Panattoni Park Ostrov North · CHOMUTOV CITY 12 11 ČESKÁ LÍPA PILSEN CITY, PILSEN DIGITAL Pilsen...
Transcript of Panattoni Park Ostrov North · CHOMUTOV CITY 12 11 ČESKÁ LÍPA PILSEN CITY, PILSEN DIGITAL Pilsen...
Panattoni Park Ostrov North
Pilsen (15 km, 16 min)Prague (90 km, 60 min)
Germany (55 km, 35 min)Karlovy Vary (107 km, 75 min)
E 442/13 EXPRESSWAY 25
EXPRESSWAY
entrance to the park
Klášterec nad Ohří (24 km, 24 min)German borders (via Chomutov 38 km, 39 min)
German borders(via Jáchymov 16 km, 20 min)
OstrovHorní Žďár
OSTROV NAD OHŘÍ
S
N
German borders(via Karlovy Vary 65 km, 40 min)
B
19 357 m2
A
102 676 m2
more than 120 000 m2 of space
11 KM FROM Karlovy Vary
EASY ACCESS TO Karlovy Vary - Chomutov - Most - Teplice
CLOSE TO ALL IMPORTANT CITIES of the region
IDEAL LOCATION due to the close proximity of German borders
AVAILABILITY OF LABOR POOL for reasonable costs
PUBLIC TRANSPORT providing quick connection to Karlovy Vary
PANATTONI PARKOSTROV - NORTHDE
N
S
20 km
KarlovyVary
Praha
Chomutov
Dresden
Chemnitz
Zwickau
Cheb
Nürnberg
Eisenach
Frankfurtam Main
Mariánskélázně
Ústí nadLabem
Litoměřice
Teplice
Most
Plzeň
Klatovy
Baunatal
Mockmuhl
Donnersdorf
NeudietendorfNohra
ButtenheimEggolsheim
Brandis
WilsdruffMeinewech
GeraErfurt
Marburg
Worms
Logistics
Logistics
Logistics
Logistics
Logistics
Logistics
Logistics
Bad Hersfeld
Logistics
Logistics
Logistics
PERFECT ACCESS FROM E 442/13 EXPRESSWAY
CHOMUTOV33 km
GERMANY38 km
GERMANY 65 km
PANATTONIOSTROV - NORTH
OSTROV
KARLOVY VARY 11 km
CZ
Hof
Leipzig
Logistics
Logistics
STANDARD TECHNICAL SPECIFICATION
DOCKS
• 1x electrically operated 3 x 3.2 m dock for each 1 000 sqm of hall
• Each dock equipped with hydraulic leveller, 60 kN capacity, PE shelter, wheel guides
• 1x electrically operated 3.5 x 4.2 m drive-in gate for each 5 000 sqm of hall
FAÇADE
• Horizontal sandwich panels with mineral wool insulation
• Prefabricated concrete façade around docks to approx. 4.5m height
• Double glazed windows in offices with insulated PVC profiles
ROOF
• Corrugated steel sheets, mineral wool insulation, PVC membrane
• Free load capacity of 15 kg/sqm for clients installations
• Min. 2% of skylights in warehouse area• Syphonic drainage system,
emergency overflows
SUPPORTING STRUCTURE
• Pad or pilot foundations, insulated plinth panels up to 30cm above floor
• Prefabricated concrete columns in 12 x 24 m grid or per layout
• Prefabricated concrete or steel roof beams, clear height of 10m
PRODUCTION UPGRADE (OPTIONAL)
• Increased façade and roof insulation• Heating and ventilation in accordance with
code for manufacturing (assembly)• 300 lux LED lighting (excluding influence of
clients installations)• Increased percentage of skylights area
OUTSIDE AREAS
• Hard areas from concrete pavers, sloped for drainage
• 2m high mesh fence, entrance barriers and manual gate
• Green areas with grass, brushes, and trees
OFFICES
• 2 level custom designed in-built, incl. offices, socials, locker rooms, day room, excl. furniture and appliance
• Aluminium entrance door with canopy to entrance lobby• Tiles, carpets or PVC floor surfaces, suspended mineral
ceiling panels• Social rooms with ceramic fixtures, wall tiles, and basic accessories• PVC cable trays below windows, 2x 220V socket per work place• Server room with 2 split units and antistatic PVC floor • Top cooling
FLOOR
• Fibre reinforced concrete floor, PE membrane, cut joints, 18cm thick, surface treated with hardener
• Load capacity of 50 kN/sqm, 60 kN point load • Flatness according to DIN 1822, table 3, line 3
HALL INSTALLATIONS
• Gas Sahara heaters or infrared gas radiators, heating according to norms for warehousing
