PART 5 Meter Exim Batas

64
DESCRIPTION PARAF DATA Checked Approped Checked Approped Checked Approped PERALATAN ME OUTFET ME C8 OF PT PLN (PERSERO) DISTRIBUSI JAWA TENGAH & D.I YOGYAKARTA

description

jangan

Transcript of PART 5 Meter Exim Batas

Page 1: PART 5 Meter Exim Batas

DESCRIPTION PARAF DATA

Checked

Approped

Checked

Approped

Checked

Approped

PERALATAN

ME OUTFET

ME C8 OF

PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA

Page 2: PART 5 Meter Exim Batas

DESCRIPTION PARAF DATA

Checked

Approped

Checked

Approped

Checked

Approped

PERALATAN

RINCIAN MATERIAL

ME C8 OF

M A T E R I A LJMLKODE M A T E R I A LJMLKODE

p

aa

4

9

Shacle anchor

4

Pole band double rack

Bolt machine ½”x req’d length

Cross arm steel 20002

cEye nut

Connector compression

STN STN

bo

vb

g

5

2

bh

bh

bh

bh

bh

bh

4

Locknut

3 Bolt eye 5/8 x req’d length

Arrester 18 kV6

oBrace steel 660

ae

ss 1

Kwh meter 3 ph 4 kwt

Sepatu kabel 240 mm2

2

Selector switch tegangan

kwh

bh

bh

1

Kas type VI out door

2 Steel channel NP 8 x 1500

Steel L 70 x 70 x 7 x 12501

chCT/PT Compacset

bh

6

Dead end assembly netral

12 Suspension isolator

Bolt double arming2

kDead end assembly primary

cc n 3

bh

bh

bhca

cv

ek

30

Ground rod 8’ - 0’

Clamp ground rod

1

ajBC 50 mm2 u/ground

ai

mtr

bh

Terminal block 12 pool Kabel NYY 4 x 4 mm230

bh

bh

3

6

100

1

24

bh

bh

bh

bh

bh

bh

mtr

mtr

bh

bh

Kabel NYAF 1 x 2,5 mm2

Sepatu kabel 2,5 mm2

PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA

Page 3: PART 5 Meter Exim Batas

DESCRIPTION PARAF DATA

Checked

Approped

Checked

Approped

Checked

Approped

PERALATAN

KWH METER EXIM1 TIANG OUT FIT

PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA

Page 4: PART 5 Meter Exim Batas

DESCRIPTION PARAF DATA

Checked

Approped

Checked

Approped

Checked

Approped

PERALATAN

KWH METER EXIM1 TIANG OUT FIT

M A T E R I A LJMLKODE M A T E R I A LJMLKODE

1 C.Arm Steel 3000 mm (UNSP 10) Galvanis 2 Pole Band Double Rack 8 1/2”

2 C.Arm Steel 2000 mm (UNSP 10) Galvanis 2 Besi Chanal NP 10" x 2 m

Brace Steel 770 mm Besi Siku NP 10 x 1.5 m

4 Brace Steel 550 mm 2 Besi Siku NP 8 x 1.5 m

Bolt Double Arming 5/8" x 20” Bolt Machine 5/8" x Req'd length

2 2

2 6

5 Pole Band Double Rack 7 1/2” 1 Monting Bracket Transformer

6 Eye Nut 5/8” 6 Pipa Galvanis 1 1/2”

Sacle Tutup T Atap 1 1/2”

6 Strain Clamp 1 KWH Meter EXIM Out Fit Lengkap

Suspension ( set ) SM 2-11 (Ground lengh dengan BC50m)

6 1

6 1

12 Lug Nut 5/8” 3 Arester 18 KV ( Set )

6 Washer Square 2 1/4” 3 Sepatu Kabel 70 mm AL/CU

Moer Baut 1 1/2" x 2 Sepatu Kabel 25 mm AL/CU

3 Isolator Long Shank 3 CCO 240-70 mm

Tie Wire Jumper ( Set )

3 4

6

KETENTUAN TEKNIS :

- Pemasangan Kas type VI sedemikian rupa sehingga memudahkan untuk pembacaan.

- Body Kas diketanahkan.

KWH METER EXIM 1 TIANG OUT FIT

1

PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA

Page 5: PART 5 Meter Exim Batas

DESCRIPTION PARAF DATA

Checked

Approped

Checked

Approped

Checked

Approped

PERALATAN

KWH METER KIRIM TERIMA PADAJTM 1 PHASA

SME/CME - A6

KETENTUAN TEKNIS :

- Pemasangan kas type VI diusahakan sedemikian rupa sehingga memudahkan pembacaan / pemeliharaan.

PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA

Page 6: PART 5 Meter Exim Batas

DESCRIPTION PARAF DATA

Checked

Approped

Checked

Approped

Checked

Approped

PERALATAN

RINCIAN MATERIAL

SME/CME - A6

M A T E R I A LKODEITEM JUMLAHSATUAN

1BuahRound, ground stell 5/8” x 8”ai1BuahClamp ground rodaj2MeterClamp ground wireaj4BuahBolt carriage 3/8” x 4 ½ ”i2BuahStrain rod-2BuahSpool insulator 53 - 4s2BuahBall clevisr2BuahSocket thimble-3BuahCross arm 3 ½ ” x 4 ½ ” x 4 - 0”g6BuahBrace wood 60cv4BuahBolt double arming 5/8 - 20”n2BuahBolt eye 3/8”o2BuahPole band double rack 7 ½ ”vb2Buahvb2BuahNut, eye 5/8”aa2BuahLocknut 5/8”ek9BuahWasher, square 2 1/4”d2BuahClevis, service, swinging insulatedas4BuahWasher, round 13/8”d2BuahStrain clamp-1DosBolt machine 3/16”c36BuahBolt machine ½ x 6”c1MeterArmor tape atp2BuahShackle anchorbo3BuahBolt machine 5/3” x req’d lenghtc1BuahCut out, fuse, single shotaf1BuahBracket cut out-3BuahConnector compressionp1BuahFuse link 8 a-2BuahClamp loop dead end 120bn1BuahLighting arresster 16 KVae2MeterJumper wire 70 mm2aq1BuahKas type VI out door-6MeterGas pipel ½”gc2BuahDouble invoering 1 ½” ptc

2MeterBesi siku 6 x 60 x 60 mm2-25BuahSepatu kabel 2 ½ - 4 mm2-1BuahMCB 4A, 220 Volt-1BuahTerminal blok 12 ples 10 mm2-10MeterBC 50 mm2 untuk ground-2UnitKWH meter 1 phasa-1UnitTrafo Tegangan 20 3/0,1 3 KV pt1UnitTrafo arus 100/5A U/TM 20 KVsd1UnitAmpere Meter/5A-1Unit

Kable NYF 1 x 2 ½ mm2- 15MeterKable NYY 4 x 4 mm2- 20MeterKable NYY 4 x 2 ½ mm2- 10MeterTali plastik pengikat kabel- 1Dos

4BuahConnector as req’dp

Pole band double rack 8 ½ ”

2BuahClamp bougle untuk gas pipel ½” -

Volt meter/100A-

PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA

Page 7: PART 5 Meter Exim Batas

DESCRIPTION PARAF DATA

Checked

Approped

Checked

Approped

Checked

Approped

KWH METER KIRIM TERIMA PADAJTM 3 PHASA

SME/CME - C8

PERALATAN

PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA

100 150 750 100150750

300

900

900

900

1200

200600 600

900 200

Page 8: PART 5 Meter Exim Batas

DESCRIPTION PARAF DATA

Checked

Approped

Checked

Approped

Checked

Approped

PERALATAN

RINCIAN MATERIAL

SME/CME - C8

M A T E R I A LJMLKODE M A T E R I A LJMLKODE

Cooper ground rod 5/8 x 7 ’1Clamp ground rod1Insulator suspension 53 - 412Spool insulator 53 - 42Botl clevis6Socket thimble6

Bolt double arming 12”82 Bolt eye 5/8” x req’d lenght

aiajksr

no

Connector clamp 70 - 2403Fuse link3Clamp loop dead end 1202Lighting aresster3Jumper as req’d4Connector comp. 240 - 2409Kast type VI out door1Gaspyp 1 ½” 6mtrDouble invoering 1 ½”2

Besi siku 6 x 60 x 60 mm2mtrCat aluminium1kgGembok kuningan u/ normal2

patbraeaqp

boxgcptc

x

kbPole band double rack 7 ½”2Pole band double rack 8 ½” 6Pole band double rack 10 ½”2Nut eye 5/8”6Locknut 5/8”4Washer square 2 1/4”10Strain clamp 240 mm6Bolt machine 3/161 dosArmor tape1mtrBolt machine 5/8 x 2”/(extra bolt)20Shackle anchor6Bolt machine 5/8” x req’d lenght7

3 Fuse cut out lengkap

vbvbvbaaekd

catpc

bocaf

Clevis, service, swinging insulated2as

Sepatu kabel 2 ½”- 4 mm2 Mcb 4 A, 220 Volt3Selector switch u/teg 3 phasa1Terminal block 14 pols.10 mm24BC. 50 mm2 u/ground30 mtrBC. 6 mm210 mtrKWH meter 3 ph, 4KWT/100 V/5A ET2Trafo teg. 20/V3/0,1/VTKV3Trafo arus 200/5A TM 20 KV.OD3Blank ampere meter .../5A3Blank volt meter .../100V1Kabel NYAF 1 x 2 ½” mm2100Kabel NYY 4 x 4 mm230

15 Kabel NYY 4 x 2 ½”mm2

sp

ss

kwhptsdav

1 dos Tali plastik pengikat kabel

Cross arm 3 ½” x 4 ½” x 2000 25 Cross arm 3 ½” x 4/2” x 2500

gg

Brace steel 66010Brace steel 5504

CvCv

KETENTUAN TEKNIS :

- Pemasangan kas type VI diusahakan sedemikian rupa sehingga memudahkan pembacaan / pemeliharaan dan bodi/badan kas diketanahkan/digrounding.

PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA

Page 9: PART 5 Meter Exim Batas

DESCRIPTION PARAF DATA

Checked

Approped

Checked

Approped

Checked

Approped

PERALATAN

KWH METER KIRIM TERIMA PADAJTM 3 PHASA

SME/CME - C8A

PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA

Page 10: PART 5 Meter Exim Batas

DESCRIPTION PARAF DATA

Checked

Approped

Checked

Approped

Checked

Approped

PERALATAN

RINCIAN MATERIAL

SME/CME - C8A

M A T E R I A LJMLKODE M A T E R I A LJMLKODE

Round, ground stell 5/8” x 8”1Clamp ground rod1Clamp ground wire (B.46)2Bolt carriage 3/8” x 4 ½ ”12Insulator suspension 53 - 412Spool insulator 53 - 42Botl clevis6Socket thimble6Bolt double arming 5/8” - 20”9

7 Bolt eye 5/8” x req’d lenght

aiajajiksr

no

Connector clamp 70 - 2403Fuse link3Clamp loop dead end 1202Lighting aresster3Jumper as req’d4Connector comp. 240 - 2409Kast type VI out door1Gaspyp 1 ½” 6mtrDouble invoering 1 ½”2

Besi siku 6 x 60 x 60 mm2mtrCat aluminium1kgGembok kuningan u/ normal2

patbraeaqp

boxgcptc

x

kb

Pole band double rack 7 ½”4Pole band double rack 8 ½” 2Pole band double rack 10 ½”2Nut eye 5/8”6Locknut 5/8”4Washer square 2 1/4”27Washer round 1 3/8”12Strain clamp 240 mm6Bolt machine 3/161 dosArmor tape1mtrBolt machine ½”x 6” 36Shackle anchor6Bolt machine 5/8” x req’d lenght7

3 Cut out, fuse, single shot

vbvbvbaaekdd

catpc

bocaf

Braket cut out3Clevis, service, swinging insulated2

Cross arm steel 15002Cross arm steel 20001Cross arm steel 30002Brace steel 6606Brace steel 5504

as

Sepatu kabel 2 ½”- 4 mm2 Mcb 4 A, 220 Volt3Selector switch u/teg 3 phasa1Terminal block 14 pols.10 mm24BC. 50 mm2 u/ground30 mtrBC. 6 mm210 mtrKWH meter 3 ph, 4KWT/100 V/5A ET2Trafo teg. 20/V3/0,1/VTKV3Trafo arus 200/5A TM 20 KV.OD3Blank ampere meter .../5A3Blank volt meter .../100V1Kabel NYAF 1 x 2 ½” mm2100Kabel NYY 4 x 4 mm230

15 Kabel NYY 4 x 2 ½”mm2

sp

ss

kwhptsdav

1 dos Tali plastik pengikat kabel

KETENTUAN TEKNIS :

- Pemasangan kas type VI diusahakan sedemikian rupa sehingga memudahkan pembacaan / pemeliharaan dan bodi/badan kas diketanahkan/digrounding.

PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA

Page 11: PART 5 Meter Exim Batas

DESCRIPTION PARAF DATA

Checked

Approped

Checked

Approped

Checked

Approped

PERALATAN

KWH METER EXIM 1 TIANG DENGAN ARESTER DAN FCO

SME / CMES / C8

PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA

Page 12: PART 5 Meter Exim Batas

DESCRIPTION PARAF DATA

Checked

Approped

Checked

Approped

Checked

Approped

PERALATAN

KWH METER EXIM 1 TIANG DENGAN ARESTER DAN FCO

SME / CMES / C8

M A T E R I A LJMLKODE M A T E R I A LJMLKODE

1 SM 2-11 16 Bolt Machine 1/2" x 6”

12 Bolt Carriage 3/8" x 4 1/2” 6 Shackle Anchor

Insulator Suspension 10" Set Cut Out Lengk

2 Spool Insulator Ansi 5-4 3 Arester

Bolt Clevis Sepatu Kabel 70 mm

6 3

15

6 Socket Thimble Eye Nut 3 CCO 240-70

2 C. Arm Steel 2000 mm (UNSP 10) Galvanis 6 CCO 240-240

C. Arm Steel 3000 mm (UNSP 10) Galvanis Loop Deade End Clamp

12 Brace Steel 770 mm 6 Jumper As req ( set )

Brace Steel 550 mm Kas type V OD

6 2

4 1

11 Bolt Double Arming 5/8" x 20” 1 Gas Pyre 1 1/2" x 6 m

2 Pole Band Double Rack 7 1/2” 1 D In Voering 1 1/2”

Pole Band Double Rack 8 1/2” Besi Siku 6 x 60 x 60

2 Pole Band Double Rack 10 1/2” 3 CT OD 40015

Locknuts 5/8” PT 20000 IV3, 100 IV3 V

6 2

3

KETENTUAN TEKNIS :

