Paul C. Rizzo Associates, Inc.Paul C. Rizzo Associates, Inc. CONSULTANTS December 10, 1990 Project...

36
Paul C. Rizzo Associates, Inc. CONSULTANTS December 10, 1990 Project No. 89-599 Ms. Donna McCartney (3HW21) SENT VIA FEDERAL EXPRESS Remedial Project Manager U.S. Environmental Protection Agency Region III 841 Chestnut Building Philadelphia, Pennsylvania 19107 Transmittal Progress Report No. 7 (November 1990) Tonolli Corporation Superfund Site Nesquehoning, Pennsylvania Dear Ms. McCartney: This letter provides the U.S. Environmental Protection Agency with a progress report for the month of November, 1990 on activities at the Tonolli Corporation Superfund Site as required by the Administrative Order by Consent. The following activities have been undertaken with respect to achieving compliance with the Administrative Order by Consent: 1. Completion of the following tasks: - Drilling, installation, and development of monitoring wells - Borehole geophysics Shallow soil sampling - Landfill test pits - XRF screening of site surface and soils - Onsite building inspection - Metal detector survey - Collection of cation exchange capacity samples 2. Continuation of the Hi-Vol air sampling and meteorological monitoring. 3. Geologic and hydrogeologic information was formally requested from the Lansford-Coaldale Joint Water Authority. 4. The Steering Committee awarded a contract to perform the baseline risk assessment to Clement International. 220 CONTINENTAL DRIVE, SUITE Jl l^NEV^Ap^E 19713 PHONE:(302) 454-790j| f P,TTSBURGH,PA COLUMBUS, OH

Transcript of Paul C. Rizzo Associates, Inc.Paul C. Rizzo Associates, Inc. CONSULTANTS December 10, 1990 Project...

Page 1: Paul C. Rizzo Associates, Inc.Paul C. Rizzo Associates, Inc. CONSULTANTS December 10, 1990 Project No. 89-599 Ms. Donna McCartney (3HW21) SENT VIA FEDERAL EXPRESS Remedial Project

Paul C. Rizzo Associates, Inc.CONSULTANTS

December 10, 1990

Project No. 89-599

Ms. Donna McCartney (3HW21) SENT VIA FEDERAL EXPRESSRemedial Project ManagerU.S. Environmental Protection AgencyRegion III841 Chestnut BuildingPhiladelphia, Pennsylvania 19107

TransmittalProgress Report No. 7 (November 1990)Tonolli Corporation Superfund Site

Nesquehoning, Pennsylvania

Dear Ms. McCartney:

This letter provides the U.S. Environmental Protection Agency with aprogress report for the month of November, 1990 on activities at theTonolli Corporation Superfund Site as required by the AdministrativeOrder by Consent.

The following activities have been undertaken with respect to achievingcompliance with the Administrative Order by Consent:

1. Completion of the following tasks:

- Drilling, installation, and development of monitoring wells- Borehole geophysics— Shallow soil sampling- Landfill test pits- XRF screening of site surface and soils- Onsite building inspection- Metal detector survey- Collection of cation exchange capacity samples

2. Continuation of the Hi-Vol air sampling and meteorologicalmonitoring.

3. Geologic and hydrogeologic information was formally requested fromthe Lansford-Coaldale Joint Water Authority.

4. The Steering Committee awarded a contract to perform the baselinerisk assessment to Clement International.

220 CONTINENTAL DRIVE, SUITE Jl l NEV Ap E 19713PHONE: (302) 454-790j| f

P,TTSBURGH,PA COLUMBUS, OH

Page 2: Paul C. Rizzo Associates, Inc.Paul C. Rizzo Associates, Inc. CONSULTANTS December 10, 1990 Project No. 89-599 Ms. Donna McCartney (3HW21) SENT VIA FEDERAL EXPRESS Remedial Project

Donna McCartney December 10, 1990

TEST RESULTS AND INTERPRETATIONS

Included with this Progress Report are preliminary meteorological dataregarding wind speed and direction and the borehole geophysics. Themeteorological data was collected from September 15 through October 15,1990.

The borehole geophysical data consists of natural gamma and EM-39induction logs for all of the recently installed deep wells and naturalgamma logs of existing wells MW-3, MW-9 and the plant pumping well. Thedeep well was logged prior to drilling the shallow well at each nestedwell location. The geophysical logs, water levels and informationgathered during the drilling and installation of the deep well were usedto determine the shallow well placement. The shallow wells were notgeophysically logged since they were drilled next to the deep wells ateach location.

