PAGE 1 OF 10 WIDE SPAN SHELVING - Madix, Inc.WIDE SPAN SHELVING ASY 061 PAGE 1 OF 10 I N S T A L L A...
Transcript of PAGE 1 OF 10 WIDE SPAN SHELVING - Madix, Inc.WIDE SPAN SHELVING ASY 061 PAGE 1 OF 10 I N S T A L L A...
-
ASY 061WIDE SPAN SHELVINGPAGE 1 OF 10
I N S T A L L A T I O N I N S T R U C T I O N S
P. O . B OX 7 2 9 / T E R R E L L , T E X A S 7 5 1 6 0 / 9 7 2 . 5 6 3 . 5 7 4 4 / 8 0 0 . 7 7 6 . 2 3 4 9P. O . B OX 1 7 7 / G O O D W AT E R , A L A B A M A 3 5 0 7 2 / 2 0 5 . 8 3 9 . 6 3 5 4 / 8 0 0 . 6 3 3 . 6 2 8 2
REV04
NOTE!This publication is intended to be a generic installationinstruction for Madix Wide Span, and may possibly besubject to change as required by local building codes...consult the building inspection department at job site.
PAGE 2-3PARTS
IDENTIFICATION
PAGE 4-5BASIC
INSTALLATION
PAGE 6-7INSTALLATION OF
EXTRAS
PAGE 8LOAD
CAPACITY
PAGE 9SAFETY
PAGE 10ANCHORING
TO FLOOR
-
ASY 061WIDE SPAN SHELVINGPAGE 2 OF 10
P A R T S I D E N T I F I C A T I O N
P. O . B OX 7 2 9 / T E R R E L L , T E X A S 7 5 1 6 0 / 9 7 2 . 5 6 3 . 5 7 4 4 / 8 0 0 . 7 7 6 . 2 3 4 9P. O . B OX 1 7 7 / G O O D W AT E R , A L A B A M A 3 5 0 7 2 / 2 0 5 . 8 3 9 . 6 3 5 4 / 8 0 0 . 6 3 3 . 6 2 8 2
REV04
LIGHT DUTY
REGULAR DUTY
HEAVYDUTY
REGULAR DUTY
HEAVYDUTY
FRAME DEPTH
WIDESPAN
DECKSUPPORT
LIGHT DUTY = LDREGULAR DUTY = RD
HEAVY DUTY = HD
RDWSDSDIMENSIONS
Deck Supports BeamsActual
Frame Actual Beam LengthDepth Length Length Inside of
Brackets18" 20" 48" 48 3/16"24" 26" 60" 60 3/16"30" 32" 72" 72 3/16"36" 38" 84" 84 3/16"42" 44" 96" 96 3/16" 48" 50” - -
FRAME DIMENSIONSFrame Actual Frame ActualDepth Depth Height Height
18" 20" 48" 48 "24" 26" 60" 60"30" 32" 72" 72"36" 38" 84" 84"42" 44" 96" 96" 48" 50" 108" 108"
- - 120" 120"
BEAM LENGTH
WIDESPAN
LIGHT DUTY = LDREGULAR DUTY = RD
HEAVY DUTY = HD
RDWSFB
FRAME DEPTH
FRAME HEIGHT
WIDE SPANFRAME
REGULAR DUTY = RDHEAVY DUTY = HD
RDWSF
FRONTBEAM
-
ASY 061WIDE SPAN SHELVINGPAGE 3 OF 10
P A R T S I D E N T I F I C A T I O N
P. O . B OX 7 2 9 / T E R R E L L , T E X A S 7 5 1 6 0 / 9 7 2 . 5 6 3 . 5 7 4 4 / 8 0 0 . 7 7 6 . 2 3 4 9P. O . B OX 1 7 7 / G O O D W AT E R , A L A B A M A 3 5 0 7 2 / 2 0 5 . 8 3 9 . 6 3 5 4 / 8 0 0 . 6 3 3 . 6 2 8 2
REV04
BEAMLENGTH
PIECELENGTH
FRAMEDEPTH
FLOW THROUGH
WIRE GRID
WIRE GRID DECKS, andFLOW THROUGH DECKS
...dimensionsFrame Actual Piece ActualDepth Depth Length Length
18" 17 3/4" 24" 23 3/4"24" 23 3/4" 36" 35 3/4"30" 29 3/4" 48" 47 3/4"36" 35 3/4" - -42" 41 3/4" - - 48" 47 3/4" - -
NOMINALFRAME DEPTH
WIDE SPAN DECK
FLOWTHROUGH
NOMINAL PIECE LENGTH
