    FOLLOWING THE BELOW PPM CHECKS & FINDINGS, CONTRACTOR IS TO REPORT DERIVED

    FINDINGS & IMPLEMENT CORRECTIVEACTIONS AS PART OF EACH VISIT, :

    DESCRIPTION OF PPM CHECK VISIT 1 # 2 # 3 # 4

    POWER

    CHECK MAIN POWER TO EQUIPMENT

    PERFORM VOLTAGE IMBALANCE CALCULATION (see below)

    PERFORM MEGGAR TEST ON ALL COMPRESSOR MOTORS

    CHECK CONTACTORS CONTACT POINT AND REPLACE WHERE NECESSARY

    CHECK MOTOR AMPERAGE AS AGAINST FLA AND VOLTAGE

    CHECK STARTER/ WIRING CONNECTIONS

    CHECK STARTER OPERATION

    CONTOLS

    CHECK CONTROL POWER

    CHECK MICROPROCESSOR AND RECORD DATA

    CHECK CHILLER SAFETY/ OPERATING CONTROLS

    Thermistors and pressure transducers functioning in conjunction with the control system to provide the unit

    with the following protections- Loss of refrigerant charge protection, Low water flow detection, Lowchilled water temperature protection, Low and high superheat protection, Low oil protection for each

    compressor, Low control voltage to unit protection, Ground current protection for each compressor,Compressors protections against Pressure Overload & Electrical overload. Diagnostic display for all alarms

    and set points

    REF

    RIGERANTCIRCUIT

    CHECK REFRIGERANT CHARGE by superheat and sub-cooling temperatures

    CHECK EXPANSION VALVE FUNTIONING & STATUS

    LOG EVAPORATOR REFRIGERANT TEMP

    EVAPORATOR REFRIGERANT APPROACH TEMP

    LOG EVAPORATOR PRESSURE

    CHECK REFRIGERANT LIQUID GLASS (IF CLEAR )

    CHECK FOR ANY LEAK IN REFRIGERANT SYSTEM AND OIL SIDE

    LOG CONDENSER REFRIGERANT TEMP

    LOG CONDENSER PRESSURE

    LOG CONDENSER SUBCOOLER PRESSURE

    CHECK FOR RESTRICTION ACROSS DRIER CORES & REPLACE WHERE REQUIRED

    CONDENSER LOG ENTERING CONDENSER AIR TEMPERATURE (ON-COIL AIR TEMP)

    LOG LEAVING CONDENSER AIR TEMPERATURE (OFF-COIL AIR TEMP)

    CHECK CONDENSER FANS FOR CLEARANCE AND ALIGNMENT, BLADES STATUS

    LUBRICATE FAN MOTOR BEARINGS ( IF BEARINGS ARE OPEN TYPE)

    OIL

    LOG OIL LEVEL

    LOG OIL PRESSURE

    PERFORM OIL ANALYSIS

    CHILLEDWATER

    LOG CHW FLOW DELTA P

    LOG CHW PUMP DELTA P

    LOG CHW TEMP

    LOG LEAVING CHW TEMPERATURE

    LOG ENTERING CHW TEMPERATURE

    PERFORM CHW ANALYSIS AND ADVISE RECOMMENDATIONS

  • 8/10/2019 Page 07 - Appendix 3 0

    3/3

    CALIBRATE CHW FLOW SWITCH ( IF NOT ELECTRNIC TYPE )

    INSPECT CHW PIPE LINE/ CLEAN STRAINERS

    DETECT AND REPORT ANY SIGNS OF CORROSION

    CHECK PAINTWORK AND APPLY NEW IF NECESSARY

    GENER

    AL

    REVIEW AND EVALUATE LOG READINGS

    CHECK GENERAL OPERATION

    The above PPM Checks shall specifically & categorically comprise the below details:

    1. Submit the details of No of Compressors failed, complete with Mean Time to Repair & MeanTime between Failures.

    2. Status of Filter/Drier core replacement

    3. Status of oil test & replacement based on findings4. Status of Expansion valve functioning

    5. Additional Refrigerant topping up where identified/applicable

    6. Purging where identified/applicable

    7.

    Based on the previous track history of repeated Compressors failure frequency, performEddy current testing to (once in five years) to detect tube degradation such as pits,

    cracks, or wall loss over time & subsequent moisture entry into compressors.8. Submit Maintenance program Accomplished Vs Planned

    9. Prevention of Motor overheat by means of internal temperature sensors

    10.Prevention of Motor overload

    11.Condenser fan & motor replacements status12.Thermistors & Transducers functioning & set-points verification (details are to be

    submitted)

    13.Assign qualified Maintenance personnel (approval is to be obtained from AccountManager) to identify and initiate PPM works based on the findings from the equipment

    history & current status and to carry out Verification & Validation of Maintenance worksis to be carried out.

    14.Resource details (Planned Vs Actual site status) are to be submitted15.Method statements are to be submitted