WORK ANTICIPATED FOR THE MONTH OF DECEMBER 1990

The following activities are anticipated to take place in the nextmonth:

1. Collection of groundwater samples from the twenty recentlyinstalled site wells.

2. Collection of sump sediment samples from three site locations.

3. Surveying of monitoring wells and sample locations.

4. Performance of slug tests in the twenty recently installed sitewells.

5. Water level and stream level measurements.

6. Preliminary data reduction and interpretation.

7. Review of the draft surface geophysical report.

8. Review of the draft site ecological characterization report.

9. Preparation of the offsite soil screening work plan.

10. Initiation of the baseline risk assessment by ClementInternational.

11. Review of potential treatment options for site wastes.

Attached to this progress report is a revised schedule of RI/FS fieldactivities.

&B3G0260

Page 3: Paul C. Rizzo Associates, Inc.Paul C. Rizzo Associates, Inc. CONSULTANTS December 10, 1990 Project No. 89-599 Ms. Donna McCartney (3HW21) SENT VIA FEDERAL EXPRESS Remedial Project

Donna McCartney December 10, 1990

PROBLEMS ENCOUNTERED OR ANTICIPATED

The Work Plan specified that natural gamma logs be run in the existingwells onsite. Wells MW-3, MW-9 and the plant well were successfullylogged. Wells MW-4, MW-5 and MW-6 were previously abandoned. WellsMW-7, MW-8 and MW-9 were not logged because MW-7 was blocked near thetop of the well, MW-9 was too shallow and, Well MW-8 was not accessibledue to erosion of the mine spoil pile.

ADDITIONAL INFORMATION

The Work Plan specified that the groundwater sampling task include fivePanther Creek wells. Pursuant to discussions with USEPA on July 19 andNovember 20, 1990, these Panther Creek wells (MW-6,7,8,9, and 10} willnot be sampled as part of the round 1 RI. We will evaluate thegroundwater data from the site wells and determine the need to samplethe Panther Creek wells in Round 2.

The Work Plan specified that these water samples be collected from sitesumps. At the request of USEPA sediment samples instead of watersamples will be collected.

If additional information is required, please call me at (302) 454-7902.

Respectfully submitted,

William C. SmithManagerDelaware Valley Operations

WCS:drenclosure

cc: Mr. Jeff Leed, PRP Technical CommitteeMr. Phillip Rotstein (3HW15), USEPA - Region IIIMs. Susan Ritter, PADER - Wilkes-Barre Regional OfficeMr. Christopher Cherniak, COM

AR30G26I

Page 4: Paul C. Rizzo Associates, Inc.Paul C. Rizzo Associates, Inc. CONSULTANTS December 10, 1990 Project No. 89-599 Ms. Donna McCartney (3HW21) SENT VIA FEDERAL EXPRESS Remedial Project
Page 5: Paul C. Rizzo Associates, Inc.Paul C. Rizzo Associates, Inc. CONSULTANTS December 10, 1990 Project No. 89-599 Ms. Donna McCartney (3HW21) SENT VIA FEDERAL EXPRESS Remedial Project

,

WIND SPEED DIRECTION SPREADSHEET

TONOLLI CORPORATION SITENESQUEHONING, PA

TIME

"0100"0200"0300"0400"0500"0600"0700"0800"0900"1000"1100"1200"1300"1400"1500"1600"1700"1800"1900"2000"2100"2200"2300"2400

DATE: Sent. 15. 1990

WINDSPEEDMPH0-82-603-43-422-42-32-73-52-52-102-102-10 S~

. 2-12 I >0-100-54-142-102-71-5 _J001-5

DIRECTION•110

330-340-

180-200270-330220-270290-310210

290-310200-300

DATE:Seot. 16. 1990

WINDSPEEDMPH0-300-200000 A0-3 fi1-4'

200-3 1<XJ 0-4270-34 \250-340

) 250-340' 210-320

180-300290-320290-320210-340190-250280-330.

