PASCHIM MEDINIPUR ZILLA PARISHAD · 2014-12-03 · Annexure-I PASCHIM MEDINIPUR ZILLA PARISHAD...

5
PASCHIM MEDINIPUR ZILLA PARISHAD Midnaporc :: 721101 Fax. (03222) 263597 :: Phonc.- (03222) 275071 :: cmail.- [email protected] :: wcbsitc.- www.zprnidwcst.org OIUlER An amount of Rs. 17.2125 lakh (Rupees seventeen lakh twenty one thousand two hundred fifty) only is hereby sub-allotted to the Executive Officer of Chandrakona-II, Daspur-l, Garhbeta-II, Garhbeta-III, Gopiballavpur-II, Kharagpur-II, Medinipur Sadar & Mohanpur Panehayat Samiti to meet up the 3 rd installment of lAY for the year 2013-14 as .. shown in annexurc-I out of the total fund ofRs, 14233.65307 lakh (Rupees one hundred forty twocrore thirty three lakh sixty five thousand three hundred seven) only received as central and state assistance of 1st installment for the year 2014-15 for new construction under Indira Awaas Yojana. Terms & conditions.- I.. The fund will be utilized for the construction of new houses @ Rs. 75000/- 10 the conditions laid down in the guidelines of Indira Awaas Yojana (ll\. Y) from lime to time. No deviation from the provisions of the guidelines is permissible. 2. Regular close supervision / inspection of the construction of houses is obligatory. During each inspection photograph of the house will have to be captured and the same should be uploaded in Awaassoft. 3. Disbursement shall be made at Block level in a camp mode on prior arrangement and intimation shall be given to Zilla Parishad, SDO and operating bank branches. Application for loan as Differential Rate of Interest (DRl) shall be collected from the beneficiaries at the time of disbursement. 4. Thc amount so disburse amongst the eligible beneficiaries must be uploaded through Awaassoft. 5. Executive Officer of Panchayat Samiti shall abide by other terms and conditions as laid down by State Govt.lMoRD in the implementation of lAY. 6. Progress Report shall be submitted by the 3 rd day of each month positively III prescribed format. 7. U C of the allotted fund must be submitted to this end. Enclo.- Annexure I ~ 1.-\1·\\\1"f . Additional District Magistrat~ & Additional Executive Officer Paschim Medinipur Zilla Parishad Page 1 of 3

Transcript of PASCHIM MEDINIPUR ZILLA PARISHAD · 2014-12-03 · Annexure-I PASCHIM MEDINIPUR ZILLA PARISHAD...

Page 1: PASCHIM MEDINIPUR ZILLA PARISHAD · 2014-12-03 · Annexure-I PASCHIM MEDINIPUR ZILLA PARISHAD Sub-allotment ofFundfornewconstruction ofhousesunderlAY3rdInstallment of-2013-14videthis

PASCHIM MEDINIPUR ZILLA PARISHADMidnaporc :: 721101

Fax. (03222) 263597 :: Phonc.- (03222) 275071 :: cmail.- [email protected] :: wcbsitc.- www.zprnidwcst.org

OIUlER

An amount of Rs. 17.2125 lakh (Rupees seventeen lakh twenty one thousand two

hundred fifty) only is hereby sub-allotted to the Executive Officer of Chandrakona-II,

Daspur-l, Garhbeta-II, Garhbeta-III, Gopiballavpur-II, Kharagpur-II, Medinipur Sadar &

Mohanpur Panehayat Samiti to meet up the 3rd installment of lAY for the year 2013-14 as

.. shown in annexurc-I out of the total fund ofRs, 14233.65307 lakh (Rupees one hundred

forty twocrore thirty three lakh sixty five thousand three hundred seven) only received

as central and state assistance of 1st installment for the year 2014-15 for new construction

under Indira Awaas Yojana.

Terms & conditions.-

I.. The fund will be utilized for the construction of new houses @ Rs. 75000/- 10 theconditions laid down in the guidelines of Indira Awaas Yojana (ll\.Y) from lime totime. No deviation from the provisions of the guidelines is permissible.

2. Regular close supervision / inspection of the construction of houses is obligatory.During each inspection photograph of the house will have to be captured and thesame should be uploaded in Awaassoft.

3. Disbursement shall be made at Block level in a camp mode on prior arrangement andintimation shall be given to Zilla Parishad, SDO and operating bank branches.Application for loan as Differential Rate of Interest (DRl) shall be collected from thebeneficiaries at the time of disbursement.

