Sugestões para o Jantar de Natal da sua empresa - Miguel Guedes de Sousa
Park Hyatt Presentation AM (1) - Miguel Guedes de Sousa
-
Upload
miguel-guedes-de-sousa -
Category
Business
-
view
223 -
download
0
description
Transcript of Park Hyatt Presentation AM (1) - Miguel Guedes de Sousa
hchit
XXXXXXXXXXXXXXXXXXXXXXXOption 1
ONE GROSVENOR CRESCENT
hamilogan international
O N E G R O S V E N O R P L A C E
tects
F E A S A B I L I T Y S T U D I E S
O N E G R O S V E N O R P L A C E
logan international
One Grosvenor Place
FeasibilityOption 4
Park Hyatt
Summary
One Grosvenor Place
Summary
• Total summary
• Accomodation schedule
• Total project area schedule
Hotel
• Development cost
• Sales prognosis
• Construction cash flow
• Interior area program
• FF&E , OS&E & Equipment program
• Operational prognosis
• IRR analysis
Apartments
• Development cost
• Sales forecast
• Sales prognosis
• Construction cash flow
• Interior area program
• FF&E , OS&E & Equipment program
• Operational prognosis
2Logan International
ONE GROSVENOR PLACE - Option 4 30-06-2011
TOTAL SUMMARY Option 4 d
HOTEL APARTMENTS TOTAL
SpecificationsTotal Land Area m² - - 5 458Number of Rooms/Apartments # 94 57 151Total Area NIA m² 10 090 16 804 26 894% allocation % 38% 62% 100%Average NIA Area per Unit m² 107 295 178Total Area GIA m² 20 773 26 480 47 253
SALES REVENUE , VAT incl.Gross Sales Revenue , VAT incl. £ 235 000 000 636 272 000 871 272 000
Rooms / Apartments £ 235 000 000 614 522 000 849 522 000Parkings £ 21 750 000 21 750 000
Price per m² NIA £/m² 23 290 37 864 32 397Avg Price Per Unit £ 2 500 000 11 162 667 5 770 013Sales costs
Sales transaction fees £ 0 -19 088 160 -19 088 160Sales & Marketing costs £ 0 -9 544 080 -9 544 080Royalties £ 0 -18 435 660 -18 435 660Sales taxes £ 0 -31 813 600 -31 813 600Sales VAT £ 0 0 0Working Capital £ 0 0 0
Subtotal Sales Costs £ 0 -78 881 500 -78 881 5000% -12% -9%
NET SALES REVENUES , excl VAT £ 235 000 000 557 390 500 792 390 500
DEVELOPMENT COSTSLand acquisition £ -83 476 798 -139 023 202 -222 500 000Construction £ -76 341 590 -88 271 387 -164 612 977FF&E £ -10 857 000 -9 949 275 -20 806 275Soft costs £ -15 798 632 -16 903 285 -32 701 917Permits £ -500 000 -500 000 -1 000 000Financing (construction) £ -7 875 492 -3 527 323 -11 402 815Opening costs £ 0 0 0Development overhead £ -28 046 103 -25 464 715 -53 510 818
Total Costs £ -222 895 615 -283 639 187 -506 534 802GROSS PROFIT (before taxes) £ 12 104 385 273 751 313 285 855 698ROI without Operations 5% 43% 33%In the optimistic scenario of the apartment sales , the gross profit (before taxes) would increase to £ 400 391 653
Required FinancingSenior Debt £ 112 116 961 0 112 116 961Construction Loan £ 0 51 159 584 51 159 584Mezzanine VAT £ 0 0 0
Total Financing £ 112 116 961 51 159 584 163 276 545% 50% 22% 36%
Equity £ 70 000 000 130 000 000 200 000 000Mezzanine by shareholders £ 0 0 0Other Contribution £ 40 000 000 53 510 818 93 510 818Working Capital/Pre-opening £ 0 0 0
Provided Equity £ 110 000 000 183 510 818 293 510 818% 50% 78% 64%
Equity + Financing £ 222 116 961 234 670 402 456 787 363
ONE GROSVENOR PLACE - Option 4 30-06-2011ACCOMODATION SCHEDULE Option 4 d
Level Qty Type Type Range m²
Avg m²
Total m²
Qty Type Avg m²
Total m²
Total m²
Remarks
Level 10 Rooms Executive 40-45 0 1 206 2060 Suite Junior 46-55 0 1 263 2638 Suite Senior 56-80 61 484 1 296 2961 Suite Ambassador 81-145 144 144 1 303 303
Suite Presidential 200-315 1 317 3179 628 5 1 385 2 013
BOH 267 Offices 490 757895 1 875 2 770
Levels 2-5 4 Levels0 Rooms Executive 40-45 0 1 158 1586 Suite Junior 46-55 52 312 1 206 2068 Suite Senior 56-80 61 484 1 263 2631 Suite Ambassador 81-145 144 144 1 278 278
Suite Presidential 200-315 1 293 2931 298 2981 303 3031 317 3171 374 374
15 940 9 277 2 490 3 430Level 6
0 Rooms Executive 40-45 0 1 158 1586 Suite Junior 46-55 52 312 1 191 1918 Suite Senior 56-80 61 484 1 206 2061 Suite Ambassador 81-145 144 144 1 244 244
Suite Presidential 200-315 1 255 2551 278 2781 293 2931 296 2961 374 374
15 940 9 255 2 295 3 235Level 7 1 Level
0 Rooms Executive 40-45 0 0,5 1304 6520 Suite Junior 46-55 0 1 2790 Suite Senior 56-80 0 1 2580 Suite Ambassador 81-145 0 1 1882 Suite Presidential 200-315 313 6252 625 3,5 393 1 377 2 002
Level 8 1 Level0 Rooms Executive 40-45 0 0,5 1304 6523 Suite Junior 46-55 52 156 1 2794 Suite Senior 56-80 56 224 1 2581 Suite Ambassador 81-145 144 144 1 1880 Suite Presidential 200-315 08 524 3,5 393 1 377 1 901
Level 9Level 10
Total 94 69 6 477 57 288 16 394 22 871Qty Avg
m²Total m²
Qty Avg m²
Total m²
Total m²
Qty Type Type Range m²
Qty Type Avg m²
Type
0 Rooms Executive 40-45 5 Type A 125-160 1-bedroom33 Suite Junior 46-55 9 Type B 160-210 2-bedroom52 Suite Senior 56-80 16 Type C 220-270 3-bedroom7 Suite Ambassador 81-145 21 Type D 300-330 4-bedroom2 Suite Presidential 200-315 5 Type E 350-370 4-bedroom
94 0 Type F 390-440 5-bedroom1 Type G 1300 duplex
57
Hotel Apartment
Hotel Apartment
ONE GROSVENOR PLACE - Option 4PROPOSED AREA SCHEDULE
Level HOTEL RESID HOTEL RESID TOTAL H + R
MEP BOH HOTEL
BOH RESID
RETAIL HOTEL RESID TOTAL H + R
TOTAL SUM
KEYS APP NIA NIA NIA NIA NIA NIA NIA GIA GIA GIA GEA# # m² m² m² m² m² m² m² m² m² m² m²
Level -3/ car park 68 17 2 040 510 2 550 0 200 0 0 3 106 707 3 813 4 077Level -2 / car park 0 70 0 2 100 2 100 800 0 0 0 713 4 453 5 166 5 458Level -1 1 178 0 1 178 718 1 300 0 0 4 586 580 5 166 5 458Ground Floor 2 435 410 2 845 0 0 150 0 2 515 715 3 230 3 460First Floor 9 5 628 1 385 2 013 incl 757 0 1 796 1 796 3 591 3 776Second Floor 15 9 940 2 490 3 430 incl incl - 1 298 3 011 4 309 4 492Third Floor 15 9 940 2 490 3 430 incl incl - 1 298 3 011 4 309 4 492Fourth Floor 15 9 940 2 490 3 430 incl incl - 1 298 3 011 4 309 4 492Fifth Floor 15 9 940 2 490 3 430 incl incl - 1 298 3 011 4 309 4 492Sixth Floor 15 9 940 2 295 3 235 incl incl - 1 298 2 815 4 113 4 301Seventh Floor 2 3,5 625 1 377 2 002 incl incl - 784 1 685 2 469 2 598Eight Floor 8 3,5 524 1 377 1 901 incl incl - 784 1 685 2 469 2 598Ninth FloorTenth FloorTotal 94 57 10 090 16 804 26 894 1 518 2 257 150 0 20 773 26 480 47 253 49 694
Proportion of NIA 38% 62% Proportion of GIA 44% 56% 100%Coefficient GEA / GIA 1,05Coefficient GIA / NIA 1,33
Parking levels 3 818 5 161 8 979Other levels 16 954 21 320 38 274
TerracesGround floor Inner patio ; 50/50 divided 999 999 1 998Sixth floor 3 196 196Seventh floor 2 3 100 550 650Total 2 6 1 099 1 745 2 844
39% 61% 100%
Notes :
All NIA figures include all internal walls , but exclude the corridors and the shared areas
30-06-2011Option 4 d
The areas above are indicative at the schematic stage , and are subject by verification by the architects , and subject to change and final
One Grosvenor Place
FeasibilityOption 4
Park Hyatt
Hotel