-230-330

0-51-52-72-62-60-60-52-41-72-71-52-100-10

DIRECTION»200-310

-320-~ ^— *s--

170-190210-270330-130000-090150-230060-180300-060360

210-330280-340030-090050-140330-060010-120300-030210-360

DATE: Sept. 17. 199d

WINDSPEEDMPH2-81-9 0-<f1-6'1-50-62-101-52-40-121-114-62-182-143-201-202-152-122-90-4001-80-4

'DIRECTION

I60-150300-120180-270120-210180-330240-360120-330180-330330-360300-360270-340270-360210-340270-090300-350300-360180-330290-340150-330170-330

-T

240-360180-330

M30Q263

Page 6: Paul C. Rizzo Associates, Inc.Paul C. Rizzo Associates, Inc. CONSULTANTS December 10, 1990 Project No. 89-599 Ms. Donna McCartney (3HW21) SENT VIA FEDERAL EXPRESS Remedial Project

1

WIND SPEED DIRECTION SPREADSHEET

TONOLLI CORPORATION SITENESQUEHONING,FA

TIME

"0100"0200"0300"0400"0500"0600"0700"0800"0900"1000"1100"1200"1300"1400"1500"1600"1700"1800"1900"2000"2100"2200"2300"2400

1DATE: SEPT. 18. 1 99d DATE: SEPT. 19. 1990

WINDSPEEDMPH02000432-53-63-116-162-96-146-11 f1-6 1 J4-74-82-3000000

DIRECTION•-300---

310180-220210-270250-290310-350290-330 1290-35C •">330-030

|) 300-330r 210-300250-330270-320170-200

------ .

WINDSPEEDMPH00000000 A2 P2 i2-422-53-72-31-71-74-12

1003-42-62

DIRECTION•----

f- s--

i 050-090030-050340-070340-0,40000-080010-100340-060000-060010-110330-350320-350

--

170-260190-280200-270

DATE: SEPT. 20. 1990

WINDSPEEDMPH

" 2-32-6 ^2-5"12-5 14-92-30222-52-32-74-102-122-53-73-121-602-30000

DIRECTION•250-330280-320300-340210-250190-230310-330

-250-260200-250240-320280-310300-340290-350040-060260-330230-290270-310290-350

-330-340

----

Page 7: Paul C. Rizzo Associates, Inc.Paul C. Rizzo Associates, Inc. CONSULTANTS December 10, 1990 Project No. 89-599 Ms. Donna McCartney (3HW21) SENT VIA FEDERAL EXPRESS Remedial Project

«

J

>1

WIND SPEED DIRECTION SPREADSHEET

TONOLLI CORPORATION SITENESQUEHONING

TIME

"0100"0200"0300"0400"0500"0600"0700"0800rogoo"1000"1100"1200"1300"1400"1500"1600"1700"1800"1900"2000"2100"2200"2300"2400

,PA

DATE: SEPT 21 , 1990

WINDSPEEDMPH30000000:1-330-22-63-62-4/2-6 ,2-5 1-31-30-40-200-200

DIRECTION•

320-330-------

190-200190-210200-22Q/;280-34<p\170-190

\ 200-220' 240-300220-250190-230320-330320-330150-170

-190- --

DATE: SEPT. 22. 1 990

WINDSPEEDMPH0-200-300-33-62-42-6 ^4-5-fi2-5 r0-22-32-3000030000-300-2

DIRECTION•340-070-

040-080000-04$.020-OfO040-070010-030010-040330-350000-040320-340

----

330-340---

300-330-300

DATE: SEPT. 23. 1990

WINDSPEEDMPH02-3 „2- T0-31-30

8-10102-34-121-72-71-41-72-32-130-62-50-62-82-42-51-72-5

DIRECTION•~-

240220-230210-270270-310

-180-210250

220-240270-330180-190210-240.200-240190-250080-090190-220190-260220-260270-300240-300280-310230-270220-290230-270

Page 8: Paul C. Rizzo Associates, Inc.Paul C. Rizzo Associates, Inc. CONSULTANTS December 10, 1990 Project No. 89-599 Ms. Donna McCartney (3HW21) SENT VIA FEDERAL EXPRESS Remedial Project

WIND SPEED DIRECTION SPREADSHEET

TONOLLI CORPORATION SITENESQUEHONING, PA

TIME

"0100"0200"0300"0400"0500"0600"0700"0800"0900"1000"1100"1200"1300"1400"1500"1600"1700"1800"1900"2000"2100"2200"2300"2400

