PART L UPDATE FOR SAP 10 08.45 - 09.00 Breakfast PART B FIRE SAFETY IN 3 …… · 2019-04-10 ·...

1
THIS EVENT IS FREE TO ATTEND FOR ALL ARCHITECTS, BUILDING SURVEYORS, CONTRACTORS, PROJECT MANAGERS, DESIGNERS & BUILDERS DEMAND WILL BE HIGH - BOOK YOUR PLACE NOW email: [email protected] tel: 01924 240563 APPROVAL Education & Training Accessibility Energy Assessments System Approval Fire Safety Inspections ACTIS INSULATION will also be present to give information and assistance on their range of Insulation products that may assist in Compliance with Approved Document L PROGRAMME 07.45 - 08.00 Registration & Refreshments 08.00 - 08.45 Part L Update for SAP 10 08.45 - 09.00 Breakfast 09.00 - 09.45 Part B Fire Safety in 3 storey dwellings with Open Accommodation & update on jhai and the Hackitt report. Wednesday 15 May 2019 The Crownhill Suite, Mercure Milton Keynes Hotel, The Approach, Two Mile Ash, Milton Keynes MK8 8LY www.jhai.co.uk jhai will provide Building Control for over 20,000 construction projects this year alone, helping architects, builders, developers and homeowners across England and Wales comply with Building Regulations as efficiently and as profitably as possible. PART L UPDATE FOR SAP 10 PART B FIRE SAFETY IN 3 STOREY DWELLINGS WITH OPEN ACCOMMODATION & update on jhai and the Hackitt report Speaker: Stephen Barnshaw BSc (Hons) MRICS Stephen Barnshaw is Associate Director of Technical Services at jhai Ltd. He has worked in both the private and public building control sector for the past 25 years, working on many major contracts. He is a Chartered Surveyor, and is an experienced RICS professional membership panel chairman. He regularly delivers seminars for RIBA, RICS and client groups across the country on both the technical and legal aspects of regulatory compliance.

Transcript of PART L UPDATE FOR SAP 10 08.45 - 09.00 Breakfast PART B FIRE SAFETY IN 3 …… · 2019-04-10 ·...

Page 1: PART L UPDATE FOR SAP 10 08.45 - 09.00 Breakfast PART B FIRE SAFETY IN 3 …… · 2019-04-10 · 07.45 - 08.00 Registration & Refreshments 08.00 - 08.45 Part L Update for SAP 10

THIS EVENT IS FREE TO ATTEND FOR ALL ARCHITECTS, BUILDING SURVEYORS, CONTRACTORS, PROJECT MANAGERS,

DESIGNERS & BUILDERS

DEMAND WILL BE HIGH - BOOK YOUR PLACE NOWemail: [email protected]

tel: 01924 240563

�APPROVAL

Education & Training Accessibility Energy AssessmentsSystem Approval Fire Safety Inspections

ACTIS INSULATION will also be present to give information and assistance on their range of Insulation products that may assist in

Compliance with Approved Document L

PROGRAMME

07.45 - 08.00Registration & Refreshments

08.00 - 08.45Part L Update for SAP 10

08.45 - 09.00Breakfast

09.00 - 09.45Part B Fire Safety in 3 storey dwellings with

Open Accommodation & update onjhai and the Hackitt report.

Wednesday 15 May 2019The Crownhill Suite, Mercure Milton Keynes Hotel,

The Approach, Two Mile Ash,Milton Keynes

MK8 8LY

www.jhai.co.ukjhai will provide Building Control for over 20,000 construction projects this year alone, helping architects, builders, developers and homeowners across England and Wales comply with Building Regulations as e�ciently and as profitably as possible.

PART L UPDATE FOR SAP 10

PART B FIRE SAFETY IN 3 STOREYDWELLINGS WITH

OPEN ACCOMMODATION& update on jhai and the Hackitt report

Speaker: Stephen Barnshaw BSc (Hons) MRICSStephen Barnshaw is Associate Director of Technical Services at jhai Ltd. He has worked in both the private and public building control sector for the past 25 years, working on many major contracts.

He is a Chartered Surveyor, and is an experienced RICS professional membership panel chairman. He regularly delivers seminars for RIBA, RICS and client groups across the country on both

the technical and legal aspects of regulatory compliance.