- Pemasangan Kas type VI sedemikian rupa sehingga memudahkan untuk pembacaan.

- Body Kas diketanahkan.

KWH METER EXIM 1 TIANG DENGAN ARESTER DAN FCO

22

ai

i

s

k

g

cv

g

cv

vb

ao

x

Washer Square 2 1/4” Pole Band Drac 9 1/2”

6 Strain Clamp 240 mm 1 KWH Meter EXIM Lengkap ( set )

Armor Tape

44 2a vb

PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA

Page 13: PART 5 Meter Exim Batas

KWH METER EXIM DENGAN FCO DAN ARESTER

DESCRIPTION PARAF DATA

Checked

Approped

Checked

Approped

Checked

Approped

PERALATAN

KWH METER EXIM DENGANFCO DAN ARESTER

SME / CME C8

PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA

Page 14: PART 5 Meter Exim Batas

DESCRIPTION PARAF DATA

Checked

Approped

Checked

Approped

Checked

Approped

PERALATAN

KWH METER EXIM DENGANFCO DAN ARESTER

SME / CME C8

M A T E R I A LJMLKODE M A T E R I A LJMLKODE

1 SM 2-11 16 Bolt Machine 1/2" x 6”

12 Bolt Carriage 3/8" x 4 1/2” 6 Shackle Anchor

Insulator Suspension 10" Set Cut Out Lengk

2 Spool Insulator Ansi 5-4 3 Arester

Bolt Clevis Sepatu Kabel 70 mm

6 3

15

6 Socket Thimble Eye Nut 3 CCO 240-70

2 C. Arm Steel 2000 mm (UNSP 10) Galvanis 6 CCO 240-240

C. Arm Steel 3000 mm (UNSP 10) Galvanis Loop Deade End Clamp

12 Brace Steel 770 mm 6 Jumper As req ( set )

Brace Steel 550 mm Kas type V OD

6 2

4 1

11 Bolt Double Arming 5/8" x 20” 1 Gas Pyre 1 1/2" x 6 m

2 Pole Band Double Rack 7 1/2” 1 D In Voering 1 1/2”

Pole Band Double Rack 8 1/2” Besi Siku 6 x 60 x 60

2 Pole Band Double Rack 10 1/2” 3 CT OD 40015

Locknuts 5/8” PT 20000 IV3, 100 IV3 V

6 2

3

KETENTUAN TEKNIS :

- Pemasangan Kas type VI sedemikian rupa sehingga memudahkan untuk pembacaan.

- Body Kas diketanahkan.

KWH METER EXIM DENGAN FCO DAN ARESTER

22

ai

i

s

k

g

cv

g

cv

vb

ao

x

Washer Square 2 1/4” Pole Band Drac 9 1/2”

6 Strain Clamp 240 mm 1 KWH Meter EXIM Lengkap ( set )

Armor Tape

44 2a vb

PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA

Page 15: PART 5 Meter Exim Batas

DESCRIPTION PARAF DATA

Checked

Approped

Checked

Approped

Checked

Approped

PERALATAN S83 C5 - 1

KAPASITOR T. M 20 KV 3 PHDIPASANG PADA 1 TIANG

PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA

Page 16: PART 5 Meter Exim Batas

DESCRIPTION PARAF DATA

Checked

Approped

Checked

Approped

Checked

Approped

PERALATAN S83 C5 - 1M

KAPASITOR T. M 3 PH DIPASANGPADA 1 TIANG

PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA

Page 17: PART 5 Meter Exim Batas

DESCRIPTION PARAF DATA

Checked

Approped

Checked

Approped

Checked

Approped

PERALATAN

RINCIAN MATERIAL

S83 C5 - 1M

M A T E R I A LJMLKODE M A T E R I A LJMLKODESTN STN

Steel chownel CPN 8 x 2500bhSteel L 70 x 70 x 1500bhPapan jati 20 x 200 x 1500bhSteel chownel CPN 8 x 1500bhSteel L 70 x 70 x 3000bhBraket transformerbhBand segmentbhPole band double rack 7 ½” bh