FTWSD
FRAME DEPTH
WIDE SPANDECK
REGULAR DUTY = RDHEAVY DUTY = HD
BEAM LENGTH
RDWSD -U
SEALED = SUNSEALED = U PARTICLE BOARD DECKS
...dimensionsFrame Actual Beam ActualDepth Depth Length Length
18" 18" 48" 47 29/32"24" 23 29/32" 60" 60"30" 30" 72" 72"36" 36" 84" 84"42" 42" 96" 96" 48" 48" - -
WIRE GRID and FLOW THROUGH PIECELENGTHS RUN PARALLEL TO BEAM LENGTHS
BEAM COMBINATIONS OF # OF DECKLENGTH PIECE LENGTHS SUPPORTS
36" 36" 248" 48" 260" 24" plus 36" 472" 36" plus 36" 484" 36" plus 48" 496" 48" plus 48" 4
NOMINALFRAME DEPTH
WIRE GRID DECK
WIDESPAN
NOMINAL PIECE LENGTH
GRID SIZE
...3"o.c.
WSWMS -3
-
ASY 061WIDE SPAN SHELVINGPAGE 4 OF 10
B A S I C I N S T A L L A T I O N
P. O . B OX 7 2 9 / T E R R E L L , T E X A S 7 5 1 6 0 / 9 7 2 . 5 6 3 . 5 7 4 4 / 8 0 0 . 7 7 6 . 2 3 4 9P. O . B OX 1 7 7 / G O O D W AT E R , A L A B A M A 3 5 0 7 2 / 2 0 5 . 8 3 9 . 6 3 5 4 / 8 0 0 . 6 3 3 . 6 2 8 2
REV04
Snap chalklines on flooras shown for shelvinglayout. See diagram onpage one for dimensions.
1
Raise first frame tovertical position and installfirst beam...frame will nowstand alone.NOTE! If floor anchors orextension frames are to beused, they should beinstalled prior to raisingframes to the verticalposition...see pages 5-6.
2
Raise second frame tovertical and install free endof first beam... installsecond beam on oppositeside.
3
Install upper beams atdesignated levels.
4
If using Dart Clips:Press dart clips throughbeam bracket and uprighton under side of beam as shown. Insert one dart clipat each end of all beams.
If using Retainer Pins:Insert one leg of a retainerpin through beam bracketand upright. Insert one pinat each end of all beams.
5
ENDLINE AISLE
LINE1
TOP OFFRAME
UPRIGHT
BOTTOM OFFRAME
UPRIGHT
23
4
5
RETAINERPIN
WSREP
RTDA CLIPWDC-50
...pack of 50
Insert dart clip from insideupright if using LD beams.
Insert dart clip from insideupright if using LD beams.
IMPORTANT: ANY BEAM USED AS A PRODUCT RETAINER MUST BE BOLTED THROUGH BOTH UPRIGHTS.
NOTE: Retainer pins and dart clips serve the same purpose - to retain beam connections
-
ASY 061WIDE SPAN SHELVINGPAGE 5 OF 10
B A S I C I N S T A L L A T I O N
P. O . B OX 7 2 9 / T E R R E L L , T E X A S 7 5 1 6 0 / 9 7 2 . 5 6 3 . 5 7 4 4 / 8 0 0 . 7 7 6 . 2 3 4 9P. O . B OX 1 7 7 / G O O D W AT E R , A L A B A M A 3 5 0 7 2 / 2 0 5 . 8 3 9 . 6 3 5 4 / 8 0 0 . 6 3 3 . 6 2 8 2
REV04
10
11
7 8 9
Holding the deck supportat an angle to the beam,squeeze the open side andinsert into the beam, thenswing the free end aroundto the opposite beam,squeeze the open side andinsert into the beam.
