M5-2 TO 8

14.4 / 24.9 KVMISCELLANEOUS PRIMARY ASSEMBLIES

ACCESSORIESJUMPER TM

PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA

Page 2: PART 3 Perlengkapan Jumper

DESCRIPTION PARAF DATA

Checked

Approped

Checked

Approped

Checked

Approped

JTM M5-9 TO 16

MISCELLANEOUS PRIMARY ASSEMBLIES

PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA

Page 3: PART 3 Perlengkapan Jumper

DESCRIPTION PARAF DATA

Checked

Approped

Checked

Approped

Checked

Approped

JTM M5-17 TO 24

MISCELLANEOUS PRIMARY ASSEMBLIES

PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA

Page 4: PART 3 Perlengkapan Jumper

DESCRIPTION PARAF DATA

Checked

Approped

Checked

Approped

Checked

Approped

JTM M5-25

FABRICATION DESIGN FOR ALLEY ARM BRACE2” x 2” x 1/4” x 120.0”

50.8mm x 50.8mm x 63.5mm x 3048mm

PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA

Page 5: PART 3 Perlengkapan Jumper

DESCRIPTION PARAF DATA

Checked

Approped

Checked

Approped

Checked

Approped

JTM M5-26

FABRICATION DESIGN FOR ALLEY ARM BRACE1 3/4” x 1 3/4” x 3/16” x 84.0”

44.5mm x 44.5mm x 4.76mm x 2134mm

PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA

Page 6: PART 3 Perlengkapan Jumper

DESCRIPTION PARAF DATA

Checked

Approped

Checked

Approped

Checked

Approped

JTM M-19

CROSSARM DRILLING GUIDE

PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA

Page 7: PART 3 Perlengkapan Jumper

DESCRIPTION PARAF DATA

Checked

Approped

Checked

Approped

Checked

Approped

K10, K11

SERVICES ASSEMBLIES

SERVICE WIRE1 OF 6

PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA

Page 8: PART 3 Perlengkapan Jumper

DESCRIPTION PARAF DATA

Checked

Approped

Checked

Approped

Checked

Approped

SK10, SK11

SERVICE ASSEMBLIESFOR

STEEL POLESSERVICE WIRE

2 OF 6

PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA

Page 9: PART 3 Perlengkapan Jumper

DESCRIPTION PARAF DATA

Checked

Approped

Checked

Approped

Checked

Approped

K10C

SERVICES ASSEMBLIES, CABLE

SERVICE WIRE3 OF 6

PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA

Page 10: PART 3 Perlengkapan Jumper

DESCRIPTION PARAF DATA

Checked

Approped

Checked

Approped

Checked

Approped

K11C, K15C, K15CX

SERVICES ASSEMBLIES, CABLE

SERVICE WIRE4 OF 6

PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA

Page 11: PART 3 Perlengkapan Jumper

DESCRIPTION PARAF DATA

Checked

Approped

Checked

Approped

Checked

Approped

SK11C, SK15C, SK15CX

SERVICE ASSEMBLIES, CABLEFOR

STEEL POLESSERVICE WIRE

5 OF 6

PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA

Page 12: PART 3 Perlengkapan Jumper

DESCRIPTION PARAF DATA

Checked

Approped

Checked

Approped

Checked

Approped

K16C, K17

SERVICE MAST ASSEMBLIES

SERVICE WIRE6 OF 6

PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA

Page 13: PART 3 Perlengkapan Jumper

DESCRIPTION PARAF DATA

Checked

Approped

Checked

Approped

Checked

Approped

KONSTRUKSI SLP1 PH JENIS DX / 3 PHJENIS QX PADA TITIK

TUMPU DINDING /TIANG KAYU & BETON

CKA - CCKC - C

KA - CKC - C

M A T E R I A LKODEJ U M L A H

sdt

j

as

ek

Pole band double rack

Lag screw 3/8” x 2 ½”

Service swinging clevis

Locknut 5/8”

Bolt machine 5/8” x 6”