Bolt machine ½”x 1 ½” bh

43101422

32

Mo graw edison KA 54 TSCpcAccessory to convertYYPE TSC Switch to 240 VACControlVoltage control 240 VAC 50 HzpcFinisher pierce cat no:2406GF J6 3CControl power transformerpc0,5 KVA, 20 KVA,240 KVAC SEC

MID Central Cat No CCM104 B 13Stainless stell strapm

1

1

1

3Clamp hot line 240 x 70 mm2bhArmour rodbhConnectorbhCompresion 70 x 70 mm2Jumper AAAC 70 mm2mSE 1-2, F1-2, CM2-12AutkMo graw edison type AZLpcArrester rated 24 KvMo graw edison type 3 unit polepcMounting rack

pc Mc graw edison type ES ALL

332

311

1

6Firlm non pcb singlePhase 2 bushing capasitor

Rod, ground, copper weld 5/8” x 8Clamp ground rodbhGround lugbhBeugel 10 ½” bhKast type 6bhCut out, fuse link 40Aset

bhCross arm stell 2000bhBrace stell 660bhBrace stell 550bh

1

1

3114

Pole band single rack 7 ½” bhWith bolt 5/8x 4 ½”

1

Pole band single rack 8 ½” bhBolt machine 5/8” x 4 ½” bh

26

chsl

ppjscsl

dm

vb

capbvp

aq

ae

pmr

va

vac

vgc

tr

cjaiaj

bg

af

3

Rated 200/150 KVAR11540 V 50 Hz Mo graw edison type YSC OILSwitch 3 ph 34,5 KV 50 HzRated 135 A capasitorSwitching 150 KV Bil

pc1Os

125KV BIL 50 Hz, 2 Bushing

Grounding wire 25 mm2

CM 5-6 (arrester 18kv)

bhm7

1

2

11

PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA

Page 18: PART 5 Meter Exim Batas

DESCRIPTION PARAF DATA

Checked

Approped

Checked

Approped

Checked

Approped

JTM M21

ANGLE CONSTRUCTION GUIDECROSSARM TO VERTICAL CONSTRUCTION

PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA

Page 19: PART 5 Meter Exim Batas

DESCRIPTION PARAF DATA

Checked

Approped

Checked

Approped

Checked

Approped

CUTTINGTREE

M22-1

TREE TRIMMING GUIDE

PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA

Page 20: PART 5 Meter Exim Batas

DESCRIPTION PARAF DATA

Checked

Approped

Checked

Approped

Checked

Approped

M22-2

TREE TRIMMING GUIDE

CUTTINGTREE

PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA

Page 21: PART 5 Meter Exim Batas

DESCRIPTION PARAF DATA

Checked

Approped

Checked

Approped

Checked

Approped

JTM

TANDA PERINGATAN( SISI 1 )

PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA

Page 22: PART 5 Meter Exim Batas

DESCRIPTION PARAF DATA

Checked

Approped

Checked

Approped

Checked

Approped

JTM

TANDA PERINGATAN( SISI 2 )

PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA

Page 23: PART 5 Meter Exim Batas

DESCRIPTION PARAF DATA

Checked

Approped

Checked

Approped

Checked

Approped

JTM

PENGHALANG PANJAT

PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA

Page 24: PART 5 Meter Exim Batas

DESCRIPTION PARAF DATA

Checked

Approped

Checked

Approped

Checked

Approped

TANDA PERINGATAN

PENJELASAN GAMBAR

- TULISAN WARNA PUTIH DASAR MERAH

- SIMBOL PLN WARNA MERAH DASAR PUTIH

- LEBAR / TINGGI 300 MM

- PANJANG 395 MM

- RUANG SIMBOL PLN 300 X 100 MM

DIPASANG PADA : GARDU DIST. (GRD. BETON, GRD TRAFO TIANG)

