Pacline Power & Free (S-310) · Pacline Power & Free (S-310) INSTALLATION OF THE CONVEYOR . PRIOR...

27
CANADA /INT’L SALES: PACLINE CORPORATION 5890 Shawson Dr.● Mississauga ● Ontario ● L4W 3W5 Tel: 905.858.2330 ● Fax: 905.858.2333 U.S.A. SALES: PACLINE CONVEYORS, INC. 155 Great Arrow Ave. ● Buffalo ● New York ● 14207 Tel: 716.876.9250 ● Fax: 716.876.9287 email: [email protected] June 2008 1 Pacline Power & Free (S-310) INSTALLATION OF THE CONVEYOR PRIOR TO INSTALLATION Check the following: - That a full set of drawings is available. - The quantity and type of parts against the packing list. - There are no damaged parts from shipping. - All necessary services are available. - All tools and lifting equipment are available. Verify the installation making sure that: The Drive: - Is located at the highest point in the layout prior to the take-up unit in direction of travel. - Has an inspection section fitted after it to allow access to “slack” chain. - Is positioned sufficient distance from a vertical or horizontal curve. A track section of a minimum one chain pitch length separates: - All opposing horizontal curves in opposite directions. - A horizontal curve to a vertical curve. A take-up unit is located: - After a drive unit at the nearest low-level point of the circuit. INSTALLATION Mark out the floor: - With three reference axes which should be defined on the layout drawing. - For each floor support, then sight the levels from base reference 0.00 and ascertain the shims required under each floor support. Erect floor supports: - Such that the supports are level throughout. - Each floor support is complete and tight. - Each bolted joint is tight and secure. Pre-assemble components: Drive, take-up, track, maintenance units: - In the correct orientation to the layout drawing. - Dry fit to the layout by laying components on the floor. - Pre-assemble into units, which are manageable to move into position.

Transcript of Pacline Power & Free (S-310) · Pacline Power & Free (S-310) INSTALLATION OF THE CONVEYOR . PRIOR...

CANADA /INT’L SALES: PACLINE CORPORATION 5890 Shawson Dr.● Mississauga ● Ontario ● L4W 3W5 Tel: 905.858.2330 ● Fax: 905.858.2333

U.S.A. SALES: PACLINE CONVEYORS, INC.

155 Great Arrow Ave. ● Buffalo ● New York ● 14207

Tel: 716.876.9250 ● Fax: 716.876.9287 email: [email protected] June 2008

1

Pacline Power & Free (S-310)

INSTALLATION OF THE CONVEYOR PRIOR TO INSTALLATION

Check the following:

- That a full set of drawings is available. - The quantity and type of parts against the packing list. - There are no damaged parts from shipping. - All necessary services are available. - All tools and lifting equipment are available.

Verify the installation making sure that:

The Drive:

- Is located at the highest point in the layout prior to the take-up unit in direction of travel. - Has an inspection section fitted after it to allow access to “slack” chain. - Is positioned sufficient distance from a vertical or horizontal curve.

A track section of a minimum one chain pitch length separates:

- All opposing horizontal curves in opposite directions. - A horizontal curve to a vertical curve.

A take-up unit is located:

- After a drive unit at the nearest low-level point of the circuit.

INSTALLATION

Mark out the floor:

- With three reference axes which should be defined on the layout drawing. - For each floor support, then sight the levels from base reference 0.00 and ascertain the shims required

under each floor support.

Erect floor supports:

- Such that the supports are level throughout. - Each floor support is complete and tight. - Each bolted joint is tight and secure.

Pre-assemble components: Drive, take-up, track, maintenance units:

- In the correct orientation to the layout drawing. - Dry fit to the layout by laying components on the floor. - Pre-assemble into units, which are manageable to move into position.

CANADA /INT’L SALES: PACLINE CORPORATION 5890 Shawson Dr.● Mississauga ● Ontario ● L4W 3W5 Tel: 905.858.2330 ● Fax: 905.858.2333

U.S.A. SALES: PACLINE CONVEYORS, INC.