DATE: SEPT. 24. 1990

WINDSPEEDMPH2-1433-73000

L o •1-84-72-102-252-62-9 x-2-11 1 >2-9 1-102-82-320000

DIRECTION•

270-330310-320210-270270-310

----

240-270270-330180-240X1;300-33CTN300-3301

) 300-330/ 190-230240-300240-270210-270250-270315----

DATE: SEPT. 25. 1990

WINDSPEEDMPH0000000

I o Ao P4-8 r

' 5-10 j5-102-83-63-81-104-92-6002220

DIRECTION•----— .xif~ s*- 1--

230-290170-210180-210200-230210-220300-330270-300270-310180-210

--180270

260-280-

DATE- SEPT _26 1390

WINDSPEEDMPH03 ^3^000002-403-9540001-32-6000000

DIRECTION•-320

330-030-----

000-030-

130-150080-100060-090

---

090-110030-060

------

RR300266

Page 9: Paul C. Rizzo Associates, Inc.Paul C. Rizzo Associates, Inc. CONSULTANTS December 10, 1990 Project No. 89-599 Ms. Donna McCartney (3HW21) SENT VIA FEDERAL EXPRESS Remedial Project

l>,

WIND SPEED DIRECTION SPREADSHEET

TONOLLI CORPORATION SITENESQUEHONING

TIME

"0100"0200"0300"0400"0500"0600"0700"0800rogoo"1000"1100"1200"1300"1400"1500"1600"1700"1800"1900"2000"2100"2200"2300"2400

,PA

DATE: SEPT. 27. 1990

WINDSPEEDMPH00000002-4

. 32 .33-52-44 X"

°"4 M5-94-62-4300000

DIRECTION•-

• ------

180-210200-210300-330

DATE: SEPT. 28. 1990

WINDSPEEDMPH00000000 .A°-£0 '

150-18CrSf 2-4100-12CJ090-150

) 150-210' 300-340

310-330310-330310-330290-320

-----

f 2-62-72-622-70-20-4000000

DIRECTION•----- S1

r- -k —

170-210180-210270-330150-210180-2201 80-220270-330240-270

-.

----

DATE: SEPT. 29. 1990

WINDSPEEDMPH0°xfX. o<o I00000023-52-51-84-102-62-61-4000.000

DIRECTION•----------

240-270220-290300-330300-330120-150280-330270-300240-300

------

ftB30G267

Page 10: Paul C. Rizzo Associates, Inc.Paul C. Rizzo Associates, Inc. CONSULTANTS December 10, 1990 Project No. 89-599 Ms. Donna McCartney (3HW21) SENT VIA FEDERAL EXPRESS Remedial Project

(

WIND SPEED DIRECTION SPREADSHEET

TONOLLI CORPORATION SITENESQUEHONING, PA

TIME

"0100"0200"0300"0400"0500"0600"0700"0800"0900"1000"1100"1200"1300"1400"1500"1600"1700"1800"1900"2000"2100"2200"2300"2400

DATE: SEPT. 30. 1990

WINDSPEEDMPH0000033-41-632-62-82-73-64-11 x-1-6 U1-42-6•3-132-83-53-112-102-52-8

DIRECTION•--- .--

055-080180-270090-150090

210-240 I260-30QX:300-350 1330-360

) 270-330' 300-340240-270280-310270-330210-270270-300210-240210-240240-270200-230"

DATE: OCT. 1 . 1 990

WINDSPEEDMPH0332-42-5002-5 A3 P2-9 12-52-42-71-92-130-132-91-7002-3000

DIRECTION•-255

310-320270-300300-330/

- x-285130

320-3-40050-070300-3-40210-2-40220-250300-330280-320330-350240-270

--255---

DATE: OCT. 2. 1990

WINDSPEEDMPH0°°1o 102-3001-72-83-133-110-73-92-82-82-102-7200000

DIRECTION•-----

210-240--

290-320300-310290-320310-340270-330240-270280-330240-300270-330240-300315-----

,8300268

Page 11: Paul C. Rizzo Associates, Inc.Paul C. Rizzo Associates, Inc. CONSULTANTS December 10, 1990 Project No. 89-599 Ms. Donna McCartney (3HW21) SENT VIA FEDERAL EXPRESS Remedial Project