1

2

1

-

-

CKC-CCKA-CKC-CKA-C

psc

p

-

Plastic strap for clamping

Bare connector bimetal

Pasir kali + batu kerikil

0,5

1

2

-

1

2

1

-

-

0,5

1

4

-

0,5

1

2

0,02

0,5

1

4

0,02

c

atp Armor tape

1

-

1

1

2

1

-

1

1

2

cpt Cement portland - - 1 1

s Spool insulator ansi 53-1

bn Clamp loop dead end

1

1

1

1

1

1

1

1

PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA

Page 14: PART 3 Perlengkapan Jumper

DESCRIPTION PARAF DATA

Checked

Approped

Checked

Approped

Checked

Approped

KONSTRUKSI SLP1 PH JENIS DX / 3 PHJENIS QX PADA TITIK

TUMPU DINDING /TIANG BETON

CKA - C2CKC - C2

CKA - C1CKC - C1

M A T E R I A LKODEJ U M L A H

o

as

ek

Bolt eye 5/8” x Panjang disesuaikan

Service swinging clevis

Locknut 5/8”

Washer square 2 1/4”

1

CKC-C2CKA-C2CKC-C1CKA-C1

psc

p

-

Plastic strap for clamping

Bare connector bimetal

Pasir kali + batu kerikil

0,5

1

2

1

0,5

1

4

0,5

1

2

0,02

0,5

1

4

0,02

d

atp Armor tape

1 1

cpt Cement portland 1 1 1 1

s Spool insulator ansi 53-1

bn Clamp loop dead end

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1 1 1 1

0,02 0,02

PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA

Page 15: PART 3 Perlengkapan Jumper

DESCRIPTION PARAF DATA

Checked

Approped

Checked

Approped

Checked

Approped

KONSTRUKSI SLP1 PH, 3 PH

JENIS TWISTEDPADA TIANG ATAP PKA - T1

PKC - T1

PKA - TPKC - T

M A T E R I A LKODEJ U M L A H

sst

stp

sdf

Stansless steel strap

Stoping bucle for sst

Service dead end fitting

-

-

1

PKC-T1PKA-T1PKC-TPKA-T

v-1

dt-1

psc

Pole attachment fitting

Service insul. dead end clamp

Plastic strap for clamping

-

1

1

-

-

1

-

1

1

1

1

1

1

1

1

0,35

1

-

0,35

1

-

PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA

Page 16: PART 3 Perlengkapan Jumper

DESCRIPTION PARAF DATA

Checked

Approped

Checked

Approped

Checked

Approped

SKA - T1 - TSKC - T1 - T

SKA - T1SKC - T1

KONSTRUKSI SLP1 PH JENIS DX / 3 PH

JENIS TWISTED PADASTR TANPA ISOLASI

DAN BERISOLASI

M A T E R I A LKODEJ U M L A H

vb

v-1

dt-1

Pole band double rack

Pole attachment fitting

Service insul.dead end clamp

1

1

1

SKC-T1-TSKA-T1-TSKC-T1SKA-T1

psc

p

p-1

Plastic strap for clamping

Bare connector bimetal

Protective cap tap connector

1

2

-

1

1

1

1

4

-

1

-

2

1

-

4

1

1

1

1

1

1

PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA

Page 17: PART 3 Perlengkapan Jumper

DESCRIPTION PARAF DATA

Checked

Approped

Checked

Approped

Checked

Approped

KONSTRUKSI SLP1 PH JENIS DX / 3 PHJENIS QX PADA STRTANPA ISOLASI DAN

BERISOLASI SKA 11 - C - TSKC 11 - C - T

SKA 11 - CSKC 11 - C

M A T E R I A LKODEJ U M L A H

vb

aa

as

s

Pole band double rack

Eye nut 5/8”

