pipeline construction works

Mechanical maintenance of equipment, ten-year integrity checks of pressure equipment, installation of insulation at the stogit plants in Bordolano, Minerbio, Sabbioncello, Alfonsine, Cortemaggiore. (Lot 2).

Amount of works 1.000.000,00 euro.

Description:

Year:Client:

Location:Project:

2017 - 2018Snam Rete Gas SpAGalliate - Romentino (NO) - ItalyAll pipeline construction works Galliate

Variation to the derivation for Galliate methane pipeline in the municipalities of Galliate and Romentino (NO);- Reconstruction of the connection 1^ common outlet of

Galliate- Reconstruction of the connection 2^ common outlet of

Galliate

Amount of works 1.110.279,66 euro.

Page 39: PBR TECHNOLOGY SRL · 2021. 3. 25. · - 13 - ACCREDITATION Iso - Eurosoa - Inet PBR TECHNOLOGY S.R.L. VIALE DELLA VITTORIA 1 33033 CODROIPO (UD) ITALIA VIA RISORGIMENTO 18 31040

- 39 -

Description:

Year:Client:

Location:Project:

2017 - 2018Snam Rete Gas SpARavenna- Mestre - ItalyAll pipeline construction worksRavenna - Mestre

Construction works on the pipeline of Ravenna- Mestre.

Amount of works 487.000,00 euro.

Description:

Year:Client:

Location:Project:

2017Anese SpAPorto Marghera - ItalyMechanical works, earth moving, excavations, backfilling, works in C.A., demolitions

Controlled Horizontal Drilling For The Crossing Of The West Industrial Canal – Porto Marghera.

Amount of works 230.000,00 euro.

Page 40: PBR TECHNOLOGY SRL · 2021. 3. 25. · - 13 - ACCREDITATION Iso - Eurosoa - Inet PBR TECHNOLOGY S.R.L. VIALE DELLA VITTORIA 1 33033 CODROIPO (UD) ITALIA VIA RISORGIMENTO 18 31040

- 40 -

Description:

Year:Client:

Location:Project:

2017Snam Rete Gas SpABassano del Grappa e Nove (VI)- ItalyAll pipeline construction works Bassano del Grappa e Nove

Works for potentiation derivation for Nove DN 250.

Variant DN 250 for the replacement of the pipe section

at the crossing of the brenta river in the municipalities of

Bassano del Grappa and Nove (VI).

Amount of works 483.502,32 euro.

Description:

Year:Client:

Location:Project:

2016 - 2017Snam Rete Gas SpAFidenza (PR) - ItalyAll pipeline construction works Fidenza – Parma

Construction of a new fidenza pipe pool and other rela-ted works in the municipality of Fidenza (PR) - Italy.

Amount of works 217.000,00 euro.

Page 41: PBR TECHNOLOGY SRL · 2021. 3. 25. · - 13 - ACCREDITATION Iso - Eurosoa - Inet PBR TECHNOLOGY S.R.L. VIALE DELLA VITTORIA 1 33033 CODROIPO (UD) ITALIA VIA RISORGIMENTO 18 31040

- 41 -

Year:Client:

Location:Project:

Description:

2016 - 2017Snam Rete gasSpina - Corato - ItalyPipeline Terlizzi DN 100 (6”)

Works for construction of the following gas pipeline / plant:

- Spina di Corato pipeline V.25-31 e V.39-44 DN 150;- Connection relinking in Municipality of Terlizzi DN 100;- Pipeline dismantling in Spina di Corato and related works.

Amount of works 2,4 millions euro.

Page 42: PBR TECHNOLOGY SRL · 2021. 3. 25. · - 13 - ACCREDITATION Iso - Eurosoa - Inet PBR TECHNOLOGY S.R.L. VIALE DELLA VITTORIA 1 33033 CODROIPO (UD) ITALIA VIA RISORGIMENTO 18 31040

Year:Client:

Location:Project:

Description:

- 42 -

2016Streicher - BouchamaouiNawara - Gabes - TunisiePipeline DN 600 (24”)

Execution of 255 Km of line excavation, including 8 wady (de-sert river) crossing, in a compact mixed hard rock terrain.