L WIND SPEED DIRECTION SPREADSHEET* \TONOLLI CORPORATION SITENESQUEHONING

TIME

"0100"0200"0300"0400"0500"0600"0700"0800•0900pooo"1100"1200"1300"1400"1500"1600"1700"1800"1900"2000"2100"2200"2300"2400

,PA

DATEOCT. 3. 1 990

WINDSPEEDMPH00000000001-41-71-61-9 X-1-9 .1-5 ^1-71-91-31-41-31-200

DIRECTION•

•—

---------

DATEOCT.4. 1990

WINDSPEEDMPH23002-32-30-3

°"2-A3-5 /J0-6 f

260-300x4 6-10270-33CT\ 4-8180-22(7

) 300-330/ 210-220

210-230360-090230-240180-220270-300330-340290--

1-62-84-141-101-81-41-61-40000

DIRECTION•

180230-250

--

110-140^320-35>270-2* 0290-050

I 320-010310-340310-340320-340190-330290-330190-270190-240190-240290-310250-280290-310

----

DATEOCT. 5. 1 990

WINDSPEEDMPH00 ^OXT0 100001-30-42-82-103-132-91-162-122-64-100-322-4000

DIRECTION•--------

150-180300-330180-240180-330180-270300-330240-330270-300270-300180-240300-330260

280-300---

&B3QQ269

Page 12: Paul C. Rizzo Associates, Inc.Paul C. Rizzo Associates, Inc. CONSULTANTS December 10, 1990 Project No. 89-599 Ms. Donna McCartney (3HW21) SENT VIA FEDERAL EXPRESS Remedial Project

,WIND SPEED DIRECTION SPREADSHEET

TONOLLI CORPORATION SITENESQUEHONING

TIME

"0100"0200"0300"0400"0500"0600"0700"0800"0900"1000"1100"1200"1300"1400"1500"1600"1700"1800"1900"2000"2100"2200"2300"2400

,PA

DATE: Oct. 6r 1 990

WINDSPEEDMPH01-30000001-41-51-94-103-92-9 X"0-5 L0-82-8

• 0-52-322000 '

DIRECTION•- ,

045-090------

150-180060-130230-270X11 80-24CM.180-240) 220-270/ 210-240270-300240-300290-330210-240330

180-300---

DATE: Oct. 7. 1 990

WINDSPEEDMPH00000000 Ao p0 /

> 1-43-81-61-51-133-81-54-6000000

DIRECTION•----^

- x--

v —-

240-270160-220210-230240-270180-220270-310270-300300-330

------

DATE: Oct. 8. 1990

WINDSPEEDMPH00 ^0"0000001-300-322-420-63000001-31

DIRECTION•---------

180-220-

080-120240-300270-330300-330210-270300-330

-----170180

RR300270

Page 13: Paul C. Rizzo Associates, Inc.Paul C. Rizzo Associates, Inc. CONSULTANTS December 10, 1990 Project No. 89-599 Ms. Donna McCartney (3HW21) SENT VIA FEDERAL EXPRESS Remedial Project

t W I N D SPEED DIRECTION SPREADSHEET1

I uNGLLi CORPORATION SITENESQUEHONING, PA

1'i ii

TIME.

"0100"0200"0300"0400"0500"0600"0700"0800|"0900pooo"1100"1200"1300"1400"1500"1600"1700"1800"1900"2000"2100"2200"2300"2400

DATE: OCT.. 9,1990

WINDSPEED

2-402-51-50-71-60-4 x~1-5 [>/2-81-60-22-72-41-4001

DIRECTION•320320350190280060

070-080010-050

-150-210270-30 9240-27 T\280-340300-330290-330300-340300-330300-330290-320280-310210-270

--180

1

DATE: OCT. 1 0. 1 990

WINDSPEEDMPH |

1111111-4

1 -Ai • &4-6 f1-61-91-91-143-134-101-61-62-82-68-142-103-82-8

DIRECTION•

160000150340

320-02>070-06009(f120125

090-150270-300180-220270-310280-320300-330300-330310-350000-050030-060030-050050-070040-090000-030030-070

DATE: OCT. 1 1 . 1 990

WINDSPEEDMPH0-83-7 .2-rq2-1112-105-105-172-111-131-124-164-124-71-101-84-84-105-91-63-101-64-91-91-3

DIRECTION•

030-070-000-030340-010330-340000-050000-020030-070310-340000-040010-050030-060010-040010-060020-060330-030330-010010-050030-060010-060030-050030-090330-030330-030330-360