ABSW, KAPASITOR, METER EQUIPMENT, LVBC DLL

PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA

Page 25: PART 5 Meter Exim Batas

DESCRIPTION PARAF DATA

Checked

Approped

Checked

Approped

Checked

Approped

KONSTRUKSI PRIMER SKUTM0 0

(0 - 10 ) Angle

DB 01

SKUTM

PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA

Page 26: PART 5 Meter Exim Batas

DESCRIPTION PARAF DATA

Checked

Approped

Checked

Approped

Checked

Approped

SKUTM

KONSTRUKSI PRIMER SKUTM0 0

(10 - 25 ) Angle

DB 02

PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA

Page 27: PART 5 Meter Exim Batas

DESCRIPTION PARAF DATA

Checked

Approped

Checked

Approped

Checked

Approped

SKUTM

KONSTRUKSI PRIMER SKUTM0 0

(25 - 45 ) Angle

DB 03

PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA

Page 28: PART 5 Meter Exim Batas

DESCRIPTION PARAF DATA

Checked

Approped

Checked

Approped

Checked

Approped

SKUTM

KONSTRUKSI PRIMER SKUTMDOUBLE DEAD END

DB 04

PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA

Page 29: PART 5 Meter Exim Batas

DESCRIPTION PARAF DATA

Checked

Approped

Checked

Approped

Checked

Approped

SKUTM

KONSTRUKSI PRIMER SKUTMDEAD END

DB 05

PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA

Page 30: PART 5 Meter Exim Batas

DESCRIPTION PARAF DATA

Checked

Approped

Checked

Approped

Checked

Approped

SKUTM

MATERIALKONSTRUKSI PRIMER SKUTM

DEAD END

DB 05

PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA

Page 31: PART 5 Meter Exim Batas

DESCRIPTION PARAF DATA

Checked

Approped

Checked

Approped

Checked

Approped

SKUTM

KONSTRUKSI PRIMER SKUTMPADA RISER POLE

( TIANG AWAL )

DB 06

PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA

Page 32: PART 5 Meter Exim Batas

DESCRIPTION PARAF DATA

Checked

Approped

Checked

Approped

Checked

Approped

SKUTM

MATERIAL KONSTRUKSI PRIMERSKUTM PADA RISER POLE

( TIANG AWAL )

DB 06

PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA

Page 33: PART 5 Meter Exim Batas

DESCRIPTION PARAF DATA

Checked

Approped

Checked

Approped

Checked

Approped

SKUTM

KONSTRUKSI PRIMER SKUTMJOINT SKUTM DENGAN SUTM

DB 08

PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA

Page 34: PART 5 Meter Exim Batas

DESCRIPTION PARAF DATA

Checked

Approped

Checked

Approped

Checked

Approped

SKUTM

SAMBUNGAN KABEL SKUTM(KABEL JOINTING)

PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA

Tenssion jointinsulated

Sambungan kabel dipastikan ditiang

Joint sleve

Isolasi

Conductor

Tension joint sleeve

Isolasi 20KV

4

4

Jointing

DB 09

Page 35: PART 5 Meter Exim Batas

SALURAN KABEL TANAH

A. Kabel TM 20 KV

Spesifikasi Kabel :

- Three core

- Single core

- Three, Single core

Pelaksanaan :

Kabel-kabel sebaiknya ditanam pada tanah umum (Milik Negara), dibawah trotoar, berm

jalan, atau melintang jalan raya.

Kabel harus diletakkan diatas pasir urug dengan ketinggian minimum 0,10 M.

Galian :

Kedalaman galian ditentukan sbb:

- Untuk galian dibawah trotoar jalan orang adalah 1,00 M

- Untuk galian dibawah jalan kendaraaan adalah 1,20 M

Lebar galian sekurang-kurangnya harus 0,40 M, namun lebar sebenarnya harus

disesuaikan dengan banyaknya kabel yang ditanam. Contoh tabel sbb:

NO JML KABEL LEBAR GALIAN

1 1 & 2 0,40

2 3 0,60

3 4 0,80

4 5 1,00

5 6 1,20

Galian harus digali tegak lurus, diupayakan agar dasar tanah permukaan rata agar tidak

merusakkan kabel dan pastikan bahwa dibawahnya tidak ada exsisting kabel, pipa gas, air

dsb. Pelaksanaan penggalian harus dikoordinasikan dengan instansi terkait.

Material Pendukung :

1.Batu pengaman

2.Pasir urug

3.Bata merah

4.Pipa PVC

5.Semen

Konstruksi :

Lihat gambar berikut :

,Ds.,f./,ds f,/df/. / h

Page 36: PART 5 Meter Exim Batas

B. Kabel Tegangan Rendah

Lingkup pekerjaan :

- Kabel Tanah Jaringan Tegangan Rendah

- Kotak hubung bagi TR

- Kabel tanah Sambungan rumah

Kabel Jaringan Tegangan Rendah.

Jenis kabel NYFGBY.70mm2

Dengan ketentuan sbb:

Untuk setiap Jurusan diperbolehkan 5 Kotak hubung bagi, dengan asumsi jarak antar kotak

hubung 80 M, sehingga jarak antara Gardu Distribusi dengan Kotak hubung terakhir adalah

400 M. Beban maksimum untuk setiap Jurusan adalah 140 Ampere. Saluran Tegangan

rendah yang keluar dari Gardu maksimum 8 saluran. Galian untuk kabel minimum 0,80 M,

dan kabel diletakkan diatas urugan pasir setinggi 0,20 M.

Kotak hubung/SDP

Kotak hubung TR terbuat dari plat besi dengan ketebalan 3 mm dicat, terpasang 0,50 M

diatas permukaan tanah. Patok / penyangga kotak hubung terbuat dari pipa besi galvanize

berdiameter 2” dengan panjang 1 M, tertanam ditanah 0,50 M dan diatas tanah 0,50 M dan di

Cor. Komponen Kotak bagi terdiri dari Main Switch Breaker, Busbar/rel, HRC Fuse, lampu,

selektor switch dan diketanahkan dengan tahanan 5 ohm.