Amount of works 4,6 millions euro.

Page 43: PBR TECHNOLOGY SRL · 2021. 3. 25. · - 13 - ACCREDITATION Iso - Eurosoa - Inet PBR TECHNOLOGY S.R.L. VIALE DELLA VITTORIA 1 33033 CODROIPO (UD) ITALIA VIA RISORGIMENTO 18 31040

Year:Client:

Location:Project:

Description:

- 43 -

2016Bonatti S.p.a.Cervignano D’Adda (Lo) - ItalyPipeline DN 900 (30/34”)

Dismantling of pipeline DN 900 30/34” and equipment portion, related to the project named: “natural gas pipeline Zimella – Cervignano D’Adda DN 1400 (56”)– dp 75 bar – lot 4 of km. 30.793 from plant no.25 in Castelletto di Sopra (CR) included (20 m upstream of v 164 of the 9th trunk), to the plant 33 in Cervignano D’Adda (LO) included and related works (connections, recon-nections and dismantlings) and new knot in Sergnano (CR).

Amount of works 2,3 millions euro.

Page 44: PBR TECHNOLOGY SRL · 2021. 3. 25. · - 13 - ACCREDITATION Iso - Eurosoa - Inet PBR TECHNOLOGY S.R.L. VIALE DELLA VITTORIA 1 33033 CODROIPO (UD) ITALIA VIA RISORGIMENTO 18 31040

Year:Client:

Location:Project:

Description:

- 44 -

2015Snam Rete GasBassano del Grappa - ItalyPipeline DN 300 (12”)

Gas Pipeline Strengthening, Derivation to NOVE DN 250: Variant DN 250 for replacement of a damaged section at the crossing of the Brenta River in the Municipality of Bassano del Grappa (VI).

Amount of works 1,1 millions euro.

Page 45: PBR TECHNOLOGY SRL · 2021. 3. 25. · - 13 - ACCREDITATION Iso - Eurosoa - Inet PBR TECHNOLOGY S.R.L. VIALE DELLA VITTORIA 1 33033 CODROIPO (UD) ITALIA VIA RISORGIMENTO 18 31040

Year:Client:

Location:Project:

Description:

- 45 -

2015Snam Rete GasLurago d’Erba - ItalyInstallations of reduction type IPRS

Strengthening of the Reduction Plant in Lurago d’Erba, type IPRS 150 inclusive of dismantling of the existing cabin # 510 and partial dismantling of the plant PIDI n.4500630/39.PIDI connection to plant DN 500 (20 “) ml. 107 approx. Connection to the plant in PIDI di Lurago DN 600 (24”) ml.100 approx.

Amount of works 1,2 millions euro.

Page 46: PBR TECHNOLOGY SRL · 2021. 3. 25. · - 13 - ACCREDITATION Iso - Eurosoa - Inet PBR TECHNOLOGY S.R.L. VIALE DELLA VITTORIA 1 33033 CODROIPO (UD) ITALIA VIA RISORGIMENTO 18 31040

Year:Client:

Location:Project:

Description:

- 46 -

2016-2017Snam Rete GasVerrucchio - ItalyPipeline DN 650 (26”)

Construction of the gas pipeline Rimini-San Sepolcro, Variantin Municipality of Verucchio (RN) Loc. La Bonina:Dn 650 (26”), DP = 75 bar, l = 1,232 m, including performanceto Microtunnel height= 3000mm

Amount of works 3 millions euro.

Page 47: PBR TECHNOLOGY SRL · 2021. 3. 25. · - 13 - ACCREDITATION Iso - Eurosoa - Inet PBR TECHNOLOGY S.R.L. VIALE DELLA VITTORIA 1 33033 CODROIPO (UD) ITALIA VIA RISORGIMENTO 18 31040

Year:Client:

Location:Project:

Description:

- 47 -

2014Snam Rete GasBronte - Catania - ItalyPipeline DN 300 (12”)

Construction of the pipeline Variant “Bronte – Catania” DN 300 (12 “) (stretch from valve 46660 / 10.1 to 13 V + 60 mt and 80 mt + 16 V to 20 V.)Pipeline All.to Saced pipeline DN 100 (4 “) - Variation in T.O.C.