AR30027I

Page 14: Paul C. Rizzo Associates, Inc.Paul C. Rizzo Associates, Inc. CONSULTANTS December 10, 1990 Project No. 89-599 Ms. Donna McCartney (3HW21) SENT VIA FEDERAL EXPRESS Remedial Project

,WIND SPEED DIRECTION SPREADSHEET

TONOLLI CORPORATION SITENESQUEHONING

TIME

"0100"0200"0300"0400"0500"0600"0700"0800"0900"1000"1100"1200"1300"1400"1500"1600"1700"1800"1900"2000"2100"2200"2300"2400

J»A

DATE-JICT _12JS90

WINDSPEEDMPH4-64-71-65-75-92-61-72-91-101-51-51-82-13 J2-8 x-1-10 L6-103-64-81-43-124-123-84-81-9

DIRECTION•

280-320320-350300-330310-330270-300270-330310-340300-030310-340000-040040-OSQx:000-08C">310-340

J 330-350010-050000-030030-060010-050030-060030-090000-040030-070015-060010-060

DATE: OCT. 13. 1950

WINDSPEEDMPH4-104-74-81-75-91-81-81-5 A* Pi '1-53-71-51-41-31-61-32-7000000

DIRECTION•

000-090030-090000-060100-120270-3 1O300-3 id-300-3RO300-340090310

010-120270-300150-190100-160250-280290-330270-330320-340

------

DATE: OCT. 14. 1990

WINDSPEEDMPH00 ^i-en1-4111-51-411-42-64-101-51-94-105-111-41-40000000

DIRECTION•--

290-310340300

150-210210-240300-310300-350180

330-360270-330290-340310-330270-300020-090210-220

-------

Ai3GG272

Page 15: Paul C. Rizzo Associates, Inc.Paul C. Rizzo Associates, Inc. CONSULTANTS December 10, 1990 Project No. 89-599 Ms. Donna McCartney (3HW21) SENT VIA FEDERAL EXPRESS Remedial Project

., — ._1 WIND SPEED DIRECTION SPREADSHEET

TONOLLI CORPORATION SITENESQUEHONING

TIME

"0100"0200"0300"0400"0500L"0600F0700"0800"0900"1000"1100"1200"1300"1400"1500"1600"1700"1800"1900"2000"2100"2200"2300"2400

PA

DATE: OCT. 1 5. 1 990

WINDSPEEDMPH0000000001-51-111-8 X-6-16 ,1-121-114-111-131-80000-200-

DIRECTION•--------- ^x*

300-350p200-300

) 280-340/ 310-330

180-330270-340300-340250-320300-330

---

310-330-

DATE:

WINDSPEEDMPH

A/ —— r-i

DIRECTION. •

xX

DATE:

WINDSPEEDMPH ^

xj

DIRECTION•

HH300273

Page 16: Paul C. Rizzo Associates, Inc.Paul C. Rizzo Associates, Inc. CONSULTANTS December 10, 1990 Project No. 89-599 Ms. Donna McCartney (3HW21) SENT VIA FEDERAL EXPRESS Remedial Project

MW-1OD NOVEMBER 15,1990

Page 17: Paul C. Rizzo Associates, Inc.Paul C. Rizzo Associates, Inc. CONSULTANTS December 10, 1990 Project No. 89-599 Ms. Donna McCartney (3HW21) SENT VIA FEDERAL EXPRESS Remedial Project

MW-11D NOVEMBER 15,1990

Page 18: Paul C. Rizzo Associates, Inc.Paul C. Rizzo Associates, Inc. CONSULTANTS December 10, 1990 Project No. 89-599 Ms. Donna McCartney (3HW21) SENT VIA FEDERAL EXPRESS Remedial Project

MW-12D NOVEMBER 15,, 1990NATURAL GAMMA

Page 19: Paul C. Rizzo Associates, Inc.Paul C. Rizzo Associates, Inc. CONSULTANTS December 10, 1990 Project No. 89-599 Ms. Donna McCartney (3HW21) SENT VIA FEDERAL EXPRESS Remedial Project

fA

0NATURE. GAMMA v

k 0 CPS 100 '

{ : /j : : : i : j: : i : : : : : :

• •••> •**•••• ' ** •••••••••••••••••••••••••*•••«••••

« ••«••••••• ' *J * ••••«•••••*»••••#••••••••••••«••••

• < J T : • • • : : :

3ESIEEEEE

MW-

1

COtD -

£D .O

12D NOVEMBER 1 5, 1 990* CONDUCTIVITY* -10 rrtS/m 100 '

i • I/T i ! ! i i

S!^: : V : : : : : : :: : T: : : ; : "":'" i"

..... .... ... 4.;... .;....;....j....j. ....... ......

i ! ! ! i i I i i! ! ' : ! ! : • • : !