Service swinging clevis

Spool insulator ansi 53-1

Clamp loop dead end

1

1

1

1

1

SKC11-C-TSKA11-C-TSKC11-CSKA11-C

psc

p

p-1

Plastic strap for clamping

Bare connector bimetal

Protective cap tap connector

0,5

1

2

-

1

1

1

1

1

0,5

1

4

-

0,5

1

-

2

0,5

1

-

4

bn

atp Armor tape

1

1

1

1

1

1

1

1

1

1

PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA

Page 18: PART 3 Perlengkapan Jumper

DESCRIPTION PARAF DATA

Checked

Approped

Checked

Approped

Checked

Approped

SKA 14 - C - TSKC 14 - C - T

SKA 14 - CSKC 14 - C

KONSTRUKSI SLP1 PH JENIS DX / 3 PHJENIS QX PADA STRTANPA ISOLASI DAN

BERISOLASI

M A T E R I A LKODEJ U M L A H

vb

da

s

Pole band double rack

Braket secondary

Spool insulator ansi 53-1

Clamp loop dead end

1

1

1

1

SKC14-C-TSKA14-C-TSKC14-CSKA14-C

psc

p

p-1

Plastic strap for clamping

Bare connector bimetal

Protective cap tap connector

0,5

1

2

-

1

1

1

1

0,5

1

4

-

0,5

1

-

2

0,5

1

-

4

bn

atp Armor tape

1

1

1

1

1

1

1

1

PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA

Page 19: PART 3 Perlengkapan Jumper

DESCRIPTION PARAF DATA

Checked

Approped

Checked

Approped

Checked

Approped

KONSTRUKSI SLP1 PH JENIS DX / 3 PHJENIS QX PADA STRTANPA ISOLASI DAN

BERISOLASI SKA - C - TSKC - C - T

SKA - CSKC - C

M A T E R I A LKODEJ U M L A H

vb

aa

dt

Pole band double rack

Eye nut 5/8”

Service allum.dead end clamping

1

1

1

SKC-C-TSKA-C-TSKC-CSKA-C

psc

p

p-1

Plastic strap for clamping

Bare connector bimetal

Protective cap tap connector

1

2

-

1

1

1

1

4

-

1

-

2

1

-

4

1

1

1

1

1

1

PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA

Page 20: PART 3 Perlengkapan Jumper

DESCRIPTION PARAF DATA

Checked

Approped

Checked

Approped

Checked

Approped

KONSTRUKSI SLP1 PH JENIS DX / 3 PHJENIS QX PADA STRTANPA ISOLASI DAN

BERISOLASI SKA - C1 - TSKC - C1 - T

SKA - C1SKC - C1

M A T E R I A LKODEJ U M L A H

vb

v-1

dt

Pole band double rack

Pole band attachment fitting

Service allum.dead end clamping

1

1

1

SKC-C1-TSKA-C1-TSKC-C1SKA-C1

psc

p

p-1

Plastic strap for clamping

Bare connector bimetal

Protective cap tap connector

1

2

-

1

1

1

1

4

-

1

-

2

1

-

4

1

1

1

1

1

1

PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA

Page 21: PART 3 Perlengkapan Jumper

DESCRIPTION PARAF DATA

Checked

Approped

Checked

Approped

Checked

Approped

KONSTRUKSI SLP1 PH JENIS DX / 3 PHJENIS QX PADA STRTANPA ISOLASI DAN

BERISOLASI SKA - C2 - TSKC - C2 - T

SKA - C2SKC - C2

M A T E R I A LKODEJ U M L A H

stp

v-1

dt

Stoping bucle for sst

Pole band attachment fitting

Service allum.dead end clamping

1

1

1

SKC-C2-TSKA-C2-TSKC-C2SKA-C2

psc

p

p-1

Plastic strap for clamping

Bare connector bimetal

Protective cap tap connector

2

1,75

1

1

1

4 - -

1

1

1

1

1

1

sst Stanless steel strap

1 1 1 1

1,75 1,75 1,75

- - 2 4

PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA

Page 22: PART 3 Perlengkapan Jumper

DESCRIPTION PARAF DATA

Checked

Approped

Checked

Approped

Checked

Approped

SKA - T - TSKC - T - T

SKA - TSKC - T

KONSTRUKSI SLP1 PH JENIS DX / 3 PH

JENIS TWISTED PADASTR TANPA ISOLASI

DAN BERISOLASI

M A T E R I A LKODEJ U M L A H

vb

aa

dt-1

Pole band double rack

Eye nut 5/8”