155 Great Arrow Ave. ● Buffalo ● New York ● 14207

Tel: 716.876.9250 ● Fax: 716.876.9287 email: [email protected] June 2008

2

Pacline Power & Free (S-310)

INSTALLATION OF THE CONVEYOR Mount the components:

- By lifting and fastening to the supports. - Securing each component fully before mounting the next. - Ensure that the component is level within spirit level tolerance at the chain track. - Ensure each track joint is lined up with no steps, taking the chain track as a reference. - Take-up or expansion units are set at mid point of the slides.

Inserting the chain:

- Run a test piece through the entire power track layout. - Clean the inside of the track as necessary. - Use the inspection section to install the chain. - Manually pull through the track. - Lubrication holes on the chain are on the top. - The flat face on the pusher is the leading edge (direction of chain flow).

Adjusting of Chain Tension Make an initial adjustment of chain tension to prevent the chain from bunching in the track. Verify tension downstream from the drive unit and in the low elevations of the layout.

Spring take-up units should be in a collapsed position to join the chain. Then pushed out to apply initial tension, locking off the spring mounting angle. Then undo the nuts on the threaded rod to enable the compression springs to apply pressure to the take-up unit curve.

Pre Start Up Check Check the oil level of the gear reducer. Check electrical connections to the motor. Adjust the torque limiter to its lowest setting. Preparation Prior to Start-up Carry out several trial runs with the chain only. Attach two carriers to chain moving at slowest speed. MONITOR

1. The carrier movement all along the layout. 2. Carrier clearances on the curves. 3. Load carriers with the largest loads and repeat steps 1 and 2.

Attach the other carriers and gradually increase the loading. Operate the conveyor for several hours. Adjust chain tension. If appropriate, make trail runs in extremes of temperature and adjust chain as necessary. Adjust the torque limiter in relation to the chain’s load.

CANADA /INT’L SALES: PACLINE CORPORATION 5890 Shawson Dr.● Mississauga ● Ontario ● L4W 3W5 Tel: 905.858.2330 ● Fax: 905.858.2333

U.S.A. SALES: PACLINE CONVEYORS, INC.

155 Great Arrow Ave. ● Buffalo ● New York ● 14207

Tel: 716.876.9250 ● Fax: 716.876.9287 email: [email protected] June 2008

3

Pacline Power & Free (S-310)

INSTALLATION OF THE CONVEYOR ATTENTION: The mechanical torque limiter is designed to protect the chain, but not the carrier or the product. The friction in the torque limiter may be sufficient to damage the product or the carrier, without stopping the conveyor. (If fitted with an electronic overload protection, refer to the instruction manual).

CONVEYOR START-UP Running in after start-up

After approximately 100 hours, the initial run-in period will be complete. Verify the chain tension once again, also oil levels, connections, and the adjustment of the torque limiter by referring to the maintenance manual.

Modifications

Do not modify the layout, speed, carriers, and distribution of carriers, volume or bulk of loads carried, without consulting with PACLINE engineering

CANADA /INT’L SALES: PACLINE CORPORATION 5890 Shawson Dr.● Mississauga ● Ontario ● L4W 3W5 Tel: 905.858.2330 ● Fax: 905.858.2333

U.S.A. SALES: PACLINE CONVEYORS, INC.

155 Great Arrow Ave. ● Buffalo ● New York ● 14207

Tel: 716.876.9250 ● Fax: 716.876.9287 email: [email protected] June 2008

4

Pacline Power & Free (S-310)

INSTALLATION OF THE CONVEYOR INSTALLATION PROCEDURE: Pre-installation notes: 1. Make sure an adequate supply of supporting steelwork and fittings are available, the recommended material for

vertical supports and sway bracing being as follows:

a) 1 ½” x 1 ½” x 3/16” angle iron. b) Alternatively 3/4” sch. 40 galvanized pipe (1.05” O.D.).

2. The conveyor track should be supported at the following recommended spans:

a) Live loads up to 20 lbs/ft. – suspended at 10 foot centers. b) Live loads from 20 to 40 lbs/ft. – suspend at 8 foot centers. c) Live loads from 40 to 80 lbs/ft. – suspend at 6 foot centers. d) When the suspension points do not fall on or very near the tangents of the track curves, horizontal or

vertical, additional hangers will be required at these points.

In addition to angle iron and pipe hangers, it may be necessary to install header steel for the hangers to attach to. Due to the building construction, the roof trusses may be at spans larger than listed in above, the recommended track support spacing could not otherwise be maintained and intermediate headers would be required to meet the above recommended spans.