: : : : : : : : :

* * * < « > « * t

; : ; ; : : : : :•••••••••••••••••••••••••••••••••••••••I****...*.

*•**•*•****•*•••••**•*•••••••••*••••••**••..*•,•.

: : : : : : : : :: : : : : : : : :

• « • ' • . . . «

: I I ! I : I I • I: : : : : : : : :

Page 20: Paul C. Rizzo Associates, Inc.Paul C. Rizzo Associates, Inc. CONSULTANTS December 10, 1990 Project No. 89-599 Ms. Donna McCartney (3HW21) SENT VIA FEDERAL EXPRESS Remedial Project

MW-13D NOVEMBER 15,, 1990NATURAL GAMMA

Page 21: Paul C. Rizzo Associates, Inc.Paul C. Rizzo Associates, Inc. CONSULTANTS December 10, 1990 Project No. 89-599 Ms. Donna McCartney (3HW21) SENT VIA FEDERAL EXPRESS Remedial Project

f

NATURAL GAMMA .*0 CPS 100 "....:... .:...,:..... ...... *....:....:....:...-:....

• • •• . tal •*••£•••••••••«•*•*!•*••••*•• •••••*•••

Y ' : : '• s •J" : : : • : i

.... ....H....L.. J..J...1... ...1...

MW~

<oTO '

£D -CD

1 3D NOVEMBER 1 5, 1 990u CONDUCTIVITYk-10 nrfi/m 100'.... .... ....:....:....:. ...:....:....|. ...:....

•••• •»•• •••••••••*••*•••«•••**•••••••••••••••••

•••

• ! • ! • •

: : : : : :

..!....!....!....!....!....!....

.„.!.,..!... .I....!....!....!....!....!....:....

• • • : : • • : :: : : : : : : : :: : : : : : : : :

AR300279

Page 22: Paul C. Rizzo Associates, Inc.Paul C. Rizzo Associates, Inc. CONSULTANTS December 10, 1990 Project No. 89-599 Ms. Donna McCartney (3HW21) SENT VIA FEDERAL EXPRESS Remedial Project

MW-140 NOVEMBER 15,1990

Page 23: Paul C. Rizzo Associates, Inc.Paul C. Rizzo Associates, Inc. CONSULTANTS December 10, 1990 Project No. 89-599 Ms. Donna McCartney (3HW21) SENT VIA FEDERAL EXPRESS Remedial Project

MW-15D NOVEMBER 15,1990

Page 24: Paul C. Rizzo Associates, Inc.Paul C. Rizzo Associates, Inc. CONSULTANTS December 10, 1990 Project No. 89-599 Ms. Donna McCartney (3HW21) SENT VIA FEDERAL EXPRESS Remedial Project

X

W-1 SO NOVEMBER 15,1990

Page 25: Paul C. Rizzo Associates, Inc.Paul C. Rizzo Associates, Inc. CONSULTANTS December 10, 1990 Project No. 89-599 Ms. Donna McCartney (3HW21) SENT VIA FEDERAL EXPRESS Remedial Project

MW-160 NOVEMBER 1S, 1990

RR30Q283

Page 26: Paul C. Rizzo Associates, Inc.Paul C. Rizzo Associates, Inc. CONSULTANTS December 10, 1990 Project No. 89-599 Ms. Donna McCartney (3HW21) SENT VIA FEDERAL EXPRESS Remedial Project

f

5- NATURAL G2 MW-16D NOVEMBER 15,1990CONDUCTIVITY

CPS____100 " " -10____________mS/m________100^CO

j»SR30028!*

Page 27: Paul C. Rizzo Associates, Inc.Paul C. Rizzo Associates, Inc. CONSULTANTS December 10, 1990 Project No. 89-599 Ms. Donna McCartney (3HW21) SENT VIA FEDERAL EXPRESS Remedial Project