Amount of works 1,6 millions euro.

Page 48: PBR TECHNOLOGY SRL · 2021. 3. 25. · - 13 - ACCREDITATION Iso - Eurosoa - Inet PBR TECHNOLOGY S.R.L. VIALE DELLA VITTORIA 1 33033 CODROIPO (UD) ITALIA VIA RISORGIMENTO 18 31040

Year:Client:

Location:Project:

Description:

- 48 -

2014Snam Rete GasChieti - ItalyPipeline DN 650 (26”)

Gas pipeline to Ravenna - Chieti DN 650 (26”):- Defense Works River Metauro and other related works in Municipality of Cartoceto and Montemaggiore al Metauro (PU). - Gas pipeline Branch to Langhirano DN 200 (8”): Defence works river Parma ed other related works in the Municipality of Parma and Monte-chiarugolo (PR).

Amount of works 1,4 millions euro.

Page 49: PBR TECHNOLOGY SRL · 2021. 3. 25. · - 13 - ACCREDITATION Iso - Eurosoa - Inet PBR TECHNOLOGY S.R.L. VIALE DELLA VITTORIA 1 33033 CODROIPO (UD) ITALIA VIA RISORGIMENTO 18 31040

Year:Client:

Location:Project:

Description:

- 49 -

2014Snam Rete GasCortemaggiore - ItalyPipeline DN 300 (12”)

Decommissioning of the gas turbine cabinets valves T4-56, repositioning new turbines, and pipeline connections.

Amount of works 2,2 millions euro.

Page 50: PBR TECHNOLOGY SRL · 2021. 3. 25. · - 13 - ACCREDITATION Iso - Eurosoa - Inet PBR TECHNOLOGY S.R.L. VIALE DELLA VITTORIA 1 33033 CODROIPO (UD) ITALIA VIA RISORGIMENTO 18 31040

Year:Client:

Location:Project:

Description:

- 50 -

2011 - 2013Sicim S.p.a.Colombia225 km long Araguaney–Banadia DN 1050 (42’’) oil pipeline

Line excavation, open-cut crossings of small and main rivers for the con-struction of the DN 1050 (42’’) 225 km “Araguaney Banadia” oil pipeline owned by Ecopetrol del Bicentenario S.A.

The jobs include:- Excavation of the main line of the oil pipline on different types of terrain.- Crossing of roads, piping systems and power lines (open-cut).- Crossing of small rivers (open cut)- Crossing of main rivers (open cut):1. Pauto river - 2. Curama river - 3. Guachiria river - 4. Muese river5. Ariporo river - 6. Aricaporo river - 7. Tamacay river - 8. Tigre river9. Caranal river

Amount of works 8,6 millions euro.

Page 51: PBR TECHNOLOGY SRL · 2021. 3. 25. · - 13 - ACCREDITATION Iso - Eurosoa - Inet PBR TECHNOLOGY S.R.L. VIALE DELLA VITTORIA 1 33033 CODROIPO (UD) ITALIA VIA RISORGIMENTO 18 31040

Year:Client:

Location:Project:

Description:

- 51 -

2012Sicim S.p.a.ColombiaRiver open-cut crossing for the laying ofDN 450 (18”) gas pipeline.

River open-cut crossing (Aguazul) for the laying ofDN 450 (18”) gas pipeline:

The rivers involved are the following:1. Chiquito river2. Cusiana river3. Unete river

1st crossing4. Unete river 2nd crossing

Amount of works 2,4 millions euro.

