Collins Aerospace Page 1 of 16 Quality Purchase Codes Revision AD
Procedure 1.6.1.8 March 22, 2019
Collins Aerospace Proprietary – This document does not contain any export controlled technical data. Hard Copy is not a controlled document.
Verify the current revision in the electronic released directory
Revision Reason for Revision Section DCRN
Number
Date
W Minor format edits
Reordered items
Changed “Acceptance Test Reports” to
“Test Reports / “Process Certifications”
Added clarification for providing Revs
when listing a process spec on
CoC
Created UPPAP code 36
All
Code 1
Code 1
Code 1
Code 36
128968 8/12/2015
Y Revised Traceability and Identification of
Provided Product section for OP5 contract
requirements
Code 1 129685 5/31/2016
AA References Procedure 1.4.24 and
Procedure 1.9.6 Spec 5000 for cosmetic
issues.
Special process section rewritten to add
laser machining exception. Additional
requirements added for C of C’s.
Code 1 130004 9/27/16
AB Added reference to ASQR-01 & UTAS-
SCM-PRO-0003.
Replaced “Goodrich” with “UTAS”
Code 1
All
131131 12/06/2017
AC Clarified SAP update and revised Note
Code 8
Code 8 131534 4/27/18
AD Update header and document references
to Collins Aerospace for alignment
All 132360 3/22/2019
Quality Purchase Code revisions will be updated in SAP and flowed to the supply base
through the Procurement department within three months of the revision date. Flow-down
will be accomplished via SAP work ticket to change the Standard PO Text for “Quality Note”
in plants 2435, 2436, 2437. Once the SAP Ticked is closed, initiator shall verify proper
wording using SAP T-CODE “ZMM_STDTEXT_DISPLAY” for each plant.
QUALITY PROCUREMENT REQUIREMENTS
Collins Aerospace - Colorado Springs
The following Quality requirements are imposed when indicated on a Collins Purchase Order. If the
supplier needs clarification, or has any questions regarding these requirements, the supplier should
contact the Collins Purchasing Agent prior to acceptance of the contract. Acceptance of the Purchase
CH
EC
K O
NLI
NE
RE
VIS
ION
LE
VE
L P
RIO
R T
O U
SIN
G
Collins Aerospace Page 2 of 16 Quality Purchase Codes Revision AD
Procedure 1.6.1.8 March 22, 2019
Collins Aerospace Proprietary – This document does not contain any export controlled technical data. Hard Copy is not a controlled document.
Verify the current revision in the electronic released directory
Order shall indicate that the supplier has read and understood the following Quality requirements
indicated on the Purchase Order and that all necessary documents are complete and shall accompany each
shipment against the Purchase Order or be on file at the supplier as required.
Quick Reference Index of Codes:
Code 1 – Collins Standard Quality Requirements
Configuration Management
Supplier’s Quality Assurance Requirements
Supplier Approval
Inspection, Acceptance and Rejection
Material Review Board (MRB) / Nonconforming Material Disposition Authority
Traceability and Identification of Provided Product
Age Control
Labeling
Barcoding of Shipping Containers
First Article Inspection
Special Process
FOD
Certificate of Conformance
Test Reports / Process Certifications
Fraudulent/Counterfeit Parts
Software Compliance
Key Characteristic Control
Order of Precedence
Record Retention
Code 2 – Reserved – Incorporated into Code 1
Code 3 – Reserved – Incorporated into Code 1
Code 4 – Reserved – Covered in Section 12 of Collins Standard Terms and Conditions of Purchase
Code 5 – Reserved – Incorporated into Code 1
Code 6 – Reserved – Incorporated into Code 1
Code 7 – Reserved – Incorporated into Code 1
Code 8 – Collins U.S. Government Provisions & Clauses For Orders Under U.S. Government Contracts
Code 9 – Reserved – Covered in Collins U.S. Government Provisions & Clauses For Orders Under U.S. Government Contracts
Code 10 – Reserved – Incorporated into Code 1
Code 11 – Government Inspection
Code 12 – Government Selective Evaluation
Code 13 – Priority Rating
Code 14 – Reserved – Covered in Collins U.S. Government Provisions & Clauses For Orders Under U.S. Government Contracts
and Incorporated in Code 1 Code 15 – Reserved – Covered in Collins U.S. Government Provisions & Clauses For Orders Under U.S. Government Contracts
and Section 9 of Collins Standard Terms and Conditions of Purchase
Code 16 – Reserved – Covered in Section 28 of Collins Standard Terms and Conditions of Purchase
Code 17 – Reserved – Incorporated into Code 1
Code 18 – Reserved – Incorporated into Code 1
Code 19 – Directed Special Processing Supplier
Code 20 – Single Lot Control
Code 21 – Human Space Flight
Code 22 – FOD Statement
CH
EC
K O
NLI
NE
RE
VIS
ION
LE
VE
L P
RIO
R T
O U
SIN
G
Collins Aerospace Page 3 of 16 Quality Purchase Codes Revision AD
Procedure 1.6.1.8 March 22, 2019
Collins Aerospace Proprietary – This document does not contain any export controlled technical data. Hard Copy is not a controlled document.