ONE GROSVENOR PLACE - ***** HOTEL PROFORMA 2011-06-30Option 4 d
Summary of Development Cost £
Land acquisitionLand 78 787 090Acquisition costs 3 939 355Predevelopment 750 353
Subtotal 83 476 798Construction costs Building surface GIA
Demolition works 2 000 000Siteworks , Infrastructure & excavation 3 000 000Building Structure , M&E & Finishings 16 954 m² @ 3 200 £/m² 54 253 485Fixed Furniture & Decorative elements 16 954 m² @ 300 £/m² 5 086 264Parking Structure & M&E 3 818 m² @ 2 000 £/m² 7 636 827Terraced buildings 1 099 m² @ 300 £/m² 329 700Pool 400 000Contingency 72 706 276 @ 5,00% 3 635 314
Subtotal 76 341 590FF&E , OS&E and Special Equipments
Rooms & Public spaces 94 @ per unit 81 064 7 620 000OS&E 94 @ per unit 11 277 1 060 000Low voltage systems 210 000IT systems & equipment 200 000Signage 50 000Kitchens, bars & laundry 1 200 000Contingency 10 340 000 @ 5,00% 517 000
Subtotal 10 857 000Professional Soft Costs / Consultants
Legal 185 914 775 0,30% of all 559 244Project management 87 198 590 5,00% of CC,FF&E 4 359 929Architects & Engineers 87 198 590 9,00% of CC,FF&E 7 847 873Interior Decorator 10 857 000 12,00% of FF&E 1 302 840Interior Decorators Spa & other specials 87 198 590 0,40% of CC,FF&E 348 794Bookkeeping & audit 185 730 241 0,1% of all 184 535Technical Services Hotel Operator 94 rooms @ 3 000 282 000Builders Risk insurance 76 341 590 @ 1,00% of CC 763 416Taxes during Construction 150 000Owners representative 0% of all 0Contingency 15 798 632 @ 5,00% inclusive
Subtotal 15 798 632Permits
Building Permits & Municipal Taxes 500 000Subtotal 500 000
Financing Finance & Inspection Fees 113 000 000 @ 0,25% 282 500 Interest during Construction 7 592 992
Subtotal 7 875 492Opening Costs
Working Capital by Operator 0Pre-opening costs by Operator 0
Subtotal 0Development Overhead
Overhead costs (excl on financing) 186 974 020 @ 15,00% 28 046 103Subtotal 28 046 103
TOTAL DEVELOPPEMENT COST 94 @ 2 287 448 215 020 123 £excl opening & financing
TOTAL DEVELOPPEMENT COST 94 @ 2 371 230 222 895 615 £
ONE GROSVENOR PLACE - ***** HOTEL PROFORMAOption 4 d
Hotel Sales
Total Constructed Covered Surface ('GIA') 20 773 m²Total Constructed Covered Surface (incl terraces) 21 872 m²Average Gross Surface GIA per Room 221 m²Number of Rooms & Suites 94
Total Gross Sales Price 235 000 000 £Gross Sales Price per Room 2 500 000 £Gross Sales Price per Gross Surface ('GIA') 11 313 £/m²
Sales Fees (incl. commission, transaction, etc.) 0,0% - £Management break up fee 0,0% - £
Total Net Sales Revenue of the Hotel 235 000 000 £
Working capital - £
Development Cost (exclusive financial cost, pre-opening, working capital) (215 020 123) £
Gross Profit 19 979 877 £
Intermediate financial cost , pre-opening + working capital (7 875 492) £
Net Profit , Land & predevelopment Inclusive 5,2% 12 104 385 £
Notes :Sales price is taken at cost price of the development
2011-06-30
ONE
GROS
VENO
R PL
ACE
- ****
* HOT
EL P
ROFO
RMA
Prov
ision
al Ca
shflo
w du
ring C
onstr
uctio
n
Cons
tructi
on Pl
anni
ngSt
udies
Cons
tructi
onSa
les Pr
ogno
sis A
partm
ents
573
49
910
88
6
Uses
Total GB
P (£)
Q3Q4
Q1Q2
Q3Q4
Q1Q2
Q3Q4
Q1Q2
Q3Q4
Cash
Land
Purc
hase
(82 72
6 445
)
(82 72
6 445
)
-
-
-
-
-
-
-
-
-
-
-
-
-
Pr
edev
elopm
ent
(750 3
53)
(75
0 353
)
-
-
-
-
-
-
-
-
-
-
-
-
-
Cons
tructi
on10
0%(70
671 5
90)
-
-
-
-
-
(10
600 7
38)
(10
600 7
38)
(10
600 7
38)
(10
600 7
38)
(7
067 1
59)
(7 06
7 159
)
(7
067 1
59)
(3 53
3 579
)
(3
533 5
79)
Sitew
orks &
infra
struc
ture
100%
(5 67
0 000
)
-
-
-
-
-
(2
268 0
00)
(1 41
7 500
)
(1
134 0
00)
(283 5
00)
(28
3 500
)
(28
3 500
)
-
-
-
FF&E
& K
itche
ns10
0%(9
261 0
00)
-
-
-
-
-
-
-
-
-
(1 38
9 150
)
(2
315 2
50)
(2 77
8 300
)
(2
778 3
00)
-
OS&E
and s
pecia
l eqm
ts10
0%(1
596 0
00)
-
-
-
-
-
-
-
-
-
(399 0
00)
(399 0
00)
(39
9 000
)
(399 0
00)
-
So
ft cos
ts10
0%(15
798 6
32)
(78
9 932
)
(2 36
9 795
)
(2
369 7
95)
(1 57
9 863
)
(1
579 8
63)
(1 57
9 863
)
(1
579 8
63)
(789 9
32)
(78
9 932
)
(789 9
32)
(789 9
32)
(78
9 932
)
-
-
Perm
its
100%
(500 0
00)
-
(25
0 000
)
(25
0 000
)
-
-
-
-
-
-
-
-
-
-
-
De
velop
ment
Overh
ead
100%
(28 04
6 103
)
(2 24
3 688
)
(1
963 2
27)
(1 96
3 227
)
(1
963 2
27)
(1 96
3 227
)
(1
963 2
27)
(1 96
3 227
)
(1
963 2
27)
(1 96
3 227
)
(1
963 2
27)
(1 96
3 227
)
(1
963 2
27)
(1 96
3 227
)
(2
243 6
88)
Pre-O
penin
g & w
orking
c10
0%-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Int
erests
& Fi
nanc
e fee
s(7
875 4
92)
-
-
-
-
-
(392 6
95)
(319 5
92)
(513 9
40)
(69
9 676
)
(864 9
42)
(1 04
4 531
)
(1
228 8
34)
(1 35
8 810
)
(1
452 4
71)
Subto
tal(22
2 895
615)
(86
510 4
18)
(4 58
3 022
)
(4
583 0
22)
(3 54
3 090
)
(3
543 0
90)
(16 80
4 524
)
(15 88
0 921
)
(15 00
1 837
)
(14 33
7 074
)
(12 75
6 909
)
(13 86
2 599
)
(14 22
6 452
)
(10 03
2 917
)
(7 22
9 739
)
VA
T0%
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
VAT r
eturn
-
-
-
-
-
-
-
-
-
-
-
-
Total
of th
e Per
iodOU
T(22
2 895
615)
(86
510 4
18)
(4 58
3 022
)
(4
583 0
22)
(3 54
3 090
)
(3
543 0
90)
(16 80
4 524
)
(15 88
0 921
)
(15 00
1 837
)
(14 33
7 074
)
(12 75
6 909
)
(13 86
2 599
)
(14 22
6 452
)
(10 03
2 917
)
(7 22
9 739
)
Re
venu
esEq
uity
Equit
y Con
tributi
on
70 00
0 000
45 73
1 764
4 583
022
4 583
022
3 543
090
3 543
090
8 016
011
Mezz
anine
by sh
areho
lders
Othe
r Con
tributi
on
40 00
0 000
40 00
0 000
Work
ing C
apita
l / Pr
e-ope
ning
-
Subto
tal11
0 000
000
85
731 7
64
4 5
83 02
2
4 5
83 02
2
3 5
43 09
0
3 5
43 09
0
8 0
16 01
1
-
-
-
-
-
-
-
-
De
bts
Senio
r Deb
t 10
4 241
469
8 3
95 81
8
15
561 3
29
14
487 8
97
13
637 3
97
11
891 9
68
12 81
8 068
12 99
7 618
8 674
107
5 777
268
Intere
sts
5,25%
7 875
492
-
-
-
392 6
95
319 5
92
513 9
40
699 6
76
864 9
42
1 044
531
1 228
834
1 358
810
1 452
471
Subto
tal11
2 116
961
-
-
-
-
-
8 7
88 51
3
24
669 4
34
39
671 2
71
54
008 3
44
66
765 2
54
80 62
7 853
94 85
4 305
104 8
87 22
2
112 1
16 96
1
Total
of th
e Per
iodIN
222 1
16 96
1
85 73
1 764
4 583
022
4 583
022
3 543
090
3 543
090
16 80
4 524
15 88
0 921
15 00
1 837
14 33
7 074
12 75
6 909
13
862 5
99
14
226 4
52
10
032 9
17
7 2
29 73
9
Cash
flow
of the
Peri
odIN
-OUT
(778 6
54)
(77
8 654
)
-
-
-
-
-
-
-
-
-
-
-
-
-
Cash
flow
Cumu
lated
Cumu
l-
(77
8 654
)
(778 6
54)
(778 6
54)
(778 6
54)
(778 6
54)
(778 6
54)
(778 6
54)
(778 6
54)
(77
8 654
)
(778 6
54)
(778 6
54)
(77
8 654
)
(778 6
54)
(77
8 654
)
Finan
ce A
ssum
ption
sHo
tel5,2
5%Av
g Deb
tEq
uity
Cash
70 00
0 000
31,5%
Senio
r Deb
t5,2
5%11
2 116
961
Non-C
ash
40 00
0 000
18,0%
Mezz
anine
Deb
t 5,2
5%-
De
btMe
zzan
ine
0To
tal D
ebts
112 1
16 96
1
Senio
r11
2 116
961
50,5%
Total
222 1
16 96
1
100%
2011
2012
2013
2014
ONE GROSVENOR PLACE - ***** HOTEL PROFORMA 2011-06-30Option 4 d
PROJECT INTERIOR AREAS
BRIEF PROJECTm²