Page 52: PBR TECHNOLOGY SRL · 2021. 3. 25. · - 13 - ACCREDITATION Iso - Eurosoa - Inet PBR TECHNOLOGY S.R.L. VIALE DELLA VITTORIA 1 33033 CODROIPO (UD) ITALIA VIA RISORGIMENTO 18 31040

Year:Client:

Location:Project:

Description:

- 52 -

Open-cut crossing under the river bed of the Müggelspree river for the “OPAL natural gas pipeline” DN 1400 (56”), in Germany. 77.4 metres crossing length , 11 metres depth from the banks.

- River bed excavation according to project depth with 70 ton excavator equipped with long reach boom and arm;- Cooperation for excavation work with watercraft;- Assistence and cooperation for laying of immersed section;- Backfill;- Isassembly and transport back of the machines and equipment used in the works.Amount of works 1,5 millions euro.

2011Bonatti S.p.a.Spreenhagen – GermanyOpal natural gas pipeline DN 1400 (56”) and open-cut river crossing

Page 53: PBR TECHNOLOGY SRL · 2021. 3. 25. · - 13 - ACCREDITATION Iso - Eurosoa - Inet PBR TECHNOLOGY S.R.L. VIALE DELLA VITTORIA 1 33033 CODROIPO (UD) ITALIA VIA RISORGIMENTO 18 31040

Year:Client:

Location:Project:

Description:

- 53 -

Permanent removal from service (elimination/plugging) of gas pipelines with works inclu-ding identification of pipes to be removed, excavation, decontamination of pipes (of any gas and hydrocarbons present), pipe sectio-ning and removal, stabilization with cement, backfill and reinstatement work.

Amount of works 2,2 millions euro.

2011Snam Rete GasTarvisio- Malborghetto–UdinePermanent removal from service of gas pipeline sections.

Page 54: PBR TECHNOLOGY SRL · 2021. 3. 25. · - 13 - ACCREDITATION Iso - Eurosoa - Inet PBR TECHNOLOGY S.R.L. VIALE DELLA VITTORIA 1 33033 CODROIPO (UD) ITALIA VIA RISORGIMENTO 18 31040

Year:Client:

Location:Project:

Description:

- 54 -

Dismantelling of the Snam Rete Gas natural gas pipeline (DN 350 and 200) bridge over the Arno river and the Florence-Pisa railway line. Civil and mechanical works including cutting of pipes into su-itable sizes, removal of pipes, steel structural work and accesso-ries, demolition of concrete structures (pillars, girders, etc), clea-ring, sectioning, transport and temporary storing of of non-ferrous materials such as pipes, steel structural work etc, and disposal of non-ferrous materials.

Amount of works 1,9 millions euro.

2011A. HAK INTERNATIONAL B.V.Florence - Pisa – ItalyDismantling of Snam Rete Gas pipeline(DN 350 (14”) and DN 200 (8”) bridge

Page 55: PBR TECHNOLOGY SRL · 2021. 3. 25. · - 13 - ACCREDITATION Iso - Eurosoa - Inet PBR TECHNOLOGY S.R.L. VIALE DELLA VITTORIA 1 33033 CODROIPO (UD) ITALIA VIA RISORGIMENTO 18 31040

Year:Client:

Location:Project:

Description:

- 55 -

Flood defence works on the Rimini-S. Sepolcro section of the natural gas pi-peline DN 650 (26”) along the right bank of the Marecchia river, in the mu-nicipality of Pennabilli (RN). The works were carried out to guarantee safety of the natural gas pipelines located in the area close to the right bank of the Marecchia river. The works include a series of reinstatement work, flood defence work and protection of the current natural gas pipeline, specifically along the right bank of the Marecchia river near the built-up area of Pennabilli (RN). Length of the section: approx. 240 linear matres.

Main works:• Rock barrier (mattress faced) and overflow channel• Rock covered drainage channel• Laying of cross-barriers• Reinstatement of river bed with alluvial soil

Amount of works 1,7 millions euro.