3. Some buildings may be unsuitable for suspending the conveyor from above in which case “cantilever”, “T” or “H”

type floor mounted support stands can be used. If the conveyor runs close to the wall, then wall brackets can be used as a conveyor support.

4. With the conveyor layout drawing, walk the conveyor path checking clearance for load carriers and noting any

obstructions, which may have to be moved. If possible mark the route out on the floor with chalk, in the “tight” areas.

5. Check that items such as drive units, take-up units, and lubricators are to be positioned in accordance with the

following instructions. DRIVE UNIT LOCATIONS AND RECOMMENDATIONS A. Drives should always be located if possible, at the highest point above floor level, in the system. B. In the case of horizontal systems the drive should be positioned at the highest point of chain pull, i.e. pulling the

most heavily loaded part of the system. C. Also in a horizontal system if there is a concentrated complex of track curves, the drive unit should be positioned

after these and not before, taking “B” above into consideration also. D. Never locate the drive in or near an oven, spray booth, degreasing tank, or pretreatment plant etc.

CANADA /INT’L SALES: PACLINE CORPORATION 5890 Shawson Dr.● Mississauga ● Ontario ● L4W 3W5 Tel: 905.858.2330 ● Fax: 905.858.2333

U.S.A. SALES: PACLINE CONVEYORS, INC.

155 Great Arrow Ave. ● Buffalo ● New York ● 14207

Tel: 716.876.9250 ● Fax: 716.876.9287 email: [email protected] June 2008

5

Pacline Power & Free (S-310)

INSTALLATION OF THE CONVEYOR E. Taking A, B, C and D into account, the drive unit location should also be accessible for service and

maintenance. F. The drive unit should be positioned to always pull and never push. G. If for any reason the drive has to be at low level, or if in doubt please consult with Pacline engineering. H. It is preferable to have a long straight run of track leading into the drive unit but not at the expense of A to G

inclusive. I. When installing a multiple drive system, the relative position of each drive to the other(s) is extremely important.

The system should be reviewed by PACLINE engineering to do a “point-to-point” chain pull analysis in conjunction with the electrical load sharing control equipment.

J. The system S-310 power and free chain, is not reversible. CHAIN TAKE-UP UNIT LOCATIONS AND RECOMMENDATIONS A. The take-up should always be located on the discharge side and as near as possible to the in-line drive unit. B. Avoid curves between the drive and take-up. If absolutely necessary, a small variance from this is acceptable,

but slightly more tension should be applied to the take-up unit to compensate for this. C. Try to avoid locating the take-up immediately prior to a decline if loads to be conveyed are heavy. This may

cause the take-up unit to collapse allowing the conveyor chain to become slack. D. If the condition in C cannot be avoided, the take-up unit should be of the self locking type to prevent collapsing. E. Never locate the take-up unit in or near ovens, spray booths, degreasing tanks, pre-treatment plants etc. F. With the multiple drive systems, it is common to have one chain take-up immediately following each drive. The

drive unit designated the “master” unit would normally be followed by a standard spring loaded take-up or perhaps an air type take-up if length warrants this, and the slave drive(s) would be followed by a manual screw type take-up without springs or air. As with multiple drives, please consult Pacline engineering.

G. Never locate the take-up unit at high level, with the drive at low level.

CANADA /INT’L SALES: PACLINE CORPORATION 5890 Shawson Dr.● Mississauga ● Ontario ● L4W 3W5 Tel: 905.858.2330 ● Fax: 905.858.2333

U.S.A. SALES: PACLINE CONVEYORS, INC.

155 Great Arrow Ave. ● Buffalo ● New York ● 14207

Tel: 716.876.9250 ● Fax: 716.876.9287 email: [email protected] June 2008

6

Pacline Power & Free (S-310)

INSTALLATION OF THE CONVEYOR INSTALLATION OF POWER & FREE S-310 SYTEMS 1. GENERAL

The conveyor track is assembled with bolted style end plates, which is quicker and cleaner in appearance than welded track joints.