4. Thc amount so disburse amongst the eligible beneficiaries must be uploaded throughAwaassoft.

5. Executive Officer of Panchayat Samiti shall abide by other terms and conditions aslaid down by State Govt.lMoRD in the implementation of lAY.

6. Progress Report shall be submitted by the 3rd day of each month positively III

prescribed format.

7. U C of the allotted fund must be submitted to this end.

Enclo.- Annexure I

~ 1.-\1·\\\1"f .Additional District Magistrat~

&Additional Executive Officer

Paschim Medinipur Zilla Parishad

Page 1 of 3

Page 2: PASCHIM MEDINIPUR ZILLA PARISHAD · 2014-12-03 · Annexure-I PASCHIM MEDINIPUR ZILLA PARISHAD Sub-allotment ofFundfornewconstruction ofhousesunderlAY3rdInstallment of-2013-14videthis

Date.-M' 11' 11Copy to the.-

1. SpI. Secretary, P&RD Deptt., Joint Administrative Building, IIC-7, Scctor-IIl,Bidhannagar, Kolkata-l 06.

2. Karmadhyaksha, Purta-Karya-O-Paribahan Sthayee Samiti, Paschim Medinipur hIlaParishad.

3. Sub Divisional Officer, Midnapore Sadar I Kharagpur I Jhargram/GhataI.

4. Dy. Secretary, Paschim Medinipur Zilla Parishad.

5. FC & CAO, Paschim Medinipur Zilla Parishad. Fund shall be transferred to therespective account of Panchayat Samiti immediately.

6. Sabhapati, Chandrakona-II, Daspur-I, Garhbeta-II, Garhbeta-III, Gopiballavpur-II,Kharagpur-II, Medinipur Sadar & Mohanpur Panchayat Samiti.

7. Executive Officer, Chandrakona-II, Daspur-I, Garhbeta-II, Garhbeta-III,Gopiballavpur-II, Kharagpur-II, Medinipur Sadar & Mohanpur Panchayat Samiti.

8. Accountant, Paschim Medinipur Zilla Parishad.

9. DIA, Paschim Medinipur Zilla Parishad, for sending this allotment letter, vide cmailand uploading in website.

10.'Cashier, Paschirn Mcdinipur Zilla Parishad.

1L PA to Sabhadhipati, Paschim Mcdinipur Zilla Parishad.

12. CA to District Magistrate, Paschim Medinipur.

~\,,1Additional District Magistrate

&Additional Executive Officer

Paschim Medinipur Zilla Parishad

C:\Rajesh\My-Dock\RD\IAY 2014-15\Order & sub-allotment_2013··14_3rd instt._lIl.docx Page 2 of 3

Page 3: PASCHIM MEDINIPUR ZILLA PARISHAD · 2014-12-03 · Annexure-I PASCHIM MEDINIPUR ZILLA PARISHAD Sub-allotment ofFundfornewconstruction ofhousesunderlAY3rdInstallment of-2013-14videthis

-.-

Anncxurc-I

Paschim Mcdinipur Ijlla Parishadl'cl3 Installmcnt afIJ\Y

2013-14...-

SI. Xarnc of the block No of beneficiaries Total amount:\0 . ··l--- ...released (@ Rs.

Fund now Fund alreadv

being released __ rc~:Cd " 11,2501- ) as 3"1installment

f/l..~. !lll!!~")_1 Chandrakona-Il 49 18 5.5125

----_ .. _.. -.. ---_ .•--_.-- ... .. .-2 Daspur-I 1 ° 0.1125

-..,Garbcta-Il 1 73 0.1125J

-4 Garh beta - l ll 49 9 5.5125- - .-. ---.',. -- --- ..._ .... - - ---

5 Gopiballavpur-Il 44 ° 4.95.. - ..- --- -- - -_ . ._- --- .- .._-

6 Kharagpur-ll 4 _ .--- .~~. _._ .. __ 1 .. _____ 0.45_7 Mcdinipur Sadar 1 ._ ..._.__._~*____.. _+. ___O(}:~~?_..

8 Mohanpur 4Total 153 ~':-1-~'~_iQ?---'~-j__....17.2125

I...

