Paint

35
AINT Paint is the homogenous mixture of Resin, solven ditivites is the basic solid content in the paint. Resin is - Flow -Body appearance -Film formation -Pigment binding -cross linking etc.. Solvent the volatile material . It mixes with paint ther properties.It need for -Reducing viscosity -change speed of dry/flashoff Pigments give the shade of the colour to the paint es for metallic finishes, Mica based. icrosoft Office Excel Worksheet

description

details

Transcript of Paint

WHAT IS PAINTPaint is the homogenous mixture of Resin, solvent pigments & additivites RESIN: It is the basic solid content in the paint. Resin is need for - Flow -Body appearance -Film formation -Pigment binding -cross linking etc.. SOLVENT: Solvent the volatile material . It mixes with paint to viscosity Settings and other properties.It need for -Reducing viscosity -change speed of dry/flashoff PIGMENTS: Pigments give the shade of the colour to the paint Aluminium flakes for metallic finishes, Mica based.

ADDITIVES: Additives added in paint small quantities to improve certain specific characteristics like UV absorbers- Durability Flow addivites- Leveling Anti settling agents Driers & catalyst. PAINTING Painting basically done to give good apperance, corrosion resistance & prevent From natural Causes like UV, Salt content , Acid content etc.. After painting process the following properties needed to check -Adhesion -Gloss -DOI -Colour -Orange peel - Hardness etc..

WBS PT/ ED

ED OVEN ED BUFFER

SEALER LINE 1 SEALER LINE 2

UBS UBS BOOTH OVEN

PRIMER SANDING

PRIMER BUFFER

PRIMER PRIMER OVEN BOOTH OFF LINE

UBS ED SANDING BUFFER

TOP COAT 1 TOP COAT 1 TOP COAT INITIAL OVEN BUFFER INSPECTION TOP COAT 2 TOP COAT 2 HRS T/C OVEN OK BLACK FINAL POLISHING LINE 1 PBS LINE TAPE POLISHING LINE 2 NOT OK SPOT REPAIR 1

ASSEMBLYSPOT REPAIR 2

PRETREATMENT:Pretreatment is the process to remove all contamination from the surface. To make the surface reactive. Pre-treatment mainly done to give corrosion resistance.

Pre treatment Process flow:ED BATH (DIP) UF-1 (SPRAY) UF-2 (DIP) UF-3 (SPRAY) RCDI-1 (SPRAY) RCDI-3 (SPRAY)

FRESH DI (SPRAY)

HOT WATER RINSE -1(11KL) SPRAY:To remove the oil contamination and any other foreign materials in the incoming Body from body shop. It improves the degreasing process& reduce degreasing Solution contamination by removing body welding chip, grinding, sanding chips . Control parameters: PH - >10.0 spray pressure- 4-6 kg/cm2 Temperature- 40- 50*c Liquid level from top- 200 mm Spray volume- 4000 l/ min. max

HOT WATER RINSE -2 (11KL)SPRAY:Control parameters : spray pressure- 1.0- 2.0 kg/cm2 Liquid level from top- 100 mm Spray volume- 1950 l/ min. max pump electric current- 14- 15A

DEGREASING (11KL) SPRAY:Degreasing process used to improve Phosphate film performance & paint Adhesion power, by removing grease, oil & other foreign particles Control parameters: Alkalinity point- 25- 30 CHEMICAL NAME: oil content- 10.0 Spray pressure- 1.5 2.5kg/cm2 Exit spray volume- 1600 l/hr

PHOSPHATING:To increase corrosion protection, durability of car by providing a solid Formation for adhesion of subsequent coat. It act as a non conducting bond between Paint & metal surface. Control parameters: Total acidity point- 22-25 Free acidity 1.0 - 1.4 zinc content- 1.0- 1.5g/lit coating weight- 1.8 3.0 g/m2 Temperature- 45 50*c

WATER RINSE- 4 SPRAY:To remove carry over of phosphating solution & to provide durability & uniform Dense of zinc phosphate layer. Total acidity< 1.5 mist spray volume- 1600l/hr spray pressure- 1.0 2.0 kg/cm2 Temperature- ambient spray volume- 1900l/min.max liquid level from top- 12-13 A

WATER RINSE -5 (DIP):Total acidity < 0.5 circul. Pressure- 1.5- 2.5 kg/cm2 Temperature- ambient mist spray volume- 1600l/hr

DI RINSE 1, 2 (SPRAY) :To prevent mineral oil contamination into the ED tank & provide uniformly Conductive surface of ED application. Control parameters: circulation pressure- 1.5 2.5 kg/cm2 liquid level from top- 100 150mm mist spray volume- 1600l/hr spray volume- 1900l/hr

DI ENTRY SPRAY:To improve ED application quality by preventing the body from semi drying& Complete drying. Body should be in full wet condition before entry in to the ED tank. Spray volume- 1000- 1600l/hr

ED TANK DIP (250 KL):To increase corrosion protection & durability of car by coating through electro Chemical process in order to provide a smooth uniform coating. It has the best ability To coat inner surface. ED process parameters the impact coating appereance, quality & Performance on all substrates. Control parameters for ED : % NVM 18- 23 PH at 25*c 5.5- 5.9 bath temperature- 28-32*c pump pressure- main ciru.- 2-3 bar cooling circulation- 2-3 bar UF module pump- 4-5 bar Rectifier voltage & current inlet bus bar- 0- 170V (max. 2000A) Main bus bar- 180- 270 V (max. 2000A) % solvent 0- 0.8 anolyte flow rate- 100l/hr/cell permeate PH at 25*c- 5- 5.9 permeate solids - 1.5%

UF -1 (ULTRA FILTRATION):The purpose is to recover carry over paint from carbody, UF rinse will prevent The body from paint dry defects and provide smooth , uniform finish. Control parameters: %NVM -