GUEST ROOMSRooms Executive x units of x m² 0 units @ m² 0Suite Junior x units of x m² 33 units @ m² 52 1 716Suite Senior x units of x m² 52 units @ m² 60 3 128Suite Ambassador x units of x m² 7 units @ m² 144 1 008Suite Presidential x units of x m² 2 units @ m² 313 625Corridors, Maids, Storage included in the GIA 0% 0Room Terraces see Terraces units @ m² 100
SUB TOTAL 94 6 477 69 6 477HOTEL PUBLIC AREA
Luggage/Valet 20Reception & Concierge 50Lobby 200Public Restrooms 50Public Stores 585Restaurant - All day x seats @ x m² 150 seats @ m² 2 300Restaurant - Speciality x seats @ x m² 100 seats @ m² 2,2 220Lounge bar 150Fitness bar included in spa 0Terraces see Terraces 0
SUBTOTAL 1 575MEETING & BOARD ROOMS
Ball & Banquet Room x units of x m²; connected & dividable 1 units @ m² 480 480Board Rooms x units of x m² 4 units @ m² 30 120Pre Function 200Business Center 10Restrooms 50B&M Pantry & Storage 15
SUBTOTAL 875BACK OF HOUSE
Kitchen/F&B for Restaurant Cafe, Bar, Room Service, B&M 500Administration all inclusive (back office, accounting, exec, etc.) 400House Keeping & Laundry 600Repairs & Maintenance 142Mechanical & Electrical 759Staff Facilities included Security, Cafeteria, Lockers, etc. 600
SUBTOTAL 3 001RECREATION
Spa including lockers/rest rooms 728Pool including lockers/rest rooms 350Fitness including lockers/rest rooms 100
SUB TOTAL 1 178OTHER
Garages Single 68 units @ m² 30 2 040Garages Double ( single parking plus storage ) 0 units @ m² 60 0
SUB TOTAL 68 2 040
TOTAL AREA NIA m² 15 146Shared spaces 27,1% m² 5 627
TOTAL AREA GIA NIA + Shared spaces m² 20 773TOTAL AREA GEA GEA = GIA * % 5,2% m² 21 846
TERRACES Room Terraces outside 2 units @ m² 50 100Ground floor inner patio 1 998 m² 50% 999
TERRACES m² 1 099
NotesThe areas above are indicative at the schematic stage , and are subject by verification by the architects , and subject to change and final confirmation.All NIA figures include all internal walls and circulation areas
BUILT SPACES ('NIA')
ONE GROSVENOR PLACE - ***** HOTEL PROFORMA 2011-06-30Option 4 d
FF&E , OS&E and Special equipments
FF&E Rooms Executive incl lights 0 Units @ £45 000 £0Suite Junior incl lights 33 Units @ £50 000 £1 650 000Suite Senior incl lights 52 Units @ £60 000 £3 120 000Suite Ambassador incl lights 7 Units @ £75 000 £525 000Suite Presidential incl lights 2 Units @ £150 000 £300 000
Public Areas (Lobby/Living Room Bar) £300 000 Restaurants 2 Units @ £200 000 £400 000 Bars 1 Units @ £200 000 £200 000 Meeting rooms £200 000 Public Stores not included £0 Decorative Lighting (excluding guest rooms) £250 000 Spa & fitness £500 000 Garden & Pool included £0 BOH areas incl engineering & maintenance £25 000 Model mock-up £150 000 Contingencies 5% £381 000 Subtotal FF&E £8 001 000
OS&E Rooms, Lobby, Corridors 94 Units @ £10 000 £940 000 Restaurants&Bars/Kitchen £100 000 Spa & Fitness £20 000 BOH areas included £0 Contingencies 5% £53 000 Subtotal OS&E £1 113 000
Owner's Direct / Special equipments Security Camera CCTV System £60 000 Sound System Equipment £150 000 Signage (interior & exterior) £50 000 IT £200 000 Kitchen & Bar equipment £1 000 000 Laundry equipment £200 000 Miscellaneous & contingencies 5% £83 000 Subtotal Owner's Direct / Special equipments £1 743 000
Total FF&E , OS&E , special equipments 94 £115 500 £10 857 000
Notes :
ONE G
ROSV
ENOR
PLAC
E - *
**** H
OTEL
PROF
ORMA
2011
-06-30
PROF
IT &
LOSS
PROJ
ECTIO
N OF
THE H
OTEL
OPE
RATIO
N FO
R 10
years
Optio
n 4 d
k£Ye
ar :
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
Numb
er of
Room
s :94
9494
9494
9494
9494
94Oc
cupie
d Roo
ms :
22 30
225
733
27 44
829
164
29 85
029
850
29 85
029
850
29 85
029
850
Occu
panc
y (%)
:65
%75
%80
%85
%87
%87
%87
%87
%87
%87
%Av
erage
Net
Rate
:95
0
%
of96
9
% of
988
%
of1 0
08
%
of1 0
28
%
of1 0
48,88
%
of1 0
69,85
%
of1 0
91,25
%
of1 1
13,08
%
of1 1
35,34
%
ofRe
vPAR
617,5
0
Gros
s72
6,75
Gr
oss
790,7
0
Gros
s85
6,93
Gr
oss
894,6
3
Gros
s91
2,52
Gr
oss
930,7
7
Gr
oss
949,3
9
Gros
s96
8,38
Gr
oss
987,7
4
Gros
sRE
VENU
ES R
ooms
21 18
661
,0%
24 93
573
,3%
27 12
974
,3%
29 40
175
,0%
30 69
575
,3%
31 30
975
,3%
31 93
575
,3%
32 57
475
,3%
33 22
575
,3%
33 88
975
,3%
F&B
8 500
24,5
3 700
10,9
3 800
10,4
4 000
10,2
4 100
10,1
4 182
10,1
4 266
10,1
4 351
10,1
4 438
10,1
4 527
10,1
Rec
reatio
n & Sp
a 1 2
003,5
1 300
3,81 3
503,7
1 400
3,61 4
503,6
1 479
3,61 5
093,6
1 539
3,61 5
703,6
1 601
3,6 M
eetin
g & Ba
nque
ts2 3
506,8
2 397
7,02 4
456,7
2 494
6,42 5
446,2
2 595
6,22 6
466,2
2 699
6,22 7
536,2
2 808
6,2 O
ther R
even
ue1 5
004,3
1 700
5,01 8
004,9
1 900
4,82 0
004,9
2 040
4,92 0
814,9
2 122
4,92 1
654,9
2 208
4,9
Tota
l34
736
100,0
34 03
210
0,036
524
100,0
39 19
510
0,040
788
100,0
41 60
410
0,042
436
100,0
43 28
510
0,044
151
100,0
45 03
410
0,0 DE
PART
EMEN
TAL E
XPEN
SES
Roo
ms5 0
6423
,95 6
6022
,75 6
9721
,05 7
6319
,65 6
7918
,55 7
9218
,55 9
0818
,56 0
2618
,56 1
4718
,56 2
7018
,5 F
&B6 6
3078
,02 8
4977
,02 8
8876
,03 0
0075
,03 0
3474
,03 0
9574
,03 1
5774
,03 2
2074
,03 2
8474
,03 3
5074
,0 R
ecrea
tion &
Spa
230
40,0
481
37,0
479
35,5
455
32,5
434
29,9
442
29,9
451
29,9
460
29,9
469
29,9
479
29,9
Mee
ting &
Banq
uets
1 410
60,0
1 438
60,0
1 467
60,0
1 496
60,0
1 526
60,0
1 557
60,0
1 588
60,0
1 620
60,0
1 652
60,0
1 685
60,0
Othe
r Rev
enue
113
49,0
765
45,0
788
43,8
813
42,8
842
42,1
859
42,1
876
42,1
894
42,1
911
42,1
930
42,1
T
otal
13 44
638
,711
193
32,9
11 32
031
,011
527
29,4
11 51
428
,211
745
28,2
11 97
928
,212
219
28,2
12 46
328
,212
713
28,2
DEPA
RTEM
ENTA
L INC
OME
21 29
061
,322
838
67,1
25 20
469
,027
668
70,6
29 27
471
,829
860
71,8
30 45
771
,831
066
71,8
31 68
771
,832
321
71,8
UNDI
STRI
BUTE
D OPE
RATIN
G EXP
ENSE
S A
dmini
strati
ve &
Gen
eral
3 474
10,0
3 403
10,0
3 470
9,53 7
249,5
3 875
9,53 9
529,5
4 031
9,54 1
129,5
4 194
9,54 2
789,5
Mark
eting
1 389
4,01 3
614,0
1 461
4,01 5
684,0
1 632
4,01 6
644,0
1 697
4,01 7
314,0
1 766
4,01 8
014,0
Main
tenan
ce1 2
853,7
1 293
3,81 3
153,6
1 372
3,51 4
283,5
1 456
3,51 4
853,5
1 515
3,51 5
453,5
1 576
3,5 U
tilities
1 424
4,11 3
273,9
1 351
3,71 3
333,4
1 387
3,41 4
153,4
1 443
3,41 4
723,4
1 501
3,41 5
313,4
T
otal
7 573
21,8
7 385
21,7
7 597
20,8
7 996
20,4
8 321
20,4
8 487
20,4
8 657
20,4
8 830
20,4
9 007
20,4
9 187
20,4
HOUS
E PRO
FIT (G
OP)
13 71
839
,515
453
45,4
17 60
748
,219
672
50,2
20 95
351
,421
372
51,4
21 80
051
,422
236
51,4
22 68
151
,423
134
51,4
MANA
GEME
NT FE
ESBa
se fe
e *
1 042
3,01 0
213,0
1 096
3,01 1
763,0
1 224
3,01 2
483,0
1 273
3,01 2
993,0
1 325
3,01 3
513,0
Incen
tive f
ee
*1 2
6810
,01 4
4310
,01 6
5110
,01 8
5010
,01 9
7310
,02 0
1210
,02 0
5310
,02 0
9410
,02 1
3610
,02 1
7810
,0Ma
rketin
g fee
*
00,0
00,0
00,0
00,0
00,0
00,0
00,0
00,0
00,0
00,0
Licen
se fe
e *
00
00
00
00
00
Total
2 310
2 464
2 747
3 025
3 197
3 261
3 326
3 392
3 460
3 529
INCO
ME BE
FORE
FIXE
D CHA
RGES
11 40
832
,812
989
38,2
14 86
040
,716