7
Squeeze the open side ofthe deck support at eachend just inside the beamand rotate upwards asshown.
8
Correct installed positionwill look like this...seeabove for quantity of decksupports per beam length.
9
Repeat with theremaining deck supports inthe shelving run.
10
Install all decks in theshelving run.
11
DECK SUPPORTS... QUANTITY & LOCATION
wood decks... three deck supports
all decks... two deck supports
wire grid and flow through decks... four deck supports
Repeat assemblysequence with remainingframes, beams and dartclips/retainer pins.NOTE! If back to back runsare being installed, seepage 6 for back to backconnectors.
6
-
ASY 061WIDE SPAN SHELVINGPAGE 6 OF 10
I N S T A L L A T I O N O F E X T R A S
P. O . B OX 7 2 9 / T E R R E L L , T E X A S 7 5 1 6 0 / 9 7 2 . 5 6 3 . 5 7 4 4 / 8 0 0 . 7 7 6 . 2 3 4 9P. O . B OX 1 7 7 / G O O D W AT E R , A L A B A M A 3 5 0 7 2 / 2 0 5 . 8 3 9 . 6 3 5 4 / 8 0 0 . 6 3 3 . 6 2 8 2
REV04
BACK TO BACKCONNECTORWSBBC-2-24
FRAME CONNECTORS
WSFC-2
AB
...indicates item, where used.
WSBBC-2-24 HARDWARE PACK #7200-079QTY. ITEM DESCRIPTION48 1/4 - 20 x 2 1/4" carriage bolt48 1/4 - 20 wing nut
A
AB
The first sections of theback to back run should beerected with beams at topand bottom of the fourframes. Locate theconnectors just below the topbeams and just above thebottom beams. Secure withthe fasteners as shown.
12
Repeat with the remainingsections.
13Install all intermediate beams
as required, then install athird connector as close aspossible to the mid-point ofthe frames. Complete theshelving run with the decksupports and decks.
14
In the sixth square holefrom the top of the lowerframe, insert a stop toprevent the connector fromdropping to the floor.
15
Insert connector into framewith flat center of connectorfacing the slotting.
16
...indicates item, where used.
WSFC-2 HARDWARE PACK #7200-078QTY. ITEM DESCRIPTION4 1/4 - 20 x 2" Phillips truss head machine screw 4 1/4 - 20 hex nut
C
CD
C
C
D
D
Screw connector to lowerframe with provided
fasteners...remove the stop.
17
Repeat above with the 2ndupright of the frame.
18Lower upper frame onto
connectors and securethrough the sixth hole up from the joint.
19
-
ASY 061WIDE SPAN SHELVINGPAGE 7 OF 10
I N S T A L L A T I O N O F E X T R A S
P. O . B OX 7 2 9 / T E R R E L L , T E X A S 7 5 1 6 0 / 9 7 2 . 5 6 3 . 5 7 4 4 / 8 0 0 . 7 7 6 . 2 3 4 9P. O . B OX 1 7 7 / G O O D W AT E R , A L A B A M A 3 5 0 7 2 / 2 0 5 . 8 3 9 . 6 3 5 4 / 8 0 0 . 6 3 3 . 6 2 8 2
REV04
FLOOR ANCHOR WSFA-2
NOTE! IF FRAME HEIGHT, OR TOTAL HEIGHT OF CONNECTED FRAMES, IS MORE THAN SIX TIMES THEFRAME DEPTH ...FRAMES MUST BE SECURED WITH FLOOR ANCHORS.
TOP CAPWSTC - -CL
Packs of 4 or 48 clearplastic top caps, two per
frame. Tap into top ofeach frame upright.
LEVELING SHIMWSLS-10C
Ten pack of galvanizedshims...dimpled
to fit in bottom of upright andmaintain
stacking interlock.
AB
C
Insert floor anchors into thebottom of each frame. Theywill only insert at 45O to theframe. Make sure thatanchors are inserted so thatthey will not project intoaisles or cross aisles.
20
Follow directions on page4 to step 6, except do notinstall dart clips on bottombeams. Secure beams toframes through the flooranchor as shown. The screwwill go through at one of thetwo locations, depending onthe beam size.
