38 April 26 th , 2017 4241.56 Lon LaClaire & Eric Mital City of Vancouver Engineering Services 507 W Broadway Vancouver, BC, V5Z 0B4 Dear Lon and Eric Re: 400 W Georgia Office Development Parking & Loading Strategy Thank you very much for the extremely helpful meeting with us on February 20 th , As we explained at the meeting, 400 W Georgia is a proposed 24-storey mixed-use office and retail project with around 366,145 sq ft of GFA by Westbank Projects Corp in Downtown Vancouver. This unique project will be an architectural landmark at the eastern gateway into downtown, and provide much needed employment uses, complimenting the growing cultural and entertainment precinct surrounding the site. Key to ensuring sustainable design translates into sustainable building management is to create the right balance of parking to meet the needs of future tenants, while not oversupplying parking so as to try and align more with future mode share targets in Downtown Vancouver. Further, this applies to the loading facilities for the building to ensure an efficient use of space while not compromising functional capabilities of the City’s lane and adjoining street network. The following paragraphs briefly outline the proposed parking, loading, and access strategy for the project moving forward, and summarize our understanding of the results of our conversation last week. Yours truly, Bunt & Associates Peter Joyce, P.Eng. Tyler Thomson, MUrb, MCIP, RPP, PTP Principal Transportation Planner 400 W Georgia | Parking & Loading Strategy | April 26 th , 2017 2 S:\PROJECTS\TT\4241-56 400 W. Georgia\5.0 Deliverables\20170426_4241-56_400-W-Georgia_Parking+Loading_V03.docx PARKING The City of Vancouver’s Parking Bylaw (Bylaw 6059, Section 4) requires the provision of: (a) minimum of one parking space for each 145 m² of gross floor area; and (b) maximum of one parking space for each 115 m² of gross floor area for non-residential uses downtown. For the proposed tower this would equate to a parking supply in the range of 235 to 296 spaces. Additionally, the City allows for parking credits to apply against the parking supply requirement, which includes: 2:1 credit for disability parking spaces (based on a minimum required number of spaces); 1:5 credit for providing Class A bicycle parking spaces for office/retail uses (i.e. 1 parking space for each 5 Class A bicycle parking spaces) above the minimum requirement up to a maximum of 1 space for each 300m 2 ; and, 4:1 credit for providing car-share vehicles (typically assessed on a case by case basis) 1 At our meeting, you expressed support for the use of the car-share vehicle credit for our proposed project, given our shared intentions for the project. This is a very important element in our thinking, and we very much appreciate this confirmation. Two parking strategy options are currently being considered, one based on seeking to provide fewer parking spaces but which would be subject to substantial payment-in-lieu fees (Option 1), and the other which would seek to strike a balance between expected market parking needs and avoiding over-parking the site and which would be subject to a lesser payment-in-lieu levy (Option 2). Option 1: Payment-In-Lieu - High In this option, the project would be seeking to provide parking at a reduced rate so as to avoid providing additional levels of parking, as per the following components: 130 regular parking spaces (including up to 25% small car spaces) 14 disability parking spaces (accounting for 28 parking spaces) 5 car-share vehicles (accounting for 20 parking spaces) 113 Class A bicycle parking spaces (accounting for 8 parking spaces) Physical Total = 149 spaces Calculated Total = 187 spaces 1 Note that the Parking Bylaw allows this credit for residential uses downtown but will sometimes also allow this parking credit for commercial uses if deemed appropriate Parking and Loading Strategy

Transcript of Parking and Loading Strategy - Vancouver · d-use office and retail project with around 366,145 sq...

Page 1: Parking and Loading Strategy - Vancouver · d-use office and retail project with around 366,145 sq ft of GFA by Westbank Projects Corp in Downtown Vancouver. This unique project will

38

Apri

l 2

6th, 2017

4241.5

6

Lon L

aCla

ire

& E

ric

Mit

al

Cit

y of

Van

couve

r

Engin

eeri

ng S

ervi

ces

507 W

Bro

adw

ay

Van

couve

r, B

C,

V5

Z 0

B4

Dea

r Lo

n a

nd E

ric

Re:

40

0 W

Geo

rgia

Off

ice D

evelo

pm

en

t

Park

ing

& L

oad

ing

Str

ate

gy

Than

k y

ou v

ery

much

for

the

extr

emel

y hel

pfu

l m

eeti

ng w

ith u

s on F

ebru

ary

20

th, A

s w

e ex

pla

ined

at

the

mee

ting, 400 W

Geo

rgia

is

a pro

pose

d 2

4-s

tore

y m

ixed-u

se o

ffic

e an

d r

etai

l pro

ject

wit

h a

round 3

66,1

45

sq f

t of

GFA

by

Wes

tban

k P

roje

cts

Corp

in D

ow

nto

wn V

anco

uve

r. This

uniq

ue

pro

ject

will be

an

arch

itec

tura

l la

ndm

ark a

t th

e ea

ster

n g

atew

ay into

dow

nto

wn, an

d p

rovi

de

much

nee

ded

em

plo

ymen

t

use

s, c

om

plim

enti

ng t

he

gro

win

g c

ult

ura

l an

d e

nte

rtai

nm

ent

pre

cinct

surr

oundin

g t

he

site

.

Key

to e

nsu

ring s

ust

ainab

le d

esig

n t

ransl

ates

into

sust

ainab

le b

uildin

g m

anag

emen

t is

to c

reat

e th

e ri

ght

bal

ance

of

par

kin

g t

o m

eet

the

nee

ds

of

futu

re t

ena n

ts, w

hile

not

ove

rsupply

ing p

arkin

g s

o a

s to

try

and

alig

n m

ore

wit

h f

utu

re m

od

e sh

are

targ

ets

in D

ow

nto

wn V

anco

uve

r. Fu

rther

, th

is a

pplies

to t

he

load

ing

faci

liti

es f

or

the

buildin

g t

o e

nsu

re a

n e

ffic

ient

use

of

spac

e w

hile

not

com

pro

mis

ing f

unct

ional

cap

abilit

ies

of

the

Cit

y’s

lane

and a

djo

inin

g s

tree

t net

work

. T

he

follow

ing p

arag

raphs

bri

efly

outl

ine

the

pro

pose

d

par

kin

g, lo

adin

g, an

d a

cces

s st

rate

gy

for

the

pro

ject

movi

ng f

orw

ard, an

d s

um

mar

ize

our

under

stan

din

g

of

the

resu

lts

of

our

conve

rsat

ion las

t w

eek.

Yours

tru

ly,

Bu

nt

& A

sso

ciate

s

Pete

r Jo

yce,

P.E

ng.

Tyl

er T

hom

son,

MU

rb,

MC

IP,

RPP

, PT

P

Prin

cipal

Tra

nsp

ort

atio

n P

lanner

400 W

Geo

rgia

| P

arkin

g &

Load

ing S

trat

egy

| A

pri

l 26

th, 2017

2

S:

\PR

OJE

CTS\

TT

\42

41

-56 4

00 W

. G

eorg

ia\5

.0

Del

iver

able

s\20

170

426

_424

1-5

6_4

00

-W-G

eorg

ia_P

arkin

g+Lo

adin

g_V

03

.docx

PAR

KIN

G

The

Cit

y of

Van

couve

r’s

Park

ing B

ylaw

(Byl

aw 6

05

9, Se

ctio

n 4

) re

quir

es t

he

pro

visi

on o

f: (

a)

min

imum

of

one

par

kin

g s

pac

e fo

r ea

ch 1

45

of

gro

ss f

loor

area

; an

d (

b)

max

imum

of

one

par

kin

g s

pac

e fo

r ea

ch

11

5 m

² of

gro

ss f

loor

area

for

non-r

esid

enti

al u

ses

dow

nto

wn. F

or

the

pro

pose

d t

ow

er t

his

would

equat

e

to a

par

kin

g s

upply

in t

he

range

of

23

5 t

o 2

96

sp

ace

s. A

ddit

ional

ly, th

e C

ity

allo

ws

for

par

kin

g c

redit

s to

apply

agai

nst

the

par

kin

g s

upply

req

uir

emen

t, w

hic

h incl

udes

:

2:1

cre

dit

for

dis

abilit

y par

kin

g s

pac

es (

bas

ed o

n a

min

imum

req

uir

ed n

um

ber

of

spac

es);

1:5

cre

dit

for

pro

vidin

g C

lass

A b

icyc

le p

arkin

g s

pac

es f

or

off

ice/

reta

il u

ses

(i.e

. 1 p

arkin

g s

pac

e

for

each

5 C

lass

A b

icyc

le p

arkin

g s

pac

es) ab

ove

the

min

imum

req

uir

emen

t up t

o a

max

imum

of

1

spac

e fo

r ea

ch 3

00

m2; an

d,

4

:1 c

redit

for

pro

vidin

g c

ar-s

har

e ve

hic

les

(typ

ical

ly a

sses

sed o

n a

cas

e by

case

bas

is)1

At

our

mee

ting, yo

u e

xpre

ssed

support

for

the

use

of

the

car-

shar

e ve

hic

le c

redit

for

our

pro

pose

d p

roje

ct,

giv

en o

ur

shar

ed inte

nti

ons

for

the

pro

ject

. T

his

is

a ve

ry im

port

ant

elem

ent

in o

ur

thin

kin

g, an

d w

e ve

ry

much

appre

ciat

e th

is c

onfi

rmat

ion.