647
42,5
17 75
743
,518
112
43,5
18 47
443
,518
844
43,5
19 22
043
,519
605
43,5
FIXED
CHAR
GES
Prope
rty ta
xes
236
0,723
10,7
248
0,726
70,7
277
0,728
30,7
289
0,729
40,7
300
0,730
60,7
Prope
rty In
suran
ce34
71,0
340
1,036
51,0
392
1,040
81,0
416
1,042
41,0
433
1,044
21,0
450
1,0Au
dit &
lega
l fees
104
0,310
20,3
110
0,311
80,3
122
0,312
50,3
127
0,313
00,3
132
0,313
50,3
Repla
ceme
nt Re
serve
695
2,01 0
213,0
1 461
4,01 5
684,0
1 632
4,01 6
644,0
1 697
4,01 7
314,0
1 766
4,01 8
014,0
To
tal1 3
834,0
1 695
5,02 1
846,0
2 344
6,02 4
396,0
2 488
6,02 5
386,0
2 588
6,02 6
406,0
2 693
6,0EB
ITDA H
OTEL
10 02
528
,9%
11 29
533
,2%
12 67
634
,7%
14 30
336
,5%
15 31
837
,6%
15 62
437
,6%
15 93
637
,6%
16 25
537
,6%
16 58
037
,6%
16 91
237
,6%
REVE
NUE /
APAR
TMEN
T SER
VICES
TOTA
L EBIT
DA
10 02
511
295
12 67
614
303
15 31
815
624
15 93
616
255
16 58
016
912
11
11
11
11
11
Increm
ental
Rev
enue
2,0%
Rema
rks :
The B
ase a
nd th
e Mark
eting
fees
are c
alcula
ted as
a %
on th
e Tota
l Rev
enu
Inflat
ion ra
te0%
N/A
The I
ncen
tive f
ee is
calcu
lated
as a
% on
the A
GOP
(GOP
less
man
agem
ent fe
es)
Incom
e with
olding
tax
*0,0
%
ONE GROSVENOR PLACE - ***** HOTEL PROFORMA 2011-06-30 Option 4 d
Analysis 'IRR'
Total Development Cost 222 895 615 £
Construction FinancingHotel % of the CostMezzanine Financing 0% - £Senior Debt 50% 112 116 961 £Equity 50% 110 000 000 £
Total Construction Sources 100% 222 116 961 £
Permanent Financing & Sales ProceedsHotel % of the CostSenior Debt 50% 112 116 961 £Equity 50% 110 000 000 £
Total Permanent Financing Sources 222 116 961 £
Return ProjectionsHotel & Club Net Operating Income (Based on First Stabilized Year - Year 3) 11 277 262 £
Hotel Unleveraged Return On Investment (ROI) Permanent Financing 5,08%
Debt Service on Hotel Loan (interest only) @ 5,25% (5 886 140) £
Annual Cash Flow 5 391 122 £
Leveraged Return On Investment (ROI) 4,90%
Total Project Seven Year IRR Calculation 13%
Period Year Total Development1 Cash Entry (110 000 000) £2 No Cash Flow during Construction - £3 Cash Flow (Hotel in year 3) 4 606 001 £4 Cash Flow (Stabilized Year 4) 6 072 734 £5 Cash Flow Year 5 6 992 255 £6 Cash Flow Year 6 7 249 822 £7 Cash Flow and Net Sales Revenues 192 519 074 £
Sales at the end of the 7th year , less the Debts 185 269 251 £Sale at 15 Cap on NOI at End of Year 7 less Debt
Percentage of Reverse Capitalization 6,50%Cash Flow of the Hotel Operation (exclusive sales of apartments) (in year 3)
Notes
One Grosvenor Place
FeasibilityOption 4
Park Hyatt
Apartments
ONE GROSVENOR PLACE - APARTMENT PROFORMA 2011-06-30Option 4 d
Summary of Development Cost £
Land acquisitionLand 131 212 910Acquisition costs 6 560 645Predevelopment 1 249 647
Subtotal 139 023 202Construction costs Building surface
Demolition works 2 000 000Siteworks , Infrastructure & excavation 3 000 000Building Structure , M&E & Finishings 21 320 m² @ 3 200 £/m² 68 223 315Fixed Furniture & Decorative elements 21 320 m² @ - £/m² 0Parking Structure & M&E 5 161 m² @ 2 000 £/m² 10 321 173Terraced buildings 1 745 m² @ 300 £/m² 523 500Pool -Contingency 84 067 988 @ 5,00% 4 203 399
Subtotal 88 271 387FF&E , OS&E and Special Equipments
Rooms & Public spaces 57 @ per unit 112 807 6 430 000OS&E 57 @ per unit - 0Low voltage systems 40 000IT systems & equipment 50 000Signage 20 000Kitchens, bars & laundry 2 935 500Contingency 9 475 500 @ 5,00% 473 775
Subtotal 9 949 275Professional Soft Costs / Consultants
Legal 253 386 988 0,30% of all 760 161Project management 98 220 662 5,00% of CC,FF&E 4 911 033Architects & Engineers 98 220 662 9,00% of CC,FF&E 8 839 860Interior Decorator 9 949 275 8,00% of FF&E 795 942Interior Decorators Spa & other specials 98 220 662 0,20% of CC,FF&E 196 441Bookkeeping & audit 253 133 855 0,1% of all 253 134Technical Services Hotel Operator 57 appts @ 2 000 114 000Builders Risk insurance 88 271 387 @ 1,00% of CC 882 714Taxes during Construction 150 000Owners representative 254 147 149 0% of all 0Contingency 16 903 285 @ 5,00% inclusive
Subtotal 16 903 285Permits
Building Permits & Municipal Taxes 500 000Subtotal 500 000
Financing Finance & Inspection Fees 109 000 000 @ 0,25% 272 500 Interest during Construction 3 254 823
Subtotal 3 527 323Opening Costs
Working Capital by Hotel operator 0Pre-opening costs by Hotel operator 0
Subtotal 0Development Overhead
Overhead costs (excl on land & financing) 254 647 149 @ 10,00% 25 464 715Subtotal 25 464 715
TOTAL DEVELOPPEMENT excl opening & financing 57 @ 4 914 243 280 111 864 £
TOTAL DEVELOPPEMENT COST 57 @ 4 976 126 283 639 187 £
ONE GROSVENOR PLACE - Option 4 30-06-2011
SALES PRICES OF THE APARTMENTS & PARKINGS Option 4 d
APARTMENTSLevel Qty Type Avg
m²Total m²
Price £/m²
Price £ Apartment
Price £/m²
Price £ Apartment
Level 10 Type A 125-160 0 32 000 0 35 000 01 Type B 160-210 206 206 36 000 7 416 000 40 000 8 240 0001 Type C 220-270 263 263 37 000 9 731 000 45 000 11 835 0003 Type D 300-330 305 916 38 000 34 808 000 47 000 43 052 0000 Type E 350-370 0 39 000 0 48 000 00 Type F 390-440 0 40 000 0 50 000 00 Type G 0 40 000 0 50 000 0
S.TOT 5 277 1 385 51 955 000 63 127 000Levels 2-5 4 Levels
1 Type A 125-160 158 158 32 000 5 056 000 35 000 5 530 0001 Type B 160-210 206 206 36 000 7 416 000 40 000 8 240 0002 Type C 220-270 271 541 37 000 20 017 000 45 000 24 345 0004 Type D 300-330 302 1 209 38 000 45 942 000 47 000 56 823 0001 Type E 350-370 374 374 39 000 14 586 000 48 000 17 952 0000 Type F 390-440 0 40 000 0 50 000 00 Type G 0 40 000 0 50 000 0
S.TOT 9 276 2 488 93 017 000 112 890 000S.TOT 36 9 952 372 068 000 451 560 000Level 6
1 Type A 125-160 158 158 32 000 5 056 000 35 000 5 530 0002 Type B 160-210 199 397 36 000 14 292 000 40 000 15 880 0003 Type C 220-270 259 777 37 000 28 749 000 45 000 34 965 0002 Type D 300-330 295 589 38 000 22 382 000 47 000 27 683 0001 Type E 350-370 374 374 39 000 14 586 000 48 000 17 952 0000 Type F 390-440 0 40 000 0 50 000 00 Type G 0 40 000 0 50 000 0
S.TOT 9 255 2 295 85 065 000 102 010 000Levels 7-8 2 Levels
0 Type A 125-160 0 32 000 0 35 000 01 Type B 160-210 188 188 36 000 6 768 000 40 000 7 520 0002 Type C 220-270 269 537 37 000 19 869 000 45 000 24 165 0000 Type D 300-330 0 38 000 0 47 000 00 Type E 350-370 0 39 000 0 48 000 00 Type F 390-440 0 40 000 0 50 000 0
0,5 Type G duplex 1 304 652 40 000 26 080 000 50 000 32 600 000S.TOT 3,5 393 1 377 52 717 000 64 285 000S.TOT 7 2 754 105 434 000 128 570 000Level 9Level 10
Total 57 287 16 386 614 522 000 745 267 000Avg 37 503 10 781 088 45 482 13 074 860
PARKINGSUnit price Total Price
87 Single parkings 250 000 21 750 0000 Double parkings 330 000 0
Total 0 0 21 750 000 21 750 000
Average Conservative Price per Apartment Average Total Total57 11 162 667 636 272 000 767 017 000
Notes :Sales taxes and/or VAT included.
