PART B
Tender 2 Nation Building Economic Stimulus Plan Stage 2
Part B Specification and Response Requirements
Annexure 2- Minimum Design & Construction Specification
Annexure 2:Minimum Design & Construction Specification for Class 1 Building
101INTRODUCTION
101.1GENERAL CONTRACT REQUIREMENTS
101.2SPECIAL REQUIREMENTS
101.2.1Generally
101.2.2Services
101.2.3Fencing
111.2.4Disputes
111.2.5Environmental Control and Rubbish Removal
111.2.6Protection of Trees
121.2.7Possession of Site
131.3BRAND NAMES
131.4COUNCIL REQUIREMENTS
142.DESIGN REQUIREMENTS
142.1GENERAL
142.2SPECIFIC DESIGN REQUIREMENTS
142.2.1General
142.2.2Maintainability
142.2.3Grading of Outdoor Areas
142.2.3.1General Principle
152.2.3.2 Useable Private Open Space
152.2.3.3 General Open Space
152.2.4 Retaining Walls
152.2.5Finished Floor Levels
152.2.6Fencing
152.2.6.1General
162.2.6.2Fence type
162.2.6.3Existing fences
162.2.7Paving
162.2.7.1Paving design
162.2.7.2Paving Materials
162.2.7.3Access for persons with disabilities
172.2.7.4Driveways.
172.2.8Garage or Carport.
172.2.8.1 General
172.2.8.2 Carports
172.2.8.3 Garages
182.2.9Clothes Lines
182.2.10Storm Water / Site Water Disposal
182.2.10.1General
192.10.2Retention and Detention Tanks
192.2.11Bathrooms
192.2.11.1Bathroom Special items
192.2.11House Fabric
192.2.11.1Floors
202.2.11.2Footings
202.2.11.2.1Bore logs
202.2.11.2.2Proposal Footing Design
212.2.11.2.3Footing Design
212.2.11.3External Walls
212.2.11.4Internal Walls
212.2.11.5Internal Ceilings
222.2.11.6External Linings
222.2.11.7Roofs & Gutters
222.2.11.8Future Room Airconditioner.
222.2.11.9Heaters
222.2.12Site lighting
222.2.13Termite Protection
233 CONSTRUCTION REQUIREMENTS
233.1General
233.1.1Application
233.1.2Approvals
233.1.3Fees and charges
233.1.4Insurance
233.1.5Site issues
233.2SITEWORKS
233.2.1Existing sites
243.2.2Site Clearing
243.2.3Trees
243.2.4Demolition
243.2.5Services
243.2.6Site levels and benching (refer Standard Details)
243.2.7Stormwater Drainage
243.2.8Imported site fill
253.2.9Retaining walls
253.2.9.1Pier and Steel Beam Retaining Walls
253.2.9.2Retaining Walls combined with Fence Posts
253.2.9.3Landscaping retaining walls - fencing
253.2.10Garden areas
263.2.11Landscaping
263.2.12Completion
263.3CONCRETE
263.3.1Standard Of Work
263.3.2Materials
273.3.3Excavation For Footings
273.3.4Termite Treatment
273.3.4.1General
273.3.4.2Special Requirements for Bath Risers:
273.3.4.3 Perimeter Protection
273.3.5Concrete Mix
273.3.5.1General
273.3.5.2Concrete Class
283.3.5.3Delivery of Pre-Mixed Concrete
283.3.5.4Site Mixed Concrete
283.3.6Tests
283.3.7Formwork
283.3.7.1Generally
283.3.7.2Treatment
283.3.7.3Stripping
283.3.7.4Stripped Surfaces
293.3.8Reinforcement Generally
293.3.8.1General Conditions
293.3.8.2Lapping
293.3.8.3Cover
293.3.9Preparation Before Pour
293.3.9.1Inspection
293.3.9.1Joining To Existing Slabs
303.3.9.3Items to be in Position
303.3.10Paving (Including Driveways)
303.3.10.1General
303.3.10.2Finished Levels
303.3.10.3Tooled Joints
313.3.11Floor Finished Levels
313.3.12Type Of Concrete Works
313.3.12.1Footings
313.3.12.2 Steps, Landings and Ramps
323.3.12.3Perimeter Paving
323.3.12.3 Driveway Paving
323.3.13Construction Details
323.3.13.1Dowelled Construction Joints (DCJ)
333.3.13.2Sealant to DCJ
333.3.13.3Separation of Paving
333.3.13.4Crossovers
333.3.14Concrete Finishes
333.3.14.1General
333.3.14.2 Surface to be Tiled
333.3.14.3 Surface to be Topped
343.3.15Placing Concrete
343.3.15.1Generally
343.3.15.2Severe Weather Conditions
343.3.16Protection And Curing
343.3.16.1General
353.3.16.2Retention of Bond
353.3.16.3 Additional Protection
353.3.17Rainwater Tank Stand
353.3.17.1Tank Stand for Rainwater tank plumbed to toilets (usually 1000 Litres)
353.3.17.2Tank Stand for Detention tank
353.3.18Reinstatement
363.4MASONRY CONSTRUCTION