Tw

o p

arkin

g s

trat

egy

opti

ons

are

curr

entl

y bei

ng c

onsi

der

ed, one

bas

ed o

n s

eekin

g t

o p

rovi

de

few

er

par

kin

g s

pac

es b

ut

whic

h w

ould

be

subje

ct t

o s

ubst

anti

al p

aym

ent-

in-lie

u f

ees

(Opti

on 1

), a

nd t

he

oth

er

whic

h w

ould

see

k t

o s

trik

e a

bal

ance

bet

wee

n e

xpec

ted m

arket

par

kin

g n

eeds

and a

void

ing o

ver-

par

kin

g

the

site

and w

hic

h w

ould

be

subje

ct t

o a

les

ser

pay

men

t-in

-lie

u lev

y (O

pti

on 2

).

Opti

on 1

: Pa

ymen

t-In

-Lie

u -

Hig

h

In t

his

opti

on, th

e pro

ject

would

be

seek

ing t

o p

rovi

de

par

kin

g a

t a

reduce

d r

ate

so a

s to

avo

id p

rovi

din

g

addit

ional

lev

els

of

par

kin

g, as

per

the

follow

ing c

om

ponen

ts:

1

30

reg

ula

r par

kin

g s

pac

es (

incl

udin

g u

p t

o 2

5%

sm

all ca

r sp

aces

)

14 d

isab

ilit

y par

kin

g s

pac

es (

acco

unti

ng f

or

28 p

arkin

g s

pac

es)

5

car

-shar

e ve

hic

les

(acc

ounti

ng f

or

20

par

kin

g s

pac

es)

1

13

Cla

ss A

bic

ycle

par

kin

g s

pac

es (ac

counti

ng f

or

8 p

arkin

g s

pac

es)

Ph

ysi

cal

Tota

l =

14

9 s

pace

s

Calc

ula

ted

Tota

l =

18

7 s

pace

s

1 N

ote

that

the

Park

ing B

ylaw

allow

s th

is c

redit

for

resi

den

tial

use

s dow

nto

wn b

ut

will so

met

imes

als

o a

llow

this

par

kin

g c

redit

for

com

mer

cial

use

s if

dee

med

ap

pro

pri

ate

Park

ing

and

Load

ing

Stra

tegy

Page 2: Parking and Loading Strategy - Vancouver · d-use office and retail project with around 366,145 sq ft of GFA by Westbank Projects Corp in Downtown Vancouver. This unique project will

39

400 W

Geo

rgia

| P

arkin

g &

Load

ing S

trat

egy

| A

pri

l 26

th, 2017

3

S:

\PR

OJE

CTS\

TT

\42

41

-56 4

00 W

. G

eorg

ia\5

.0

Del

iver

able

s\20

170

426

_424

1-5

6_4

00

-W-G

eorg

ia_P

arkin

g+Lo

adin

g_V

03

.docx

This

str

ateg

y re

sult

s in

a s

ho

rtfa

ll o

f 4

8 p

ark

ing

sp

ace

s fr

om

the

byl

aw r

equir

emen

t w

hic

h w

ou

ld r

esu

lt

in a

park

ing

paym

en

t-in

-lie

u f

ee o

f $

969

,60

0.

Bey

ond t

his

, W

estb

ank is

pro

posi

ng t

o u

tilize

som

e su

rplu

s par

kin

g f

rom

the

Tel

us

Gar

den

Off

ice

(TG

O)

pro

ject

nea

rby

whic

h h

as p

rovi

ded

addit

ional

par

kin

g b

eyond t

he

min

imum

req

uir

emen

t. A

ccord

ing t

o

Wes

tban

k’s

rec

ord

s, t

he

byl

aw p

arkin

g r

equir

emen

t fo

r T

GO

was

38

0 p

arkin

g s

pac

es (in

cludin

g 3

20

for

TG

O, an

d 6

0 p

arkin

g s

pac

es f

or

the

William

Far

rell b

uildin

g), w

hile

the

pro

ject

act

ual

ly p

rovi

ded

387

par

kin

g s

pac

es lea

ving 7

surp

lus

spac

es c

om

par

ed t

o t

he

byl

aw r

equir

emen

t. A

pp

lyin

g t

hese

7 p

ark

ing

space

s to

400

West

Geo

rgia

wo

uld

red

uce

th

e p

ark

ing

su

pp

ly s

ho

rtfa

ll t

o 4

1 s

pace

s, w

hic

h w

ou

ld

resu

lt i

n a

paym

en

t-in

-lie

u f

ee o

f $

82

8,2

00

.

At

our

mee

ting, w

e w

ere

very

ple

ased

to h

ear

your

open

-min

ded

nes

s, a

nd e

ven e

nth

usi

asm

, ab

out

a

dis

cuss

ion w

ith u

s re

gar

din

g c

reat

ive

on-s

ite

or

nea

rby

idea

s to

dir

ect

thes

e fu

nds

tow

ard, an

d w

e

dis

cuss

ed t

he

poss

ibilit

y of

a co

llab

ora

tive

pro

cess

bet

wee

n u

s to

gen

erat

e pote

nti

al idea

s.

Furt

her

, giv

en t

he

site

const

rain

ts a

t th

e gro

und lev

el, C

lass

A load

ing w

ill hav

e to

be

acco

mm

odat

ed

wit

hin

the

under

gro

und p

arkad

e; w

hile

the

load

ing s

upply

rat

ional

e w

ill be

des

crib

ed b

elow

, th

e pro

ject

is

lookin

g t

o p

rovi

de

a to

tal of

5 C

lass

A s

pac

es u

nder

gro

und. T

his

wo

uld

am

ou

nt

to a

tota

l o

f 15

4

ph

ysi

cal

park

ing

an

d C

lass

A l

oad

ing

sp

ace

s p

rovid

ed

belo

w g

rad

e.

Opti

on 2

: Pa

ymen

t-In

-Lie

u -

Low

Giv

en t

he

par

kin

g c

redit

allow

ance

s, t

he

pro

ject

would

be

seek

ing t

o p

rovi

de

par

kin

g a

t a

reduce

d r

ate

as

per

the

follow

ing c

om

ponen

ts:

1

18

reg

ula

r par

kin

g s

pac

es

3

7 s

mal

l ca

r par

kin

g s

pac

es

14 d

isab

ilit

y par

kin

g s

pac

es (

acco

unti

ng f

or

28 p

arkin

g s

pac

es)

5

car

-shar

e ve

hic

les

(acc

ounti

ng f

or

20

par

kin

g s

pac

es)

1

13

Cla

ss A

bic

ycle

par

kin

g s

pac

es (ac

counti

ng f

or

9 v

ehic

le p

arkin

g s

pac

es)

Ph

ysi

cal

Tota

l =

17

4 s

pace

s (e

xcl

ud

ing

Cla

ss A

lo

ad

ing

)

Calc

ula

ted

Tota

l =

21

2 s

pace

s

As

wit

h O

pti

on 1

, th

e pro

ject

would

be

seek

ing t

o u

tilize

the

7 s

urp

lus

par

kin

g s

pac

es in T

GO

pro

vided

above

the

byl

aw r

equir

emen

t an

d a

pply

thes

e to

400 W

Geo

rgia

’s p

arkin

g s

upply

. T

his

wo

uld

am

ou

nt

to

a t

ota

l ca

lcu

late

d p

ark

ing

su

pp

ly o

f 2

19

sp

ace

s, w

hic

h w

ou

ld b

e 1

6 s

pace

s sh

ort

of

the b

yla

w

req

uir

em

en

t. The

resu

ltin

g p

arkin

g p

aym

ent-

in-lie

u f

ee w

ould

be

$3

23

,20

0 w

ith t

his

opti

on.

We

wer

e al

so k

een t

o u

nder

stan

d t

hat

the

Cit

y w

as w

illing t

o a

llow

the

car-

shar

e cr

edit

for

com

mer

cial

use

s as

pro

pose

d in b

oth

par

kin

g s

upply

opti

ons

for

this

pro

ject

.