Verify the current revision in the electronic released directory
Code 23 – Flammability and Product Identification
Code 24 – Collins Source Inspection
Code 25 – Collins Furnished Material
Code 26 – Packaging and Handling
Code 27 – Reserved – Incorporated into Code 1
Code 28 – Reserved – No longer used.
Code 29 – Regulatory Certification
Code 30 – Calibration
Code 31 – Reserved – Incorporated into Code 1
Code 32 – Reserved – Covered in Collins U.S. Government Provisions & Clauses For Orders Under U.S. Government Contracts
Code 33 – Higher-Level Contract Quality Requirements
Code 34 – GRESS (General Requirement for Equipment and System Suppliers)
Code 35 – Reserved- Incorporated into Code 24
Code 36 – United Technologies Production Part Approval Process (UPPAP)
Code 1 –Collins Standard Quality Requirements
Configuration, Material, Design Change Management
Products made for this PO become part of an assembly that has an APPROVAL FOR AN OVERALL
DESIGN AND TEST RESULT. Any changes, EVEN IMPROVEMENTS, could result in UNTESTED
ASSEMBLIES that prevent the sale or use of the part, component, and possibly aircraft.
The Supplier shall maintain Engineering, Manufacturing, and Quality Controls such that the configuration of
items scheduled for delivery under this Purchase Order/ Subcontract conforms to the performance specifications
defining the item, and the configuration management requirements set forth in the following tasks.
The Supplier shall at any time after Purchase Order/ Subcontract award provide Collins with 90 days
written notice prior to making any Class A-Form, Fit, or Function change(s) to the design, quality system
or manufacturing location.
The Supplier shall give written notice describing any proposed change in sufficient detail (including cost
and schedule impact analysis) to enable an understanding by Collins of the total impact of the change.
Supplemental documentation (exhibits) sketches, drawings, draft service bulletin, etc.) shall be included.
Collins will endeavor, within 30 days after receipt of such change proposal, to advise Supplier of its
consent to, rejection of, or the status of Collins consideration of such change. In no event shall Supplier
proceed to incorporate such change into the items ordered on the Collins Purchase Order/Subcontract
prior to receipt of written consent by Collins .
Nonconforming articles and materials returned by Collins and subsequently resubmitted by the supplier
shall bear adequate identification of nonconformance, either on the articles, materials, or applicable
records. The supplier shall reference the applicable Collins nonconformance document number on all
resubmittals.
Supplier Approval
CH
EC
K O
NLI
NE
RE
VIS
ION
LE
VE
L P
RIO
R T
O U
SIN
G
Collins Aerospace Page 4 of 16 Quality Purchase Codes Revision AD
Procedure 1.6.1.8 March 22, 2019
Collins Aerospace Proprietary – This document does not contain any export controlled technical data. Hard Copy is not a controlled document.
Verify the current revision in the electronic released directory
All Collins suppliers are required to be 3rd
party registered / certified by an RAB approved party, or approved
by Collins to the current AS/ISO 9001-9100 specifications.
When noted on the purchase order, other approvals may be required based upon contract, component, or
process being purchased by Collins .
Note: The supplier is responsible to send an updated, revised or discontinued 3rd
party registrations and
certification when issued.
Supplier’s Quality Assurance Requirements
Supplier shall perform, or have performed; all inspections (examinations and tests) required substantiating
compliance with the technical requirements of the part numbers ordered.
Visual appearance of parts is paramount. Parts can be rejected for surface defects, dents, scratches or
other cosmetic irregularities and should be inspected at the supplier to ensure compliance per Procedure
1.4.24 which is referenced in Spec 5000 (referenced on drawings).
Supplier shall maintain a calibration system consistent with ANSI/NCSL Z540 or ISO 10012-1.
Supplier shall comply with ARP 9013 for all sample inspection plans used in lieu of 100% inspection.
o Note: Sample inspection plans require that 100% of the characteristics on each part are inspected
in the sample.
Supplier shall inspect 100% any characteristics or parts indicated on the drawing, in referenced
specifications, or in the PO as safety critical unless a control / inspection plan describing the inspection
process has been approved by Collins .
Supplier shall comply with all requirements of ASQR-01 with any exceptions outlined in this document.
ASQR-01 and all related documents may be found at:
http://www.utc.com/Suppliers/Pages/Aerospace-Supplier-Quality-Requirement-Documents.aspx
Supplier shall comply with all requirements of COL-ASQR-PRO-0003.
