PARK LANE SOUTH

Presentation to Kew Gardens Civic Association

February 15, 2017

1

Page 2: PARK LANE SOUTH - Welcome to NYC.gov | City of New York€¦ · nyc.gov/dot 3 PROJECT AREA • 68 total injuries (2011-2015) • 14 pedestrians (1 severe) • 1 Motorcycle fatality

nyc.gov/dot 2

1 Project Background

Page 3: PARK LANE SOUTH - Welcome to NYC.gov | City of New York€¦ · nyc.gov/dot 3 PROJECT AREA • 68 total injuries (2011-2015) • 14 pedestrians (1 severe) • 1 Motorcycle fatality

nyc.gov/dot 3

PROJECT AREA

• 68 total injuries

(2011-2015)

• 14 pedestrians (1

severe)

• 1 Motorcycle

fatality (July

2015)

• Myrtle Ave and

Metropolitan Av are

Vision Zero priority

corridors

Page 4: PARK LANE SOUTH - Welcome to NYC.gov | City of New York€¦ · nyc.gov/dot 3 PROJECT AREA • 68 total injuries (2011-2015) • 14 pedestrians (1 severe) • 1 Motorcycle fatality

nyc.gov/dot 4

COMMUNITY CONCERNS

• Community Board 9 requested Park Lane S traffic safety study in July 2014

• Numerous citizen requests to improve safety at Park Lane S / Beverly Rd

• Elected official requests to improve pedestrian safety at Lefferts Blvd / Grenfell St

• Council Member Karen Koslowitz requested in May 2015

• State Senator Joseph Addabo, Jr. requested in June 2015

• Elected official request to improve pedestrian safety at Park Lane S / Myrtle Ave

• Assembly Member Michael Miller requested in June 2016

• Online petition to improve safety at Metropolitan Av / Park Lane S

Page 5: PARK LANE SOUTH - Welcome to NYC.gov | City of New York€¦ · nyc.gov/dot 3 PROJECT AREA • 68 total injuries (2011-2015) • 14 pedestrians (1 severe) • 1 Motorcycle fatality

nyc.gov/dot 5

2016 RESURFACING AND MARKINGS

Before – Beverly Rd to Metropolitan Av

After – Beverly Rd to Metropolitan Av

Wide parking lanes installed on Park Lane S

between Beverly Rd and Metropolitan Av after

resurfacing to calm traffic

Treatment will be continued between Metropolitan

Av and Myrtle Av after repaving in 2017

January 2016 speed study

found significant speeding

between Metropolitan Av

and Myrtle Ave

Page 6: PARK LANE SOUTH - Welcome to NYC.gov | City of New York€¦ · nyc.gov/dot 3 PROJECT AREA • 68 total injuries (2011-2015) • 14 pedestrians (1 severe) • 1 Motorcycle fatality

nyc.gov/dot 6

2 2017 Proposal – Park Lane S Corridor

Page 7: PARK LANE SOUTH - Welcome to NYC.gov | City of New York€¦ · nyc.gov/dot 3 PROJECT AREA • 68 total injuries (2011-2015) • 14 pedestrians (1 severe) • 1 Motorcycle fatality

nyc.gov/dot 7

1

2

3

N

Proposed Improvements: 1) Beverly Rd/Onslow Pl 2) Metropolitan Av 3) 115 St 4) Myrtle Av

2017 PROJECT AREA – PARK LANE S

4

Forest Park

Page 8: PARK LANE SOUTH - Welcome to NYC.gov | City of New York€¦ · nyc.gov/dot 3 PROJECT AREA • 68 total injuries (2011-2015) • 14 pedestrians (1 severe) • 1 Motorcycle fatality

nyc.gov/dot 8

EXISTING ISSUES – BEVERLY RD

Uncontrolled slip

lane in front of park

entrance stairs

Free flowing elbow

traffic movement

makes it difficult to

find gaps for

stopped vehicles

and crossing

pedestrians

Page 9: PARK LANE SOUTH - Welcome to NYC.gov | City of New York€¦ · nyc.gov/dot 3 PROJECT AREA • 68 total injuries (2011-2015) • 14 pedestrians (1 severe) • 1 Motorcycle fatality

nyc.gov/dot 9

EXISTING ISSUES – BEVERLY RD

No crosswalks for

pedestrian desire

paths to park

Long crossing

distance (42’)