MW-17D NOVEMBER 15,1990CONDUCTIVITYNATURAL GAMMA

u r •*•*••«••*•*•*•*•••••••••*«•»•••r | • » • • • • •* I * II * • • • *

fiR300285

Page 28: Paul C. Rizzo Associates, Inc.Paul C. Rizzo Associates, Inc. CONSULTANTS December 10, 1990 Project No. 89-599 Ms. Donna McCartney (3HW21) SENT VIA FEDERAL EXPRESS Remedial Project

MW-18D NOVEMBER 15,1990NATURAL GAMMA K______________ CONDUCTIVITY

Page 29: Paul C. Rizzo Associates, Inc.Paul C. Rizzo Associates, Inc. CONSULTANTS December 10, 1990 Project No. 89-599 Ms. Donna McCartney (3HW21) SENT VIA FEDERAL EXPRESS Remedial Project

MW-19D NOVEMBER 15,1990NATURAL GAMMA _____ CONDUCTIVITY

Page 30: Paul C. Rizzo Associates, Inc.Paul C. Rizzo Associates, Inc. CONSULTANTS December 10, 1990 Project No. 89-599 Ms. Donna McCartney (3HW21) SENT VIA FEDERAL EXPRESS Remedial Project

-r

MW-19D NOVEMBER 15, 1990

SR300288

Page 31: Paul C. Rizzo Associates, Inc.Paul C. Rizzo Associates, Inc. CONSULTANTS December 10, 1990 Project No. 89-599 Ms. Donna McCartney (3HW21) SENT VIA FEDERAL EXPRESS Remedial Project

MW-1 NOVEMBER 15,1990NATURAL GAMMA

N0 CPS 100

A

0

O4fro

cn

o>

CD

AH30Q289

Page 32: Paul C. Rizzo Associates, Inc.Paul C. Rizzo Associates, Inc. CONSULTANTS December 10, 1990 Project No. 89-599 Ms. Donna McCartney (3HW21) SENT VIA FEDERAL EXPRESS Remedial Project

A

MW-1 NOVEMBER 15,1990NATURAL GAMMA

CPS 100CO

JOo

too

AR300290

Page 33: Paul C. Rizzo Associates, Inc.Paul C. Rizzo Associates, Inc. CONSULTANTS December 10, 1990 Project No. 89-599 Ms. Donna McCartney (3HW21) SENT VIA FEDERAL EXPRESS Remedial Project

MW-1 NOVEMBER 15,1990NATURAL GAfctIA

CPS 100

A

to .o

roto

roroo

ro

ro^o

rouio

roSJ>o

11300291

Page 34: Paul C. Rizzo Associates, Inc.Paul C. Rizzo Associates, Inc. CONSULTANTS December 10, 1990 Project No. 89-599 Ms. Donna McCartney (3HW21) SENT VIA FEDERAL EXPRESS Remedial Project

AI*

P

MW-1 NOVEMBER 15,1c NATURALGAMMA•w*

CPS 100 *

: :

I CjI'M'£ i

'"&' '"""•"V"':""

" !/"! ': ) :

... *141.•:xf|xx*|T:

• / •

HfcJ,.

"i j -O:

..J1-.!....\ :•/ J

C' :][ :i >\

•L :..J....L..1 !.• «rf* ...*.••*.

<p...i...\| !

l*vJ•"2

**v....3....""i T"'

; :

>

.... *•••

X

....

X1

....

••

'

....

• •*•

• •*•

990

1

roo

roCO .o

roto _

04

o

O4

0

O4JO .O

O

RR300292

Page 35: Paul C. Rizzo Associates, Inc.Paul C. Rizzo Associates, Inc. CONSULTANTS December 10, 1990 Project No. 89-599 Ms. Donna McCartney (3HW21) SENT VIA FEDERAL EXPRESS Remedial Project

fA

P

MWH2" NOVEMBER 15,1990NATURAL GAMMA *

CPS

AR300293

roTO

Page 36: Paul C. Rizzo Associates, Inc.Paul C. Rizzo Associates, Inc. CONSULTANTS December 10, 1990 Project No. 89-599 Ms. Donna McCartney (3HW21) SENT VIA FEDERAL EXPRESS Remedial Project

P

A

MW-3 NOVEMBER 15,1990NATURAL GAMMA__j gjg

AR30G29U

100

roTO

OJTO

-I*'TO