Inspection, Acceptance, and Rejection
All goods (which throughout this contract includes, without limitation, raw materials, components,
intermediate assemblies, end products and, where applicable, services to be performed hereunder) shall be
subjected to inspection and test at all times and places, including the period of manufacture by Collins and its
customers. Collins, its customers, and appropriate regulatory agencies shall have access to all related product and
records and all facilities of the Supplier or of Suppliers subcontractors in which work on this contract is being
performed. Supplier and Suppliers subcontractors shall provide all reasonable facilities for the safety and
convenience of Inspectors at no additional cost. Supplier shall furnish to Inspectors all information and data as
may be reasonably required to perform their inspection. All goods to be delivered hereunder shall be subject to
final inspection, test and acceptance by Collins at destination, notwithstanding any payment or inspection at
source. Collins shall accept or give notice of rejection of goods delivered hereunder within a reasonable time
after receipt of such goods. Failure to give notice of rejection shall constitute acceptance, but acceptance by any
manner shall not waiver any warranty obligations of Suppliers.
CH
EC
K O
NLI
NE
RE
VIS
ION
LE
VE
L P
RIO
R T
O U
SIN
G
Collins Aerospace Page 5 of 16 Quality Purchase Codes Revision AD
Procedure 1.6.1.8 March 22, 2019
Collins Aerospace Proprietary – This document does not contain any export controlled technical data. Hard Copy is not a controlled document.
Verify the current revision in the electronic released directory
Any tender of goods which is nonconforming as to the quality or quantity of the delivery schedule shall
constitute a breach of this contract and Collins shall have the absolute right to reject such goods, in whole or in
part, and notify Supplier thereof. In the event of such a tender, Collins shall be entitled to all remedies as
provided by law, and in addition thereto shall have the right to do any or all of the following: (i) to hold such
nonconforming goods for a reasonable period at Supplier's risk and expense pending a determination to accept or
reject any or all thereof, (ii) to return same to Supplier at Collins’ election and at Supplier's risk and expense for
replacement or correction, (iii) to accept same subject to an equitable price reduction, (iv) to replace or correct
same and charge to supplier the cost occasioned to Collins thereby, (v) to recover by offset or otherwise any and
all expenses, costs, price reductions and damages paid, incurred, or suffered by Collins as a result of such
holding, return, replacement, correction, reduction, or rejections, of nonconforming goods.
Requests for a Return Authorization number shall be satisfied within 48 hours. If an RMA# is not
provided in 48 hours, the buyer will assign the QN# as the RMA # and return the product to the
supplier.
Material Review Board (MRB) / Nonconforming Material Disposition Authority:
Supplier may disposition nonconforming material as “scrap” or “rework to print” without Collins Approval.
Any nonconformance to design or contract that cannot be eliminated and brought back into conformance to
Collins design or contract shall be presented to Collins for approval (i.e. “use as is” or “repair”) prior to shipment.
If the product is dispositioned as scrap by Collins , but the material is shipped back to the supplier on a
miscellaneous shipper for analysis, the supplier shall control the product until physically rendered unusable
(i.e. the product is not allowed to be reworked and sent back to Collins as production units).
Scrap dispositions apply only to supplier supplied material. When replacement of product is necessary to
fulfill the deliverable quantity on lot controlled items, such replacements shall be from the same material lot,
batch or heat lot, as applicable. In the event that the scrap disposition renders the deliverable quantity short,
notify Collins buyer immediately.
The supplier shall notify Collins within three (3) days of any nonconformity affecting product already
delivered. Notification shall include a clear description of the discrepancy; parts affected (Serial Number, lot
number or manufacturing date, as applicable), quantity, and delivery date(s). Supplier shall support Collins with
additional data, and parts if necessary per contract, to resolve customer concerns.
Traceability and Identification of Provided Product:
The supplier shall retain evidence to document that items furnished under this contract conform to
contract requirements. Evidence will generally include information tracing the items back to the
manufacturing source or its authorized distributor. At a minimum, evidence shall be sufficient to establish the
identity of the item, its manufacturing source, and conformance to the item description.
Examples of traceability documentation include, but are not limited to, the following:
CH
EC
K O
NLI
NE
RE
VIS
ION
LE
VE
L P
RIO
R T
O U
SIN
G
Collins Aerospace Page 6 of 16 Quality Purchase Codes Revision AD
Procedure 1.6.1.8 March 22, 2019
Collins Aerospace Proprietary – This document does not contain any export controlled technical data. Hard Copy is not a controlled document.
Verify the current revision in the electronic released directory
Purchase order(s)/invoice(s) between manufacturer(s)/distributor(s), identifying part number (and/or
technical data package (TDP) with revision level), specific partially completed part requirements (e.g.,
a manufactured part less heat treating, less chemical processing, less paint, etc.), and quantities;
Original Equipment Manufacturer (OEM) or approved/qualified source’s packing slips, identifying
part number (and/or TDP with revision level) and quantities;
OEM or approved/qualified source’s certification, identifying part number, revision level, and
quantities;
Acceptance test reports (see below) and inspection acceptance documentation and results.