Page 10: PARK LANE SOUTH - Welcome to NYC.gov | City of New York€¦ · nyc.gov/dot 3 PROJECT AREA • 68 total injuries (2011-2015) • 14 pedestrians (1 severe) • 1 Motorcycle fatality

nyc.gov/dot 10

EXISTING CONDITIONS – BEVERLY RD

Uncontrolled slip

lane in front of

park entrance

stairs

1

No crossings for

pedestrians across

Park Lane S

Vehicles stopped

at intersection

have difficulty

finding gaps

Page 11: PARK LANE SOUTH - Welcome to NYC.gov | City of New York€¦ · nyc.gov/dot 3 PROJECT AREA • 68 total injuries (2011-2015) • 14 pedestrians (1 severe) • 1 Motorcycle fatality

nyc.gov/dot 11

PROPOSAL – BEVERLY RD

1

Signalize intersection and

provide pedestrian crossings Remove 3 parking

spaces to install

right turn bay

Restrict

northbound

left turn (5 vehicles during

rush hours)

Expand concrete

triangle island

Page 12: PARK LANE SOUTH - Welcome to NYC.gov | City of New York€¦ · nyc.gov/dot 3 PROJECT AREA • 68 total injuries (2011-2015) • 14 pedestrians (1 severe) • 1 Motorcycle fatality

nyc.gov/dot 12

EXISTING ISSUES – METROPOLITAN AV

Aggressive left turning

vehicles do not yield to

pedestrians

Northbound Q37

bus blocks thru

traffic when

stopped

Page 13: PARK LANE SOUTH - Welcome to NYC.gov | City of New York€¦ · nyc.gov/dot 3 PROJECT AREA • 68 total injuries (2011-2015) • 14 pedestrians (1 severe) • 1 Motorcycle fatality

nyc.gov/dot 13

EXISTING CONDITIONS – METROPOLITAN AV

2

Aggressive left turning

vehicles do not yield to

pedestrians (430 vehicles in AM rush hour)

Northbound Q37

bus blocks thru

traffic when

stopped

Page 14: PARK LANE SOUTH - Welcome to NYC.gov | City of New York€¦ · nyc.gov/dot 3 PROJECT AREA • 68 total injuries (2011-2015) • 14 pedestrians (1 severe) • 1 Motorcycle fatality

nyc.gov/dot 14

PROPOSAL – METROPOLITAN AV

2

Restrict southbound

left turn (25-30 vehicles during rush

hours)

Add Qwick Kurb to

calm left turns Relocate northbound

bus stop to ease

traffic congestion

Switch northbound

protected turn (left green

arrow phase) from

“leading” to “lagging”

Add leading

pedestrian interval

(LPI) to north-south

crossing

Page 15: PARK LANE SOUTH - Welcome to NYC.gov | City of New York€¦ · nyc.gov/dot 3 PROJECT AREA • 68 total injuries (2011-2015) • 14 pedestrians (1 severe) • 1 Motorcycle fatality

nyc.gov/dot 15

EXISTING ISSUES – 115 ST

Uncontrolled slip

lane in front of park

entrance stairs

No crosswalks at

intersection

Vehicles stopped at

intersection have

difficulty finding gaps

Free flowing elbow movement

encourages speeding

Existing Qwick Kurb

hit frequently by

vehicles

No pedestrian

crossing at Q37

bus stop locations

Page 16: PARK LANE SOUTH - Welcome to NYC.gov | City of New York€¦ · nyc.gov/dot 3 PROJECT AREA • 68 total injuries (2011-2015) • 14 pedestrians (1 severe) • 1 Motorcycle fatality

nyc.gov/dot 16

EXISTING CONDITIONS – 115 ST

3

Free flowing

elbow movement

encourages

speeding

No pedestrian

crossing at Q37

bus stop location Existing Qwick Kurb hit frequently by

vehicles

Page 17: PARK LANE SOUTH - Welcome to NYC.gov | City of New York€¦ · nyc.gov/dot 3 PROJECT AREA • 68 total injuries (2011-2015) • 14 pedestrians (1 severe) • 1 Motorcycle fatality