21
Check run alignment tochalkline prior to drilling floorfor expansion bolts. Due tovarying floor conditions,expansion bolts must beordered separately. If theywere not ordered initially, butare required, see page 8 toorder from Madix orpurchase locally.
22
WSFA-2 HARDWARE PACK #7200-080QTY. ITEM DESCRIPTION2 1/4 - 20 x 2 1/2" round head machine screw 2 1/4 - 20 hex nut2 1/4" flat washer
A
A
BC
...indicates item, where used.
2021
-
ASY 061WIDE SPAN SHELVINGPAGE 8 OF 10
L O A D S A F E T Y
P. O . B OX 7 2 9 / T E R R E L L , T E X A S 7 5 1 6 0 / 9 7 2 . 5 6 3 . 5 7 4 4 / 8 0 0 . 7 7 6 . 2 3 4 9P. O . B OX 1 7 7 / G O O D W AT E R , A L A B A M A 3 5 0 7 2 / 2 0 5 . 8 3 9 . 6 3 5 4 / 8 0 0 . 6 3 3 . 6 2 8 2
REV04
HAND STACK ONLY!
POWERED FORK TRUCKS
OR STACKERS ARE NOT
RECOMMENDED FOR USE
ON WIDE SPAN SHELVING
FRAME LOADING
• Based on evenlydistributed loads
• Based on 96”beam length, all
frame widths
Frame loading is the vertical load, measured in pounds, that can be applied on any Wide span frame. Each Wide span frame will bear ONE HALF OF THE LOAD ON EACH BEAM PAIR that it supports.
ALL FRAMES HAVE 10,000 POUND LOAD CAPACITY!
MAXIMUMBEAMLOAD
CAPACITY...PERBEAMPAIR
BEAM LIGHT REGULAR HEAVY # OF DECKLENGTH DUTY DUTY DUTY SUPPORTS
48" 1000 # 1600 # 3000 # 260" 1000 # 1600 # 3000 # 372" 1000 # 1600 # 3000 # 384" 1000 # 1600 # 3000 # 396" 1000 # 1600 # 3000 # 3
Height to Depth Ratio:Ratio should not exceed 6 to 1measuring to the top of topmost load. If ratio exceeds6 to 1 the constraint can beovercome with properanchoring or external bracingof the rack structure.CONSULT YOUR STRUCTURALENGINEER FOR SOLUTIONS.
!
-
ASY 061WIDE SPAN SHELVINGPAGE 9 OF 10
S A F E T Y D U R I N G I N S T A L L A T I O N
P. O . B OX 7 2 9 / T E R R E L L , T E X A S 7 5 1 6 0 / 9 7 2 . 5 6 3 . 5 7 4 4 / 8 0 0 . 7 7 6 . 2 3 4 9P. O . B OX 1 7 7 / G O O D W AT E R , A L A B A M A 3 5 0 7 2 / 2 0 5 . 8 3 9 . 6 3 5 4 / 8 0 0 . 6 3 3 . 6 2 8 2
REV04
GENERAL
1. Contact the local building department prior to starting installation to check on any restrictions.
2. Only parts and accessories produced or supplied by Madix are covered by Madix warranty.
3. Installation sequence must be followed exactly for assembly and leveling.
4. Under no circumstances should damaged parts be used.
5. Do not use shelving parts or accessories for any purpose other than originally intended.
6. Installation instructions with product load ratings are included with each order and must be followedcarefully.
7. Merchandisers must be made aware of possible overloading as specified in load ratings. If you do notreceive these, please contact your sales or customer service representative.
8. Initial installation or relocation of Madix gondola, wall or racking fixtures should be supervisedexclusively by qualified personnel.