400 W

Geo

rgia

| P

arkin

g &

Load

ing S

trat

egy

| A

pri

l 26

th, 2017

4

S:

\PR

OJE

CTS\

TT

\42

41

-56 4

00 W

. G

eorg

ia\5

.0

Del

iver

able

s\20

170

426

_424

1-5

6_4

00

-W-G

eorg

ia_P

arkin

g+Lo

adin

g_V

03

.docx

LOA

DIN

G

Bas

ed o

n t

he

Cit

y of

Van

couve

r’s

Park

ing B

ylaw

(Byl

aw 6

059, Se

ctio

n 5

), t

he

pro

pose

d d

evel

opm

ent

requir

es a

tota

l of

5 C

lass

A load

ing s

pac

es (al

l fo

r off

ice

use

s) a

nd 6

Cla

ss B

load

ing s

pac

es (4

for

off

ice,

and 2

for

reta

il).

Bas

ed o

n B

unt’

s pas

t ex

per

ience

for

sim

ilar

dow

nto

wn o

ffic

e an

d r

etai

l dev

elop

men

ts in

Van

couve

r w

e bel

ieve

the

Cit

y’s

byl

aw r

equir

emen

t to

be

gre

ater

than

the

actu

al o

bse

rved

dem

and,

par

ticu

larl

y fo

r C

lass

B load

ing n

eeds.

In p

arti

cula

r, t

he

obse

rved

pea

k load

ing d

eman

d r

ate

for

Cla

ss A

and C

lass

B load

ing v

ehic

les

for

mix

ed-

use

off

ice

tow

ers

wit

h g

round f

loor

support

ing r

etai

l is

appro

xim

atel

y 2

.7 v

eh

icle

s/1

0,0

00

sq

ft

GFA

/ho

ur

(65

% C

lass

A, an

d 3

5%

Cla

ss B

). A

t a

targ

et o

ccupan

cy o

f 70

% (

i.e.

load

ing s

pac

es a

re o

ccupie

d

for

70

% o

f th

e ty

pic

al 1

0-h

our

work

day

, 7am

– 5

pm

), t

his

would

equat

e to

a r

ecom

men

ded

supply

of

5

Cla

ss A

load

ing s

pac

es, an

d 2

Cla

ss B

load

ing s

pac

es t

o a

chie

ve t

his

lev

el o

f ef

fici

ency

.

Ther

efore

, th

e p

roje

ct i

s se

ekin

g t

o p

rovid

e 5

Cla

ss A

lo

ad

ing

sp

ace

s bel

ow

gra

de

in t

he

P1 lev

el o

f th

e

par

kad

e, a

nd

2 C

lass

B l

oad

ing

sp

ace

s at

the

gro

und lev

el a

cces

sed f

rom

the

rear

lan

e. It

is

also

inte

nded

that

thes

e lo

adin

g s

pac

es w

ould

be

shar

ed b

etw

een o

ffic

e an

d r

etai

l use

s to

allow

for

more

effi

cien

t use

. T

o h

elp f

acilit

ate

this

, it

is

expec

ted t

he

Cit

y w

ill re

quir

e a

robust

Load

ing M

anag

emen

t Pl

an

(LM

P) o

utl

inin

g t

he

pro

toco

l fo

r how

the

load

ing f

acilit

ies

would

be

uti

lize

d a

nd m

anag

ed a

s w

ell as

pro

vide

a le

vel of

indic

atio

n o

f sc

hed

uling o

f use

thro

ughout

a ty

pic

al d

ay/w

eek. A

t our

mee

ting, yo

u

expre

ssed

support

in p

rinci

ple

for

this

load

ing a

ppro

ach, on t

he

under

stan

din

g t

hat

we

would

pro

vide

the

pre

viousl

y-m

enti

oned

load

ing m

anag

emen

t pla

n.

AC

CES

S A

t our

mee

ting, w

e al

so d

iscu

ssed

acc

ess

to t

he

site

, an

d it

was

agre

ed t

hat

par

kin

g a

cces

s w

ould

be

from

the

lane,

while

it is

assu

med

at

this

tim

e th

e la

ne

connec

tion t

o G

eorg

ia S

tree

t w

ould

rem

ain o

pen

. T

his

would

lik

ely

rem

ain t

he

case

unti

l th

e ti

me

the

adja

cent

site

to t

he

wes

t is

up f

or

redev

elopm

ent

at w

hic

h

tim

e a

pote

nti

al lan

e co

nnec

tion t

o R

ichar

ds

Stre

et c

oul d

be

inve

stig

ated

if

it d

esir

able

to c

lose

the

Geo

rgia

Stre

et lan

e ac

cess

.

It w

as a

lso d

iscu

ssed

that

a n

ew o

ne-

way

lan

e co

nnec

tion w

ould

connec

t fr

om

Hom

er S

tree

t to

the

rear

lane

and p

rovi

de

for

dro

p-o

ff/p

ick-u

p a

ctiv

ity

for

the

buildin

g o

n its

south

sid

e.

We

under

stan

d s

ince

this

mee

ting t

he

Cit

y has

voic

ed o

pposi

tion t

o t

his

connec

tion a

nd it

has

bee

n r

emove

d f

rom

the

pla

ns.

cc.

Kar

en H

oes

e, C

ity

of

Van

couve

r

Mic

hae

l N

aylo

r, C

ity

of

Van

couve

r G

il K

elle

y, C

ity

of

Van

couve

r Bre

nt

Tod

eria

n, Tod

eria

n U

rban

Work

s D

ave

Leung

, W

estb

ank

Mit

ch S

akum

oto

, M

erri

ck A

rchit

ectu

re

Page 3: Parking and Loading Strategy - Vancouver · d-use office and retail project with around 366,145 sq ft of GFA by Westbank Projects Corp in Downtown Vancouver. This unique project will

40

Apri

l 2

6th, 2

01

7

42

41

.56

Mit

ch S

akum

oto

Mer

rick

Arc

hit

ectu

re

30

0-8

39

Cam

bie

Str

eet

Van

couve

r, B

C

V6

B 2

P4

VIA

E-M

AIL

: sa

kum

oto

@m

erri

ckar

ch.c

om

Dea

r M

itch

:

Re:

40

0 W

Geo

rgia

Rezo

nin

g –

Tra

nsp

ort

ati

on

Revie

w

D

raft

Lett

er

As

reques

ted, Bunt

has

pre

par

ed a

Tra

nsp

ort

atio

n R

evie

w in s

upport

of

the

Rez

onin

g A

pplica

tion f

or

Wes

tban

k’s

pro

pose

d m

ixed

-use

off

ice

tow

er d

evel

opm

ent

at 4

00

W G

eorg

ia in D

ow

nto

wn V

anco

uve

r, B

C.

The

follow

ing let

ter

incl

udes

a s

um

mar

y of

key

tra

nsp

ort

atio

n e

lem

ents

of

the

des

ign a

t th

is s

tage

of

the

pro

ject

such

as

vehic

le c

ircu

lati

on, par

kin

g a

nd b

icyc

le p

arkin

g p

rovi

sions,

load

ing a

cces

s an

d p

rovi

sions,

as w

ell as

the

anti

cipat

ed lev

el o

f tr

affi

c to

be

gen

erat

ed b

y th

e dev

elopm

ent

in t

he

futu

re. T

his

sco

pe

has

bee

n c

onfi

rmed

wit

h t

he

Cit

y to

sat

isfy

the

tran

sport

atio

n c

om

ponen

t of

the

applica

tion.

We

trust

that

this

rep

ort

will pro

vide

the

nec

essa

ry s

upport

for

the

dev

elopm

ent

thro

ugh t

he

rezo

nin

g

pro

cess

.

Yours

tru

ly,

Bu

nt

& A

sso

ciate

s

Tyl

er T

hom

son,

MU

rb,

MC

IP,

RPP

, PT

P A

my

Do, EI

T

Tra

nsp

ort

atio

n P

lanner

Tra

nsp

ort

atio

n A

nal

yst

cc.

Pete

r Jo

yce,

Bunt

& A

ssoci

ates

40

0 W

Geo

rgia

Rezo

nin

g –

Tra

nsp

ort

atio

n R

evie

w |

Dra

ft L

ette

r | A

pri

l 2

6th, 2017

2

S:

\PR

OJE

CTS\

TT

\42

41

-56 4

00 W

. G

eorg

ia\5

.0

Del

iver

able

s

1.

INTR

OD

UC

TIO

N

400 W

Geo

rgia

is

a pro

pose

d 2

4-s

tore

y m

ixed

-use

off

ice

and r

etai

l pro

ject

wit

h a

round 3

66

,00

0 s

q

ft o

f G

FA b

y W

estb

ank P

roje

cts

Corp

(W

estb

ank) in

Dow

nto

wn V

anco

uve

r. This

uniq

ue

pro

ject

will

be

an a

rchit

ectu

ral la

ndm

ark a

t th

e ea

ster

n g

atew

ay into

dow

nto

wn, an

d p

rovi

de

much

nee

ded

emplo

ymen

t use

s, c

om

plim

enti

ng t

he

gro

win

g c

ult

ura

l an

d e

nte

rtai

nm

ent

pre

cinct

surr

oundin

g t

he

site

.