Special Process certifications and documentation validating product was processed per requirements
(i.e. 3rd
party certifications, internal processing documentation), specific partially completed part
requirements (e.g., a manufactured part less heat treating, less chemical processing, less paint, etc.).
When Government specifications or seller controlled processing is required, the Certificate of
Conformance supplied with each shipment of product to Collins shall indicate conformance to, and the
revision level of, the specified document. The certificate shall also indicate that either the actual
chemical/physical and/or mechanical test data is on file and available for Collins and/or Collins
Customer’s review. Sellers subcontractor shall certify that raw materials conform to the applicable
specification(s) and that test reports are on file and available for review.
All parts and/or packages must be identified per the design documentation. When not specified in the design,
identify with the applicable part number, part revision, manufactured date, and other information necessary to
provide traceability to manufacturing processes and raw material.
The supplier shall provide documentation of traceability for review upon request by Collins.
Age Control
Materials or articles having definite age degradation characteristics (shelf life) shall be identified with
manufacturing date, and/or cure date, shelf life, expiration date, storage condition requirements and any other
data pertinent to the supplied materials or articles.
Labeling
Labeling Requirements
Information;
Unless otherwise defined on the print, individual parts and packages must be identified at minimum
with the following information:
Part number
Revision
PO number
Manufacture date
Items will be individually identified by applying the part information above directly on the item. Parts
CH
EC
K O
NLI
NE
RE
VIS
ION
LE
VE
L P
RIO
R T
O U
SIN
G
Collins Aerospace Page 7 of 16 Quality Purchase Codes Revision AD
Procedure 1.6.1.8 March 22, 2019
Collins Aerospace Proprietary – This document does not contain any export controlled technical data. Hard Copy is not a controlled document.
Verify the current revision in the electronic released directory
that are too small <2”X2” may be packaged per the criteria below.
Marking Method:
All identification methods need to be permanent and legible.
Ink Stamp
Laser scribe
Location:
On any non-cosmetic flat surface with an area larger than 2”X2” in area. If the supplier has the
capability to permanently mark directly on smaller parts this marking method is preferred.
Packaging Exception:
Parts that are larger than 2”X2”, but without the flat surface area larger than 2”x2” that may not be
“packagable”, please include paper labels for 10% of the ordered quantity or a minimum of three (3)
labels.
Small Parts or Parts with Cosmetic Finish concerns:
Whenever cosmetic finish is affected or parts are too small; items may be packaged with identification
labels inside and attached to the individual package(s) with the above information.
Each shipment shall be broken up into several packaged quantities based on part quantity. Each
package of small parts is to be provided with identification labels based on the table below:
Parts
Quantity Packaging
Quantity of Labels Inside
Each Package
1-30 Single package with an identification label
on the package. 3
30-50 Packaged in quantities of 25 with an
identification label on each package. 3
51-100 Packaged in quantities of 25 with an
identification label on each package. 3
101-250 Packaged in quantities of 25 or 50 with an
identification label on each package. 3
251-500 Packaged in quantities of 50 or 100 with
an identification label on each package. 5
501-1000 Packaged in quantities of 100 or 200 with
an identification label on each package. 10
String tag is allowed only for assemblies not for individual parts. No adhesive labels on any parts.
CH
EC
K O
NLI
NE
RE
VIS
ION
LE
VE
L P
RIO
R T
O U
SIN
G
Collins Aerospace Page 8 of 16 Quality Purchase Codes Revision AD
Procedure 1.6.1.8 March 22, 2019
Collins Aerospace Proprietary – This document does not contain any export controlled technical data. Hard Copy is not a controlled document.
Verify the current revision in the electronic released directory
The packaging requirement does not apply to suppliers who directly stock production areas (i.e.
consignment stock)
Barcoding of Shipping Containers
All shipping containers will be barcoded using Code 39 with ATA Spec2000 text element identifiers. The
following example illustrates items that must be on all barcode labels.
Barcodes are to be created for each line item in a Purchase Order and placed on the container and one copy of
each inside the container.
First Article Inspection
First article inspection (FAI) shall be completed and maintained by the supplier per AS 9102 and the
additional requirements of ASQR-01.
(Note: FAI shall not be performed on development processes and 100% inspection shall be used with data
available to Collins if requested).
Special Process
Special processes performed by members of the supply chain and outlined as requiring NADCAP or ILAC
approval in ASQR-01, with the exception of Laser Beam Machining, shall be NADCAP approved.
Nonconventional machining shall only be used on parts approved per Procedure 1.4.42 Thermal
Cutting/Machining Evaluation.
