Passive Fire Protection According to UBBL Malaysia
Click here to load reader
-
Upload
zhaowei-kim -
Category
Law
-
view
1.173 -
download
81
Transcript of Passive Fire Protection According to UBBL Malaysia
![Page 1: Passive Fire Protection According to UBBL Malaysia](https://reader038.fdocuments.net/reader038/viewer/2022102400/589db39a1a28ab21728b6e53/html5/thumbnails/1.jpg)
Passive Fire ProtectionDesign and Application
![Page 2: Passive Fire Protection According to UBBL Malaysia](https://reader038.fdocuments.net/reader038/viewer/2022102400/589db39a1a28ab21728b6e53/html5/thumbnails/2.jpg)
![Page 3: Passive Fire Protection According to UBBL Malaysia](https://reader038.fdocuments.net/reader038/viewer/2022102400/589db39a1a28ab21728b6e53/html5/thumbnails/3.jpg)
CONCEPTS OF FIRE SAFETY
1 EVACUATION
2 PASSIVE CONTAINMENT
3 ACTIVE INTERVENTION
4 ACCESS FOR FIRE FIGHTING AND RESCUE
![Page 4: Passive Fire Protection According to UBBL Malaysia](https://reader038.fdocuments.net/reader038/viewer/2022102400/589db39a1a28ab21728b6e53/html5/thumbnails/4.jpg)
• 134 – designation of purpose group• 136 – limits of compartment sizes• 137 & 138 - compartment floors• 140 – separation of fire risk areas• 215 – vertical compartment wall• 5th Schedule
UBBL
Compartmentation
![Page 5: Passive Fire Protection According to UBBL Malaysia](https://reader038.fdocuments.net/reader038/viewer/2022102400/589db39a1a28ab21728b6e53/html5/thumbnails/5.jpg)
• 5th ScheduleUsage / purpose group limits of dimensions
Hotel / III Height > 28mFloor area : 2000m2Volume : 5500m3
Office / IV Height > 28mFloor area : no limitVolume : no limit
Shops / V Floor area : 2000m2Volume : 7000m3
Basement Car Park / VIII Floor area : no limitVolume : 21,000m3
4,000m211,000m3
4,000m214,000m3
42,000m3
* UBBL Clause 136 : with Automatic Sprinklers : limits shall be x 2
![Page 6: Passive Fire Protection According to UBBL Malaysia](https://reader038.fdocuments.net/reader038/viewer/2022102400/589db39a1a28ab21728b6e53/html5/thumbnails/6.jpg)
1800m2 / flr
40000m2 / flr
40,000m2 / flr ( 160,000m2 total )
UBBL 137Compartment Floors
UBBL 137Compartment Floors
UBBL 138(d)Compartment floor
UBBL 215Vertical separation
![Page 7: Passive Fire Protection According to UBBL Malaysia](https://reader038.fdocuments.net/reader038/viewer/2022102400/589db39a1a28ab21728b6e53/html5/thumbnails/7.jpg)
Shop compartment limit 4,000m2 14,000m3
Compartment A
Compartment B No limits if
At least 60% area are shopsLess than 280m2 each
Compartment C
![Page 8: Passive Fire Protection According to UBBL Malaysia](https://reader038.fdocuments.net/reader038/viewer/2022102400/589db39a1a28ab21728b6e53/html5/thumbnails/8.jpg)
Basement compartment volume limit 42,000m2
Compartment A
Compartment B
Compartment C
Separation of vertical ‘shaft’
Compartment D
![Page 9: Passive Fire Protection According to UBBL Malaysia](https://reader038.fdocuments.net/reader038/viewer/2022102400/589db39a1a28ab21728b6e53/html5/thumbnails/9.jpg)
• 165 – measurements of travel distance• 166 – minimum 2 separate exits• 167 – storey exits• 171 – horizontal exit• 174 – storey exit to lead to final exit• 7th Schedule
UBBL
Exits Considerations
![Page 10: Passive Fire Protection According to UBBL Malaysia](https://reader038.fdocuments.net/reader038/viewer/2022102400/589db39a1a28ab21728b6e53/html5/thumbnails/10.jpg)
• 7th Schedule
Maximum Travel Distance Occupant load capacity of exitsDead End / w Sprinklers ( e.g Stair )
Hotel 10m / 45m 2 pax / room 45
Office 15m / 60m 10m2 per person 60(gross)
Shops 15m / 45m street level 3m2 / pax 60upper level 6m2 / pax 60
Basement 15m / 30m* not specified
* Basement garages limited to 30m even with sprinklers
![Page 11: Passive Fire Protection According to UBBL Malaysia](https://reader038.fdocuments.net/reader038/viewer/2022102400/589db39a1a28ab21728b6e53/html5/thumbnails/11.jpg)
Final exit
Exit route
horizontal exit
storey exit
Travel distance