RACKING... FRAMES / BEAMS
9. Observe all prohibitions in the installation instructions on the use of powered lifts.
10. A minimum of four people are required to erect frames taller than 8’.
11. Be sure all beams or accessories are completely seated and locked or secured in frame slotting.
12. Ladders, if used, should be at least frame height.
13. Never stand on lower beams to install upper beams.
14. Do not walk on decks, especially wire grid.
15. Never try to move a completed racking run, especially if merchandised.
-
NOTE! The expansion anchors provided by Madix for floor anchoring at this site have been supplied by one ofthe firms listed below. All the anchors have been tested and approved as stated by the following ICC (ICBO) report numbers and all are manufactured in the United States or Canada. If the anchors are not provided by Madix andfield substitution other than listed be proven, Madix cannot be held responsible. Should verification be required,call Madix Customer Service at: 800.776.2349 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .ICC (ICBO) #
COBRA ANCHORS CORP., Parawedge concrete anchors . . . . . . . . . . . . . . . . . . . . . . . . . . . . .ER-2350 S1DIVERSIFIED FASTENING SYSTEMS, DFS Wedge anchor . . . . . . . . . . . . . . . . . . . . . . . . . . .ER-4194 S1GUNNEBO FASTENING CORP.,Drop-in concrete anchors . . . . . . . . . . . . . . . . . . . . . . . . . . . . .ER-3219 S1HILTI, INC., Kwik-bolt-TZ concrete anchors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .ESR-1917MKT FASTENING, High Load Anchor SZ . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .AC-193ITW RAMSET/RED HEAD, ITW Ramset stud, Trubolt wedge concrete anchors . . . . . . . . . . .ESR-2251MARKSMAN MANUFACTURING CO., Thunderstud wedge and sleeve anchor . . . . . . . . . . . . . .ER-2713 S1POWERS FASTENING INNOV., Power-Stud+SD2 concrete anchors . . . . . . . . . . . . . . . . . . . . .ESR-2502WEJ-IT, Wej-it anchors bolt and ANKR-TITE wedge anchor . . . . . . . . . . . . . . . . . . . . . . . . . . . .ER-1825CYW, INC., POWER BULL, Wedge anchor . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .ESR-2254*Embedment must be minimum 5x bolt diameter.
OTHER ICC (ICBO) APPROVED ANCHORING MATIERALS... not furnished by Madix
PNEUMATIC OR POWDER-DRIVEN STEEL STUDS AND NAILSHILTI, INC., Hilti low velocity powder actuated or pneumatically driven fasteners . . . . . . . . . . . . . .ESR-1663 ITW RAMSET/RED HEAD, Ramset Powder-Actuated and PowerPoint fasteners . . . . . . . . . . . . . .ESR-1799
ADHESIVE/ EPOXY ANCHORSHILTI, INC., HIT-HY 150 Adhesive anchor system . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ESR-2678 ITW RAMSET/RED HEAD, ITW Red Head Epcon system Ceramic 6+ epoxy anchors . . . . . . . . . ESR-3577
ASY 061WIDE SPAN SHELVINGPAGE 10 OF 10
A N C H O R I N G T O T H E F L O O R
P. O . B OX 7 2 9 / T E R R E L L , T E X A S 7 5 1 6 0 / 9 7 2 . 5 6 3 . 5 7 4 4 / 8 0 0 . 7 7 6 . 2 3 4 9P. O . B OX 1 7 7 / G O O D W AT E R , A L A B A M A 3 5 0 7 2 / 2 0 5 . 8 3 9 . 6 3 5 4 / 8 0 0 . 6 3 3 . 6 2 8 2
REV04
EXPANSION BOLTS FOR FLOOR ANCHORS...50 expansion bolts, 3/8”-16 x 3 1/2” POWERS/ Power-Stud+SD2 concrete anchors orother ICC (ICBO) approved expansion bolts.
SFA-EB50: See below for other ICC (ICBO) approved expansion bolts which may be used.
REV# ECN# REVISION BY DATE
REV# ECN# REVISION BY DATE
02 5*14150 ADDED HEIGHT/DEPTH RATIO01 5- 13950 UPDATED TO CORRECT ANCHOR INFO
CAB 02/14/14
03 5*16478 SHOWED LD BEAM DART CLIP ON PG 4 TED 06/29/15
04 5*18143 ADDED BOLTING REQ. TO PG 4 NRD 09/12/16 SAM 1/7/14
ASY-061-1ASY-061-2ASY-061-3ASY-061-4ASY-061-5ASY-061-6ASY-061-7ASY-061-8ASY-061-9ASY-061-10