CH
EC
K O
NLI
NE
RE
VIS
ION
LE
VE
L P
RIO
R T
O U
SIN
G
Collins Aerospace Page 9 of 16 Quality Purchase Codes Revision AD
Procedure 1.6.1.8 March 22, 2019
Collins Aerospace Proprietary – This document does not contain any export controlled technical data. Hard Copy is not a controlled document.
Verify the current revision in the electronic released directory
F.O.D.
The Supplier shall develop and maintain a Foreign Object Debris/Damage (“FOD”) prevention program
in accordance with National Aerospace Standard NAS-412, NAS-412 Foreign Object Damage/Foreign Object
Debris (FOD) Prevention including the processes and controls at manufacturing areas to prevent introduction
of foreign objects into any item delivered under this Purchase Order.
Whenever or wherever FOD entrapment or foreign objects can migrate, supplier shall ensure that a FOD
prevention program is flowed to sub-contractors at every tier.
Prior to closing inaccessible or obscured area and compartments during assembly, supplier shall inspect
for foreign objects/materials and ensure no FOD barriers remain embedded (eg. protective plugs). Supplier
shall ensure tools, jigs, fixtures and test or handling equipment are maintained in a state of cleanliness and
repair to prevent FOD.
Certificate of Conformance
A Certificate of Conformance, signed by the Supplier’s authorized representative, shall accompany all
materials shipped against this order. As a minimum, the certificate shall include the following:
The Collins Purchase Order number.
Part number.
Revision level
Quantity
Serial number, when applicable.
Shelf Life, when applicable.
Lot number, when applicable.
Unit of Measure
List of processing specifications and revision levels, when applicable (Process CoC – See test reports for
more detail)
A statement that certifies compliance to the drawing / specification.
The applicable chemical / physical and/or mechanical test data is on file and available for Collins and/or
Collins’ customer review.
Signature, date and title of the seller’s responsible representative.
Special statements may also be required when applicable to this contract:
Certificate of Conformance to applicable specifications when FAR 25.853 a) is required per the
design. Report results per Specification 6030 and procedures: 1.10.36 for leathers or 1.10.37 for all other
non-metallics.
A Certificate of Conformance stating “We certify that material furnished by Collins was used to fabricate
these parts” is required when Collins provides materials.
When the purchase order or design specifies the material is for the FASS program, the C of C shall
include the purchase order number, and must include the statement “Material supplied supports FASS II
program”. All supplier records in support of FASS II must be retained, pending disposition instructions
CH
EC
K O
NLI
NE
RE
VIS
ION
LE
VE
L P
RIO
R T
O U
SIN
G
Collins Aerospace Page 10 of 16 Quality Purchase Codes Revision AD
Procedure 1.6.1.8 March 22, 2019
Collins Aerospace Proprietary – This document does not contain any export controlled technical data. Hard Copy is not a controlled document.
Verify the current revision in the electronic released directory
by an authorized representative of Collins AIP.
Test Reports/ Process Certifications
Test reports shall be maintained per record requirements and provided to Collins as followed when required
by drawing, specification, or contract. Unless otherwise noted on the PO or design, latest revision of industry
standards shall be required,
Chemical and/or Physical Test Reports - Each shipment must be accompanied by one (1) legible and
reproducible copy of all chemical and physical test reports identifiable to the materials submitted. These
reports must contain the signature and title of the authorized representative of the agency performing the
test, the test procedure used (including current revision level) and must assure conformance to specified
requirements.
Process Certifications - Each shipment must include one (1) legible and reproducible copy of a
certificate showing each process used, such as heat treating, welding, magnetic particle inspection,
surface preparation and treatment, etc. The certificate(s) shall include the specification number and
revision and the signature and title of an authorized representative of the seller. When parts are
serialized, serial numbers must appear on the certification.
Nondestructive Test Reports - All shipments requiring nondestructive test shall be accompanied by
one (1) legible and reproducible copy of actual nondestructive test results identifiable with acceptance
requirements and material submitted. These reports must contain the signature and title of the
authorized representative of the agency performing the inspection and must assure conformance to
specified requirements. When parts are serialized, serial numbers must appear on the certification.
Certification of x-ray - All parts requiring radiographic certification will be submitted to a Collins
approved x-ray laboratory and processed in accordance with applicable Collins and Government
specifications and standards. The x-ray film and one (1) legible and reproducible copy of the report
must accompany the material. When parts are serialized, serial numbers must appear on the
certification and x-ray film.
Raw Material Analysis- Raw Material orders require chemical and physical analysis for all raw
materials used in the manufacturing of this product. Acceptance of raw material(s) utilizing "Typical
Analysis Report" will only be accepted if the report specifies the lot, batch, heat, mill, and name of the
producer.