Service insul.dead end clamp

1

1

1

SKC-T-TSKA-T-TSKC-TSKA-T

psc

p

p-1

Plastic strap for clamping

Bare connector bimetal

Protective cap tap connector

1

2

-

1

1

1

1

4

-

1

-

2

1

-

4

1

1

1

1

1

1

PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA

Page 23: PART 3 Perlengkapan Jumper

DESCRIPTION PARAF DATA

Checked

Approped

Checked

Approped

Checked

Approped

KONSTRUKSI SLP1 PH JENIS DX / 3 PH

JENIS TWISTED PADASTR TANPA ISOLASI

DAN BERISOLASI SKA - T2 - TSKC - T2 - T

SKA - T2SKC - T2

M A T E R I A LKODEJ U M L A H

stp

v-1

dt-1

Stoping bucle for sst

Pole band attachment fitting

Service insul.dead end clamp

1

1

1

SKC-T2-TSKA-T2-TSKC-T2SKA-T2

psc

p

p-1

Plastic strap for clamping

Bare connector bimetal

Protective cap tap connector

2

1,75

1

1

1

4 - -

1

1

1

1

1

1

sst Stanless steel strap

1 1 1 1

1,75 1,75 1,75

- - 2 4

PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA

Page 24: PART 3 Perlengkapan Jumper

DESCRIPTION PARAF DATA

Checked

Approped

Checked

Approped

Checked

Approped

KONSTRUKSI SLP1 PH JENIS DX / 3 PH

JENIS QX PADATIANG ATAP PKA - C

PKC - C

PKA 16 - CPKC 16 - C

M A T E R I A LKODEJ U M L A H

s

dr

sdf

Spool insulator ansi 53-1

Clevis service conduit

Service dead end fitting

1

-

1

PKC-CPKA11-CPKA16-CPKA16-C

psc

p

bn

Plastic strap for clamping

Bare connector bimetal

Clamp loop dead end

2

0,5

1

-

1

4 2 4

1

1

1

1

1

1

atp Armor tape

1 1 1 1

0,5 0,5 0,5

1 1 1 1

as Service swinging clevis - - 1 1

PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA

Page 25: PART 3 Perlengkapan Jumper

DESCRIPTION PARAF DATA

Checked

Approped

Checked

Approped

Checked

Approped

KONSTRUKSI SLP1 PH JENIS DX / 3 PHJENIS QX PADA TITIK

TUMPU DINDING /TIANG KAYU

KA 10 - C1KC 10 - C1

KA 10 - CKC 10 - C

M A T E R I A LKODEJ U M L A H

s

bt

aq

Spool insulator ansi 53-1

Wire holders clevis screw

Eye Screw ½”x 4”

1

-

1

KC10-C1KA10-C1KC10-CKA10-C

psc

p

bn

Plastic strap for clamping

Bare connector bimetal

Clamp loop dead end

2

0,5

1

-

1

4 2 4

-

1

1

-

1

1

atp Armor tape

1 1 1 1

0,5 0,5 0,5

1 1 1 1

as Service swinging clevis - - 1 1

PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA

Page 26: PART 3 Perlengkapan Jumper

DESCRIPTION PARAF DATA

Checked

Approped

Checked

Approped

Checked

Approped

KONSTRUKSI SLP1 PH, 3 PH JENIS

TWISTED PADA TITIKTUMPU DINDING

/ TIANG KAYU & BETONCKA - TCKC - T

KA - TKC - T

M A T E R I A LKODEJ U M L A H

ek

sdf

j

Locknut 5/8”

Service dead end fitting

Lag screw 3/8” x 2 ½”