2. CONVEYOR TRACK AND CURVES

Standard track sections and curves supplied are carefully cut with true and square ends, but it will be necessary to site cut straight lengths of track to finish off each “leg”. A small powered saw gives the best results, but a hacksaw may be used if the track is first scribed all round, using a square. All burrs, particularly on the inside faces, must be removed. The section through a track curve may differ slightly from that of the straight track, and when making a “track to curve” connection, make sure that the bottom flanges, and the flange towards the “inside” of the curve do not form a “step”. A small chamfer filed on the inside edges will help in producing a cleaner joint. The slot on horizontal curves is machined approximately 2 mm (5/64 inch) off the centre line towards the inside radius of the curve. A transition section of track re-aligning the slot back to the centerline of the horizontal curve is welded at either end of each bend. This transition piece of straight track is at least 8” long (1 chain pitch length), which must be fitted between each horizontal curve, which changes in direction. This is also desirable between horizontal and vertical curves. This rule of thumb should be extended to the load bar length in the power and free track sections, so as to insure the smooth transition of the carrier through the layout, without “de-dogging” or jamming the free trolley.

3. WELDING PROCEDURE

No special welding technique is necessary when electric arc welding the track bolted end plates to shortened or cut track sections. Care must be taken not to burn through the track, or leave any protrusions on the inside surface, which would not allow free passage of the conveyor chain and free trolleys. Care must also be taken that the inside faces of the track walls and bolted end plates are square with the track, before welding. 12 gauge welding rods are recommended. The end plate or yoke should first be tack welded and checked before final welding. For conformity and ease of installation PACLINE recommends that all of the track sections joints be assembled with bolted style end plates

4. INSPECTION SECTIONS

All systems must have an inspection section fitted in the track layout. Longer systems should have one installed every 100 feet throughout the system. The removable top cover of this unit allows for chain examination, maintenance and fitting or removal of the chain, or for manual application of grease if an automatic lubricator is not used. It is recommended that the inspection section be positioned as near to a track support as possible.

CANADA /INT’L SALES: PACLINE CORPORATION 5890 Shawson Dr.● Mississauga ● Ontario ● L4W 3W5 Tel: 905.858.2330 ● Fax: 905.858.2333

U.S.A. SALES: PACLINE CONVEYORS, INC.

155 Great Arrow Ave. ● Buffalo ● New York ● 14207

Tel: 716.876.9250 ● Fax: 716.876.9287 email: [email protected] June 2008

7

Pacline Power & Free (S-310)

INSTALLATION OF THE CONVEYOR 5. AUTOMATIC LUBRICATORS

Automatic brush type lubricators are recommended, on systems that have high temperature ovens, or if there are degreasing and or pre-treatment washers, or if the system is long in length. The lubricator is mounted on a short section of track. The lubricator should ideally be positioned at a point where the chain will be at its coolest, and if a second unit is fitted, this should be located immediately after a de-greasing or pre-treatment area. The lubricator should be wired into the conveyor starter so that it is in operation at all times when the conveyor is running. For non-oven systems this is still recommended, although an isolator switch can be inserted between the lubricator and starter so that the lubricator can be manually switched on and off independently. Alternately an automatic shot type lubricator can be installed

INSTALLATION SEQUENCE for the S-310 SYSTEM 1. The drive unit should be the first item to be installed. Four vertical hangers should rigidly support the drive. If

these hangers are long, they should be cross-braced with diagonal bracings taken outwards in both directions, particularly in direction of travel, to absorb chain pull reaction. Make sure that the drive unit is the right way for correct direction of chain travel (indicated by an arrow), and also ensure that the unit is level in both directions.

2. Next install the take-up unit immediately after or as near as possible after, the drive unit suspending this from

the four hangers (six if the unit is 8 feet or wider). This should be cross-braced in a similar manner to the drive unit.

3. Follow the route marked on the layout drawing, using track hanger clamps to support the track on the yokes.

Alternately the track can be hung from intermediate yokes field welded to the track or from clamps, which attach to the power track. First put in support hangers at the pre-determined span, and a chalk line can be used to ensure straightness. Check with a level that the track is level in both directions. Floor to track height elevations should also be regularly checked.