• ESFR sprinklers under roof, FM Global certified tank and pumps• 200 lux LED lighting (excluding influence of clients installations)• 1x 630 kVA dry transformer station per each 25 000 sqm of hall
Development conceptTotal built-up area 120 982 sqm
Building A 101 808 sqmPersonal car park. places 853Truck parking places 149Docks 137
Building B 19 174 sqmPersonal car park. places 173Truck parking places 12Docks 22
WAREHOUSEColumn grid 12 m x 24 mClear height 10 mESFR sprinkler systemLight intensity in the hall 200 luxSkylights min 2%Floor loading 5t/sqm
OFFICE PREMISESClear height 2,7 m Light intensity 500 luxBuilt to suit solution
SUSTAINABILITY TRENDSLED lightingBREEAM Very Good certified
• Excellent access to the exit from highway• Designed and constructed to the highest
A class standard• Suitable for logistics and
production activities• Turnkey solution according to the
client´s requirements• Accessibility 24/7
145 m
133 m
529 m
193 m
173 personal carparking places in total
11 docks
25 truckparking places
entrance tothe park
201 personalcar parking places
38 docks
28 docks
339 personal carparking places
44 truckparking places
36 docks
35 docks
12 truckparking places
11 docks
48 truckparking places
313 personal carparking places
32 truckparking places
A
B
Panattoni WorldwideInternational vision. Local focus.With an expansive international platform, Panattoni Development Company, Inc. specializes in industrial, office and build-to-suit development. Our 28 offices in the United States, Canada and Europe are respon-sible for development of ca. 30 million square meters. Each office is rooted in the local community with strong partnerships that produce the best results for our clients in each region. You can find us in Poland, Great Britain, the Czech Republic, Slovakia, Germany, Romania, Luxemburg and the Netherlands.
SLOVAKIAPanattoni EuropePalisády 55811 06 BratislavaSlovakia
[email protected]: +421 2 3231 0560 www.panattoni.comwww.panattonieurope.com/sk
CZECH REPUBLICPanattoni EuropeSlovanský dům, Na Příkopě 859/22110 00 Prague 1Czech Republic
[email protected]: +420 225 341 321www.panattoni.czwww.panattonieurope.com/cz
BratislavaMunich
ATHU
Gyor
Salzburg
10
9
8
7
Prague
Liberec
ČeskéBudějovice
Brno Zlín
JihlavaPísek
Wroclaw
Žilina
Regensburg
Dresden
Leipzig
KLATOVY
OSTROV NORTH
PILSEN WEST
CHEB
PŘEŠTICE
HOŘOVICE
D4 D5
D6
D8 D35
E48 PRAGUE AIRPORT II
MLADÁ BOLESLAV
1
2 5
6
D1
D1
D2
D11
D10
D3
E442
D1
A4
A14
A72
A6
A93
E442
E75
E58 E58 E77
D1
E58
D4
A3
A3
A9
A4
DE
CZ
PL
SK
D7
STARÁ BOLESLAV
3
Ostrava
Chemnitz
NOŠOVICE
Dingolfing
Deggendorf
Hof
Zwickau
TrenčínKošice
Prešov
PETROVANY
Frýdek-MístekProstějov
Olomouc
Tábor
Most
BRNO AIRPORT
KolínHradec Králové
Pardubice
Svitavy
PARDUBICE4
CHOMUTOV NORTHCHOMUTOV CITY
12
11
ČESKÁ LÍPA
PILSEN CITY,PILSEN DIGITAL
Pilsen
HRADEC KRÁLOVÉ NORTH
PRAGUE BUSINESS PARK
TEPLICE SOUTH
13
UNIČOV
PŘEROV
PIEŠŤANY
DUNAJSKÁSTREDA
KARLOVY VARY
STŘÍBRO
14TRNAVA
KOŠICE AIRPORT
Budapest
Linz Vienna
Nitra
A1
A1A4
A8
A8
BanskáBystrica
1 Amazon, GM Electronic, CEVA Logistics, StayOnline, Stokvis Tapes, Iron Mountain
2 DSV, TIREX TYRE, SMIC, Panalpina, Europe Ecommerce Services, Huajie, ViaPharma
3 Yanfeng (Johnson Controls)4 Alpha Corporation (Assa Abloy)5 Simoldes Plasticos6 HP Tronic7 Saint Gobain Sekurit, Raben Group8 KION Group, Lear Corporation, Leoni,
Steelcase, Ideal Automotive, Assa Abloy, GEA Bock Czech
9 DHL, BWI, Tchibo 10 Filtration Group, Trost, Faurecia,
SONY DADC, Alutech, IAC, Maurice Ward, Groupe Plastivaloire
11 IAC12 Bombardier13 Okay, Lorenc Logistic, Richter+Frenzel,
Dermacol, Baby Direkt14 TI Automotive, Streit15 Lear Corporation
PANATTONI PARKS
BUILT - TO - SUIT AND CLIENTS
15