1

2

-

CKC-TCKA-TKC-TKA-T

-

cpt

dt-1

Pasir kali + batu kerikil

Cement portland

Services insul.dead end clamp

-

1

1

2

-

- 1 1

-

0,02

-

0,02

psc Plastic strap for clamping

- - 2 2

1 1 1

1 1 1 1

c Bolt machine 5/8” x 6” - - 1 1

1 1

PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA

Page 27: PART 3 Perlengkapan Jumper

DESCRIPTION PARAF DATA

Checked

Approped

Checked

Approped

Checked

Approped

KONSTRUKSI SLP1 PH, 3 PH JENIS

TWISTED PADA TITIKTUMPU DINDING / TIANG KAYU

KA - T2KC - T2

KA - T1KC - T1

M A T E R I A LKODEJ U M L A H

psc

aq

j

Plastic strap for clamping

Eye screw ½” x 4”

Lag screw ½ ” x 4”

1

-

CKC-T2CKA-T2KC-T1KA-T1

dt-1 Services insul.dead end clamp

1

- 1 1

1 1 1 1

1 1 1 1

v-1 Pole attachment fitting - - 1 1

- -

PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA

Page 28: PART 3 Perlengkapan Jumper

DESCRIPTION PARAF DATA

Checked

Approped

Checked

Approped

Checked

Approped

KONSTRUKSI SLP1 PH / 3 PH JENISTWISTED PADA

DINDING / TIANGBETON

CKA - T2CKC - T2

CKA - T1CKC - T1

M A T E R I A LKODEJ U M L A H

ek

v-1

d

Locknut 5/8”

Pole attachment fitting

Washer square 2 1/4”