4. The support hangers should be clamped, to the existing building structure (if possible). When it is determined

that the conveyor track is correctly positioned and that it is straight and level in both directions then the hangers can be welded or bolted permanently in position. (Note: headers and hangers should be bolted to the building steel and not welded. Bolted connections are quicker and does not alter the strength of the existing building steel)

5. Sway bracing should then be fitted to prevent sway across the line of conveyor track. It is usually sufficient to

cross-brace alternative hangers one way and the remainder in the other direction. The bracing will increase the rigidity of the track.

6. Where changes in conveyor elevation occur, the length of the inclined section of straight track (tight track bite)

can be established by laying out the track components with a chalk line on the floor. (the layout drawing should have the elevation plan shown)

7. Where possible, it is better to bolt these inclined sections together with their vertical curves, on the floor, then lift

the complete assembly into position. 8. It is desirable to support at both the top and bottom of inclined sections in addition to regular support span

requirements.

CANADA /INT’L SALES: PACLINE CORPORATION 5890 Shawson Dr.● Mississauga ● Ontario ● L4W 3W5 Tel: 905.858.2330 ● Fax: 905.858.2333

U.S.A. SALES: PACLINE CONVEYORS, INC.

155 Great Arrow Ave. ● Buffalo ● New York ● 14207

Tel: 716.876.9250 ● Fax: 716.876.9287 email: [email protected] June 2008

8

Pacline Power & Free (S-310)

INSTALLATION OF THE CONVEYOR 9. Although the track hanger clamps should securely grip the track when bolted together, it is advisable to put a

small tack weld on one half, to prevent it moving. 10. In the case of high temperature oven conveyors, a track expansion joint at the entrance and exit of the oven is

essential. The track inside the oven should expand at the same rate as the oven since they are both constructed from steel. If the track is rigidly attached to the oven steel and cannot freely expand with the oven then expansion joints will be required inside the oven.

FITTING OF CHAIN 1. When the track installation is complete, a cloth should be pulled through the complete layout, remove and

replace with a clean cloth at each inspection section. 2. After cleaning out the track, insert a small piece of chain into the track at an inspection section, and pull this

chain sample around the entire system as a final check for internal obstructions. Repair or replace any bad joints.

3. The conveyor chain is hand packed in polythene bags. It is essential that cleanliness is maintained while fitting

the chain into the conveyor track. The area can be kept clean, with a drop sheet of industrial paper, plastic or cloth laid on the floor.

4. Each bag contains a link and four spare rivets. Join two or more lengths together using the connecting link,

taking care that the bearing rivet is “peened” over sufficiently to stop the inner race of the bearing from rotating and also that the block rivets are well “peened” over so that they do not rotate in the side links but are consistent with the factory assembled blocks, to pivot freely on the rivet. A ball peen hammer and steel block are all that is necessary for hand riveting.

5. Feed the chain into the track via, an inspection section, or a power & free maintenance track unit, or at the drive

unit with the bottom plates removed. The chain should be inserted in the direction of conveyor travel and pulled round with a rope tied to the first pendant, adding further lengths. Several hundred feet can often be pulled around quite easily, but in very long systems, it may be necessary to move to another inspection section to complete the chain installation.

6. When making the last chain connection, the chain take-up unit should be fully “collapsed” and as much slack

chain as possible pulled out before connecting the two ends. . 7. It will almost certainly be necessary to cut the last length of chain and care should be taken that the last link is a

vertical link the same as either end of a standard 10’ – 0” length, to suit the connector which is a horizontal link. 8. If the conveyor chain is to be hand lubricated, this can be brush applied at the time the chain is being fitted. 9. During chain assembly, the bottom plates will need to be removed from the drive unit, so that the chain can

mesh with the drive “dogs”. The front face of the drive dogs should locate behind the radiused chain block, and the conveyor should not be run until the bottom plates have been re-fitted and tightly secured. When refitting ensure that there is no “step” at points where plates meet track.

9. Check tightness of all nuts and bolts for the entire system.

CANADA /INT’L SALES: PACLINE CORPORATION 5890 Shawson Dr.● Mississauga ● Ontario ● L4W 3W5 Tel: 905.858.2330 ● Fax: 905.858.2333

U.S.A. SALES: PACLINE CONVEYORS, INC.