(/?U[iC('.1 seventeen lakh twenty one thousand two hundred lift.•.} onlv

-~ - 1 - j-.i/ - ~ ?,.\I \\ t ,

Additional District Mbi'fitratc&

Additional Executive OfficerPaschim Medinipur ZiJIa Panshad

C:\R~jr.sh\My Dock\RD\II\Y 2014 lS\Ordcr & sub allotment .. 2013-14 ..3rd instt._III.docx· Page30f3

Page 4: PASCHIM MEDINIPUR ZILLA PARISHAD · 2014-12-03 · Annexure-I PASCHIM MEDINIPUR ZILLA PARISHAD Sub-allotment ofFundfornewconstruction ofhousesunderlAY3rdInstallment of-2013-14videthis

OFFICE OF THEPASCHIM MEDINIPORE ZILLA PARISHAD

Memo N0'/38IAccts. Date: 24-11-2014

ToThe Sr. Branch ManagerUnited Bank of India,Sepoybazar, Midnapore

Sub: Transfer of fund for 3,i1lnstallment of 2013-14 from Zilla Parish ad's lAY Account to lAYAccounts of 8 nos Panchayat Samities

Sir,Please debit a sum of Rs. 17,21,250.00 ( Rupees seventeen lakh twenty one thousand two

hundred fifty) only from Paschim Medinipore Zilla Parishads lAY SB Account No.0788011937190

and credit the same amount to 8 nos Panchayat Samity's lA Y Savings Bank Account as stated in

Annexure -I for construction of Houses under lAY for 3rdlnstallment 2013-14 ..

Please ensure that transfer of fund as mentioned in Annexure- I should be given effect to only

when both the name of recipient body and its account no. match.

The entire process oftransmission should be done immediately.

This may be treated as urgent.

Enclo: Annexure-IY~s ~~hfully,

Fi~g~~er&

Chief Accounts OfficerPaschim Medinipore Zilla Parisahd.

Memo No. \ 38ft (6~ccts.Copy Along forwarded to the:

1. Savadhipati, Paschim Medinipore Zilla Parisahd.2. District Magistrate, Paschim Medinipore & Executive Officer, Paschim

Medinipore Zilla Parisahd .. 3. Addiitonal District Magistarte & Additional Executive Officer, Paschim Medinipore Zilla

Parisahd. This has a reference to her no. 119511(12)/RD dated: 20.11.2014.4. Secretary, Paschim Medinipore Zilla Parishad5. Deputy Secretary, Paschim Medinipore Zilla Parishad.

6. Sabhapati, Panchayat Samity.7. Executive Officer, Panchayat Samity.8. Accountant, Paschim Medinipore Zilla Parishad.9. Cashier, Paschim Medinipore Zilla Parishad.

10. Monoj Das Dutta, UDA, DA for file.11. DIA, Paschim Medinipore Zilla Parishad with a request to upload the allotment in website

~~'WJFinancial Controller

&

Date: 24-11-2014

Pas 1L'"" Medi 'po-e Zilla Parisahd.

Page 5: PASCHIM MEDINIPUR ZILLA PARISHAD · 2014-12-03 · Annexure-I PASCHIM MEDINIPUR ZILLA PARISHAD Sub-allotment ofFundfornewconstruction ofhousesunderlAY3rdInstallment of-2013-14videthis

Annexure-I

PASCHIM MEDINIPUR ZILLA PARISHAD

Sub-allotment of Fund for new construction of houses under lAY 3rd Installment of - 2013-14 vide this Office memo No. 194/1(12)/RD dt.24.11.14

Total

0 Fund now Fund alreadyAmount released @

z Name of Block Bank Name Bank Branch Branch Code Account No. IFSCCODE Rs11250/- as 3rdVi being released released

installment( Rs. In lakh)

1 Chandrakona-II UCO Chandrakona 0643 06430110011782 UCBAOOOO643 49 18 551250.00

2 Oaspur-I UBI Oaspur 0188010166027 UTBI00AS295 1 0 11250.00

3 Mohanpur UBI Mohanpore MHP-078 0693010110044 UTBIOMHP078 4 24 45000.00

4 Gopiballavpur-II UBI Beliaberh 0847 0847010108485 UTBIOBEBC53 44. 0 495000.00

5 Garbeta-II UBI Goaltore GLT-061 06840101111867 UTBIOGLT061 1 73 11250.00

6 Kharagpur-II PNB Madpur 3209000100079498 PUNB0320900 4 29 45000.00

7 Garbeta-III 581 Chandrakona Road 11386 30917841565 SBINOOl1386 49 9 551250.00

8 Medinipur 5adar lOBI lOBI, Midnapur 420 0420104000103961 IBKLOOO0420 1 56 11250.00

GRAND TOTAL: ( Rupees seventeen lakh twenty one thousand two hundred fifty) only 153 209 1721250.00

F~901~&

Chief Accounts Officer

Paschim Medinipur Zilla Parishad

;\U! UMAII\0esIttop\tAY-2014-1S\IAYsuballotment2013-14·2ndInsla~· Copy-Copy