Key

to e

nsu

ring s

ust

ainab

le d

esig

n t

ransl

ates

into

sust

ainab

le b

uildin

g m

anag

emen

t is

to c

reat

e th

e

right

bal

ance

of

par

kin

g t

o m

eet

the

nee

ds

of

futu

re t

enan

ts, w

hile

not

ove

rsupply

ing p

arkin

g s

o a

s

to t

ry a

nd a

lign m

ore

wit

h f

utu

re m

ode

shar

e ta

rget

s in

Dow

nto

wn V

anco

uve

r. Fu

rther

, th

is a

pplies

to t

he

load

ing f

acilit

ies

for

the

buildin

g t

o e

nsu

re a

n e

ffic

ient

use

of

spac

e w

hile

not

com

pro

mis

ing

funct

ional

cap

abilit

ies

of

the

Cit

y’s

lane

and a

djo

inin

g s

tree

t net

work

.

The

Cit

y of

Van

couve

r’s

Engin

eeri

ng D

epar

tmen

t is

req

ues

ting a

n a

bbre

viat

ed t

raff

ic s

tudy

for

40

0

W G

eorg

ia g

iven

that

they

hav

e al

read

y ex

tensi

vely

stu

die

d t

he

area

as

par

t of

the

Via

duct

s st

udy.

This

stu

dy

is r

equir

ed t

o incl

ude

info

rmat

ion s

um

mar

izin

g t

he

par

kin

g, an

d load

ing p

rovi

sions

for

the

pro

ject

, as

wel

l as

des

crib

ing t

he

site

acc

ess

and c

ircu

lati

on f

or

gen

eral

veh

icle

s an

d load

ing

vehic

les.

In

addit

ion t

o t

his

the

Cit

y has

req

ues

ted info

rmat

ion r

egar

din

g e

xis

ting t

raff

ic c

ondit

ions

and t

he

expec

ted t

rip g

ener

atio

n f

or

the

site

wit

h t

he

dev

elopm

ent

in p

lace

.

The

follow

ing s

ecti

ons

bri

efly

outl

ine

the

pro

pose

d p

arkin

g a

nd load

ing r

atio

nal

e, a

s w

ell as

an

under

stan

din

g o

f th

e on-s

ite

circ

ula

tion, ac

cess

str

ateg

y an

d a

nti

cipat

ed t

rip g

ener

atio

n f

or

the

pro

ject

movi

ng f

orw

ard. F

irs

the

dev

elopm

ent

pla

n s

tati

stic

s ar

e pre

sente

d in S

ecti

on 2

.

2.

DEV

ELO

PMEN

T P

LAN

T

he

pro

pose

d d

evel

opm

ent

pla

n s

tati

stic

s ar

e su

mm

ariz

ed in T

ab

le 2

.1 a

nd w

ill be

use

d t

o

calc

ula

te t

he

par

kin

g a

nd load

ing r

equir

emen

ts, al

ong w

ith t

he

vehic

le t

rip g

ener

atio

n in t

he

follow

ing s

ecti

ons.

Tab

le 2

.1: D

evel

opm

ent

Plan

Conte

nt.

LA

ND

USE

GR

OSS F

LO

OR

AR

EA

Sq

ft

Sq m

C

om

mer

cial

– O

ffic

e 349,2

78

32,4

49

C

om

mer

cial

- R

etai

l 5,7

75

536

Tota

l 3

66

,14

5

34

,01

6

The

site

pla

n is

show

n f

or

the

gro

und lev

el o

n E

xh

ibit

2.1

.

Page 4: Parking and Loading Strategy - Vancouver · d-use office and retail project with around 366,145 sq ft of GFA by Westbank Projects Corp in Downtown Vancouver. This unique project will

41

N

asso

ciates

&unt

b

[Issu

ed fo

r Disc

ussio

n; no

t for C

onstr

uctio

n]

40

0 W

est

Geo

rgia

42

41

.56

A

pri

l 2

01

7

S

cale

Cust

om

on L

ette

r

P

repar

ed b

y A

D

Exh

ibit

2

.1

Site

Pla

n

S:\PROJECTS\TT\4241-56 400 W. Georgia\4.0 Analysis & Design\AutoTURN\04242017\04242017_4241-56_GF_TA.dwg2017/04/25 15:47, Plotted by Amy Do

[Bas

ed on

Dra

wing

1701

-A2.0

6 Gro

und F

loor f

rom

Merri

ck A

rchite

cture

dated

2017

0424

]

Page 5: Parking and Loading Strategy - Vancouver · d-use office and retail project with around 366,145 sq ft of GFA by Westbank Projects Corp in Downtown Vancouver. This unique project will

42

40

0 W

Geo

rgia

Rezo

nin

g –

Tra

nsp

ort

atio

n R

evie

w |

Dra

ft L

ette

r | A

pri

l 2

6th, 2017

4

S:

\PR

OJE

CTS\

TT

\42

41

-56 4

00 W

. G

eorg

ia\5

.0

Del

iver

able

s

3.

PAR

KIN

G &

LO

AD

ING

REV

IEW

T

he

Cit

y of

Van

couve

r’s

Park

ing B

ylaw

(Byl

aw 6

059, Se

ctio

n 4

) re

quir

es t

he

pro

visi

on o

f: (

a)

min

imum

of

one

par

kin

g s

pac

e fo

r ea

ch 1

45

of

gro

ss f

loor

area

; an

d (

b)

max

imum

of

one

par

kin

g s

pac

e fo

r ea

ch 1

15 m

² of

gro

ss f

loor

area

for

non-r

esid

enti

al u

ses

dow

nto

wn. F

or

the

pro

pose

d t

ow

er t

his

would

equat

e to

a p

arkin

g s

upply

in t

he

range

of

23

5 t

o 2

96 s

pace

s.

Addit

ional

ly, th

e C

ity

allo

ws

for

par

kin

g c

redit

s to

apply

agai

nst

the

par

kin

g s

upply

req

uir

emen

t,

whic

h incl

udes

:

2:1

cre

dit

for

dis

abilit

y par

kin

g s

pac

es (

bas

ed o

n a

min

imum

req

uir

ed n

um

ber

of

spac

es);

1:5

cre

dit

for

pro

vidin

g C

lass

A b

icyc

le p

arkin

g s

pac

es f

or

off

ice/

reta

il u

ses

(i.e

. 1 p

arkin

g s

pac

e

for

each

5 C

lass

A b

icyc

le p

arkin

g s

pac

es) ab

ove

the

min

imum

req

uir

emen

t up t

o a

max

imum

of

1 s

pac

e fo

r ea

ch 3

00m

2;

and,

4:1

cre

dit

for

pro

vidin

g c

ar-s

har

e ve

hic

les

(typ

ical

ly a

sses

sed o

n a

cas

e by

case

bas

is)1

The

par

kin

g s

trat

egy

dev

eloped

for

this

pro

ject

is

seek

ing t

o s

trik

e a

bal

ance

bet

wee

n e

xpec

ted

mar

ket

par

kin

g n

eeds

and a

void

ing o

ver-

par

kin

g t

he

site

and w

hic

h w

ould

be

subje

ct t

o a

les

ser

pay

men

t-in

-lie

u lev

y.

3.1

Park

ing S

trat

egy

Giv

en t

he

par

kin

g c

redit

allow

ance

s, t

he

pro

ject

would

be

seek

ing t

o p

rovi

de

par

kin

g a

t a

reduce

d

rate

com

par

ed t

o t

he

Cit

y’s

Park

ing B

ylaw

as

per

the

follow

ing c

om

ponen

ts:

1

18

reg

ula

r par

kin

g s

pac

es

3

7 s

mal

l ca

r par

kin

g s

pac

es

14 d

isab

ilit

y par

kin

g s

pac

es (

acco

unti

ng f

or

28 p

arkin

g s

pac

es)

5

car

-shar

e ve

hic

les

(acc

ounti

ng f

or

20

par

kin

g s

pac

es)

1

13

Cla

ss A

bic

ycle

par

kin

g s

pac

es (ac

counti

ng f

or

9 v

ehic

le p

arkin

g s

pac

es)