Conservative Scenario Optimistic Scenario
ONE GROSVENOR PLACE - APARTMENT PROFORMAOption 4 d
Sales of the Apartments & Parkings
ApartmentsTotal Constructed Covered Surface ('NIA') 20 323 m²Total Constructed Covered Surface (' GIA ') 26 480 m²Total Constructed Covered Surface (incl terraces) 28 225 m²Average Net Surface ('NIA') per Apartment 288 m²Average Gross Surface ('GIA') per Apartment 465 m²Number of Apartments 57
Average Sales price per Apartment (incl VAT) 10 781 088 £Average Sales price per Net m² Apartment Surface (incl VAT) 37 485 £Total Sales Revenue of the Apartments (incl VAT) 100% 614 522 000 £VAT on Sales 0% - £
Total Sales Revenue of the Apartments (excl VAT) 614 522 000 £
Sales fees (inclusive commission) 3,0% (18 435 660) £Royalty 3,0% (18 435 660) £Marketing costs 1,5% (9 217 830) £Sales taxes 5,0% (30 726 100) £
Total Net Sales Revenue of the Apartments (excl VAT) 537 706 750 £Total Development Costs , Land exclusive (144 615 985) £Gross Profit , Land exclusive 393 090 765 £Land & predevelopment costs (139 023 202) £
Gross Profit Apartments , before taxes 41,3% 254 067 563 £
ParkingsNumber of Parkings 87Average Sales price per Parking (incl VAT) 250 000 £Total Sales Revenue of the Parkings (incl VAT) 100% 21 750 000 £VAT on Sales 0% - £
Total Sales Revenue of the Parkings (excl VAT) 21 750 000 £
Sales fees (inclusive commission) 3,0% (652 500) £Royalty 0,0% - £Marketing costs 1,5% (326 250) £Sales taxes 5,0% (1 087 500) £
Total Net Sales Revenue of the Parkings (excl VAT) 19 683 750 £Total Development Costs , Land exclusive - £Gross Profit , Land exclusive 19 683 750 £Land & predevelopment costs - £
Gross Profit Parkings , before taxes 90,5% 19 683 750 £
Apartments & Parkings
Total Sales Revenue of the Apartments & Parkings (excl VAT) 636 272 000 £Gross Profit Apartments & Parkings , before taxes 43,0% 273 751 313 £Average Sales Price per Apartment , Parking inclusive 11 162 667 £
Notes:No land and/or building costs are being atributed to the ParkingsNo VAT on the sales
2011-06-30
ONE G
ROSV
ENOR
PLAC
E - A
PART
MENT
PROF
ORMA
Prov
ision
al Ca
sh Fl
ow du
ring C
onstr
uctio
n
Cons
tructi
on Pl
annin
gStu
dies
Cons
tructi
onSa
les Pr
ogno
sis A
partm
ents
573
49
910
88
6
Uses
Totau
xCa
sh0
Q3Q4
Q1Q2
Q3Q4
Q1Q2
Q3Q4
Q1Q2
Q3Q4
Q1Q2
Q3Q4
Land
Purch
ase
(137 7
73 55
5)
(13
7 773
555)
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Pred
evelo
pmen
t(1
249 6
47)
(1
249 6
47)
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Ma
rketin
g cos
ts(9
217 8
30)
-
-
-
(1
843 5
66)
(4 60
8 915
)
(2
765 3
49)
-
-
-
-
-
-
-
-
-
-
-
-
Co
nstru
ction
(83 02
1 387
)
-
-
-
-
-
(12
453 2
08)
(12
453 2
08)
(12
453 2
08)
(12
453 2
08)
(8
302 1
39)
(8 30
2 139
)
(8
302 1
39)
(4 15
1 069
)
(4
151 0
69)
-
-
-
-
De
moliti
on,Si
tework
s & in
frastr
uctur
e(5
250 0
00)
-
-
-
-
-
(2
100 0
00)
(1 31
2 500
)
(1
050 0
00)
(262 5
00)
(262 5
00)
(262 5
00)
-
-
-
-
-
-
-
FF
&E &
Kitch
ens
(9 83
3 775
)
-
-
-
-
-
-
-
-
-
(1 47
5 066
)
(2
458 4
44)
(2 95
0 133
)
(2
950 1
33)
-
-
-
-
-
OS
&E an
d spe
cial e
qmts
(115 5
00)
-
-
-
-
-
-
-
-
-
(28
875)
(28
875)
(28
875)
(28
875)
-
-
-
-
-
Soft c
osts
(16 90
3 285
)
(84
5 164
)
(2
535 4
93)
(2 53
5 493
)
(1
690 3
28)
(1 69
0 328
)
(1
690 3
28)
(1 69
0 328
)
(84
5 164
)
(84
5 164
)
(84
5 164
)
(84
5 164
)
(84
5 164
)
-
-
-
-
-
-
Perm
its
(500 0
00)
-
(25
0 000
)
(25
0 000
)
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Deve
lopme
nt Ov
erhea
d(25
464 7
15)
(2 03
7 177
)
(1
782 5
30)
(1 78
2 530
)
(1
782 5
30)
(1 78
2 530
)
(1
782 5
30)
(1 78
2 530
)
(1
782 5
30)
(1 78
2 530
)
(1
782 5
30)
(1 78
2 530
)
(1
782 5
30)
(1 78
2 530
)
(2
037 1
77)
-
-
-
-
Op
ening
costs
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Intere
st & F
inanc
e fee
s(3
527 3
23)
(37
2 574
)
(11
5 756
)
(12
8 068
)
(15
0 364
)
(20
9 247
)
(43
5 718
)
Su
btotal
(292 8
57 01
7)
(14
2 278
118)
(4
683 7
79)
(4 69
6 090
)
(5
466 7
88)
(8 29
1 021
)
(21
227 1
34)
(17
238 5
67)
(16
130 9
02)
(15
343 4
02)
(12
696 2
74)
(13
679 6
52)
(13
908 8
41)
(8
912 6
07)
(6 18
8 247
)
-
-
-
-
VAT o
n cos
ts0%
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
VAT C
ash D
ifferen
tial
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Total
of th
e Peri
odOU
T(29
2 857
017)
(142 2
78 11
8)
(4 68
3 779
)
(4
696 0
90)
(5 46
6 788
)
(8
291 0
21)
(21 22
7 134
)
(17 23
8 567
)
(16 13
0 902
)
(15 34
3 402
)
(12 69
6 274
)
(13 67
9 652
)
(13 90
8 841
)
(8 91
2 607
)
(6
188 2
47)
-
-
-
-
Sa
les Re
venu
Avg U
nit Sa
les Pr
ice , V
AT in
cl.10
781 0
88At
optio
n sign
ature
10%
61 45
2 200
3 234
326
4 312
435
9 702
979
9 702
979
10 78
1 088
8 624
870
8 624
870
6 468
653
At co
ntrac
t sign
ature
10%
61 45
2 200
3 234
326
4 312
435
9 702
979
9 702
979
10 78
1 088
8 624
870
8 624
870
6 468
653
At Fo
unda
tions
20
%12
2 904
400
6 468
653
8 624
870
19 40
5 958
19 40
5 958
21 56
2 175
17 24
9 740
30 18
7 046
At Clo
sed c
onstr
uctio
n 25
%15
3 630
500
8 085
816
10 78
1 088
24 25
7 447
24 25
7 447
26 95
2 719
59 29
5 982
At Fin
ishing
25
%15
3 630
500
8 085
816
10 78
1 088
24 25
7 447
110 5
06 14
9At
Rece
ption
10%
61 45
2 200
3 234
326
58 21
7 874
Gros
s Sale
s Rev
enue
, VAT
incl
100%
614 5
22 00
00
00
00
03 2
34 32
67 5
46 76
120
484 0
6736
116 6
4450
671 1
1271
155 1
7973
850 4
5186
787 7
5626
4 675
704
00
Sales
costs
(fees
,taxe
s,roy
alty)
-11%
(67 59
7 420
)
-
-
-
-
-
-
(35
5 776
)
(83
0 144
)
(2
253 2
47)
(3 97
2 831
)
(5
573 8
22)
(7 82
7 070
)
(8
123 5
50)
(9 54
6 653
)
(29
114 3
27)
-
-
VAT
0%-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Net S
ales R
even
ue , V
AT ex
cl.54
6 924
580
00
00
00
2 878
550
6 716
618
18 23
0 819
32 14
3 813
45 09
7 290
63 32