155 Great Arrow Ave. ● Buffalo ● New York ● 14207

Tel: 716.876.9250 ● Fax: 716.876.9287 email: [email protected] June 2008

9

Pacline Power & Free (S-310)

INSTALLATION OF THE CONVEYOR TESTING AND RUN-IN INSTRUCTIONS 1. Take initial slack out of the chain by means of the spring loaded adjusting rods on the take-up unit. 1/16” gap

between the spring coils represents approximately 200 lbs chain tension. 1/8” equals 100 lbs etc. The chain should be firm at all points around the system but not excessively tight.

2. Wind by hand, the “belt” between the motor pulley and gear box (ensuring correct direction) and see if the

conveyor chain moves freely in the track. 3. Set conveyor to its lowest speed by adjusting the motor plate outwards (as fitted to standard drive units) or on

remote control panel if electrical variable speed fitted. Note: speed variation by motor plate (mechanical style with sheaves) adjustment should normally be done with motor running.

4. Press starter button and conveyor should run. If the motor is running and the chain does not move, check the

torque limiter (mechanical friction clutch) fitted to the transmission chain wheel on the drive unit head shaft, to see if this is “slipping”.

5. If so switch off, remove the chain guard and adjust each of the three set bolts located and equally spaced round

a brass ring. Make only small incremental adjustments, trying the conveyor between adjustments until it moves. Then give a further quarter turn to each bolt. Normally this adjustment should not be necessary until loads are placed on the system.

6. Allow the conveyor to run for at least one hour, or in the case of long slow moving at least one complete

circulation of the system, before attempting to fit carriers. 7. Fit two consecutive carriers to the conveyor and follow these around the conveyor path to ensure that not only

do they clear each other around horizontal curves and also on the inclines, but that they also clear any possible obstructions.

8. Fit remainder of carriers after clearance has been established, and then place loads on carriers for a full load

test. 9. During this, it may be necessary to adjust the torque limiter again, and it is worthwhile making alignment marks,

one on the chain wheel. If these move relative to each other, “slip” has occurred. 10. The ideal setting for the torque limiter is to allow for slip to take place if any slight overload is applied to a fully

loaded system. This protects the equipment in case of a “jam” and also minimizes possible injury to personnel. 11. After a relatively short period of running, it may also be necessary to adjust the take-up unit to compensate for

chain wear-in or “stretch”. 12. Care must be taken when adjusting the motor plate for speed variation (the speed range is approximately 2.5:1)

do not to attempt adjustment beyond the limits set by “stops” on the adjuster screw. Speed adjustment over a range of 10:1 can be obtained by electrical speed control, not the mechanical variable speed.

CANADA /INT’L SALES: PACLINE CORPORATION 5890 Shawson Dr.● Mississauga ● Ontario ● L4W 3W5 Tel: 905.858.2330 ● Fax: 905.858.2333

U.S.A. SALES: PACLINE CONVEYORS, INC.

155 Great Arrow Ave. ● Buffalo ● New York ● 14207

Tel: 716.876.9250 ● Fax: 716.876.9287 email: [email protected] June 2008

10

Pacline Power & Free (S-310)

INSTALLATION OF THE CONVEYOR LUBRICATION GUIDE Experience has shown that proper lubrication of the conveyor systems is important to extend the life. The purpose of this guide, therefore, is to establish proper guidelines for regular and proper lubrication procedures to be used in the operation of all Pacline equipment. There are many factors that effect lubrication recommendations, some of these are as follows: 1. Oven Temperature (if any) 2. Humidity 3. Speed of chain 4. Oil viscosity and ambient temperature 5. Process vapors (alkali fumes, steam, solvent vapors, etc.) 6. Load on chain 7. Length of chain 8. Atmospheric contaminants such as rust, dust, lint, paint over spray, etc. There is no such thing as an all purpose lubricant that will satisfy each individual application. It is necessary for the end user to accept the responsibility for providing his own lubricant and set up his own lubrication maintenance procedures. However, information on recommended lubricant can be seen in the maintenance section. The following is a recommended checklist of the more common causes of torque limiter slippage: 1. Check to see if conveyor chain is jammed in the drive unit.

A slight cocking of one or two chain pendants is evidence of a jammed condition, and it may be confirmed by manually operating the v-belt drive in reverse. The chain will give a definite “jump” as the jammed link releases. A common cause of this type of jam is slack chain and the take-up may be fully extended.