Synthetic Rubber Components and Raw Material - Each package of synthetic rubber components shall
be marked with date of cure, part number, quantity, compound number, and manufacturer's
identification (if different from part number). Date of cure on O-rings shipped to Collins shall not be
older than is permissible under Bulletin SAE-ARP5316. Synthetic rubber raw materials shall be
identified with date of cure, compound, and manufacturer's name.
Hazardous Material. Certification and appropriate data sheets defining chemical composition, safety
and health hazards, first-aid measures and storage requirements for materials supplied with this order
shall be forwarded to the buyer at a minimum of three (3) days prior to delivery and accompany
shipment.
Fraudulent/Counterfeit Parts
CH
EC
K O
NLI
NE
RE
VIS
ION
LE
VE
L P
RIO
R T
O U
SIN
G
Collins Aerospace Page 11 of 16 Quality Purchase Codes Revision AD
Procedure 1.6.1.8 March 22, 2019
Collins Aerospace Proprietary – This document does not contain any export controlled technical data. Hard Copy is not a controlled document.
Verify the current revision in the electronic released directory
Seller shall establish and maintain a counterfeit parts prevention and control plan using industry standard
AS5553 as a guideline.
If suspect/counterfeit parts are furnished under this agreement and are found by Collins or its customers, such
parts shall be impounded. The seller shall promptly replace such items with items acceptable to Collins and the
seller shall be liable for all costs relating to impoundment, removal and replacement. Collins may turn such items
over to the U.S. Office of Inspector general, F.B.I., etc. for investigation and reserves the right to withhold
payment for the suspect items pending the results of the investigation.
For purposes of this clause, Work consists of those parts delivered under this contract that are the lowest
level of separately identifiable items (e.g. articles, components, goods and assemblies). Counterfeit Work
means work that is or contains items misrepresented as having been designed and/or produced under an
approved system or other acceptable method. The term also includes approved work that has reached a
design life limit or has been damaged beyond possible repair, but is altered and misrepresented as
acceptable.
Seller agrees and shall ensure that Counterfeit work is not delivered to Collins
Seller shall only purchase products to be delivered to and incorporated as Work to Collins directly from
the Original component Manufacturer (OCM)/Original Equipment Manufacturer or through an
OCM/OEM authorized distributor chain. Work shall not be acquired from independent distributors or
brokers unless approved in advance in writing by Collins.
Seller shall immediately notify Collins with the pertinent facts if Seller becomes aware or suspects that is
has furnished Counterfeit Work. When requested by Collins, Seller shall provide OCM/OEM
documentation that authenticates traceability of affected items to the applicable OCM/OEM.
In the event that Work delivered under this purchase order constitutes or includes Counterfeit Work,
Seller shall, at is expense, promptly replace such Counterfeit Work with Genuine Work conforming to the
requirements of this purchase order. Notwithstanding any other provision in the Purchase Order, Seller
shall be liable for all costs relating to the removal and replacement of Counterfeit Work , including
without limitation Collins costs of removing Counterfeit Work, of reinserting replacement work and of
any testing necessitated by the reinstallation of Work after Counterfeit Work has been exchanged. The
remedies in this paragraph are in are in addition to any remedies Collins may have at law, equity or under
other provisions of this purchase order.
This clause applies in addition to any quality provision, specification, statement of work or other
provision included in this contract addressing the authenticity of Work. To the extent such provisions
conflict with this clause, this clause prevails.
Seller is required to utilize the Government Industry Data Exchange Program (“GIDEP”) to alert the
industry of encountered Counterfeit parts. If the Seller is eligible for membership, Seller is required to be
a member of GIDEP.
Software Compliance
All deliverable software for this contract must comply with AS9115-Requirements for
Aviation, Space and Defense Organizations-Deliverable Software.
All non-deliverable software used for this contract must comply with ARP9005-Aerospace
Guidance for Non-Deliverable Software.
CH
EC
K O
NLI
NE
RE
VIS
ION
LE
VE
L P
RIO
R T
O U
SIN
G
Collins Aerospace Page 12 of 16 Quality Purchase Codes Revision AD
Procedure 1.6.1.8 March 22, 2019
Collins Aerospace Proprietary – This document does not contain any export controlled technical data. Hard Copy is not a controlled document.
Verify the current revision in the electronic released directory
Safety, Quality, and Process Key Characteristic Control
When the Engineering print, referenced or included specifications, special instructions, or purchase order
contains Key Characteristic indication or symbols ( , SAFETY
PARTS), compliance to COL- PRO-0028 is required. The supplier shall develop a control plan to document
the compliance methods and obtain Collins approval initially and prior to making changes. Any out of control
condition shall be considered as nonconforming and reviewed for acceptance by Collins prior to use
regardless of a pass or fail to the print
Refer to COL-PRO-0028 for a full explanation symbols.
ORDER OF PRECEDENCE.