Untuk pemasangan lihat gambar :

Page 37: PART 5 Meter Exim Batas

DESCRIPTION PARAF DATA

Checked

Approped

Checked

Approped

Checked

Approped

PERLETAKAN 1 KABEL TANAH 20 KVTIAP 1 M MELINTANG

JALAN RAYA ASPAL (DIGALI)

AMKA01

STANDARDKONSTRUKSI

PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA

Page 38: PART 5 Meter Exim Batas

DESCRIPTION PARAF DATA

Checked

Approped

Checked

Approped

Checked

Approped

PERLETAKAN 2 KABEL TANAH 20 KVTIAP 1 M MELINTANG

JALAN RAYA ASPAL (DIGALI)

AMKA02

STANDARDKONSTRUKSI

PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA

Page 39: PART 5 Meter Exim Batas

DESCRIPTION PARAF DATA

Checked

Approped

Checked

Approped

Checked

Approped

PERLETAKAN 3 KABEL TANAH 20 KVTIAP 1 M MELINTANG

JALAN RAYA ASPAL (DIGALI)

AMKA03

STANDARDKONSTRUKSI

PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA

Page 40: PART 5 Meter Exim Batas

DESCRIPTION PARAF DATA

Checked

Approped

Checked

Approped

Checked

Approped

PERLETAKAN 4 KABEL TANAH 20 KVTIAP 1 M MELINTANG

JALAN RAYA ASPAL (DIGALI)

AMKA04

STANDARDKONSTRUKSI

PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA

Page 41: PART 5 Meter Exim Batas

DESCRIPTION PARAF DATA

Checked

Approped

Checked

Approped

Checked

Approped

PERLETAKAN 5 KABEL TANAH 20 KVTIAP 1 M MELINTANG

JALAN RAYA ASPAL (DIGALI)

AMKA05

STANDARDKONSTRUKSI

PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA

Page 42: PART 5 Meter Exim Batas

DESCRIPTION PARAF DATA

Checked

Approped

Checked

Approped

Checked

Approped

PERLETAKAN 6 KABEL TANAH 20 KVTIAP 1 M MELINTANG

JALAN RAYA ASPAL (DIGALI)

AMKA06

STANDARDKONSTRUKSI

PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA

Page 43: PART 5 Meter Exim Batas

DESCRIPTION PARAF DATA

Checked

Approped

Checked

Approped

Checked

Approped

PERLETAKAN 6 KABEL TANAH 20 KVTIAP 1 M MELINTANG JALAN RAYA

ASPAL (PD AREA YANG SEMPIT)

