1-11-A7-P10-HT-K056-2TA160CBE-063 Punch List29-Dec-2021
Status PCWBS Drawing Punch No. Category Type Description CreatedDate Created By
WorkCompleted
Date
WorkCompleted
By
WorkConfirmed
Date
WorkConfirmed
ByRejected Reason Images
Included Remarks
Closed 2TA160CBE
2TA160CBE-1X110130-03 0Sheet 1 of 1 Q-001-AB AB QC BTM Report to be attached 25-Apr-2021 RYOSUKE
YAMASHITA 16-Nov-2021 Ryota Sakai 16-Nov-2021 Ryota Sakai No 1.1100-06-PS-0004-A-CML-01
Closed 2TA160CBE
2TA160CBE-1X110130-03 0Sheet 1 of 1 Q-002-AB AB QC BTM Report to be attached 25-Apr-2021 RYOSUKE
YAMASHITA 16-Nov-2021 Ryota Sakai 16-Nov-2021 Ryota Sakai No 1.1100-06-PS-0004-A-CML-02
Closed 2TA160CBE
2TA160CBE-1X110061-010D1 Sheet 1 of 1 S-001-AB AB BOLTS AND
NUTSbolt tightening (torqueing, tensioning) to be
completed after test 04-Aug-2021 Zan Shijun 15-Nov-2021 Zan Shijun 15-Nov-2021 Zan Shijun No
Closed 2TA160CBE
2TA160CBE-1X110129-01 0Sheet 1 of 1 S-011-AB AB BOLTS AND
NUTSbolt tightening (torqueing, tensioning) to be
completed after test 04-Aug-2021 Zan Shijun 15-Nov-2021 Zan Shijun 15-Nov-2021 Zan Shijun No
Closed 2TA160CBE
2TA160CBE-1X110129-01 0Sheet 1 of 1 S-012-AB AB INSTRUMEN
TSInstrument items removed for testing to be re-
installed 04-Aug-2021 Zan Shijun 15-Nov-2021 Zan Shijun 15-Nov-2021 Zan Shijun No Confirm with PMCteam
Closed 2TA160CBE
2TA160CBE-1X110129-01 0Sheet 1 of 1 S-013-AB AB INSTRUMEN
TSInstrument items removed for testing to be re-
installed 04-Aug-2021 Zan Shijun 15-Nov-2021 Zan Shijun 15-Nov-2021 Zan Shijun No Confirm with PMCteam
Closed 2TA160CBE
2TA160CBE-1X110129-020D3 Sheet 1 of 1 S-022-AB AB INSTRUMEN
TSInstrument items removed for testing to be re-
installed 05-Aug-2021 Zan Shijun 15-Nov-2021 Zan Shijun 15-Nov-2021 Zan Shijun No Confirm with PMCteam
Closed 2TA160CBE
2TA160CBE-1X110129-020D3 Sheet 1 of 1 S-023-AB AB INSTRUMEN
TSInstrument items removed for testing to be re-
installed 05-Aug-2021 Zan Shijun 15-Nov-2021 Zan Shijun 15-Nov-2021 Zan Shijun No Confirm with PMCteam
Closed 2TA160CBE
2TA160CBE-1X110129-020D3 Sheet 1 of 1 S-024-AB AB INSTRUMEN
TSInstrument items removed for testing to be re-
installed 05-Aug-2021 Zan Shijun 15-Nov-2021 Zan Shijun 15-Nov-2021 Zan Shijun No Confirm with PMCteam
Closed 2TA160CBE
2TA160CBE-1X110129-020D3 Sheet 1 of 1 S-025-AB AB INSTRUMEN
TSInstrument items removed for testing to be re-
installed 05-Aug-2021 Zan Shijun 15-Nov-2021 Zan Shijun 15-Nov-2021 Zan Shijun No Confirm with PMCteam
Closed 2TA160CBE
2TA160CBE-1X110129-020D3 Sheet 1 of 1 S-029-AB AB BOLTS AND
NUTSbolt tightening (torqueing, tensioning) to be
completed after test 05-Aug-2021 Zan Shijun 15-Nov-2021 Zan Shijun 15-Nov-2021 Zan Shijun No
Closed 2TA160CBE