Ph

ysi

cal

Tota

l =

17

4 s

pace

s

Calc

ula

ted

Tota

l =

21

2 s

pace

s

Bey

ond t

his

, th

e pro

ject

is

seek

ing t

o u

tilize

7 s

urp

lus

par

kin

g s

pac

es f

rom

Wes

tban

k’s

adja

cent

TEL

US

Gar

den

Off

ice

pro

ject

whic

h a

re p

rovi

ded

above

the

byl

aw r

equir

emen

t (i.e

. re

quir

ed 3

80

,

supplied

387

) an

d a

pply

thes

e to

400 W

Geo

rgia

’s p

arkin

g s

upply

. T

his

wo

uld

am

ou

nt

to a

tota

l

1 N

ote

that

the

Park

ing B

ylaw

allow

s th

is c

red

it f

or

resi

den

tial

use

s d

ow

nto

wn

but

will so

met

imes

als

o a

llow

this

par

kin

g c

redit

for

com

mer

cial

use

s if

dee

med

ap

pro

pri

ate

40

0 W

Geo

rgia

Rezo

nin

g –

Tra

nsp

ort

atio

n R

evie

w |

Dra

ft L

ette

r | A

pri

l 2

6th, 2017

5

S:

\PR

OJE

CTS\

TT

\42

41

-56 4

00 W

. G

eorg

ia\5

.0

Del

iver

able

s

calc

ula

ted

park

ing

su

pp

ly o

f 21

9 s

pace

s, w

hic

h w

ou

ld b

e 1

6 s

pace

s sh

ort

of

the b

yla

w

req

uir

em

en

t . The

resu

ltin

g p

arkin

g p

aym

ent-

in-lie

u f

ee w

ould

be

$3

23

,20

0 w

ith t

his

opti

on

Furt

her

, giv

en t

he

site

const

rain

ts a

t th

e gro

und lev

el, C

lass

A load

ing w

ill hav

e to

be

acco

mm

odat

ed w

ithin

the

under

gro

und p

arkad

e; w

hile

the

supply

rat

ional

e w

ill be

des

crib

ed b

elow

,

the

pro

ject

is

lookin

g t

o p

rovi

de

a to

tal of

5 C

lass

A s

pac

es u

nder

gro

und. T

his

wo

uld

am

ou

nt

to a

tota

l o

f 1

79

ph

ysi

cal

park

ing

an

d C

lass

A l

oad

ing

sp

ace

s p

rovid

ed

belo

w g

rad

e.

3.2

Load

ing R

evie

w

Bas

ed o

n t

he

Cit

y of

Van

couve

r’s

Park

ing B

ylaw

(Byl

aw 6

059, Se

ctio

n 5

), t

he

pro

pose

d d

evel

opm

ent

requir

es a

tota

l of

5 C

lass

A load

ing s

pac

es (al

l fo

r off

ice

use

s) a

nd 6

Cla

ss B

load

ing s

pac

es (4

for

off

ice,

and 2

for

reta

il).

Bas

ed o

n B

unt’

s pas

t ex

per

ience

for

sim

ilar

dow

nto

wn o

ffic

e an

d r

etai

l

dev

elopm

ents

in V

anco

uve

r w

e bel

ieve

the

Cit

y’s

byl

aw r

equir

emen

t to

be

gre

ater

than

the

actu

al

obse

rved

dem

and,

par

ticu

larl

y fo

r C

lass

B load

ing n

eeds.

In p

arti

cula

r, t

he

obse

rved

pea

k load

ing d

eman

d r

ate

for

Cla

ss A

and C

lass

B load

ing v

ehic

les

for

mix

ed-u

se o

ffic

e to

wer

s w

ith g

round f

loor

support

ing r

etai

l is

appro

xim

atel

y 2

.7 v

eh

icle

s/1

0,0

00

sq f

t G

FA

/ho

ur

(65

% C

lass

A, an

d 3

5%

Cla

ss B

). A

t a

targ

et o

ccupan

cy o

f 70

% (

i.e.

load

ing s

pac

es

are

occ

upie

d f

or

70

% o

f th

e ty

pic

al 1

0-h

our

work

day

, 7

am –

5p

m),

this

would

equat

e to

a

reco

mm

ended

supply

of

5 C

lass

A load

ing s

pac

es, an

d 2

Cla

ss B

load

ing s

pac

es t

o a

chie

ve t

his

lev

el

of

effi

cien

cy.

Ther

efore

, th

e p

roje

ct i

s se

ekin

g t

o p

rovid

e 5

Cla

ss A

lo

ad

ing

sp

ace

s bel

ow

gra

de

in t

he

P1 lev

el

of

the

par

kad

e, a

nd

2 C

lass

B l

oad

ing

sp

ace

s at

the

gro

und lev

el a

cces

sed f

rom

the

rear

lan

e. It

is

also

inte

nded

that

thes

e lo

adin

g s

pac

es w

ould

be

shar

ed b

etw

een o

ffic

e an

d r

etai

l use

s to

allow

for

more

eff

icie

nt

use

. T

o h

elp f

acilit

ate

this

, it

is

expec

ted t

he

Cit

y w

ill re

quir

e a

robust

Load

ing

Man

agem

ent

Plan

(LM

P) o

utl

inin

g t

he

pro

toco

l fo

r how

the

load

ing f

acilit

ies

would

be

uti

lize

d a

nd

man

aged

as

wel

l as

pro

vide

a le

vel of

indic

atio

n o

f sc

hed

uling o

f use

thro

ughout

a ty

pic

al

day

/wee

k.

4.

ON

-SIT

E C

IRC

ULA

TIO

N R

EVIE

W

Auto

TU

RN

anal

ysis

was

per

form

ed o

n P

1 t

o P

6 p

arkin

g a

nd g

round f

loor

(GF)

load

ing p

lan lay

outs

.

The

des

ign v

ehic

le u

sed f

or

the

bulk

of

this

anal

ysis

was

the

type

P (T

AC

) an

d in s

om

e ca

ses

(i.e

.

smal

l ca

r sp

aces

), a

typ

ical

pas

senger

veh

icle

(Fo

rd T

auru

s) w

as t

este

d t

o e

nsu

re s

ite

circ

ula

tion a

nd

adeq

uat

e tu

rnin

g m

ove

men

t sp

ace

for

vehic

les

circ

ula

ting t

he

par

kad

e. A

n S

U9

was

use

d a

s th

e

des

ign v

ehic

le f

or

the

Gro

und F

loor

Cla

ss B

load

ing.

Exh

ibit

s 4

.1 t

o 4

.7 s

how

the

circ

ula

tion m

ove

men

ts f

or

P1 t

o P

6 a

nd G

F la

youts

. Pa

rkin

g m

aneu

ver

dia

gra

ms

are

incl

uded

in A

ppen

dix

A.

Page 6: Parking and Loading Strategy - Vancouver · d-use office and retail project with around 366,145 sq ft of GFA by Westbank Projects Corp in Downtown Vancouver. This unique project will

43

N

asso

ciates

&unt

b

[Issu

ed fo

r Disc

ussio

n; no

t for C

onstr

uctio

n]

400 W

est

Geo

rgia

4241.5

6

Apri

l 2017

S

cale

1:2

50

on L

ette

r P

repar

ed b

y A

D

Exh

ibit

4

.2P2

Turn

ing A

nal

ysis

- C

ircu

lati

on

S:\PROJECTS\TT\4241-56 400 W. Georgia\4.0 Analysis & Design\AutoTURN\04242017\04242017_4241-56_P2_TA.dwg2017/04/24 11:05, Plotted by Amy Do

[Bas

ed on

Dra

wing

1701

-A2.0

4 Par

king L

evel

P2 fr

om M

erric

k Arch

itectu

re da

ted 20

1704

24]

N

asso

ciates

&unt

b

[Issu

ed fo

r Disc

ussio

n; no

t for C

onstr

uctio

n]

400 W

est

Geo

rgia

4241.5

6

Apri

l 2017

S

cale

1:2

50

on L

ette

r P

repar

ed b

y A

D

Exh

ibit

4

.1P1

Turn

ing A

nal

ysis

S:\PROJECTS\TT\4241-56 400 W. Georgia\4.0 Analysis & Design\AutoTURN\04242017\04242017_4241-56_P1_TA.dwg2017/04/25 14:24, Plotted by Amy Do

[Bas

ed on

Dra

wing

1701

-A2.0

5 Par

king L

evel

P1 fr

om M

erric

k Arch

itectu

re da

ted 20

1704

24]

Page 7: Parking and Loading Strategy - Vancouver · d-use office and retail project with around 366,145 sq ft of GFA by Westbank Projects Corp in Downtown Vancouver. This unique project will

44

N

asso

ciates

&unt

b

[Issu

ed fo

r Disc

ussio

n; no

t for C

onstr

uctio

n]

40

0 W

est

Geo

rgia

42

41

.56

A

pri

l 2

01

7

S

cale

1:2

50

on L

ette

r

P

repar

ed b

y A

D

Exh

ibit

4

.4P4

Turn

ing A

nal

ysis

- C

ircu

lati

on

S:\PROJECTS\TT\4241-56 400 W. Georgia\4.0 Analysis & Design\AutoTURN\04242017\04242017_4241-56_P4_TA.dwg2017/04/25 14:43, Plotted by Amy Do

[Bas

ed on

Dra

wing

1701

-A2.0

2 Par

king L

evel

P4 fr

om M

erric

k Arch

itectu

re da

ted 20

1704

24]

N

asso

ciates

&unt

b

[Issu

ed fo

r Disc

ussio

n; no

t for C

onstr

uctio

n]

40

0 W

est

Geo

rgia

42

41

.56

A

pri

l 2

01

7

S

cale

1:2

50

on L

ette

r

P

repar

ed b

y A

D

Exh

ibit

4

.3P3

Turn

ing A

nal

ysis

- C

ircu

lati

on

S:\PROJECTS\TT\4241-56 400 W. Georgia\4.0 Analysis & Design\AutoTURN\04242017\04242017_4241-56_P3_TA.dwg2017/04/25 14:34, Plotted by Amy Do

[Bas

ed on

Dra

wing

1701

-A2.0

3 Par

king L

evel

P3 fr

om M

erric

k Arch

itectu

re da

ted 20

1704

24]

Page 8: Parking and Loading Strategy - Vancouver · d-use office and retail project with around 366,145 sq ft of GFA by Westbank Projects Corp in Downtown Vancouver. This unique project will

45

N

asso

ciates

&unt

b

[Issu

ed fo

r Disc

ussio

n; no

t for C

onstr

uctio

n]

40

0 W

est

Geo

rgia

42

41

.56

A

pri

l 2

01

7

S

cale

1:2

50

on L

ette

r

P

repar

ed b

y A

D

Exh

ibit

4

.6P6

Turn

ing A

nal

ysis

- C

ircu

lati

on

S:\PROJECTS\TT\4241-56 400 W. Georgia\4.0 Analysis & Design\AutoTURN\04242017\04242017_4241-56_P6_TA.dwg2017/04/24 11:53, Plotted by Amy Do

[Bas

ed on

Dra

wing

1701

-A2.0

0 Par

king L

evel

P6 fr

om M

erric

k Arch

itectu

re da

ted 20

1704

24]

N

asso

ciates

&unt

b

[Issu

ed fo

r Disc

ussio

n; no

t for C

onstr

uctio

n]

40

0 W

est

Geo

rgia

42

41

.56

A

pri

l 2

01

7

S

cale

Cust

om

on L

ette

r

P

repar

ed b

y A

D

Exh

ibit

4

.5P5

Turn

ing A

nal

ysis

- C

ircu

lati

on

S:\PROJECTS\TT\4241-56 400 W. Georgia\4.0 Analysis & Design\AutoTURN\04242017\04242017_4241-56_P5_TA.dwg2017/04/24 11:31, Plotted by Amy Do

[Bas

ed on

Dra

wing

1701

-A2.0

1 Par

king L

evel

P5 fr

om M

erric

k Arch

itectu

re da

ted 20

1704

24]

Page 9: Parking and Loading Strategy - Vancouver · d-use office and retail project with around 366,145 sq ft of GFA by Westbank Projects Corp in Downtown Vancouver. This unique project will

46

40

0 W

Geo

rgia

Rezo

nin

g –

Tra

nsp

ort

atio

n R

evie

w |

Dra

ft L

ette

r | A

pri

l 2

6th, 2017

13

S:\P

RO

JEC

TS\

TT

\42

41

-56 4

00 W

. G

eorg

ia\5

.0

Del

iver

able

s

5.

EXIS

TIN

G T

RA

FFIC

& F

UTU

RE

TR

IP G

ENER

ATIO

N R

EVIE

W

5.1

Exis

ting T

raff

ic

Exis

ting v

ehic

le m

ove

men

ts a

t th

e fo

llow

ing n

earb

y in

ters

ecti

ons

are

sum

mar

ized

in E

xh

ibit

5.1

.

W

est

Geo

rgia

Str

eet

/ H

om

er S

tree

t

W

est

Geo

rgia

Str

eet

/ N

ort

h-S

outh

Lan

e

W

est

Geo

rgia

Str

eet

/ Ric

har

ds

Stre

et

Rob

son S

tree

t /

Ric

har

ds

Stre

et

Robso

n S

tree

t /

Hom

er S

tree

t

Note

thes

e vo

lum

es a

re p

rovi

ded

for

conte

xt

and w

ill not

be

anal

yzed

wit

h t

his

stu

dy

giv

en t

he

Cit

y’s

under

stan

din

g o

f ex

isti

ng c

ondit

ions

in t

he

area

. T

he

pro

ject

ed s

ite

vehic

le m

ove

men

ts f

rom

the

nex

t se

ctio

n w

ould

be

added

onto

this

net

work

rel

ativ

ely

equal

ly (i.e.

aro

und 2

0-2

5%

eac

h).

5.2

Site

Tri

p G

ener

atio

n

To u

nder

stan

d t

he

num

ber

of

new

veh

icle

s tr

ips

that

will be

gen

erat

ed b

y th

e pro

pose

d

redev

elopm

ent,

Bunt

applied

tri

p g

ener

atio

n r

ates

obta

ined

in 2

016

fro

m a

nea

rby

off

ice

tow

er a

t

401 W

est

Geo

rgia

. Tri

p g

ener

atio

n r

ates

for

this

sit

e w

ere

found b

y su

rvey

ing t

he

amount

of

vehic

les

ente

ring a

nd e

xit

ing t

he

par

kad

e duri

ng p

eak h

ours

, an

d t

hes

e w

ere

revi

ewed

com

par

ativ

e

to t

he

buildin

gs

GFA

, an

d e

xis

ting p

arkin

g s

upply

. A

s th

e new

400 W

est

Geo

rgia

off

ice

tow

er is

in

very

clo

se p

roxim

ity

and h

as s

imilar

lan

d u

ses

to t

his

tow

er (gro

und f

loor

reta

il w

ith o

ffic

e sp

ace

above

), t

he

trip

rat

e fo

r th

e ex

isti

ng b

uildin

g w

ould

be

repre

senta

tive

for

pro

ject

ing e

xpec

ted t

raff

ic

for

400 W

Geo

rgia

.

Tw

o d

iffe

rent

trip

rat

es a

re a

pp

lied

: tr

ips

per

par

kin

g s

tall a

nd t

rips

per

10

0 s

quar

e fe

et. T

his

pro

vides

a r

ange

of

expec

ted t

rips

for

the

pro

pose

d d

evel

opm

ent

at 4

00 W

est

Geo

rgia

. T

ab

le 5

.1

sum

mar

izes

the

two t

rip r

ates

for

the

pro

pose

d r

edev

elopm

ent

and t

he

resu

ltin

g n

um

ber

of

vehic

le

trip

s ex

pec

ted.

Tab

le 5

.1: Fu

ture

Veh

icle

Tri

p G

en

era

tio

n

TR

IP R

AT

E T

YPE

LA

ND

U

SE

UN

ITS

RA

TE

(VPH

1/U

NIT

) PM

VEH

ICLE T

RIP

S (

VPH

1)

Tri

p r

ate

bas

ed o

n

occ

upie

d p

arkin

g

stal

ls

Off

ice

+

Ret

ail

174

par

kin

g

spac

es

0.2

5 (0.0

2 in,

0.2

3 o

ut)

44 (3 in,

41 o

ut)

Tri

p r

ate

bas

ed o

n

per

1,0

00 s

quar

e fe

et

Off

ice

+

Ret

ail

366,0

00

sq f

t 92 (8 in,

84 o

ut)

1 - V

PH –

Veh

icle

Tri

ps

Per

Hour

As

the

table

show

s, t

he

redev

elopm

ent

is e

xpec

ted t

o g

ener

ate

in t

he

range

of

44

and 9

2 n

ew

vehic

le t

rips

duri

ng t

he

wee

kday

PM

pea

k h

our

dep

endin

g o

n t

he.

N

asso

ciates

&unt

b

[Issu

ed fo

r Disc

ussio

n; no

t for C

onstr

uctio

n]

40

0 W

est

Geo

rgia

42

41

.56

A

pri

l 2

01

7

S

cale

1:2

50

on L

ette

r

P

repar

ed b

y A

D

Exh

ibit

4

.7Lo

adin

g S

U 9

Turn

ing A

nal

ysis

S:\PROJECTS\TT\4241-56 400 W. Georgia\4.0 Analysis & Design\AutoTURN\04242017\04242017_4241-56_GF_TA.dwg2017/04/25 11:16, Plotted by Amy Do

[Bas

ed on

Dra

wing

1701

-A2.0

6 Gro

und F

loor f

rom

Merri

ck A

rchite

cture

dated

2017

0424

]

Page 10: Parking and Loading Strategy - Vancouver · d-use office and retail project with around 366,145 sq ft of GFA by Westbank Projects Corp in Downtown Vancouver. This unique project will

47

40

0 W

Geo

rgia

Rezo

nin

g –

Tra

nsp

ort

atio

n R

evie

w |

Dra

ft L

ette

r | A

pri

l 2

6th, 2017

14

S:\P

RO

JEC

TS\

TT

\42

41

-56 4

00 W

. G

eorg

ia\5

.0

Del

iver

able

s

In a

ddit

ion, a

spot

count

was

conduct

ed o

n A

pri

l 12

th, 2

01

7 f

rom

3:0

0 –

3:3

0 p

m a

t th

e ex

isti

ng 4

00

Wes

t G

eorg

ia s

ite

(Budget

Car

Ren

tal) t

o d

eter

min

e th

e ex

isti

ng s

ite

vehic

le t

rips

in o

rder

to w

ork

out

the

net

new

veh

icle

tri

ps

on t

he

net

work

. T

hes

e num

ber

s w

ere

subtr

acte

d f

rom

the

trip

gen

erat

ion r

esult

s to

det

erm

ine

the

net

new

tri

ps

gen

erat

ed. T

ab

le 5

.2 s

um

mar

izes

the

net

new

trip

s in

the

PM P

eak h

our.

TR

IP R

AT

E

TY

PE

SO

UR

CE

TR

IP R

AT

E B

ASED

ON

PA

RK

ING

ST

ALLS

TR

IP R

AT

E B

ASED

ON

10

0

SQ

UA

RE F

EET

GFA

In

O

ut

Tota

l In

O

ut

Tota

l Ex

isti

ng s

ite

Spot

count

6

10

16

6

10

16

New

gen

erat

ed

trip

s

Tri

p g

ener

atio

n (

Tab

le

5.1

) 3

41

44

8

84

92

Net

new

tr

ips

1

* 3

1

32

2

7

4

76

* ad

just

ed t

o t

he

nea

rest

posi

tive

num

ber

.

As

the

table

show

s, a

round 3

2-7

6 n

et n

ew v

ehic

le t

rips

(tw

o-w

ay) ar

e ex

pec

ted d

ue

to t

he

redev

elopm

ent

when

consi

der

ing t

he

rem

ova

l of

the

exis

ting s

ite

use

s.

If t

he

conse

rvat

ive

esti

mat

e of

76

veh

icle

s w

ere

dis

trib

ute

d a

mongst

the

4 a

dja

cent

inte

rsec

tions

note

d in S

ecti

on 5

.1, th

is w

ould

rep

rese

nt

around

19

veh

icle

tri

ps

(tw

o-w

ay) th

rough e

ach o

f th

ese

inte

rsec

tions.

T

o p

ut

this

into

conte

xt,

if

19

new

veh

icle

tri

ps

wer

e ad

ded

to t

he

inte

rsec

tion o

f W

Geo

rgia

Str

eet

and H

om

er

Stre

et (ar

ound 2

,350 v

ehic

les)

this

would

rep

rese

nt

less

than

a 1

%

incr

ease

in t

raff

ic a

t th

e in

ters

ecti

on a

nd w

ould

not

be

noti

ceab

le o

n t

he

inte

rsec

tion’s

oper

atio

ns.

In s

um

mar

y, t

he

dev

elopm

ent

is e

xpec

ted t

o h

ave

a nom

inal

im

pac

t on t

he

adja

cent

stre

et n

etw

ork

.

Once

the

Cit

y has

rel

ease

d its

futu

re p

lans

for

Geo

rgia

Str

eet

in t

his

are

a w

ith t

he

rem

ova

l of

the

Geo

rgia

and D

unsm

uir

Via

duct

s th

en t

he

oper

atio

nal

ass

um

pti

ons

for

Geo

rgia

Str

eet

should

be

revi

ewed

agai

n.

&

use t

his

to o

utl

ine s

ite e

tc

4241.5

6

401 W

Georg

ia T

ransport

ati

on R

evie

w

N

Scale

: N

TS

S:\PROJECTS\TT\4241-56 400 W. Georgia\5.0 Deliverables\Graphics

Exh

ibit

5.1

Exis

ting P

M P

eak H

our

Tra

ffic

Volu

mes

Apri

l 2017

Sit

e

Use t

his

font

and s

ize f

or

road n

am

es

Fre

ew

ay

Hig

hw

ay

Art

eri

al

Collecto

r

Local

Railw

ay

Pro

pose

dExis

ting

Use t

his

font

and s

ize f

or

road n

am

es

Wes

t Geo

rgia Stree

t

Robs

on Stree

t

Fre

ew

ay

Hig

hw

ay

Art

eri

al

Collecto

r

Local

Railw

ay

Tw

o W

ay S

top

All W

ay S

top

Roundabout

Pedestr

ian S

ignal

Tra

ffic

Sig

nal

Pro

pose

d

Hom

er Stree

t

Rich

ards

Stree

t

00

0 (

00

0)

(00

0)

00

0

0,0

00

(0,0

00

)

0,0

00

(0,0

00

)

(00

0)

00

0(0

00

)0

00

00

00

0

00

0

00

0

00

0 00

0

00

0

00

00

00

00

0

00

00

00

00

0

00

00

0

00

0

00

00

00

00

00

00

00

30

15

45

6013

5

140

40

35

355

5

540

(00

0)

00

0(0

00

)0

00(0

00

)0

00

00

0 (

00

0)

00

0 (

00

0)

(00

0)

00

0

(00

0)

00

0

(00

0)

00

0

00

0 (

00

0)

00

0(0

00

)0

00

(00

0)

00

0(0

00

)

00

90

501,50

5

150

155

1255

5

260

100

151,

430

285

395

1561

5

40

2522

0

125

45

120

950

00

0

00

00

,00

0

0,0

00

AA

0.31 A()0.31 A()

0.31 A()0.31 A()

0.3

1

A()

0.3

1

A()

0.3

1

A()

0.3

1

A()

0.31 A()0.31 A()

0.31 A()0.31 A()

0.3

1

A()

0.3

1

A()

0.3

1

A()

0.3

1

A()

0.31 A()0.31 A()

0.31 A()0.31 A()

0.3

1

A()

0.3

1

A()

0.3

1

A()

0.3

1

A() 1

4

0.7

9A0

.79

A

0.31 A()

0.31 A()

0.31 A()

0.31 A()

0.3

1 A(

)

0.3

1 A()

0.3

1 A(

)

0.3

1 A(

)

0.31 A()

0.31 A()

0.31 A()

0.31 A()

0.3

1 A(

)

0.3

1 A(

)

0.3

1 A()

0.3

1 A(

)

0.31 A()

0.31 A()

0.31 A()

0.31 A()

0.3

1 A(

)

0.3

1 A(

)

0.3

1 A(

)

0.3

1 A(

)

16

0.7

9 A

0.7

9 A

0.31 A()

0.31 A()

0.3

1 A()

0.3

1 A(

)

0.3

1 A(

)

0.3

1 A(

)

0.3

1 A(

)

0.3

1 A(

)

0.31 A()

0.31 A()

0.3

1 A(

)

0.3

1 A()

12

Pedestr

ian S

ignal

Tra

ffic

Sig

nal

Inte

rsecti

on #

L

ink V

olu

mes

Unsig

nalized

00

0(0

00)

00

00

00

00

00

AM

PM

AM

PM Inte

rsecti

on

V

olu

mes

2 W

ay S

top

All W

ay S

top

Roundabout

Pedestr

ian S

ignal

Tra

ffic

Sig

nal

Inte

rsecti

on #

L

ink V

olu

mes

00

00

0(0

00)

00

00

00

00

AM

PM

AM

PM Inte

rsecti

on

V

olu

mes

Pedestr

ian S

ignal

Tra

ffic

Sig

nal

Unsig

nalized

Tw

o W

ay S

top

All W

ay S

top

Roundabout

Pedestr

ian S

ignal

Tra

ffic

Sig

nal

Sto

rage L

ength

(m

)

00

00

00

(#)

(#)

Fre

ew

ay

Hig

hw

ay

Art

eri

al Road

Collecto

r Road

Local Road

Road s

tyle

1

Road s

tyle

2

Road s

tyle

3

Unsig

nalized

Pedestr

ian S

ignal

Tra

ffic

Sig

nal

Exis

ting

Exis

ting

Pro

pose

dPro

pose

d

Use t

his

font

and s

ize f

or

road n

am

es

LO

S A

to D

V/C

<0

.85

LO

S E

V/C

>0

.85

<0

.90

LO

S F

V/C

>0

.90

0.8

9

C

0.91 F()

0.5

4

B()

0.70() D*

Lane G

roup L

OS

Lane G

roup V

/C

Lane G

roup

Overa

ll V

/C

Overa

ll L

OS

th9

5 %

Queue

exceeds a

vailable

sto

rage

No

tes:

PM

Peak H

our:

4:3

0-5

:30

pm

Tra

ffic

data

fro

m V

anM

aps

(20

07

or

20

11

)

Tra

ffic

Sig

nal

000

PM

Inte

rsecti

on

V

olu

mes

in: 20 o

ut:

26

Page 11: Parking and Loading Strategy - Vancouver · d-use office and retail project with around 366,145 sq ft of GFA by Westbank Projects Corp in Downtown Vancouver. This unique project will

48

N

asso

ciates

&unt

b

[Issu

ed fo

r Disc

ussio

n; no

t for C

onstr

uctio

n]

40

0 W

est

Geo

rgia

42

41

.56

A

pri

l 2

01

7

S

cale

1:2

50

on L

ette

r

P

repar

ed b

y A

D

Exh

ibit

A

.2P2

Turn

ing A

nal

ysis

- O

ut

S:\PROJECTS\TT\4241-56 400 W. Georgia\4.0 Analysis & Design\AutoTURN\04242017\04242017_4241-56_P2_TA.dwg2017/04/25 14:30, Plotted by Amy Do

[Bas

ed on

Dra

wing

1701

-A2.0

4 Par

king L

evel

P2 fr

om M

erric

k Arch

itectu

re da

ted 20

1704

24]

N

asso

ciates

&unt

b

[Issu

ed fo

r Disc

ussio

n; no

t for C

onstr

uctio

n]

40

0 W

est

Geo

rgia

42

41

.56

A

pri

l 2

01

7

S

cale

1:2

50

on L

ette

r

P

repar

ed b

y A

D

Exh

ibit

A

.1P2

Turn

ing A

nal

ysis

- In

S:\PROJECTS\TT\4241-56 400 W. Georgia\4.0 Analysis & Design\AutoTURN\04242017\04242017_4241-56_P2_TA.dwg2017/04/25 14:29, Plotted by Amy Do

[Bas

ed on

Dra

wing

1701

-A2.0

4 Par

king L

evel

P2 fr

om M

erric

k Arch

itectu

re da

ted 20

1704

24]

Page 12: Parking and Loading Strategy - Vancouver · d-use office and retail project with around 366,145 sq ft of GFA by Westbank Projects Corp in Downtown Vancouver. This unique project will

49

N

asso

ciates

&unt

b

[Issu

ed fo

r Disc

ussio

n; no

t for C

onstr

uctio

n]

40

0 W

est

Geo

rgia

42

41

.56

A

pri

l 2

01

7

S

cale

1:2

50

on L

ette

r

P

repar

ed b

y A

D

Exh

ibit

A

.3P3

Turn

ing A

nal

ysis

- In

S:\PROJECTS\TT\4241-56 400 W. Georgia\4.0 Analysis & Design\AutoTURN\04242017\04242017_4241-56_P3_TA.dwg2017/04/25 14:37, Plotted by Amy Do

[Bas

ed on

Dra

wing

1701

-A2.0

3 Par

king L

evel

P3 fr

om M

erric

k Arch

itectu

re da

ted 20

1704

24]

N

asso

ciates

&unt

b

[Issu

ed fo

r Disc

ussio

n; no

t for C

onstr

uctio

n]

40

0 W

est

Geo

rgia

42

41

.56

A

pri

l 2

01

7

S

cale

1:2

50

on L

ette

r

P

repar

ed b

y A

D

Exh

ibit

A

.4P3

Turn

ing A

nal

ysis

- O

ut

S:\PROJECTS\TT\4241-56 400 W. Georgia\4.0 Analysis & Design\AutoTURN\04242017\04242017_4241-56_P3_TA.dwg2017/04/25 14:46, Plotted by Amy Do

[Bas

ed on

Dra

wing

1701

-A2.0

3 Par

king L

evel

P3 fr

om M

erric

k Arch

itectu

re da

ted 20

1704

24]

Page 13: Parking and Loading Strategy - Vancouver · d-use office and retail project with around 366,145 sq ft of GFA by Westbank Projects Corp in Downtown Vancouver. This unique project will

50

N

asso

ciates

&unt

b

[Issu

ed fo

r Disc

ussio

n; no

t for C

onstr

uctio

n]

40

0 W

est

Geo

rgia

42

41

.56

A

pri

l 2

01

7

S

cale

1:2

50

on L

ette

r

P

repar

ed b

y A

D

Exh

ibit

A

.5P4

Turn

ing A

nal

ysis

- In

S:\PROJECTS\TT\4241-56 400 W. Georgia\4.0 Analysis & Design\AutoTURN\04242017\04242017_4241-56_P4_TA.dwg2017/04/24 10:54, Plotted by Amy Do

[Bas

ed on

Dra

wing

1701

-A2.0

2 Par

king L

evel

P4 fr

om M

erric

k Arch

itectu

re da

ted 20

1704

24]

N

asso

ciates

&unt

b

[Issu

ed fo

r Disc

ussio

n; no

t for C

onstr

uctio

n]

40

0 W

est

Geo

rgia

42

41

.56

A

pri

l 2

01

7

S

cale

1:2

50

on L

ette

r

P

repar

ed b

y A

D

Exh

ibit

A

.6P4

Turn

ing A

nal

ysis

- O

ut

S:\PROJECTS\TT\4241-56 400 W. Georgia\4.0 Analysis & Design\AutoTURN\04242017\04242017_4241-56_P4_TA.dwg2017/04/24 10:57, Plotted by Amy Do

[Bas

ed on

Dra

wing

1701

-A2.0

2 Par

king L

evel

P4 fr

om M

erric

k Arch

itectu

re da

ted 20

1704

24]

Page 14: Parking and Loading Strategy - Vancouver · d-use office and retail project with around 366,145 sq ft of GFA by Westbank Projects Corp in Downtown Vancouver. This unique project will

51

N

asso

ciates

&unt

b

[Issu

ed fo

r Disc

ussio

n; no

t for C

onstr

uctio

n]

40

0 W

est

Geo

rgia

42

41

.56

A

pri

l 2

01

7

S

cale

1:2

50

on L

ette

r

P

repar

ed b

y A

D

Exh

ibit

A

.7P5

Turn

ing A

nal

ysis

- In

S:\PROJECTS\TT\4241-56 400 W. Georgia\4.0 Analysis & Design\AutoTURN\04242017\04242017_4241-56_P5_TA.dwg2017/04/25 14:48, Plotted by Amy Do

[Bas

ed on

Dra

wing

1701

-A2.0

1 Par

king L

evel

P5 fr

om M

erric

k Arch

itectu

re da

ted 20

1704

24]

N

asso

ciates

&unt

b

[Issu

ed fo

r Disc

ussio

n; no

t for C

onstr

uctio

n]

40

0 W

est

Geo

rgia

42

41

.56

A

pri

l 2

01

7

S

cale

1:2

50

on L

ette

r

P

repar

ed b

y A

D

Exh

ibit

A

.8P5

Turn

ing A

nal

ysis

- O

ut

S:\PROJECTS\TT\4241-56 400 W. Georgia\4.0 Analysis & Design\AutoTURN\04242017\04242017_4241-56_P5_TA.dwg2017/04/24 11:32, Plotted by Amy Do

[Bas

ed on

Dra

wing

1701

-A2.0

1 Par

king L

evel

P5 fr

om M

erric

k Arch

itectu

re da

ted 20

1704

24]

Page 15: Parking and Loading Strategy - Vancouver · d-use office and retail project with around 366,145 sq ft of GFA by Westbank Projects Corp in Downtown Vancouver. This unique project will

52

N

asso

ciates

&unt

b

[Issu

ed fo

r Disc

ussio

n; no

t for C

onstr

uctio

n]

40

0 W

est

Geo

rgia

42

41

.56

A

pri

l 2

01

7

S

cale

Cust

om

on L

ette

r

P

repar

ed b

y A

D

Exh

ibit

A

.9P6

Turn

ing A

nal

ysis

- In

S:\PROJECTS\TT\4241-56 400 W. Georgia\4.0 Analysis & Design\AutoTURN\04242017\04242017_4241-56_P6_TA.dwg2017/04/24 14:17, Plotted by Amy Do

[Bas

ed on

Dra

wing

1701

-A2.0

0 Par

king L

evel

P6 fr

om M

erric

k Arch

itectu

re da

ted 20

1704

24]

N

asso

ciates

&unt

b

[Issu

ed fo

r Disc

ussio

n; no

t for C

onstr

uctio

n]

40

0 W

est

Geo

rgia

42

41

.56

A

pri

l 2

01

7

S

cale

1:2

50

on L

ette

r

P

repar

ed b

y A

D

Exh

ibit

A

.10

P6 T

urn

ing A

nal

ysis

- O

ut

S:\PROJECTS\TT\4241-56 400 W. Georgia\4.0 Analysis & Design\AutoTURN\04242017\04242017_4241-56_P6_TA.dwg2017/04/24 14:17, Plotted by Amy Do

[Bas

ed on

Dra

wing

1701

-A2.0

0 Par

king L

evel

P6 fr

om M

erric

k Arch

itectu

re da

ted 20

1704

24]