2010Snam Rete GasPennabilli - Rimini – ItalyFlood defense works Rimini–San Sepolcro natural gas pipeline DN 650 (26”)

Page 56: PBR TECHNOLOGY SRL · 2021. 3. 25. · - 13 - ACCREDITATION Iso - Eurosoa - Inet PBR TECHNOLOGY S.R.L. VIALE DELLA VITTORIA 1 33033 CODROIPO (UD) ITALIA VIA RISORGIMENTO 18 31040

Year:Client:

Location:Project:

Description:

- 56 -

2006 - 2009Mantovani S.p.a.Municipality of Gela - Caltanissetta – ItalySea defense works

Profiling work on escarpments, defense and con-solidation works on the sea dam of Porto Isola di Gela. The work was carried out with a Liebherr 984 excavator equipped with long-reach boom and 100 ton approx. weight.

Amount of works 3,1 millions euro.

Page 57: PBR TECHNOLOGY SRL · 2021. 3. 25. · - 13 - ACCREDITATION Iso - Eurosoa - Inet PBR TECHNOLOGY S.R.L. VIALE DELLA VITTORIA 1 33033 CODROIPO (UD) ITALIA VIA RISORGIMENTO 18 31040

Year:Client:

Location:Project:

Description:

- 57 -

2008Snam Rete GasSettala Rodano - Milan – ItalyNatural gas pipeline DN 300 (12”)

All earthmoving and mechanical works for the construction of the Settala-Ro-dano natural gas pipeline: DN 300 (12”) – pressure = 75 bar – length 9.465 metres.Main work stages:- Setting up of temporary structures (pipe stacking sites )- Clearance work- Pipe stringing along the right of way- Welding work on pipline and connections- Trench excavation- Trench excavation and pipe push holes- Pipe push drilling- Coating of jointings- Pipeline laying and Pipeline burial- Hydraulic testing, connection and inspection of pipeline- Reinstatement works (land features, drains, vegetation)

Amount of works 2,4 millions euro.

Page 58: PBR TECHNOLOGY SRL · 2021. 3. 25. · - 13 - ACCREDITATION Iso - Eurosoa - Inet PBR TECHNOLOGY S.R.L. VIALE DELLA VITTORIA 1 33033 CODROIPO (UD) ITALIA VIA RISORGIMENTO 18 31040

Year:Client:

Location:Project:

Description:

- 58 -

2008A. Hak International B.VPortobuffolè - Treviso – ItalyReplacement of pipe DN 1050 (42”)

Civil works for the Snam Rete Gas Spa project, including:Replacement of DN 1050 (42”) with DN 1200 (48”) pipe on the Tarvi-sio–Sergnano natural gas pipeline in the municipalities of Portobuffole and Mansuè (Treviso). Replacement of monolithic joint n° 6250460/9 DN 1200 (48”) on the line of natural gas imported from C.I.S. countries in the locality of Pontebba (Udine).The works consisted in:· route clearance· excavation· pre backfill· collaboration for pipe laying· backfill· reinstatement work· complementary workAmount of works 3,4 millions euro.

Page 59: PBR TECHNOLOGY SRL · 2021. 3. 25. · - 13 - ACCREDITATION Iso - Eurosoa - Inet PBR TECHNOLOGY S.R.L. VIALE DELLA VITTORIA 1 33033 CODROIPO (UD) ITALIA VIA RISORGIMENTO 18 31040

Year:Client:

Location:Project:

Description:

- 59 -

Construction of the 36km Martirano Rende section of the Martirano Morano natural gas pipeline DN 1200 (48”).Sub-contract work regarding the execution of excavation and pipe-line open-cut crossings for the Martirano-Rende section (approx. 36.3 kilometres) of the Martirano – Morano Snam Rete Gas SpA natural gas pipeline DN 1200 (48”) project. Excavation work in different types of terrain including rock, mid slo-pe, vertical and very steep sections with the use of cableway, win-ches and special excavation equipment.

Amount of works 1,8 millions euro.