Travel distanceTravel distance
Final exit
![Page 12: Passive Fire Protection According to UBBL Malaysia](https://reader038.fdocuments.net/reader038/viewer/2022102400/589db39a1a28ab21728b6e53/html5/thumbnails/12.jpg)
• Occupant load :
• Capacity of Exits : • Exit width required : • Total exit width required :
• ‘redundancy’ calculation :
UBBL 168, 175, 176, 177, 181
Exit capacity calculation : Hotel
2 pax X 40 rooms = 80 pax / floor (By law 175)
45 per unit (By law 176 ,7th schedule), 80/45 =1.77, say 1.8 (By law 176, 7th schedule)
1.8 X 550mm = 990mm (By law 176, 7th schedule)
round up to 2 full units (By law 177,181) therefore, 2 X 550mm = 1100mmSay 1 staircase inaccessible, 2-1 = 1, therefore min exit width = 1100mm
![Page 13: Passive Fire Protection According to UBBL Malaysia](https://reader038.fdocuments.net/reader038/viewer/2022102400/589db39a1a28ab21728b6e53/html5/thumbnails/13.jpg)
• Occupant load :
• Capacity of Exits : • Exit width required : • Total exit width required : • ‘redundancy’ calculation :
UBBL 168, 175, 176, 177, 181
Exit capacity calculation : Office
Gross floor area = 1800m2, 10 m2/pax, therefore 1800/10 = 180 pax/floor
60 per unit (By law 176, 7th schedule), 180/60 = 3 (By law 176, 7th schedule)
3 X 550mm = 1650mm (By law 176,7th Sch
Say 1 staircase inaccessible, 2-1 = 1, therefore the min exit width = 1650mm
![Page 14: Passive Fire Protection According to UBBL Malaysia](https://reader038.fdocuments.net/reader038/viewer/2022102400/589db39a1a28ab21728b6e53/html5/thumbnails/14.jpg)
• Occupant load :
• Capacity of Exits : • Exit width required : • Total exit width required : • ‘redundancy’ calculation :
UBBL 168, 175, 176, 177, 181
Exit capacity calculation : Shopping Podium
Gross floor area = 40 000 – 4000 (Atrium) = 36 000m2, 6m2 / pax, therefore = 36 000 / 6 = 6000 pax / floor 60 per unit (By law 176, 7th schedule), 6000 / 60 = 100 (By law 176, 7th schedule)
100 X 550mm = 55 000mm (By law 176,7th schedule)
Say 1 staircase inaccessible, 14-1 = 13, therefore the min exit width = 55 000mm/13 = 4200mm
![Page 15: Passive Fire Protection According to UBBL Malaysia](https://reader038.fdocuments.net/reader038/viewer/2022102400/589db39a1a28ab21728b6e53/html5/thumbnails/15.jpg)
• Occupant load :
• Capacity of Exits : • Exit width required : • Total exit width required : • ‘redundancy’ calculation :
UBBL 168, 175, 176, 177, 181
Exit capacity calculation : Basement carpark
Gross floor area = 40 000, assume 2 pax/car and 40m2/car, therefore 40 000/40 = 1000 car or 2000 pax/floor
Compare 2000 to 6000 (shopping),
factor reduction = 1/3 55 000 / 3 = 18300 mm (By law 176, 7th schedule)
Say 1 staircase inaccessible, 14-1 = 13, therefore the min exit width = 18 300mm / 13 = 1400mm
![Page 16: Passive Fire Protection According to UBBL Malaysia](https://reader038.fdocuments.net/reader038/viewer/2022102400/589db39a1a28ab21728b6e53/html5/thumbnails/16.jpg)
Final exit
Exit route
horizontal exit
storey exit
Final exit250 pax
400 pax
200 pax 150 pax
300 pax
250 pax
400 pax
400 pax
400 pax
400 pax
200 pax
![Page 17: Passive Fire Protection According to UBBL Malaysia](https://reader038.fdocuments.net/reader038/viewer/2022102400/589db39a1a28ab21728b6e53/html5/thumbnails/17.jpg)
Exit route to discharge direct to final exit
Basement
Exit route to discharge direct to final exit
![Page 18: Passive Fire Protection According to UBBL Malaysia](https://reader038.fdocuments.net/reader038/viewer/2022102400/589db39a1a28ab21728b6e53/html5/thumbnails/18.jpg)
Travel distance• UBBL 165• 7th Schedule• Dead end • initial travel distance before a point where an alternative path
becomes available
• Direct distance• Stipulates that travel distance must be measured along the actual
path of travel
• Open plan• Where an actual path of travel cannot be determined, the direct
distance can be measured as a straight line direct to the exit. Permitted travel distance is then reduced to 2/3.
