PAST PROJECTS / CLIENT TESTIMONIALS Project: Hewlett Packard - Data Storage and Distribution Facility (12,000 m2) Eastern Creek Client: Laing O’Rourke Contract Value: $640,000 Contract Duration: 12 weeks Project complete on time and within budget Scope of Work: The SoW required the building to be cleaned to a Level 2 standard of handover. (Level 1 being the highest standard projects such as biohazard labs) Key Elements: Cleaning high level tunnel like A/C ducts (crawl spaces) forming part of the air recycling system. This space had to be completely dust free. Cleaning thousands of metres of cable racking to a hospital standard clean. Client Testimonial: The level of clean required for this project was extremely demanding with much of the areas / services in difficult to access areas. Redclean completed the cleaning work on time and within budget. Great effort. Johnathon Richard (Proj Mgr) RL 61.000 5710 53440 STAFF / VISITOR CAR PARK (28 SPACES) LOADING DOCK AREA FUTURE DATA CENTRE DATA CENTRE CELL 2 ADMIN AREA ELECTRICAL DATA CENTRE CELL 1 UTURE CENTRE FUTURE DATA CENTRE UNDERGROUND IRRIGATION TANK BATT ER PERIMETER ACCESS ROAD BATTER BATTER PERIMETER ACCESS ROAD PERIMETER ACCESS ROAD S ROAD FUTURE ACCESS ROAD Project: “The Residence” College Street, Sydney Client: Hutchinson Builders Contract Value: $300,000 Contract Duration: 12 weeks Project complete on time and within budget Scope of Work: The SoW required the detailed cleaning of up market residential apartments commanding magnificent views over Hyde Park and the city of Sydney. Key Elements: Kitchen and bathroom finishes in particular required a great attention to detail. Leisure areas including lap pool and spa, sauna, steam room and gymnasium. Common areas including entry lobbies, lifts and corridors and external paved areas. Client Testimonial: Redclean did a fantastic job cleaning all elements of the building and their meticulous attention to detail ensured the building and apartments looked first class at handover. Their Communication Book process proved invaluable. Andrew Gulliford (Proj Mgr)

Transcript of PAST PROJECTS / CLIENT TESTIMONIALS · PAST PROJECTS / CLIENT TESTIMONIALS Project: Hewlett Packard...

Page 1: PAST PROJECTS / CLIENT TESTIMONIALS · PAST PROJECTS / CLIENT TESTIMONIALS Project: Hewlett Packard - Data Storage and Distribution Facility (12,000 m2) Eastern Creek Client: 3.00°Laing

PAST PROJECTS / CLIENT TESTIMONIALS

Project: Hewlett Packard - Data Storage and Distribution Facility (12,000 m2) Eastern Creek

Client: Laing O’Rourke

Contract Value: $640,000 Contract Duration: 12 weeks

Project complete on time and within budget

Scope of Work: The SoW required the building to be cleaned to a Level 2 standard of handover.

(Level 1 being the highest standard projects such as biohazard labs)

Key Elements: Cleaning high level tunnel like A/C ducts (crawl spaces) forming part of the air recycling system.

This space had to be completely dust free. Cleaning thousands of metres of cable racking to a

hospital standard clean.

Client Testimonial: The level of clean required for this project was extremely demanding with much of the

areas / services in difficult to access areas. Redclean completed the cleaning work on time and

within budget. Great effort. Johnathon Richard (Proj Mgr)

RL 61.000

57100

53440

CAPICURE DR

ROBE

RTS R

OAD

TURNINGAREA FORREJECTEDVEHICLES

STAFF / VISITOR CARPARK (28 SPACES)