Order of precedence shall be per the applicable Manufacturing and Acceptance Standards (i.e. Collins
Specification 5000 or 1847-084).
Record Retention
Unless otherwise specified, supplier and/or supplier’s subcontractor will retain all inspection records, actual
chemical/physical, process certification and/or mechanical test data, as applicable, for a minimum of 10 years
after the final payment under the contract. Supplier shall not destroy the records without first providing
Collins the opportunity to retain the records and obtaining Collins written permission for destruction.
Code 2 – Reserved – Incorporated into Code 1
Code 3 - Reserved – Incorporated into Code 1
Code 4 – Reserved – Covered in Section 12 of UTC Standard Terms and Conditions of Purchase
Code 5 – Reserved – Incorporated into Code 1
Code 6 – Reserved –Incorporated into Code 1
Code 7 – Reserved –Incorporated into Code 1
Code 8 – UTC U.S. Government Provisions & Clauses For Orders Under U.S. Government Contracts
Code 9 – Reserved – Covered in UTC U.S. Government Provisions & Clauses For Orders Under U.S.
Government Contracts
Code 10 – Reserved – Incorporated into Code 1
CH
EC
K O
NLI
NE
RE
VIS
ION
LE
VE
L P
RIO
R T
O U
SIN
G
Collins Aerospace Page 13 of 16 Quality Purchase Codes Revision AD
Procedure 1.6.1.8 March 22, 2019
Collins Aerospace Proprietary – This document does not contain any export controlled technical data. Hard Copy is not a controlled document.
Verify the current revision in the electronic released directory
Code 11 – Government Inspection
Supplier must provide evidence of Government Oversight.
The supplier shall contact the local Defense Contract Management Agency (DCMA) Quality Assurance
Representative (QAR) who services their facility to obtain the product source and/or process inspection
plan.
A stamp and/or signature by the Government representative must be provided on the appropriate product
documentation. If a signature is used, it must visibly indicate DCMA by a method such as a DCMA
signature line or hand written DCMA with the signature.
Code 12 – Government Selective Evaluation
During performance of this Government contract, Supplier's quality control or inspection system and
manufacturing processes are subject to review, verification and analysis by authorized Government
representatives. Government inspection or release of product to shipment IS NOT required unless otherwise
noted. Parts to be inspected by DCMA upon arrival at Collins receiving inspection. – FAR 44.305-2, 52.245-1
(B)(1), DFAR 244.305-70
Code 13 – Priority Rating
Seller is required to follow the provisions of Code of Federal Regulations (CFAR) Title 15, Part 700 and of
all applicable regulations and orders of the U.S. Department of Commerce in obtaining controlled materials and
other products needed to fill this order. Any priority rated order or contract under the CFAR priority regulations
obligates the supplier to extend the priority rating on every order issued in fulfilling their delivery requirement(s).
Receipt of this order on the P.O. promised or reschedule date is critical, if this order will not be received on the
promised date the Supplier must contact the Collins buyer immediately. FAR 52.211-15
Code 14 –Reserved – Covered in UTC U.S. Government Provisions & Clauses For Orders Under U.S.
Government Contracts and Incorporated in Code 1
Code 15 – Reserved – Covered in UTC U.S. Government Provisions & Clauses For Orders Under U.S.
Government Contracts and Section 9 of UTC Standard Terms and Conditions of Purchase
Code 16 – Reserved – Covered in Section 28 of UTC Standard Terms and Conditions of Purchase
Code 17 – Reserved – Incorporated into Code 1
Code 18 – Reserved – Incorporated into Code 1
Code 19 - Directed Special Processing Supplier
CH
EC
K O
NLI
NE
RE
VIS
ION
LE
VE
L P
RIO
R T
O U
SIN
G
Collins Aerospace Page 14 of 16 Quality Purchase Codes Revision AD
Procedure 1.6.1.8 March 22, 2019
Collins Aerospace Proprietary – This document does not contain any export controlled technical data. Hard Copy is not a controlled document.
Verify the current revision in the electronic released directory
The special processing for this order shall be performed by sources specifically approved by the Prime
contractor and/or Collins. If a processor is not specified on Purchase Order, notify the Collins buyer for a listing
of approved processors.
Code 20 – Single Lot Control
Parts and materials furnished for this order shall be manufactured under single lot control. A single lot requires
the parts/materials to be processed with the same design, methods, construction and materials, in an essentially
continuous and unchanged process. Seller shall certify that the raw material(s) used for this order is from one
single lot, batch, heat and mill. The seller shall keep raw material lots segregated and identified.
Code 21 – Human Space Flight
Items on this order are for manned space flight application. Materials, manufacturing and workmanship of
the highest quality standards are essential to astronaut safety. If you are able to supply the desired item with a
higher quality than that of the items specified or proposed, you are requested to bring this fact to the immediate
attention of the Collins Purchasing Agent.