8 109
65 72
6 901
77 24
1 103
235 5
61 37
60
0Eq
uity
Equit
y Con
tributi
on
130 0
00 00
0
13
0 000
000
Me
zzan
ine by
share
holde
rs-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Ot
her C
ontrib
ution
53
510 8
18
4 2
80 86
5
3 7
45 75
7
3 7
45 75
7
3 7
45 75
7
3 7
45 75
7
3 7
45 75
7
3 7
45 75
7
3 7
45 75
7
3 7
45 75
7
3 7
45 75
7
3 7
45 75
7
3 7
45 75
7
3 7
45 75
7
4 2
80 86
5
-
-
-
-
Work
ing C
apita
l / Pr
e-ope
ning
-
Su
btotal
183 5
10 81
8
13
4 280
865
3 7
45 75
7
3 7
45 75
7
3 7
45 75
7
3 7
45 75
7
3 7
45 75
7
3 7
45 75
7
3 7
45 75
7
3 7
45 75
7
3 7
45 75
7
3 7
45 75
7
3 7
45 75
7
3 7
45 75
7
4 2
80 86
5
-
-
-
-
Finan
cing
Cons
tructi
on Lo
an7 6
24 67
8
82
2 266
82
2 266
1 5
70 66
7
4 3
36 01
6
17
045 6
58
10 61
4 259
5 6
68 52
8
(6
633 1
74)
(23 19
3 296
)
(35 16
3 395
)
(53 16
5 026
)
(60 56
0 052
)
(75 33
3 722
)
(235 5
61 37
6)
-
-
-
Int
erest
5,25%
3 527
323
37
2 574
11
5 756
12
8 068
15
0 364
20
9 247
43
5 718
58
0 749
66
2 771
58
4 409
28
7 667
(17
0 076
)
(87
0 100
)
(1
676 3
70)
(2 68
7 128
)
(5
814 1
39)
Total
Deb
tSub
total
51 15
9 584
7 997
252
8 935
274
9 885
607
11 60
6 638
16 15
1 901
33 63
3 278
44 82
8 286
51 15
9 584
45 11
0 819
22 20
5 190
(13 12
8 282
)
(67 16
3 407
)
(129 3
99 82
9)
(207 4
20 67
9)
(448 7
96 19
4)
Total
of th
e Peri
odIN
730 4
35 39
8
14
2 278
118
4 6
83 77
9
4 6
96 09
0
5 4
66 78
8
8 2
91 02
1
21
227 1
34
17
819 3
16
16
793 6
73
15
927 8
12
12
983 9
42
13
509 5
75
13
038 7
41
7 2
36 23
7
3 5
01 11
9
(5
814 1
39)
-
-
-
Fin
ance
Assu
mptio
nsAp
artme
nts5,2
5%Av
g Deb
t Cos
tEq
uity
Cash
183 5
10 81
8
25
%Se
nior D
ebt
5,25%
-
Non-C
ash
0%Me
zzan
ine D
ebt
5,25%
51 15
9 584
Debt
Mezz
anine
51 15
9 584
7%De
bt To
tal51
159 5
84
Se
nior
0%To
tal23
4 670
402
32%
2011
2012
2013
2014
2015
ONE GROSVENOR PLACE - APARTMENT PROFORMA 2011-06-30Option 4 d
PROJECT INTERIOR AREAS
BRIEF PROJECTm²
APARTMENTSType A - 1 bedroom x units of NIA x m² 5 units @ m² 125-160 790Type B - 2 bedroom x units of NIA x m² 9 units @ m² 160-210 1 803Type C - 3 bedroom x units of NIA x m² 16 units @ m² 220-270 4 278Type D - 4 bedroom x units of NIA x m² 21 units @ m² 300-330 6 341Type E - 4 bedroom x units of NIA x m² 5 units @ m² 350-370 1 870Type F - 5 bedroom x units of NIA x m² 0 units @ m² 390-440 0Type G - duplex x units of NIA x m² 1 units @ m² 1300 1 304Corridors included in GIA 0Maids, Storage not foreseenGuest Room Terraces 6 units @ m² 746Garages see OthersIndividual pools not foreseen
SUB TOTAL 57 16 386PUBLIC AREA
Luggage/Valet 20Reception & Concierge incl Security 200Lounge Bar not foreseen 0Public Restrooms not foreseen 0Store not foreseen 0Restaurant not foreseen 0
SUBTOTAL 220BACK OF HOUSE
Kitchen/F&B for Room Service 50Administration all included (back office, accounting, exec, etc.) 150House Keeping & Laundry Maids storage 148Repairs & Maintenance integrated in Hotel 0Mechanical & Electrical Mechanical rooms 759Staff Facilities integrated in Hotel 0
SUBTOTAL 1 107RECREATIONAL
Outside Pool not foreseen 0Other not foreseen 0
SUB TOTAL 0OTHER
Garages, in the building Single 87 units @ m² 30 2 610Garages, in the building Double 0 units @ m² 60 0
SUB TOTAL 2 610
TOTAL AREA NIA m² 20 323Shared spaces m² 23,3% 6 157
TOTAL AREA GIA NIA + Shared spaces m² 26 480TOTAL AREA GEA GEA = GIA * % m² 5,2% 27 848
TERRACES Room Terraces Penthouse 500m² & others 6 units @ m² 746Ground floor Outside 1 998 50% m² 999
TERRACES m² 1 745
Notes :The areas above are indicative at the schematic stage , and are subject by verification by the architects , and subject to change and final confirmation.All NIA figures include all internal walls and circulation areas
BUILT AREAS "NIA"
ONE GROSVENOR PLACE - APARTMENT PROFORMA 2011-06-30Option 4 d
FF&E , OS&E and Special equipments
FF&E Type A - 1 bedroom incl lights 5 Units @ £85 000 £425 000Type B - 2 bedroom incl lights 9 Units @ £95 000 £855 000Type C - 3 bedroom incl lights 16 Units @ £105 000 £1 680 000Type D - 4 bedroom incl lights 21 Units @ £115 000 £2 415 000Type E - 4 bedroom incl lights 5 Units @ £125 000 £625 000Type F - 5 bedroom incl lights 0 Units @ £135 000 £0Type G - duplex incl lights 1 Units @ £200 000 £200 000
Public Area £25 000 Restaurant £0 Decorative Lighting (excluding guest rooms) £5 000 Garden & Pool FF&E £0 BOH areas incl engineering & maintenance £100 000 Model mock-up room £100 000 Contingencies 5% £321 500 Subtotal FF&E 57 Units @ £118 447 6 751 500£
OS&E Rooms, Lobby, Corridors,… 57 Units @ 0 € 0 Restaurant/Kitchen 57 Units @ 0 € 0 BOH areas included € 0 Contingencies 5% € 0 Subtotal OS&E 57 Units @ £0 € 0
Owner's Direct / Special equipments Security Camera CCTV System £40 000 Sound System Equipment £0 Signage (interior & exterior) £20 000 IT £50 000 Kitchen & Bar equipment 57 Units @ £50 000 £2 850 000 Laundry equipment 57 Units @ £1 500 £85 500 Miscellaneous & contingencies 5% £152 275 Subtotal Owner's Direct / Special equipments 3 197 775£
Total FF&E , OS&E , special equipments 57 £174 549 9 949 275£
Notes :The FF&E for the Apartments does include only the fixed furniture in the rooms e.g. the buit-in cupboards) & bathrooms
ONE
GROS
VENO
R PL
ACE
- AP
ARTM
ENT P
ROFO
RMA
2011
-06-
30Op
tion 4
dPR
OFIT
& LO
SS P
ROJE
CTIO
N OF
THE
APAR
TMEN
T OPE
RATIO
N FO
R 10
year
sK
£K
£Ye
ar :
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
Numb
er of
Roo
ms :
5757
5757
5757
5757
5757
Owne
r Usa
ge D
ays p
er yr
:0
00
00
00
00
Effec
tive A
vaila
ble D
ays p
er yr
:36
536
536
536
536
536
536
536
536
536
5Oc
cupie
d Roo
ms :
20 80
520
805
20 80
520
805
20 80
520
805
20 80
520
805
20 80
520
805
Occu
panc
y (%)
:10
0%10
0%10
0%10
0%10
0%10
0%10
0%10
0%10
0%10
0%Av
erage