2TA160CBE-1X110129-020D3 Sheet 1 of 1 S-030-AB AB BOLTS AND
NUTSbolt tightening (torqueing, tensioning) to be
completed after test 05-Aug-2021 Zan Shijun 15-Nov-2021 Zan Shijun 15-Nov-2021 Zan Shijun No
Closed 2TA160CBE
2TA160CBE-1X110129-020D3 Sheet 1 of 1 S-031-AB AB BOLTS AND
NUTSbolt tightening (torqueing, tensioning) to be
completed after test 05-Aug-2021 Zan Shijun 15-Nov-2021 Zan Shijun 15-Nov-2021 Zan Shijun No
Closed 2TA160CBE
2TA160CBE-1X110129-03 0Sheet 1 of 1 S-039-AB AB BOLTS AND
NUTSbolt tightening (torqueing, tensioning) to be
completed after test 05-Aug-2021 Zan Shijun 15-Nov-2021 Zan Shijun 15-Nov-2021 Zan Shijun No
Closed 2TA160CBE
2TA160CBE-1X110129-061a Sheet 1 of 1 S-045-AB AB BOLTS AND
NUTSbolt tightening (torqueing, tensioning) to be
completed after test 05-Aug-2021 Zan Shijun 15-Nov-2021 Zan Shijun 15-Nov-2021 Zan Shijun No
Closed 2TA160CBE
2TA160CBE-1X110129-061a Sheet 1 of 1 S-050-AB AB BOLTS AND
NUTSbolt tightening (torqueing, tensioning) to be
completed after test 05-Aug-2021 Zan Shijun 15-Nov-2021 Zan Shijun 15-Nov-2021 Zan Shijun No
Closed 2TA160CBE
2TA160CBE-1X110129-061a Sheet 1 of 1 S-051-AB AB BOLTS AND
NUTSbolt tightening (torqueing, tensioning) to be
completed after test 05-Aug-2021 Zan Shijun 15-Nov-2021 Zan Shijun 15-Nov-2021 Zan Shijun No
Closed 2TA160CBE
2TA160CBE-1X110130-010D1a Sheet 1 of 1 S-058-AB AB SUPPORT Temporary supports not removed 05-Aug-2021 Zan Shijun 15-Nov-2021 Zan Shijun 15-Nov-2021 Zan Shijun No
Closed 2TA160CBE
2TA160CBE-1X110130-010D1a Sheet 1 of 1 S-059-AB AB SUPPORT Temporary supports not removed 05-Aug-2021 Zan Shijun 15-Nov-2021 Zan Shijun 15-Nov-2021 Zan Shijun No
Closed 2TA160CBE
2TA160CBE-1X110130-010D1a Sheet 1 of 1 S-061-AB AB BOLTS AND
NUTSbolt tightening (torqueing, tensioning) to be
completed after test 05-Aug-2021 Zan Shijun 15-Nov-2021 Zan Shijun 15-Nov-2021 Zan Shijun No
Closed 2TA160CBE
2TA160CBE-1X110130-010D1a Sheet 1 of 1 S-062-AB AB BOLTS AND
NUTSbolt tightening (torqueing, tensioning) to be
completed after test 05-Aug-2021 Zan Shijun 15-Nov-2021 Zan Shijun 15-Nov-2021 Zan Shijun No
Closed 2TA160CBE
2TA160CBE-1X110130-020b Sheet 1 of 1 S-067-AB AB BOLTS AND
NUTSbolt tightening (torqueing, tensioning) to be
completed after test 05-Aug-2021 Zan Shijun 15-Nov-2021 Zan Shijun 15-Nov-2021 Zan Shijun No
Closed 2TA160CBE
2TA160CBE-1X110130-04 0Sheet 1 of 1 S-079-AB AB BOLTS AND
NUTSbolt tightening (torqueing, tensioning) to be
completed after test 05-Aug-2021 Zan Shijun 15-Nov-2021 Zan Shijun 15-Nov-2021 Zan Shijun No
Closed 2TA160CBE
2TA160CBE-1X110130-03 0Sheet 1 of 1 S-070-AB AB BOLTS AND
NUTSbolt tightening (torqueing, tensioning) to be
completed after test 05-Aug-2021 Zan Shijun 15-Nov-2021 Zan Shijun 15-Nov-2021 Zan Shijun No