CKC-T2CKA-T2CKC-T1CKA-T1

-

cpt

dt-1

Pasir kali + batu kerikil

Cement portland

Services insul.dead end clamp

1

1 1

0,02 0,02

psc Plastic strap for clamping 1 1 1

1 1 1 1

c Bolt machine 5/8” x Panjang disesuaikan

0,02 0,02

1 1

1 1 1 1

1 1 1 1

1 1 1 1

1 1 1 1

PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA

Page 29: PART 3 Perlengkapan Jumper

DESCRIPTION PARAF DATA

Checked

Approped

Checked

Approped

Checked

Approped

KONSTRUKSI SMP DNGTIANG ATAP UNTUK SR

1 PH / 3 PH DENGAN SLPJENIS DX/QX DAN SMP

JENIS NYM/NYY DILUARBANGUNAN

PMA 8 - CPMC 8 - C

PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA

Page 30: PART 3 Perlengkapan Jumper

DESCRIPTION PARAF DATA

Checked

Approped

Checked

Approped

Checked

Approped

KONSTRUKSI SMP DNGTIANG ATAP UNTUK SR1PH / 3PH DENGAN SLPJENIS DX/QX DAN SMP

JENIS NYM/NYY DILUARPLAFON

PMA 8 - C1PMC 8 - C1

PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA

Page 31: PART 3 Perlengkapan Jumper

DESCRIPTION PARAF DATA

Checked

Approped

Checked

Approped

Checked

Approped

KONSTRUKSI SMP DNGTITIK TUMPU UNTUK SR1PH / 3PH DENGAN SLPJENIS DX/QX DAN SMP

JENIS NYM/NYY DILUARBANGUNAN

MA 8 - CMC 8 - C

PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA

Page 32: PART 3 Perlengkapan Jumper

DESCRIPTION PARAF DATA

Checked

Approped

Checked

Approped

Checked

Approped

KONSTRUKSI SMP DNGTITIK TUMPU UNTUK SR1PH / 3PH DENGAN SLPJENIS DX/QX DAN SMP

JENIS NYM/NYY DILUARBANGUNAN

CMA 8 - CCMC 8 - C

PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA

Page 33: PART 3 Perlengkapan Jumper

DESCRIPTION PARAF DATA

Checked

Approped

Checked

Approped

Checked

Approped

KONSTRUKSI SMP DNGTIANG ATAP UNTUK SR

1 PH / 3 PH TANPASAMBUNGAN JENIS

TWISTED

PMA 8 - TPMC 8 - T

PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA

Page 34: PART 3 Perlengkapan Jumper

DESCRIPTION PARAF DATA

Checked

Approped

Checked

Approped

Checked

Approped

KONSTRUKSI SMP DNGTIANG ATAP UNTUK SR

1PH / 3PH TANPASAMBUNGAN JENIS

TWISTED

PMA 8 - T1PMC 8 - T1

PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA

Page 35: PART 3 Perlengkapan Jumper

DESCRIPTION PARAF DATA

Checked

Approped

Checked

Approped

Checked

Approped

KONSTRUKSI SMP DNGTIANG ATAP UNTUK SR

1PH / 3PH TANPASAMBUNGAN JENIS

TWISTED

MA 8 - TMC 8 - T

PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA

Page 36: PART 3 Perlengkapan Jumper

DESCRIPTION PARAF DATA

Checked

Approped

Checked

Approped

Checked

Approped

KONSTRUKSI SMP DNGTITIK TUMPU UNTUK SR

1PH / 3PH TANPASAMBUNGAN JENIS

TWISTED

CMA 8 - TCMC 8 - T

PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA

Page 37: PART 3 Perlengkapan Jumper

DESCRIPTION PARAF DATA

Checked

Approped

Checked

Approped

Checked

Approped

SR M24

CABLE SERVICE ASSEMBLY GUIDE

PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA

Page 38: PART 3 Perlengkapan Jumper

DESCRIPTION PARAF DATA

Checked

Approped

Checked

Approped

Checked

Approped

SR & APP M24-10

ASSEMBLY GUIDE OF SERVICE MASTFOR OUTSIDE METERING

PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA

Page 39: PART 3 Perlengkapan Jumper

DESCRIPTION PARAF DATA

Checked

Approped

Checked

Approped

Checked

Approped

SR M24-10-A

CONVERSION DIAGRAMFOR

EXISTING SERVICE MASTS

PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA

Page 40: PART 3 Perlengkapan Jumper

DESCRIPTION PARAF DATA

Checked

Approped

Checked

Approped

Checked

Approped

KETENTUAN UMUMSAMBUNGAN LUAR

PELAYANAN

MA 24 - 2MC 24 - 2

1. Dari satu tiang boleh dipasang Max 5 SLP.

2. Dari SLP 1 boleh disambung berturut-turut (seri) Max 5 pelanggan dan tetap

memperhatikan beban dan susut tegangan.

3. Jarak sambungan dari tiang ke rumah atau dari rumah ke rumah Max 30 m untuk SLP Jenis

Twisted dan Max 45 m untuk SLP Jenis DX/QX.

4. Jarak sambungan dari tiang ke rumah terakhir Max 150 m dan tetap memperhatikan susut

tegangan yang diijinkan.

5. Susut tegangan sepanjang SR yang diijinkan Max 2% bila SLP disambung pada STR, Max

10% bila SLP disambung pada Gardu Trafo/Peti TR.