2007SicimMartirano Rende - Cosenza – ItalySnam Rete Gas 36km gas pipeline

Page 60: PBR TECHNOLOGY SRL · 2021. 3. 25. · - 13 - ACCREDITATION Iso - Eurosoa - Inet PBR TECHNOLOGY S.R.L. VIALE DELLA VITTORIA 1 33033 CODROIPO (UD) ITALIA VIA RISORGIMENTO 18 31040

Year:Client:

Location:Project:

Description:

- 60 -

Execution of all the required works, including earth compactation and other com-plementary work, flood defense work, flow regulation work, special reinstatement work, and supply of equipment and service for the constuction of:- Branch connecting to the Ravenna-Mestre natural gas pipeline DN 550 (22”), with

new piping DN 550 (22”) approx. 510 metres in length, including crossings of the via Idrovora municipal road and the Scoli Consorziali S. Margherita and Altipiano drainage channels;

- Construction of one PIDI ( important branch interruption point) DN 550 (22”) with relative access;

- Construction of the connection known as the “Allaciamento Comune di Codevi-go” DN 100 (4”) with length of approx.15 metres and reconstruction of the PIDA ( important point with connection disc) DN 100 n° 4.140.624/1;

- Crossing (approx. 75 metres in length) of the Scolo Consorziale Altipiano drainage channel with piping DN 200 (8”) up to the connection point with the natural gas pipeline DN 125 (5”) known as the “Derivazione per Pontelongo”.

Amount of works 2,2 millions euro.

2007Snam Rete GasCodevigo - Padua – ItalyConstruction of Ravenna - Mestre natural gas pipeline branches DN 550 (22”)

Page 61: PBR TECHNOLOGY SRL · 2021. 3. 25. · - 13 - ACCREDITATION Iso - Eurosoa - Inet PBR TECHNOLOGY S.R.L. VIALE DELLA VITTORIA 1 33033 CODROIPO (UD) ITALIA VIA RISORGIMENTO 18 31040

Year:Client:

Location:Project:

Description:

- 61 -

Costruction of the Bosentino -Trent natural gas pipeline DN 400 (16”) - 75 bar - length = 8.600 metres, and construction of the branch to the natural gas pipeline known as “Derivazione per la Valsugana” DN 250 (10”) - 75 bar (operating pressure 64 bar).• Line civil works (land survey work, route staking, route clearance, excavation, backfill, defi-

nitive reinstatement work, complementary works, and crossings of roads, water-courses or underground facilities with open-cut system, pipe pushing drill or H.D.D. etc.);

• Pipeline mechanical works (pipe stringing, bending, jointing and welding, non-destructive testing, sand-blasting and wrapping, pipeline laying, connection of pipeline branches, hy-draulic tests, pipeline cathodic protection jobs, etc.);

• Civil and mechanical works (excavations and earth moving work, concrete pouring, backfill, piping pre-fabrication, mechanical assembly, non-destructive testing, sand-blasting and wrapping, hydraulic tests, complementary work, etc.);

• Mechanical and civil works of the pipeline construction in special sections of the line (very steep, mid slope, vertical) executed with the use of cableway, winches and special excava-tion equipment; demolition of the bridge over the Adige river, etc.

Amount of works 2,8 millions euro.

2006 - 2007Snam Rete GasBosentino - Trent – ItalyGas pipeline DN 400 (16”) - 75 bardi 8.6 Km

Page 62: PBR TECHNOLOGY SRL · 2021. 3. 25. · - 13 - ACCREDITATION Iso - Eurosoa - Inet PBR TECHNOLOGY S.R.L. VIALE DELLA VITTORIA 1 33033 CODROIPO (UD) ITALIA VIA RISORGIMENTO 18 31040

Year:Client:

Location:Project:

Description:

- 62 -

Open-cut crossing of the Piave river and pipe laying of the steel pipe DN 100 (4”) of the military pipeline and execution of the re-lative welding jobs on right side at Nervesa and on left side at Susegana (Treviso).

Amount of works 1,3 millions euro.