nyc.gov/dot 17

PROPOSAL – 115 ST

3

Traffic signal

under

investigation

Maintain

existing turn

restriction

Add southbound

thru movement

Add pedestrian

crossings

Add concrete

triangle island

Loss of 3

parking spaces

Page 18: PARK LANE SOUTH - Welcome to NYC.gov | City of New York€¦ · nyc.gov/dot 3 PROJECT AREA • 68 total injuries (2011-2015) • 14 pedestrians (1 severe) • 1 Motorcycle fatality

nyc.gov/dot 18

EXISTING ISSUES – MYRTLE AV

Underutilized space Long crossing distances

Page 19: PARK LANE SOUTH - Welcome to NYC.gov | City of New York€¦ · nyc.gov/dot 3 PROJECT AREA • 68 total injuries (2011-2015) • 14 pedestrians (1 severe) • 1 Motorcycle fatality

nyc.gov/dot 19

EXISTING CONDITIONS – MYRTLE AV

4

Large

underutilized

space

Wide entrance

only used by

Parks vehicles

Long crossing

distances

Visibility issues between

crossing pedestrians and

turning vehicles

Page 20: PARK LANE SOUTH - Welcome to NYC.gov | City of New York€¦ · nyc.gov/dot 3 PROJECT AREA • 68 total injuries (2011-2015) • 14 pedestrians (1 severe) • 1 Motorcycle fatality

nyc.gov/dot 20

PROPOSAL – MYRTLE AV

4

Relocate stop bar to

allow for easier bus

turns Build channelization

with pavers and narrow

entryway to park

Add crosswalk

Restrict eastbound

right turn (1-5 vehicles during rush

hours)

Widen crosswalk to

accommodate

pedestrian desire paths

to park

Page 21: PARK LANE SOUTH - Welcome to NYC.gov | City of New York€¦ · nyc.gov/dot 3 PROJECT AREA • 68 total injuries (2011-2015) • 14 pedestrians (1 severe) • 1 Motorcycle fatality

nyc.gov/dot

3 Proposal – Grenfell St Improvements

21

Page 22: PARK LANE SOUTH - Welcome to NYC.gov | City of New York€¦ · nyc.gov/dot 3 PROJECT AREA • 68 total injuries (2011-2015) • 14 pedestrians (1 severe) • 1 Motorcycle fatality

nyc.gov/dot 22

6

5

N

Proposed Improvements: 5) Lefferts Blvd /

Grenfell St 6) Onslow Pl /

Grenfell St / 82 Av

2017 PROJECT AREA – GRENFELL ST

Forest Park

Page 23: PARK LANE SOUTH - Welcome to NYC.gov | City of New York€¦ · nyc.gov/dot 3 PROJECT AREA • 68 total injuries (2011-2015) • 14 pedestrians (1 severe) • 1 Motorcycle fatality

nyc.gov/dot

Pedestrian desire

lines not

accommodated by

existing crossings

23

EXISTING ISSUES –

LEFFERTS BLVD / GRENFELL ST

Page 24: PARK LANE SOUTH - Welcome to NYC.gov | City of New York€¦ · nyc.gov/dot 3 PROJECT AREA • 68 total injuries (2011-2015) • 14 pedestrians (1 severe) • 1 Motorcycle fatality

nyc.gov/dot 24

EXISTING ISSUES –

LEFFERTS BLVD / GRENFELL ST

Southbound vehicles on

Grenfell St block those

attempting to head north

MTA cited this issue as a cause

of congestion for westbound

traffic, creating delays for Q10

Page 25: PARK LANE SOUTH - Welcome to NYC.gov | City of New York€¦ · nyc.gov/dot 3 PROJECT AREA • 68 total injuries (2011-2015) • 14 pedestrians (1 severe) • 1 Motorcycle fatality

nyc.gov/dot 25

EXISTING CONDITIONS –

LEFFERTS BLVD / GRENFELL ST

Grenfell St is narrow for

two-way traffic.

