Parque Eolico Villonaco Ecuador - wlscorporation.com · Major Components for 11 Goldwind Turbines:...

30
Ecuador Villonaco WIND FARM PROJECT 2010-2012

Transcript of Parque Eolico Villonaco Ecuador - wlscorporation.com · Major Components for 11 Goldwind Turbines:...

Ecuador Villonaco WIND FARM PROJECT

2010-2012

PROJECT SUMMARY

Location: Loja City, Ecuador

Total power: 16.5MW

Estimated annual production: 37 GW.h (for an equivalent of 2,500 hours of full load/year)

Estimated Completion: January 2013

Villonaco is the first wind farm in Ecuador, and the first in the world at an altitude of 2,700 meters.

TRANSPORTATION & LOGISTICS

Major Components for 11 Goldwind Major Components for 11 Goldwind Turbines:Turbines:• 11 Generators, 46 metric tons each• 11 3-piece Towers, each 65 meters high • 33 blades, each 6.5 metric tons and 34 meters in length (3 blades per tower)

Transport Equipment Used:Transport Equipment Used:• 2 extendable flatbed trucks • 2 lowboys four axles • 1 lowboy 3 axles• 1 Grove crane – 140 ton• 1 Grove crane – 45 ton• 1 stacker • 1 3-ton forklift