Closed 2TA160CBE
2TA160CBE-1X110130-03 0Sheet 1 of 1 S-071-AB AB BOLTS AND
NUTSbolt tightening (torqueing, tensioning) to be
completed after test 05-Aug-2021 Zan Shijun 15-Nov-2021 Zan Shijun 15-Nov-2021 Zan Shijun No
Closed 2TA160CBE
2TA160CBE-1X110130-03 0Sheet 1 of 1 S-072-AB AB BOLTS AND
NUTSbolt tightening (torqueing, tensioning) to be
completed after test 05-Aug-2021 Zan Shijun 15-Nov-2021 Zan Shijun 15-Nov-2021 Zan Shijun No
Closed 2TA160CBE
2TA160CBE-1X110130-03 0Sheet 1 of 1 S-073-AB AB BOLTS AND
NUTSbolt tightening (torqueing, tensioning) to be
completed after test 05-Aug-2021 Zan Shijun 15-Nov-2021 Zan Shijun 15-Nov-2021 Zan Shijun No
Closed 2TA160CBE
2TA160CBE-1X110130-03 0Sheet 1 of 1 S-074-AB AB VALVES Valves removed for testing to be re-installed 05-Aug-2021 Zan Shijun 15-Nov-2021 Zan Shijun 15-Nov-2021 Zan Shijun No
Closed 2TA160CBE
2TA160CBE-1X110130-03 0Sheet 1 of 1 S-075-AB AB VALVES Valves removed for testing to be re-installed 05-Aug-2021 Zan Shijun 15-Nov-2021 Zan Shijun 15-Nov-2021 Zan Shijun No
Copyright MODS 2021
Page 1 of 17
1-11-A7-P10-HT-K056-2TA160CBE-063 Punch List29-Dec-2021
Status PCWBS Drawing Punch No. Category Type Description CreatedDate Created By
WorkCompleted
Date
WorkCompleted
By
WorkConfirmed
Date
WorkConfirmed
ByRejected Reason Images
Included Remarks
Closed 2TA160CBE
2TA160CBE-1X110129-020D3 Sheet 1 of 1 E-003-AB AB SUPPORT locking nut not installed as per drawing.(Hex nut
should be installed first) 16-Oct-2021 Chong Xiao 18-Nov-2021 Zan Shijun 20-Nov-2021 Chong Xiao No
Closed 2TA160CBE
2TA160CBE-1X110129-020D3 Sheet 1 of 1 E-004-AB AB SUPPORT Supports not installed as per drawing 16-Oct-2021 Chong Xiao 18-Nov-2021 Zan Shijun 20-Nov-2021 Chong Xiao No
Special type pipesupport to be checked
carefully
Closed 2TA160CBE
2TA160CBE-1X110130-010D1a Sheet 1 of 1 E-005-AB AB SUPPORT Supports not installed as per drawing.(temporary
support shall be pink color) 16-Oct-2021 Chong Xiao 18-Nov-2021 Zan Shijun 20-Nov-2021 Chong Xiao No
Closed 2TA160CBE
2TA160CBE-1X110130-010D1a Sheet 1 of 1 E-006-AB AB SUPPORT Supports not installed as per drawing.(Hex nut
shall be installed first) 16-Oct-2021 Chong Xiao 18-Nov-2021 Zan Shijun 20-Nov-2021 Chong Xiao No
Closed 2TA160CBE
2TA160CBE-1X110130-010D1a Sheet 1 of 1 E-007-AB AB SUPPORT Only north side requires 35mm gap, south side
shall install normal guide. 16-Oct-2021 Chong Xiao 18-Nov-2021 Zan Shijun 22-Nov-2021 Chong Xiao No
Closed 2TA160CBE
2TA160CBE-1X110129-020D3 Sheet 1 of 1 E-008-AB AB VALVES Valve shall be installed as per ISO drawing
coordinates.(Strainer cover to be rotated) 16-Oct-2021 Chong Xiao 18-Nov-2021 Zan Shijun 20-Nov-2021 Chong Xiao No