![Page 19: Passive Fire Protection According to UBBL Malaysia](https://reader038.fdocuments.net/reader038/viewer/2022102400/589db39a1a28ab21728b6e53/html5/thumbnails/19.jpg)
![Page 20: Passive Fire Protection According to UBBL Malaysia](https://reader038.fdocuments.net/reader038/viewer/2022102400/589db39a1a28ab21728b6e53/html5/thumbnails/20.jpg)
![Page 21: Passive Fire Protection According to UBBL Malaysia](https://reader038.fdocuments.net/reader038/viewer/2022102400/589db39a1a28ab21728b6e53/html5/thumbnails/21.jpg)
• 196, 197 - smoke lobbies, protected lobbies
• 198, 199, 200, 201 – ventilation of stairs• 229 – fire fighting lobbies
UBBL
Protection of stairs and lobbies
![Page 22: Passive Fire Protection According to UBBL Malaysia](https://reader038.fdocuments.net/reader038/viewer/2022102400/589db39a1a28ab21728b6e53/html5/thumbnails/22.jpg)
Protection of stairs and lobbies
• Protected Lobby : protected lobby separated or isolated from fire and smoke infiltration
• Smoke Lobby : a protected lobby primarily to isolate staircases from smoke infiltration
• ventilated lobby : protected/smoke lobby by means of natural ventilation from outside
• Fire Fighting Access Lobby : a protected lobby designed for fire fighting access
![Page 23: Passive Fire Protection According to UBBL Malaysia](https://reader038.fdocuments.net/reader038/viewer/2022102400/589db39a1a28ab21728b6e53/html5/thumbnails/23.jpg)
![Page 24: Passive Fire Protection According to UBBL Malaysia](https://reader038.fdocuments.net/reader038/viewer/2022102400/589db39a1a28ab21728b6e53/html5/thumbnails/24.jpg)
PROTECTED / PRESSURISED
![Page 25: Passive Fire Protection According to UBBL Malaysia](https://reader038.fdocuments.net/reader038/viewer/2022102400/589db39a1a28ab21728b6e53/html5/thumbnails/25.jpg)
![Page 26: Passive Fire Protection According to UBBL Malaysia](https://reader038.fdocuments.net/reader038/viewer/2022102400/589db39a1a28ab21728b6e53/html5/thumbnails/26.jpg)
> 45o
Room < 6 pax
![Page 27: Passive Fire Protection According to UBBL Malaysia](https://reader038.fdocuments.net/reader038/viewer/2022102400/589db39a1a28ab21728b6e53/html5/thumbnails/27.jpg)
UBBL 229
![Page 28: Passive Fire Protection According to UBBL Malaysia](https://reader038.fdocuments.net/reader038/viewer/2022102400/589db39a1a28ab21728b6e53/html5/thumbnails/28.jpg)
![Page 29: Passive Fire Protection According to UBBL Malaysia](https://reader038.fdocuments.net/reader038/viewer/2022102400/589db39a1a28ab21728b6e53/html5/thumbnails/29.jpg)
60m
![Page 30: Passive Fire Protection According to UBBL Malaysia](https://reader038.fdocuments.net/reader038/viewer/2022102400/589db39a1a28ab21728b6e53/html5/thumbnails/30.jpg)
UBBL Clause 140Volume of building > 112,000m3 hence, island site
Hydrants to be located at max. 90m intervals
![Page 31: Passive Fire Protection According to UBBL Malaysia](https://reader038.fdocuments.net/reader038/viewer/2022102400/589db39a1a28ab21728b6e53/html5/thumbnails/31.jpg)