Southbound vehicles

block those attempting to

head north

Dani’s

C Town

Chase

Giorgio’s

Salon Pedestrian desire line

not accommodated by

existing crosswalks

5

Page 26: PARK LANE SOUTH - Welcome to NYC.gov | City of New York€¦ · nyc.gov/dot 3 PROJECT AREA • 68 total injuries (2011-2015) • 14 pedestrians (1 severe) • 1 Motorcycle fatality

nyc.gov/dot

Dani’s

C Town

Chase

Giorgio’s

Salon

26

PEDESTRIAN COUNTS –

LEFFERTS BLVD / GRENFELL ST

5

AM / PM / WKND

Page 27: PARK LANE SOUTH - Welcome to NYC.gov | City of New York€¦ · nyc.gov/dot 3 PROJECT AREA • 68 total injuries (2011-2015) • 14 pedestrians (1 severe) • 1 Motorcycle fatality

nyc.gov/dot 27

PROPOSAL –

LEFFERTS BLVD / GRENFELL ST

Dani’s

C Town

Chase

Giorgio’s

Salon

5

Change Grenfell St

to one-way

northbound

Install new

crosswalk

Add speed bumps

to Grenfell St

Page 28: PARK LANE SOUTH - Welcome to NYC.gov | City of New York€¦ · nyc.gov/dot 3 PROJECT AREA • 68 total injuries (2011-2015) • 14 pedestrians (1 severe) • 1 Motorcycle fatality

nyc.gov/dot 28

EXISTING STREET NETWORK – GRENFELL ST

Page 29: PARK LANE SOUTH - Welcome to NYC.gov | City of New York€¦ · nyc.gov/dot 3 PROJECT AREA • 68 total injuries (2011-2015) • 14 pedestrians (1 severe) • 1 Motorcycle fatality

nyc.gov/dot 29

PROPOSED STREET NETWORK – GRENFELL ST

Add speed bumps

to Grenfell St

between Lefferts

Blvd and 82 Av

Diverted SB

Grenfell St Vehicles

AM Peak – 145

(20 from train station)

PM Peak – 115

(25 from train station)

Page 30: PARK LANE SOUTH - Welcome to NYC.gov | City of New York€¦ · nyc.gov/dot 3 PROJECT AREA • 68 total injuries (2011-2015) • 14 pedestrians (1 severe) • 1 Motorcycle fatality

nyc.gov/dot

Vehicles often do not comply with stop

signs and speed around corner from

Onslow Pl to 82 Av Bridge

30

EXISTING ISSUES – ONSLOW PL

No pedestrian

crossings

Page 31: PARK LANE SOUTH - Welcome to NYC.gov | City of New York€¦ · nyc.gov/dot 3 PROJECT AREA • 68 total injuries (2011-2015) • 14 pedestrians (1 severe) • 1 Motorcycle fatality

nyc.gov/dot 31

EXISTING CONDITIONS – ONSLOW PL

No pedestrian crossings

6

Vehicles often do not comply

with stop signs and speed

around corner from Onslow Pl

to 82 Av Bridge Narrow Grenfell St

blocks traffic flow

Page 32: PARK LANE SOUTH - Welcome to NYC.gov | City of New York€¦ · nyc.gov/dot 3 PROJECT AREA • 68 total injuries (2011-2015) • 14 pedestrians (1 severe) • 1 Motorcycle fatality

nyc.gov/dot 32

PROPOSAL – ONSLOW PL

6

Total parking loss

of 8 spaces

Change Grenfell

St to one-way

northbound

Add crosswalks

Install concrete traffic

circles to calm traffic

Page 33: PARK LANE SOUTH - Welcome to NYC.gov | City of New York€¦ · nyc.gov/dot 3 PROJECT AREA • 68 total injuries (2011-2015) • 14 pedestrians (1 severe) • 1 Motorcycle fatality

nyc.gov/dot 33

Project Benefits

• Improves safety for all roadway users

• Calms traffic

• Shortens crossing distances for pedestrians

• Provides direct pedestrian crossings

• Clarifies traffic movements

• Improves traffic flow

PROJECT BENEFITS

Page 34: PARK LANE SOUTH - Welcome to NYC.gov | City of New York€¦ · nyc.gov/dot 3 PROJECT AREA • 68 total injuries (2011-2015) • 14 pedestrians (1 severe) • 1 Motorcycle fatality

nyc.gov/dot 34

Project Benefits NEXT STEPS

Develop plan for

implementation in

2017 and 2018

Revise plan in

response to

comments

Revise plan based

on comments

Present to

Community Board 9

Kew Gardens Civic

Association

Page 35: PARK LANE SOUTH - Welcome to NYC.gov | City of New York€¦ · nyc.gov/dot 3 PROJECT AREA • 68 total injuries (2011-2015) • 14 pedestrians (1 severe) • 1 Motorcycle fatality

nyc.gov/dot 35

Questions?

Thank you

NYC DOT NYC DOT nyc_dot NYC DOT