Code 22 - FOD Statement
The Supplier shall include a signed and stamped statement with the product indicating that the product is
free of any Foreign Object or Debris.
Code 23 – Flammability and Product Identification
All parts provided on this order must comply with FAR 25.853 (flammability) require a label that at a
minimum shall include the following:
P.O.
Part Number and Revision
FAR 25.853(a)
Type A Part (when applicable)
Code 24 – Collins Source Inspection
A) Collins’ Source Inspection required prior to shipment of products from Supplier’s facility. Supplier shall
notify Collins Purchasing Dept. seven (7) days in advance of date parts will be ready for inspection.
B) Verify Inc. source inspection required prior to shipment of products from Supplier’s facility. Supplier
will need to launch a request at least 24 hours prior to the need date and before 5:00 pm (PST). It is
important to comply with the 24 hour requirement to ensure inspections are completed in time to meet
supplier shipment needs. Log into http://www.vscnet.com/Suppliers to submit a source inspection
scheduling request.
Code 25 – Collins Furnished Material
CH
EC
K O
NLI
NE
RE
VIS
ION
LE
VE
L P
RIO
R T
O U
SIN
G
Collins Aerospace Page 15 of 16 Quality Purchase Codes Revision AD
Procedure 1.6.1.8 March 22, 2019
Collins Aerospace Proprietary – This document does not contain any export controlled technical data. Hard Copy is not a controlled document.
Verify the current revision in the electronic released directory
Supplier shall assure that all Collins furnished raw materials and/or partially processed components,
subassemblies, etc., are free of shipping damage prior to processing this order. In the event that materials
furnished by Collins are damaged, notify the Collins Purchasing Agent immediately. Supplier is not responsible
for Collins controlled parameters, but assumes responsibility of protecting Collins’ investment in raw materials
and/or partially processed components, subassemblies, etc. The Supplier assumes responsibility of total value of
material, components, subassemblies, etc., when scrapped as a result of processing subject articles.
Code 26 - Packaging and Handling
A) Materials shall be packaged in a manner and with materials necessary to prevent deterioration, corrosion
or damage during transit, and when applicable, during storage.
B) DOD FAR Supplements 252.223-7001, 252.223-7002 and 252.223-7003 are invoked on this order. The
seller shall be responsible for packaging, identification and transportation compliant to Federal, State and
local regulations.
Code 27 – Reserved – Incorporated into Code 1
Code 28 – Delegated Source Suppliers Reserved – No longer used.
Code 29 – Regulatory Certification
The supplier is required to submit an 8130-3 or JAA Form One Certification.
Code 30 – Calibration
A) Calibrate and Certify to N.I.S.T. and indicate the specific standards and procedures used during the
calibration process. Identify before condition (as received) and post calibration condition readings.
Identify any out of tolerance condition.
B) Instrument calibration shall be accomplished over a minimum of three output/input levels,
encompassing the usable range of the instrument. Ranges are identified to the supplier on the
purchase order by Collins AIP. Contact Collins if ranges are not provided.
C) Certification shall include additional statements that the calibration conforms to other
controlling/governing specifications beyond the N.I.S.T or requirements when they are identified on
the Collins purchase order.
Code 31 – Reserved – Incorporated into Code 1
Code 32 –Reserved – Covered in UTC U.S. Government Provisions & Clauses For Orders Under U.S.
Government Contracts
Code 33 – Higher-Level Contract Quality Requirements
This order is subject to the requirements of FAR 52.246-11 – Higher-Level Contract Quality requirements
found at: http://farsite.hill.af.mil/vffara.htm
CH
EC
K O
NLI
NE
RE
VIS
ION
LE
VE
L P
RIO
R T
O U
SIN
G
Collins Aerospace Page 16 of 16 Quality Purchase Codes Revision AD
Procedure 1.6.1.8 March 22, 2019
Collins Aerospace Proprietary – This document does not contain any export controlled technical data. Hard Copy is not a controlled document.
Verify the current revision in the electronic released directory
Code 34 – GRESS (General Requirement for Equipment and System Suppliers)
A) AP1013.0 Section 0.5 GRESS Commitment applies.
B) AP1013.1 Section 1.3 Supplier’s Key Contributing Parties Monitoring and Control applies.
C) AP1013.4 Section 4.5 Purchasing Control applies.
Note: each of these requirements as originally flowed down by Airbus are each inclusive in their
individual entirety (i.e. all of section and subsections of 0.5 are applicable).
Code 35 –- Reserved- Incorporated into Code 24
Code 36 – United Technologies Production Part Approval Process (UPPAP)
This order is subject to the requirements of UPPAP per ASQR 09.2. Contact your Collins representative
for more information and requirements.
CH
EC
K O
NLI
NE
RE
VIS
ION
LE
VE
L P
RIO
R T
O U
SIN
G