Apa
rtmen
t Rate
/mon
th (£
) :3 0
000
00
00
00
00
RevP
AR (£
) :3 0
000
00
00
00
00
REVE
NUES
Roo
ms2 0
52 00
048
,8%
2 093
040
48,8
%2 1
34 90
148
,8%
2 177
599
48,8
%2 2
21 15
148
,8%
2 265
574
48,8
%2 3
10 88
548
,8%
2 357
103
48,8
%2 4
04 24
548
,8%
2 452
330
48,8
% F
&B2 0
80 50
049
,52 1
22 11
049
,52 1
64 55
249
,52 2
07 84
349
,52 2
52 00
049
,52 2
97 04
049
,52 3
42 98
149
,52 3
89 84
149
,52 4
37 63
749
,52 4
86 39
049
,5 R
ecrea
tion &
Spa
68
400
1,669
768
1,671
163
1,672
587
1,674
038
1,675
519
1,677
030
1,678
570
1,680
142
1,681
744
1,6 C
lub0
0,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00
0,0 O
ther R
even
u0
0,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00
0,0
Tota
l4 2
00 90
010
0,04 2
84 91
810
0,04 3
70 61
610
0,04 4
58 02
910
0,04 5
47 18
910
0,04 6
38 13
310
0,04 7
30 89
610
0,04 8
25 51
410
0,04 9
22 02
410
0,05 0
20 46
410
0,0 D
EPAR
TEME
NTAL
EXPE
NSES
R
ooms
490 4
2823
,947
5 120
22,7
448 3
2921
,042
6 809
19,6
410 9
1318
,541
9 131
18,5
427 5
1418
,543
6 064
18,5
444 7
8518
,545
3 681
18,5
F&B
1 435
545
69,0
1 368
761
64,5
1 294
402
59,8
1 269
510
57,5
1 254
364
55,7
1 279
451
55,7
1 305
040
55,7
1 331
141
55,7
1 357
764
55,7
1 384
919
55,7
Rec
reatio
n & S
pa
27 36
040
,025
814
37,0
25 26
335
,523
591
32,5
22 13
729
,922
580
29,9
23 03
229
,923
492
29,9
23 96
229
,924
442
29,9
Club
060
,00
60,0
060
,00
60,0
060
,00
60,0
060
,00
60,0
060
,00
60,0
Othe
r Rev
enu
049
,00
45,0
043
,80
42,8
042
,10
42,1
042
,10
42,1
042
,10
42,1
T
otal
1 953
333
46,5
1 869
695
43,6
1 767
994
40,5
1 719
910
38,6
1 687
414
37,1
1 721
163
37,1
1 755
586
37,1
1 790
698
37,1
1 826
512
37,1
1 863
042
37,1
DEPA
RTEM
ENTA
L INC
OME
2 247
567
53,5
2 415
223
56,4
2 602
622
59,5
2 738
119
61,4
2 859
775
62,9
2 916
970
62,9
2 975
310
62,9
3 034
816
62,9
3 095
512
62,9
3 157
422
62,9
UNDI
STRI
BUTE
D OP
ERAT
ING
EXPE
NSES
Adm
inistr
ative
& G
enera
l84
018
2,085
698
2,087
412
2,089
161
2,090
944
2,092
763
2,094
618
2,096
510
2,098
440
2,010
0 409
2,0 M
arketi
ng84
018
2,085
698
2,087
412
2,089
161
2,090
944
2,092
763
2,094
618
2,096
510
2,098
440
2,010
0 409
2,0 M
ainten
ance
168 0
364,0
162 8
273,8
152 9
723,5
142 6
573,2
131 8
682,9
134 5
062,9
137 1
962,9
139 9
402,9
142 7
392,9
145 5
932,9
Utili
ties
126 0
273,0
167 1
123,9
152 9
723,5
142 6
573,2
131 8
682,9
134 5
062,9
137 1
962,9
139 9
402,9
142 7
392,9
145 5
932,9
T
otal
462 0
9911
,050
1 335
11,7
480 7
6811
,046
3 635
10,4
445 6
259,8
454 5
379,8
463 6
289,8
472 9
009,8
482 3
589,8
492 0
069,8
HOUS
E PRO
FIT (G
OP)
1 785
468
42,5
1 913
887
44,7
2 121
854
48,5
2 274
484
51,0
2 414
150
53,1
2 462
433
53,1
2 511
682
53,1
2 561
916
53,1
2 613
154
53,1
2 665
417
53,1
MANA
GEME
NT FE
ESBa
se fe
e *
126 0
273,0
128 5
483,0
131 1
183,0
133 7
413,0
136 4
163,0
139 1
443,0
141 9
273,0
144 7
653,0
147 6
613,0
150 6
143,0
Incen
tive f
ee
*16
5 944
10,0
178 5
3410
,019
9 074
10,0
214 0
7410
,022
7 773
10,0
232 3
2910
,023
6 976
10,0
241 7
1510
,024
6 549
10,0
251 4
8010
,0Ma
rketin
g fee
*
00,0
00,0
00,0
00,0
00,0
00,0
00,0
00,0
00,0
00,0
Licen
se fe
e 0
00
00
00
00
0To
tal29
1 971
7,030
7 082
7,233
0 192
7,634
7 815
7,836
4 189
8,037
1 473
8,037
8 902
8,038
6 480
8,039
4 210
8,040
2 094
8,0
INCO
ME B
EFOR
E FIX
ED C
HARG
ES1 4
93 49
735
,61 6
06 80
637
,51 7
91 66
241
,01 9
26 66
943
,22 0
49 96
145
,12 0
90 96
045
,12 1
32 78
045
,12 1
75 43
545
,12 2
18 94
445
,12 2
63 32
345
,1 FI
XED
CHAR
GES
Prop
erty t
axes
00,0
00,0
00,0
00,0
00,0
00,0
00,0
00,0
00,0
00,0
Prop
erty I
nsura
nce
00,0
00,0
00,0
00,0
00,0
00,0
00,0
00,0
00,0
00,0
Audit
& le
gal fe
es0
0,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00
0,00
0,0Re
place
ment
Rese
rve0
0,00
0,00
0,00
0,00
0,00
0,00
0,019
3 021
4,019
6 881
4,020
0 819
4,0
Total
00,0
00,0
00,0
00,0
00,0
00,0
00,0
193 0
214,0
196 8
814,0
200 8
194,0
EBITD
A1 4
93 49
735
,6%
1 606
806
37,5
%1 7
91 66
241
,0%
1 926
669
43,2
%2 0
49 96
145
,1%
2 090
960
45,1
%2 1
32 78
045
,1%
1 982
415
41,1
%2 0
22 06
341
,1%
2 062
504
41,1
%1
11
11
11
11
1Re
venu
e to A
partm
ent O
wners
0
0,00
%0
00
00
00
00
Reve
nue t
o Hote
l Own
er1 4
93 49
710
0,0%
1 606
806
1 791
662
1 926
669
2 049
961
2 090
960
2 132
780
1 982
415
2 022
063
2 062
504
Reve
nue I
ncre
menta
l2,0
%No
tes :
The B
ase f
ee is
calcu
lated
as a
% of
Tota
l Rev
enu ;
The
Ince
ntive
fee i
s calc
ulated
as a
% on
the A
GOP
Inflat
ion R
ate0,0
%N/
ATh
e AGO
P is
calcu
lated
as th
e GOP
less
the m
anag
emen
t fees
( Ba
se fe
e , M
arke
ting f
ee , L
icens
e fee
)Inc
ome w
ithold
ing ta
x *
0,0%
Ther
e is n
o pay
-out
of the
Rev
enu t
o the
Apa
rtmen
t Own
ers !
Prop
erty
taxes
, Pro
pert
Insur
ance
, Leg
al fee
s & R
eplac
emen
t res
erve
are t
o Own
ers a
ccou
ntTh
e rep
lacem
ent R
eser
ve is
not fo
rese
en (
to be
chec
ked)
hamiltons architectshamiltons architects
D E V E L O P M E N T S T U D I E S
O N E G R O S V E N O R P L A C E
hamiltons architects
Architects. Masterplanners.
The Site
Architects. Masterplanners.
N
Context
Access from Outside
hamiltons architects
Architects. Masterplanners.
Organisational Patterns
Flexibilty Daylight / Sunlight
Serv
ices
Efficient Services Structural Flexibilty
Prominent Views
Serv
ices
Serv
ices
A
B
Clear Servicing Strategy
Organisational Strategy
Access off central courtyard
Maximise Potential with dual facing units
Gri
d to
sui
t
Architects. Masterplanners.
Organisational Patterns Access off central courtyard
Flexibilty
Serv
ices
Efficient Services Structural Flexibilty
Prominent Views over Hyde Park Maximise Potential with dual facing units
Serv
ices
Serv
ices
Hyd
e Pa
rk
A
B
Clear Servicing Strategy
Organisational Strategy
Heirarchy of use
Architects. Masterplanners.