AMKA 06 K

STANDARDKONSTRUKSI

PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA

Page 44: PART 5 Meter Exim Batas

DESCRIPTION PARAF DATA

Checked

Approped

Checked

Approped

Checked

Approped

PERLETAKAN 7 KABEL TANAH 20 KVTIAP 1 M MELINTANG JALAN

RAYA ASPAL

AMKA07

STANDARDKONSTRUKSI

PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA

Page 45: PART 5 Meter Exim Batas

DESCRIPTION PARAF DATA

Checked

Approped

Checked

Approped

Checked

Approped

PERLETAKAN 8KABEL TANAH 20 KVTIAP 1 M MELINTANG JALAN

RAYA ASPAL

AMKA08

STANDARDKONSTRUKSI

PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA

Page 46: PART 5 Meter Exim Batas

DESCRIPTION PARAF DATA

Checked

Approped

Checked

Approped

Checked

Approped

KONSTRUKSI PEMASANGAN KABELNAIK UNTUK JARAK SPAN LEBIH

BESAR DARI 50 M

AMKK01/2/1

STANDARDKONSTRUKSI

PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA

Page 47: PART 5 Meter Exim Batas

DESCRIPTION PARAF DATA

Checked

Approped

Checked

Approped

Checked

Approped

KONSTRUKSI PEMASANGAN KABELNAIK UNTUK JARAK SPAN LEBIH

BESAR DARI 50 M

AMKK01/2/2

STANDARDKONSTRUKSI

PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA

Page 48: PART 5 Meter Exim Batas

DESCRIPTION PARAF DATA

Checked

Approped

Checked

Approped

Checked

Approped

KONSTRUKSI PANEL DENGANPONDASI BETON

PRK05

STANDARDKONSTRUKSI

PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA

Page 49: PART 5 Meter Exim Batas

DESCRIPTION PARAF DATA

Checked

Approped

Checked

Approped

Checked

Approped

SAMBUNGAN RUMAH DENGANPENEMPATAN PANEL

DI TEPI JALAN

PRK06

STANDARDKONSTRUKSI

PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA

Page 50: PART 5 Meter Exim Batas

DESCRIPTION PARAF DATA

Checked

Approped

Checked

Approped

Checked

Approped

SAMBUNGAN RUMAH DENGANPENEMPATAN PANEL MELINTASI

PARIT DI TEPI JALAN

PRK06A

STANDARDKONSTRUKSI

PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA

Page 51: PART 5 Meter Exim Batas

DESCRIPTION PARAF DATA

Checked

Approped

Checked

Approped

Checked

Approped

PENEMPATAN PANELDI TEPI JALAN

PRK07

STANDARDKONSTRUKSI

PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA

Page 52: PART 5 Meter Exim Batas

DESCRIPTION PARAF DATA

Checked

Approped

Checked

Approped

Checked

Approped

JTR - KABEL TANAHUNTUK KOMPLEK PERUMAHAN

PRK11

STANDARDKONSTRUKSI

PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA

Page 53: PART 5 Meter Exim Batas

DESCRIPTION PARAF DATA

Checked

Approped

Checked

Approped

Checked

Approped

PERLETAKAN 1 KABEL TANAH TRTIAP 1 M DI BAWAH BERM

ARKB01

STANDARDKONSTRUKSI

PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA

Page 54: PART 5 Meter Exim Batas

DESCRIPTION PARAF DATA

Checked

Approped

Checked

Approped

Checked

Approped

PERLETAKAN 2 KABEL TANAH TRTIAP 1 M DI BAWAH BERM

ARKB02

STANDARDKONSTRUKSI

PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA

Page 55: PART 5 Meter Exim Batas

DESCRIPTION PARAF DATA

Checked

Approped

Checked

Approped

Checked

Approped

ARKB03

STANDARDKONSTRUKSI

PERLETAKAN 3 KABEL TANAH TRTIAP 1 M DI BAWAH BERM

PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA

Page 56: PART 5 Meter Exim Batas

DESCRIPTION PARAF DATA

Checked

Approped

Checked

Approped

Checked

Approped

ARKB04

STANDARDKONSTRUKSI

PERLETAKAN 4 KABEL TANAH TRTIAP 1 M DI BAWAH BERM

PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA

Page 57: PART 5 Meter Exim Batas

DESCRIPTION PARAF DATA

Checked

Approped

Checked

Approped

Checked

Approped

ARKB05

STANDARDKONSTRUKSI

PERLETAKAN 5 KABEL TANAH TRTIAP 1 M DI BAWAH BERM

PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA

Page 58: PART 5 Meter Exim Batas

DESCRIPTION PARAF DATA

Checked

Approped

Checked

Approped

Checked

Approped

ARKB06

STANDARDKONSTRUKSI

PERLETAKAN 6 KABEL TANAH TRTIAP 1 M DI BAWAH BERM

PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA

Page 59: PART 5 Meter Exim Batas

DESCRIPTION PARAF DATA

Checked

Approped

Checked

Approped

Checked

Approped

ARKB07

STANDARDKONSTRUKSI

PERLETAKAN 7 KABEL TANAH TRTIAP 1 M DI BAWAH BERM

PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA

Page 60: PART 5 Meter Exim Batas

DESCRIPTION PARAF DATA

Checked

Approped

Checked

Approped

Checked

Approped

ARKB08

STANDARDKONSTRUKSI

PERLETAKAN 8 KABEL TANAH TRTIAP 1 M DI BAWAH BERM

PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA

Page 61: PART 5 Meter Exim Batas

DESCRIPTION PARAF DATA

Checked

Approped

Checked

Approped

Checked

Approped

PERLETAKAN 1 KABEL TANAH TRTIAP 1 M MELINTANG

JALAN RAYA ASPAL (DIGALI)

ARKA01

STANDARDKONSTRUKSI

PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA

Page 62: PART 5 Meter Exim Batas

DESCRIPTION PARAF DATA

Checked

Approped

Checked

Approped

Checked

Approped

ARKA02

STANDARDKONSTRUKSI

PERLETAKAN 2 KABEL TANAH TRTIAP 1 M MELINTANG

JALAN RAYA ASPAL (DIGALI)

PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA

Page 63: PART 5 Meter Exim Batas

DESCRIPTION PARAF DATA

Checked

Approped

Checked

Approped

Checked

Approped

ARKA03

STANDARDKONSTRUKSI

PERLETAKAN 3 KABEL TANAH TRTIAP 1 M MELINTANG

JALAN RAYA ASPAL (DIGALI)

PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA

Page 64: PART 5 Meter Exim Batas

DESCRIPTION PARAF DATA

Checked

Approped

Checked

Approped

Checked

Approped

ARKA04

STANDARDKONSTRUKSI

PERLETAKAN 4 KABEL TANAH TRTIAP 1 M MELINTANG

JALAN RAYA ASPAL (DIGALI)

PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA