Park School ModernizationSummer 2012
New paint, new glass, new landscape, new flagpole, and new paving
Before AfterEntry
New retaining wall, fence, and walkway around tree made of pavers
Before AfterSidewalk dead ends into tree
New paint, new asphalt, new lights, new railings, stairs, ramps, seat walls, planters, and planting
Before AfterSouthern entrance into school
New window glazing, water fountain, paint, asphalt, lighting and playground striping
Before AfterBack of school
New addition to building adding 3 restrooms, covert old restroom to storage room, new planter with seat walls, plants, and new concrete walkways
Before AfterOld boys restroom
New seat walls, planters, planting, walkways, asphalt, paint, new glazing, and covered walkway
Before AfterPlanter
New ball walls, seat walls, planters, planting, walkways, asphalt, paint, new window glazing, and covered walkway
Before AfterCampus
New seat walls, planters, planting, asphalt, concrete walkways, paint, new window glazing, and covered walkway
Before AfterCampus
New ball walls, seat walls, planters, planting, asphalt, concrete walkways, paint, new window glazing, and covered walkway
Before AfterCampus
New Exit stairs, paint, and playground striping
Before AfterExit stairs
New exit stairs and playground striping
Before AfterExit stairs
New siding on Annex Building
Before AfterOld siding on Annex Building
New ADA compliant ramp and retaining wall
Before AfterRamp
New entry store front, paint and railing
Before AfterEntry
New Paint
Before AfterCeiling at front entry
New casework and paint
Before AfterResource room
New white boards, pin up boards, column cover, carpet, storage closet, ceiling lighting, and heater
Before AfterLower level classroom
New casework, flooring, in-fill walls, sink, lighting, paint and pin-up boards
Before AfterLower level classroom
Flooring, paint, pin-up panels, restroom addition, convert old restroom to storage room, and new fire alarm with sprinkler
Before AfterHallway
Building addition for three restrooms, new water fountain, fire alarm with sprinkler, flooring and paint
Before AfterHallway
New carpet, paint, door, counter, pin-up panels
Before AfterAdministrative offices
New wall creating nurse station, new paint, flooring, doors
Before AfterAdministrative Office
Remove wall, new casework, new sink
Before AfterStaff work room
New window glazing where windows failed
Before AfterTypical Classroom
New projector, screen, speakers, clock, paint, carpet, fire alarm with sprinkler, ceiling fans, and thermostat controls for radiator
Before AfterTypical classroom
New storefront exit system, larger landing with abrasive action carpet new railing
Before AfterExit stairs
All new fixtures and finishes
Before AfterTypical upper restroom