View from Front - Showing Existing Building
View from Front - Showing Existing Buildings and Rights to Light Constraint View from Rear - Showing Existing Buildings and Rights to Light Constraint
View from Rear - Showing Existing Building
Massing - Existing Building
Development Studies
Option 1 Option 4
Option 2 Option 4 : Typical Upper FloorOption 4: Ground FloorOption 3
Options explored relating to client preference
hotel
residential
residential
hotel
hotel
residential
hotel
residential
hamiltons architects
Massing Studies
hamiltons architects
hamiltons architects
Lifts
Lifts
Lifts
Lifts
Ground Floor Plan
Key
HotelResidentialHotel Back of HouseShared Hotel / Residential CoreRetailPlant
N
ONE GROSVENOR PLACE - Option 4
hamiltons architects
303m2 263m2 317m2 296m2
206m2
Approx. Rooms Sizes GIA (Room number) 8 x Hotel Room B 60 sqm
1 x Hotel Suite 70-100 sqm
Level One Floor Plan
Key
HotelResidentialHotel Back of HouseShared Hotel / Residential CoreRetailPlant
N
apt 1 apt 2 apt 3 apt 4
apt 5
ONE GROSVENOR CRESCENT - Option 4
Lifts
Lifts
Lifts
Lifts
hamiltons architects
Level Two - Five - Floor Plan
Approx. Rooms Sizes GIA (Room number)
6 x Hotel Room A 50 sqm
8 x Hotel Room B 60 sqm
1 x Hotel Suites 100 sqm
303m2 263m2 317m2 296m2
206m2
374m2 293m2 278m2 158m2
Key
HotelResidentialHotel Back of HouseShared Hotel / Residential CoreRetailPlant
N
apt 1 apt 2 apt 3 apt 4
apt 5
apt 6 apt 7 apt 8 apt 9
Lifts
Lifts
Lifts
Lifts
ONE GROSVENOR PLACE - Option 4
hamiltons architects
Level Six Floor Plan
244m2 191m2 255m2 296m2
206m2
Key
HotelResidentialHotel Back of HouseShared Hotel / Residential CoreRetailPlant
N
apt 1 apt 2 apt 3 apt 4
apt 5
Lifts
Lifts
Lifts
Lifts
Approx. Rooms Sizes GIA (Room number)
6 x Hotel Room A 50 sqm
8 x Hotel Room B 60 sqm
1 x Hotel Suites 100 sqm
374m2 293m2 278m2 158m2apt 6 apt 7 apt 8 apt 9
ONE GROSVENOR PLACE - Option 4
hamiltons architects
Level Seven Floor Plan
Approx. Rooms Sizes GIA (Room number)
1 x Presidential Suite 625 sqm
652m2
279m2 258m2 188m2
Key
HotelResidentialHotel Back of HouseShared Hotel / Residential CoreRetailPlant
N
apt 1
Presidential Suite
apt 2 apt 3 apt 4
ONE GROSVENOR PLACE - Option 4
hamiltons architects
Level Eight Floor Plan
652m2
279m2 258m2 188m2
Key
HotelResidentialHotel Back of HouseShared Hotel / Residential CoreRetailPlant
N
apt 1
apt 2 apt 3 apt 4
Approx. Rooms Sizes GIA (Room number)
7 x Hotel Room A 55 sqm
1 x Hotel Suites 100 sqm
ONE GROSVENOR PLACE - Option 4
hamiltons architects
Level Basement 1 - Floor Plan
Key
HotelResidentialHotel Back of HouseShared Hotel / Residential CoreRetailPlant
N
Lifts
Lifts
Lifts
Lifts
ONE GROSVENOR PLACE - Option 4
hamiltons architects
Level Basement 2 - Floor Plan
Key
HotelResidentialHotel Back of HouseShared Hotel / Residential CoreRetailPlant
N
Lifts
Lifts
Lifts
Lifts
ONE GROSVENOR PLACE - Option 4
hamiltons architects
Level Basement 3 - Floor Plan
Key
HotelResidentialHotel Back of HouseShared Hotel / Residential CoreRetailPlant
N
Lifts
Lifts
Lifts
Lifts
ONE GROSVENOR PLACE - Option 4
hamiltons architects
1-3 Grosvenor PlaceProposed Area Schedule
sqm sqft sqm sqft sqm sqft sqm sqft sqm sqft sqm sqft sqm sqft sqm sqft sqm sqft
Level 3 - Carpark Level 0 0 0 0 0 0 0 0 0 0 0 0 3813 41,043 0 0 4077 43,885Level 2 - Carpark Level 0 0 0 0 697 7,503 0 0 0 0 0 0 5166 55,607 0 0 5458 58,750Level 1 - Basement Level 1,178 12,680 0 0 1,518 16,340 679 7,309 0 0 0 0 5166 55,607 0 0 5458 58,750Ground Floor 2,435 26,210 560 6,028 0 0 0 0 0 0 0 0 2515 27,071 715 7,696 3460 37,243First Floor 608 6,545 1385 14,908 267 2,874 490 5,274 1281 13,789 2310 24,865 3776 40,645Second Floor 940 10,118 2488 26,781 1298 13,972 3011 32,410 4492 48,352Third Floor 940 10,118 2488 26,781 1298 13,972 3011 32,410 4492 48,352Fourth Floor 940 10,118 2488 26,781 1298 13,972 3011 32,410 4492 48,352Fifth Floor 940 10,118 2488 26,781 1298 13,972 3011 32,410 4492 48,352Sixth Floor 940 10,118 2295 24,703 1298 13,972 2815 30,301 4301 46,296Seventh Floor 625 6,728 1377 14,822 784 8,439 1695 18,245 2598 27,965Eighth Floor 524 5,640 1377 14,822 784 8,439 1695 18,245 2598 27,965
Total 10,070 108,393 16,946 182,407 2,215 23,842 946 10,183 490 5,274 0 0 25,999 279,853 21,274 228,993 49,694 534,906
TOTAL CAR PARKING NO: 139
NOTE:The areas above are indicative at the feasibilty stage only and are subject to change and confirmation. All NIA figures include all internal walls and circulation areas.
A cladding zone of 450mm has been adopted for the purposes of these area calculations
HOTEL & RESIDENTIALGEA
(iii) Construction methods and building tolerances.(iv) Local Authority consents.
These areas have been calculated in accordance with the RICS/ISVA Code of Measuring Practice, 6th Edition, RICS 2001 using the stated options NIA, GIA and GEA.Conversion factor between square metres and square feet: 1sq.m = 10.764sq.ft
Areas are approximate and relate to the likely areas of the building at the current stage of the design. Any decision to be made on the basis of these predictions, whether as to project viability, pre-letting, lease agreements and the like, should make allowance for the following:(i) Design development.
HOTELGIA
RETAILNIA
(ii) Accurate site survey, site levels and dimensions.
HOTELNIA
RESIDENTIALNIA
RESIDENTIALGIA
(MEP)LEVEL
BOH (hotel) BOH (residential)NIANIA NIA
hamiltons architects
Area ScheduleONE GROSVENOR PLACE - Option 4 ONE GROSVENOR PLACE - Option 4
hamiltons architectshamiltons architects
Hotel
1 64 6892 60 6463 60 6464 60 6465 60 6466 60 6467 60 6468 60 6469 144 1,55010 52 56011 52 56012 52 56013 52 56014 52 56015 52 560
Apartment
1 303 3,2612 263 2,8313 317 3,4124 296 3,1865 206 2,2176 374 4,0267 293 3,1548 278 2,9929 158 1,701
Total 940 10,118 2,488 26,781
Resi NIA (sqm)
Resi NIA (sqft)
Hotel NIA (sqm)
Hotel NIA (sqft)Type Room #
Level 2-5
Hotel
1 64 6892 60 6463 60 6464 60 6465 60 6466 60 6467 60 6468 60 6469 144 1,550
BOH 267 2,874
Apartment
1 303 3,2612 263 2,8313 317 3,4124 296 3,1865 206 2,217
BOH 490 5,274
Total 895 9,634 1,875 20,183
Hotel NIA (sqm)
Hotel NIA (sqft)Type
Level 1
Room # Resi NIA (sqm)
Resi NIA (sqft)
NOTES: These areas have been calculated in accordance with the RICS/ISVA Code of Measuring Practice, 5th Edition, RICS 2001 using the stated options NSA, GEA and GIA.Conversion factor between square metres and square feet: 1sq.m = 10.764sq.ft
Areas are based on an exterior wall thickness of aproximately 400mm, party wall thickness 300mm and corridor width of 1500mm.They are approximate and relate to the likely areas of the building at the current stage of the design. Any decision to be made on the basis of these predicitons, whether as to project viability, pre-letting, lease agreements and the like, should make due allowancefor the following(i) Design development.(ii) Accurate site survey, site levels and dimensions.(iii) Construction methods and building tolerances.(iv) Local Authority consents.
Accommodation ScheduleONE GROSVENOR PLACE - Option 4
hamiltons architectshamiltons architects
Hotel
1 625 6,728
Apartment
1 652 7,0182 279 3,0033 258 2,7774 188 2,024
Total 625 6,728 1,377 14,822
Resi NIA (sqm)
Resi NIA (sqft)
Presidential Suite
Hotel NIA (sqm)
Hotel NIA (sqft)Type Room #
Level 7
Hotel
1 64 6892 60 6463 60 6464 60 6465 60 6466 60 6467 60 6468 60 6469 144 1,55010 52 56011 52 56012 52 56013 52 56014 52 56015 52 560
Apartment
1 244 2,6262 191 2,0563 255 2,7454 296 3,1865 206 2,2176 374 4,0267 293 3,1548 278 2,9929 158 1,701
Total 940 10,118 2,295 24,703
Room # Hotel NIA (sqm)
Hotel NIA (sqft)Type
Level 6Resi NIA
(sqm)Resi NIA
(sqft)
NOTES: These areas have been calculated in accordance with the RICS/ISVA Code of Measuring Practice, 5th Edition, RICS 2001 using the stated options NSA, GEA and GIA.Conversion factor between square metres and square feet: 1sq.m = 10.764sq.ft
Areas are based on an exterior wall thickness of aproximately 400mm, party wall thickness 300mm and corridor width of 1500mm.They are approximate and relate to the likely areas of the building at the current stage of the design. Any decision to be made on the basis of these predicitons, whether as to project viability, pre-letting, lease agreements and the like, should make due allowancefor the following(i) Design development.(ii) Accurate site survey, site levels and dimensions.(iii) Construction methods and building tolerances.(iv) Local Authority consents.
Accommodation ScheduleONE GROSVENOR PLACE - Option 4
hamiltons architectshamiltons architects
Hotel
1 56 6032 56 6033 56 6034 56 6035 144 1,5506 52 5607 52 5608 52 560
Apartment
1 652 7,0182 279 3,0033 258 2,7774 188 2,024
Total 524 5,640 1,377 14,822
Level 8
Room # Type Hotel NIA (sqm)
Hotel NIA (sqft)
Resi NIA (sqm)
Resi NIA (sqft)
NOTES: These areas have been calculated in accordance with the RICS/ISVA Code of Measuring Practice, 5th Edition, RICS 2001 using the stated options NSA, GEA and GIA.Conversion factor between square metres and square feet: 1sq.m = 10.764sq.ft
Areas are based on an exterior wall thickness of aproximately 400mm, party wall thickness 300mm and corridor width of 1500mm.They are approximate and relate to the likely areas of the building at the current stage of the design. Any decision to be made on the basis of these predicitons, whether as to project viability, pre-letting, lease agreements and the like, should make due allowancefor the following(i) Design development.(ii) Accurate site survey, site levels and dimensions.(iii) Construction methods and building tolerances.(iv) Local Authority consents.
Accommodation ScheduleONE GROSVENOR PLACE - Option 4