2006Vidoni SpANervesa della Battaglia-Treviso – ItalyLaying of military oil pipeline DN 100 (4”) via crossing of the Piave river

Page 63: PBR TECHNOLOGY SRL · 2021. 3. 25. · - 13 - ACCREDITATION Iso - Eurosoa - Inet PBR TECHNOLOGY S.R.L. VIALE DELLA VITTORIA 1 33033 CODROIPO (UD) ITALIA VIA RISORGIMENTO 18 31040

Year:Client:

Location:Project:

Description:

- 63 -

Route clearance- excavation of the line and connections, preparation of bed for pipeline laying, Pipeline side fill and covering, Laying of multi pipelines, preparation of bed for pipeline laying and placing of marker tape, backfill, reinstatement work, collaboration for laying work, holiday detecting, connections; Crossing and flood defence work of the Tagliamento river, Ledra river and Ri-pudio stream:1. Route clearance work with demolition of existing rock barriers and walls2. Concrete gunite preparation with use of formwork and sidebooms for moving the pipes

before and after gunite application 3. All the necessary dewatering operations before the excavation work4. Earth moving and excavtion work according to project depth on different types of terrain

including rock, conglomerate, and also in water5. Cooperation for the laying with all the yard equipment6. Backfill7. Reinstatement of flood defense works (rocks and walls)Amount of works 1,8 millions euro.

2004NcapBordano-Flaibano – ItalyBordano-Flaibano natural gas pipeline DN 1200 (48”)

Page 64: PBR TECHNOLOGY SRL · 2021. 3. 25. · - 13 - ACCREDITATION Iso - Eurosoa - Inet PBR TECHNOLOGY S.R.L. VIALE DELLA VITTORIA 1 33033 CODROIPO (UD) ITALIA VIA RISORGIMENTO 18 31040

Year:Client:

Location:Project:

Description:

- 64 -

All earthmoving (route, excavation of line and di connection, back-fill, definitive reinstatement work, complementary works, crossings of roads, watercourses or under-ground facilities with open-cut sy-stem) for the construction of the Malborghetto–Flaibano natural gas pipeline DN 1200 (48”) and open-cut crossing of the Tagliamento river.

Amount of works 3,4 millions euro.

2002Ghizzoni S.p.a.Venzone - Udine – ItalyMalborghetto – Bordano SNAM natural gas pipeline DN 1200 (48”)

Page 65: PBR TECHNOLOGY SRL · 2021. 3. 25. · - 13 - ACCREDITATION Iso - Eurosoa - Inet PBR TECHNOLOGY S.R.L. VIALE DELLA VITTORIA 1 33033 CODROIPO (UD) ITALIA VIA RISORGIMENTO 18 31040

Year:Client:

Location:Project:

Description:

- 65 -

All earthmoving for the construction of the Pordenone-Istrana section (60 kilometres) of the natural gas pipeline DN 1200, with crossing of the Piave river, Noncello river, and other watercourses.

Amount of works 2,5 millions euro.

1999 - 2000SPIE-CAPAG SA - ParisPordenone-Oderzo-Istrana – ItalyNatural gas pipeline DN 1200

Page 66: PBR TECHNOLOGY SRL · 2021. 3. 25. · - 13 - ACCREDITATION Iso - Eurosoa - Inet PBR TECHNOLOGY S.R.L. VIALE DELLA VITTORIA 1 33033 CODROIPO (UD) ITALIA VIA RISORGIMENTO 18 31040

Year:Client:

Location:Project:

Description:

- 66 -

1998ARAZA U.T.E Calle PARISBarcelona – Spain80 km excavation work for naturalgas pipeline

Excavation work in different types of terrain including rock.

Amount of works 2,3 millions euro.