6. Pada satu tiang atap boleh dipasang Max 3 SLP.

PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA

Page 41: PART 3 Perlengkapan Jumper

ITEM MATERIAL

ITEM MATERIALCODENO

1

2

3

itt Insulating tape

4

JUMLAH

1 set

sps Split plastic sleve 1 bh

sst Stainless steel strap 1,2 mt

stb Stopping buckle 2 bh

DESCRIPTION PARAF DATA

Checked

Approped

Checked

Approped

Checked

Approped

JTR

KONSTRUKSI UNTUKPELINDUNG UJUNG LVTC

MJ6 - T

PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA

Page 42: PART 3 Perlengkapan Jumper

DESCRIPTION PARAF DATA

Checked

Approped

Checked

Approped

Checked

Approped

M22 - 1

PENEBANGAN POHON

CATATAN :BAGIAN-BAGIAN POHON TIDAK

0 0BOLEH LEBIH DEKAT DARI 6 0 TERHADAP JARINGA TELANJANG.PENEBANGAN HARUSMEMBENTUK POHON ITUNAMPAK SIMETRIS

PETUNJUK PENEBANGAN POHON

PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA

Page 43: PART 3 Perlengkapan Jumper

DESCRIPTION PARAF DATA

Checked

Approped

Checked

Approped

Checked

Approped

PEMASANGAN APPPELANGGAN TR 3 PHDENGAN OK TYPE IIIDENGAN PELINDUNG

TAMBAHAN

APPC - IIIR1

M A T E R I A LKODE

go

-

-

-

APP 3 phasa dengan OK type III

Asbes gelombang 1400 x 900

Segitiga penyangga 400 x 400 x 560 dengan besi

Kayu 40 x 60 x 1300

L 50 x 50 x 5

-

-

-

Paku payung

Pasir (kubik)

Semen (kg)

4

6

0,01

3

- Mur - baut 3/8” x 3 ½”

1

1

2

2

- Fisher 3/8 ”

- Paku sekrup 3/8” x 2”

4

4

J U M L A H

PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA

Page 44: PART 3 Perlengkapan Jumper

DESCRIPTION PARAF DATA

Checked

Approped

Checked

Approped

Checked

Approped

PEMASANGAN APPPELANGGAN TR 3 PHPADA GARDU TRAFO

TIANG

AAPC - VIP

PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA

Page 45: PART 3 Perlengkapan Jumper

DESCRIPTION PARAF DATA

Checked

Approped

Checked

Approped

Checked

Approped

PEMASANGAN APPPELANGGAN TR 1/3 PHDENGAN OK TYPE I/IIIPADA DINDING YANG

TELAH ADAPELINDUNGNYA

APPA - IRAPPC - IIIR

M A T E R I A LKODEJ U M L A H

go APP denganAPP 3 phasa dengan OK type III -

3 PHASA1 PHASA

go APP 1 phasa dengan OK type I 1 -

1

PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA

Page 46: PART 3 Perlengkapan Jumper

DESCRIPTION PARAF DATA

Checked

Approped

Checked

Approped

Checked

Approped

PEMASANGAN APPPELANGGAN TR 1 PHDENGAN OK TYPE I

DENGAN PELINDUNGTAMBAHAN

APPA - IR1

M A T E R I A LKODE

go

-

-

-

APP 1 phasa dengan OK type I

Asbes gelombang 1000 x 550

Segitiga penyangga 200 x 200 x 280 dengan besi

Kayu 40 x 60 x 900

L 50 x 50 x 5

-

-

-

Paku payung

Pasir (kubik)

Semen (kg)

4

6

0,01

2

- Mur - baut 3/8” x 3 ½”

1

1

2

2

- Fisher 3/8 ”

- Paku sekrup 3/8” x 2”

4

4

J U M L A H

PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA

Page 47: PART 3 Perlengkapan Jumper

DESCRIPTION PARAF DATA

Checked

Approped

Checked

Approped

Checked

Approped

JTM M-20

WOOD POLE FRAMING GUIDEAND

DIMENSIONS

PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA

Page 48: PART 3 Perlengkapan Jumper

NO CODE ITEM MATERIAL SIZE QUANT NO CODE ITEM MATERIAL QUANTSIZE

ITEM MATERIAL

1 Tiang beton 1As req

100

200

150

300

300

300

poss of bolt center bracket

poss ofbolt for x’arm

poss of bolt side bracket

terminal lug

neutral position

position of sec. dressing(x1)

position of sec. dressing(x2)

terminal lug of ground

DESCRIPTION PARAF DATA

Checked

Approped

Checked

Approped

Checked

Approped

PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA

JTM

KONSTRUKSI LUBANG TIANG BETONDAN PENGGUNAAN ASLINYA

Page 49: PART 3 Perlengkapan Jumper

DESCRIPTION PARAF DATA

Checked

Approped

Checked

Approped

Checked

Approped

JTM SM-20

STEEL POLE DRILLING GUIDECLASS A, B AND C

PT PLN (PERSERO) DISTRIBUSIJAWA TENGAH & D.I YOGYAKARTA