363.4.1Workmanship And Materials
363.4.1.1Standard of Workmanship and Materials
363.4.2Masonry Units
363.4.2.1Uniformity
363.4.2.2Clay Bricks
363.4.2.3Concrete Blocks & Bricks
363.4.2.4Aerated Autoclaved Concrete (AAC)
363.4.2.5Natural Stone
363.4.3Mortar
363.4.3.1 Materials
373.4.3.2Mortar Mixes
373.4.3.3Mixing
373.4.4Damp Proofing
373.4.4.1Damp Proof Membrane and Flashings
383,4.5Curing Period
383.4.6Wall Construction
383.4.6.1Laying
383.4.6.2Gabled Walling on Boundary
383.4.6.3Closing of Cavity
383.4.6.4Junction of Walls Internal & External
383.4.6.5Party Walls
393.4.6.6Reinforced Work
393.4.6.7Chasing
393.4.7Joints
393.4.7.1Fair Face Work
393.4.7.2Rendered Work
393.4.7.3Articulated Joints
403.4.8Ties And Reinforcement
403.4.8.1Wall Ties
403.4.8.2Spacing of Wall Ties
403.4.8.3Door Strap Ties
403.4.8.4Roof Ties in Solid Masonry
403.4.8.4.1Wall Plate Fixing
413.4.8.4.2Tie Down Fixing
413.4.8.5Reinforcement
413,4.9Ventilation
413.4.9.1Cavity Ventilation
413.4.9.2Ventilation Under Suspended Floors
413.4.10Building In
413.4.10.1General
423.4.11Sills And Copings
423.4.11.1General
423.4.12Lintels
423.4.12.1Steel Lintels for Masonry
423.4.12.2Block Lintels and Bond Beams
423.4.13Reinforced Brick Piers
433.4.14Provision For Ac Unit
433.4.15Cleaning And Pointing
433.4.15.1Making Good and Pointing
433.4.15.2Cleaning
433.4.16Rendering
433.4.16.1Workmanship
433.4.16.2Materials
433.4.16.3Mixing
433.4.16.4Rendered Finish
443.5WALL, FLOOR and ROOF FRAMING
443.5.1Workmanship
443.5.2Wall Framing
443.5.2.1General Requirements
453.5.2.2Timber
453.5.2.3Steel
453.5.2.4Wall Openings and Beams
453.5.2.5Junctions with Concrete Floors
453.5.2.6Provision for Fixtures
463.5.3House Roofs And Ceilings
463.5.3.1General Requirements
463.5.3.2Roof Trusses
463.5.4Porches, Verandahs, Carports And The Like
463.5.4.1General Requirements
463.5.4.2Posts
473.5.5Eaves And Soffits
473.5.5.1General Items.
473.5.5.2Timber Fascias
473.5.5.3Metal Fascias
473.5.5.4Barge Details
473.5.5.5Soffit Linings
473.5.6Ceiling Access
473.5.6.1Standard Detail Access
483.5.6External Wall Cladding
483.5.6.1General
483.5.6.1Hardiplank
483.5.6.2Weathertex Plank
483.5.6.3Timber Boarding
483.5.6.4F.R.C.B. Sheet Wall Lining
493.5.6.5Other Wall Lining
493.5.7Floor Construction
493.5.7.1Preparation and Clearance Under Suspended Ground Floors
493.5.7.2Timber Sizes
493.5.7.3Steel Sizes
493.5.8Upper Floor Framing - 2 Storey Housing
493.5.8.1General Requirements
493.5.8.2 Steel Members
493.5.8.3Timber Beams
503.5.8.4Joists
503.5.9Flooring
503.5.9.1Particle Board/Plywood Flooring
503.5.9.2Wet Area Flooring
513.5.9.3Strip (or Board) Floors
513.6INTERNAL LININGS AND TRIM
513.6.1Linings Generally
513.6.2 Wet Areas
513.6.3Plasterboard
513.6.3.1Sheet Material
523.6.3.1Flushing
523.6.4Fibre Cement Board
523.6.4.1Sheet Material
523.6.4.2Flushing
523.6.5Cornices And Vents
523.6.5.1Plasterboard Cornice
523.6.5.1Vents
523.6.6Timber Mouldings
533.7INSULATION
533.8.WINDOWS
533.8.1 General
533.8.2 Aluminium windows
533.8.2.1General
543.8.2.2Finish
543.8.3Protection
543.8.4Hardware and Seals
543.8.5Flyscreens
543.9DOORS
543.9.1Types, sizes and finishes
543.9.1.1Thickness
553.9.1.2Standard of Manufacture
553.9.1.3Types of Doors
553.9.1.4Hardware
563.9.2 Timber door frames and jambs
563.9.3 Metal door frames and jambs
563.9.4 Flyscreen Doors (To hinged doors)
563.9.5 Door seals and thresholds
573.9.6 Door stops
573.9.7Locks and Door Furniture
573.9.7.1Complying Locks and Door Furniture
573.9.7.2Mounting Heights
583.9.7.3Keying
583.10JOINERY
583.10.1General
583.10.2Cupboards
583.10.2.1General
593.10.2.2Method of Assembling
593.10.2.3Bench Units
593.10.2.4Drawers
593.10.2.5Doors
603.10.2.6Linen, Wardrobe and Utility Cupboards
603.10.2.7Installation
603.10.2.8 Door Hardware
613.11HARDWARE
613.11.1Metal Cabinets
613.11.2House Numbers
613.11