Open 2TA160CBE
2TA160CBE-1X110130-04 0Sheet 1 of 1 S-078-A2 A2 BOLTS AND
NUTSbolt tightening (torqueing, tensioning) to be
completed after test 05-Aug-2021 Zan Shijun No
Open 2TA160CBE
2TA160CBE-1X110130-04 0Sheet 1 of 1 S-080-A2 A2 BOLTS AND
NUTSbolt tightening (torqueing, tensioning) to be
completed after test 05-Aug-2021 Zan Shijun No
Open 2TA160CBE
2TA160CBE-1X110130-010D1a Sheet 1 of 1 S-091-A2 A2 PIP Hook-up location (dimension control) to be
checked after test 05-Aug-2021 Zan Shijun No
Open 2TA160CBE
2TA160CBE-1X110061-010D1 Sheet 1 of 1 S-097-A2 A2 PIPING (A2) Spectacle blind to be kept open after
reinstatement until Pre-Comm activity. 20-Aug-2021 KonishiTakashi No
Open 2TA160CBE
2TA160CBE-1X110129-020D3 Sheet 1 of 1 S-098-A2 A2 PIPING (A2) Temporary spool to be maintained for Pre-
Comm activity 07-Sep-2021 KonishiTakashi No
Open 2TA160CBE
2TA160CBE-1X110130-010D1a Sheet 1 of 1 S-099-A2 A2 PIPING (A2) Temporary spool to be maintained for Pre-
Comm activity 07-Sep-2021 KonishiTakashi No
Open 2TA160CBE
2TA160CBE-1X110129-01 0Sheet 1 of 1 E-001-A2 A2 BOLTS AND
NUTSTo conduct touch-up paint for set bolt of Butterfly
Valve as per L001-00000-MP-7205-1258 16-Oct-2021RODRIGO
JR. SEVILLAGERTOS
No
Open 2TA160CBE
2TA160CBE-1X110130-020b Sheet 1 of 1 E-002-A2 A2 BOLTS AND
NUTSTo conduct touch-up paint for set bolt of Butterfly
Valve as per L001-00000-MP-7205-1258 16-Oct-2021RODRIGO
JR. SEVILLAGERTOS
No
Open 2TA160CBE
2TA160CBE-1X110130-020b Sheet 1 of 1 S-068-A2 A2 BOLTS AND
NUTSbolt tightening (torqueing, tensioning) to be
completed after test 05-Aug-2021 Zan Shijun No
Open 2TA160CBE
2TA160CBE-1X110129-061a Sheet 1 of 1 S-052-A2 A2 BOLTS AND
NUTSbolt tightening (torqueing, tensioning) to be
completed after degreasing 05-Aug-2021 Zan Shijun No
Open 2TA160CBE
2TA160CBE-1X110130-010D1a Sheet 1 of 1 S-056-A2 A2 SUPPORT Supports not installed as per drawing 05-Aug-2021 Zan Shijun No
Special type pipesupport to be checked
carefully
Open 2TA160CBE
2TA160CBE-1X110129-04 0Sheet 1 of 1 S-042-A2 A2 BOLTS AND
NUTSbolt tightening (torqueing, tensioning) to be
completed after test 05-Aug-2021 Zan Shijun No
Open 2TA160CBE
2TA160CBE-1X110129-020D3 Sheet 1 of 1 S-016-A2 A2 PIP Hook-up location (dimension control) to be
checked after test 04-Aug-2021 Zan Shijun No
Open 2TA160CBE
2TA160CBE-1X110061-010D1 Sheet 1 of 1 S-002-A2 A2 BOLTS AND
NUTSbolt tightening (torqueing, tensioning) to be
completed after degreasing 04-Aug-2021 Zan Shijun No
Copyright MODS 2021
Page 2 of 17
Page 3 of 17
Page 4 of 17
Page 5 of 17
Page 6 of 17
Page 7 of 17
Page 8 of 17
Page 9 of 17
Page 10 of 17
Page 11 of 17
Page 12 of 17
Page 13 of 17
Page 14 of 17
Page 15 of 17
Page 16 of 17
Page 17 of 17