LOADING DOCKAREA

FUTUREDATA CENTRE DATA CENTRE

CELL 2

ADMIN AREA

ELECTRICAL AIS SWITCH STATION

DATA CENTRECELL 1

FUTUREDATA CENTRE

FUTUREDATA CENTRE

UNDERGROUNDIRRIGATION TANK

BATTER

PERIMETER ACCESS ROAD

PERIMETER ACCESS ROAD BATT

ER

BATTER

BATTER

BATT

ER

BATTER

PERIMETER ACCESS ROAD

PERIMETER ACCESS ROAD

FUTURE ACCESS ROAD

EXISTINGDETENTION BASIN

ACCESS ROAD

3.00°

3.00°

3.00°

3.00°

FUTURE ACCESS ROAD

30500

30.5m SETBACK TOBOUNDARYHP REQUIREMENT

3m SETBACK TO BOUNDARYCOUNCIL REQUIREMENT

GATEHOUSE

TREES TO BERETAINED

FUTURE ABOVE GROUND DIESELTANKS AND GENERATORS IN

ACOUSTIC ENCLOSURE

SLIDING SECURITYGATES TO SITEENTRY / EXIT

RETAINING WALL

RETAINING WALL

FENCE TOSWITCHING YARDSECURITY FENCETO BOUNDARY

SERVICE BUILDING TO INTEGRALENERGY REQUIREMENTS

SERVICE BUILDING TOHP REQUIREMENTS

SECURITY FENCETO BOUNDARY

SECURITY FENCETO BOUNDARY

SECURITY FENCETO BOUNDARY

SEPARATE ACCESS TO HV SWITCHSTATION AS PER INTEGRAL

ENERGY REQUIREMENTS

HVAC PUMP ROOM

UNDER GROUNDHVAC TANK

ABOVE GROUND DIESEL TANKS ANDGENERATORS IN ACOUSTICENCLOSURE

SECURITY FENCETO BOUNDARY

30.5m SETBACK TOBOUNDARY

HP REQUIREMENT

3m SETBACK TO BOUNDARYCOUNCIL REQUIREMENT

SLIDING SECURITY GATESTO SITE ENTRY / EXIT

SECURITY FENCETO PERIMETER OFSWITCHING YARD

INTERNAL FENCETO SWITCHINGYARD

FUTURE UNDERGROUND HVAC TANK

FUTURE HVACTANKS

SPRINKLER ANDHYDRANT TANK

SPRINKLER AND HYDRANTPUMP ROOM

NEW SEPARATEACCESS ROAD TO HVSWITCH STATION AS

PER INTEGRAL ENERGYREQUIREMENTS

RETAINING WALL

FUTURE DETENTIONBASIN

343 Pacific HighwayNorth Sydney NSW 2060T +612 9964 9500F +612 9964 9683ABN 61 007 747 748www.woodhead.com.au

Drawing Number Issue

ScaleDrawing TitleProject Number

Project Description

Drawing Coordinated

Checked

Architects

Client

Landscape Architect

BCA Consultant

Quantity Surveyor

Project Management

Issue Revision Description Date

Key Plan.

NOTESThis drawing is copyright and the property of WOODHEAD and must not be usedwithout written authorisation. Do not scale this drawing. All dimensions are to beverified on site and any discrepancies reported before commencement of any work orshop drawings.

Drawing Director Approval

Engineering

As indicated

M7 BUSINESS HUBCAPICURE DRIVE

EASTERN CREEK, NSW

HC:\Project\HP_DATA\2121-A-MM-LF.rvt17/09/2010 5:11:24 PM

W1002

SITE PLAN - GROUND FLOOR10212102 AR

EC DATA CENTRE

Checker

HP Critical Facilities Services303 Second St. | Suite 500

South Tower San Francisco | CA 94107-6003

TBC

TBC

TBC

PRELIMINARY

AECOMLevel 11, 44 Market Street, Sydney,NSW 2000

SK06 1 : 10001 Proposed Site Plan - Ground Floor

FUTURE SITE AREA SCHEDULE (F.E.C.A.)Number Name Area

2.1 Future Data Centre 11852 m²2.2 Future Diesel Tanks Area 2022 m²3.1 Future Data Centre 6072 m²

19946 m²

SITE AREA SCHEDULE (F.E.C.A.)Number Name Area

1.1 Admin Area 3203 m²1.3 Data Centre Cell 1 & 2 11528 m²1.3 Electrical Switch Station 11239 m²1.4 Gate House 30 m²1.5 HVAC Pump Room 87 m²1.6 Sprinkler Pump Room 84 m²1.7 Diesel Tanks Area 2248 m²

28419 m²

PROPERTY SCHEDULEName Area

HP DATA CENTRE EASTERN CREEK 145119 m²

STAGE 1 SITE COVERAGE IS AT 19.5%

PARKING SCHEDULESIZE

5500 x 260028

STAGE 2 SITE COVERAGE (INCL STAGE 1) IS AT 33.3%

STAGE 1 BUILT AREA =

STAGE 2 BUILT AREA =

SITE AREA SCHEDULE (ROAD STAGE 1)Number Name Area

1.01 Road 2385 m²1.02 Road 14818 m²

17203 m²

A FOR INFORMATION 30/08/2010B FOR INFORMATION 01/09/2010C FOR INFORMATION 02/09/2010D FOR INFORMATION 07/09/2010E FOR INFORMATION 08/09/2010F FOR INFORMATION 10/09/2010G FOR INFORMATION 13/09/2010H EA ISSUE 17/09/2010

Project: “The Residence” College Street, Sydney

Client: Hutchinson Builders

Contract Value: $300,000 Contract Duration: 12 weeks

Project complete on time and within budget

Scope of Work: The SoW required the detailed cleaning of up market residential apartments commanding

magnificent views over Hyde Park and the city of Sydney.

Key Elements: Kitchen and bathroom finishes in particular required a great attention to detail.

Leisure areas including lap pool and spa, sauna, steam room and gymnasium.

Common areas including entry lobbies, lifts and corridors and external paved areas.

Client Testimonial: Redclean did a fantastic job cleaning all elements of the building and their meticulous

attention to detail ensured the building and apartments looked first class at handover. Their

Communication Book process proved invaluable. Andrew Gulliford (Proj Mgr)