Page 67: PBR TECHNOLOGY SRL · 2021. 3. 25. · - 13 - ACCREDITATION Iso - Eurosoa - Inet PBR TECHNOLOGY S.R.L. VIALE DELLA VITTORIA 1 33033 CODROIPO (UD) ITALIA VIA RISORGIMENTO 18 31040

Year:Client:

Location:Project:

Description:

- 67 -

Excavation work (including on rock) for pipeline laying in mid slope, vertical and very steep sections with the use of cableway, winches and special excavation equi-pment.Open-cut crossing of the Dora Baltea river.Execution of the following works:- Route ckearance- Earth moving work near the watercourse- Excavation work- Dewatering and drying operations before the excavation work- Setup of gunite preparation area as required- Pipe stringing

- Gunite application after checking pipe coating with holiday detector, pipe formwork fitting; subsequent concrete pouring to weighten the piping as well as the upward bends:- Welding of pipe sections in transportable lengths- Non-destructive testing on the welding work carried out- Wrapping- Hydraulic testing of pipeline and washout - Pipeline immersion and laying- Reinstatement and levelling of work areas

Amount of works 2,6 millions euro.

1997Impresa Tre Colli S.p.a.Saint Vincent – ItalyChampdepraz–G.S. Bernardo Snam Rete Gas natural gas pipeline DN 400 (16”)

Page 68: PBR TECHNOLOGY SRL · 2021. 3. 25. · - 13 - ACCREDITATION Iso - Eurosoa - Inet PBR TECHNOLOGY S.R.L. VIALE DELLA VITTORIA 1 33033 CODROIPO (UD) ITALIA VIA RISORGIMENTO 18 31040

Year:Client:

Location:Project:

Description:

- 68 -

Crossing of the Po river for the Snam Ripal-ta-Cortemaggiore natural gas pipeline DN 1200 (48”), in the Caorso and Caselle Landi locality.

Crossing under the bed of the Po river( depth 17 metres - length 1.500 metres)

Amount of works 0,8 millions euro.

1994-95SAIPEM ITALIA SPACaorso and Caselle Landi – ItalyRipalta – Cortemaggiore SNAM natural gas pipeline DN 1200 (48”)

Page 69: PBR TECHNOLOGY SRL · 2021. 3. 25. · - 13 - ACCREDITATION Iso - Eurosoa - Inet PBR TECHNOLOGY S.R.L. VIALE DELLA VITTORIA 1 33033 CODROIPO (UD) ITALIA VIA RISORGIMENTO 18 31040

Year:Client:

Location:Project:

Description:

- 69 -

Earthmoving in different types of ter-rain including rock, and civil works for the laying of gas pipeline DN 1000 (40”).

Amount of works 1,1 millions euro.

1993Bonatti Rotus GmbhPirmasens (Germany)Rock excavation for gas pipelineDN 1000 (40”)

Page 70: PBR TECHNOLOGY SRL · 2021. 3. 25. · - 13 - ACCREDITATION Iso - Eurosoa - Inet PBR TECHNOLOGY S.R.L. VIALE DELLA VITTORIA 1 33033 CODROIPO (UD) ITALIA VIA RISORGIMENTO 18 31040

Year:Client:

Location:Project:

Description:

- 70 -

Demolition of a 58 metre high buil-ding located in Rue des Alouettes de la Villette, Paris.

Amount of works 1,8 millions euro.

1995PROMOPAR S.A. NanterreParis - FranceBuilding demolition

Page 71: PBR TECHNOLOGY SRL · 2021. 3. 25. · - 13 - ACCREDITATION Iso - Eurosoa - Inet PBR TECHNOLOGY S.R.L. VIALE DELLA VITTORIA 1 33033 CODROIPO (UD) ITALIA VIA RISORGIMENTO 18 31040

Year:Client:

Location:Project:

Description:

- 71 -

Excavation of 25 kilometre long irrigation chan-nel (50 m3 per linear metre).

Amount of works 1,2 millions euro.

1994-95ICORI ESTERO SPA LOMBARDINI SPAMaroccoChannel excavation work

Page 72: PBR TECHNOLOGY SRL · 2021. 3. 25. · - 13 - ACCREDITATION Iso - Eurosoa - Inet PBR TECHNOLOGY S.R.L. VIALE DELLA VITTORIA 1 33033 CODROIPO (UD) ITALIA VIA RISORGIMENTO 18 31040

31040 Gorgo al Monticano (TV), Via Risorgimento 18