Adjust the take-up springs so that there is a gap of approximately 3/16” between coils. If this does not free the chain, or if the drive stalls again, examine the system for further problems, as it is possible for this type of jam to be the result of another problem elsewhere in the system.

ADJUSTMENT PROCEDURE After the conveyor has been installed and the power has been connected to the drive motor, it is necessary to properly set the torque limiter. The procedure outlined below is recommended. Model 500 1. Loosen three cap screws until points are below surface of adjusting nut. 2. Loosen adjusting nut and re-tighten to finger tight condition. Make certain that the disc springs are properly

centered in the pilot plate located beneath the adjusting nut. 3. Tighten set screw in adjusting nut so that it seats in either a groove or flat provided on torque limiter body – not

on the body threads.

CANADA /INT’L SALES: PACLINE CORPORATION 5890 Shawson Dr.● Mississauga ● Ontario ● L4W 3W5 Tel: 905.858.2330 ● Fax: 905.858.2333

U.S.A. SALES: PACLINE CONVEYORS, INC.

155 Great Arrow Ave. ● Buffalo ● New York ● 14207

Tel: 716.876.9250 ● Fax: 716.876.9287 email: [email protected] June 2008

11

Pacline Power & Free (S-310)

INSTALLATION OF THE CONVEYOR 4. Tighten each of the three cap screws finger tight. 5. Alternately tighten cap screws half a turn and start conveyor. Slippage should occur. 6. Allow drive to run for about 10 minutes to “break-in” the friction discs. 7. Stop motor. Loosen cap screws. Now loosen adjusting nut one and a half turns. Repeat No. 3 and 4 above.

Alternately tighten cap screws half turn until heads bottom out. 8. Start conveyor. If slippage occurs repeat No. 7 but tighten adjusting nut 1/4 turn. Continue this procedure until

slippage stops. 9. Start loading conveyor. If slippage occurs repeat 8. Continue until conveyor is fully loaded. 10. Making an “alignment mark”, one placed on the sprocket and the other on the friction disc and backup plate, can

be used to check slippage. After stopping the drive unit, if the marks are not aligned, slippage has occurred. Repeat No. 8.

11. Repeat until no slippage is evident. Torque limiter is now properly adjusted. CAUTION Atmospheric conditions, moisture, lubricants, and surface corrosion affect the operating characteristics and capacity of torque limiters. The life of the friction facings may be greatly reduced by rust on the center plate. Due to this regular maintenance of the torque limiter is urged. 1. Check the lubrication of the chain. It should be moist, or even wet, with oil. If the chain has been allowed to dry

out or become gummy, the friction in the system could be increased to the point of adding excessive chain pull.

If the chain is very gummy and dirty, it should be pulled out of the system and thoroughly cleaned with solvent. It should be given a light coating of oil (same as in the conveyor lubricator) before reinstalling into the system. Do not allow the chain to be dragged around the floor while being pulled out of the system or re-installed. It is good practice to clean out the track by pulling through first a damp solvent saturated cloth, and then a dry rag before re-installing the chain. Blow out the track with a high-pressure air jet if necessary.

If the chain is not sufficiently dirty to warrant removal and cleaning, it should still be re-lubricated. Temporarily tighten the torque limiter so the system may be operated while it is being re-lubricated. Restore the torque limiter to its original setting after the chain is running freely again. If the system is equipped with a brush type lubricator fill the reservoir temporarily, increase the oil feed. Make sure the solenoid is energized, and run the system for several chain revolutions, until oil begins to visually appear on the pusher dogs. Re-adjust the lubricator with recommended oil for continuous operation.

CANADA /INT’L SALES: PACLINE CORPORATION 5890 Shawson Dr.● Mississauga ● Ontario ● L4W 3W5 Tel: 905.858.2330 ● Fax: 905.858.2333

U.S.A. SALES: PACLINE CONVEYORS, INC.

155 Great Arrow Ave. ● Buffalo ● New York ● 14207

Tel: 716.876.9250 ● Fax: 716.876.9287 email: [email protected] June 2008

12

Pacline Power & Free (S-310)

INSTALLATION OF THE CONVEYOR

2. Walk through and carefully inspect the entire system, looking for jammed or caught loads or load carriers. A few of the possible causes of jammed loads are:

a) Improper loads on system, loads or carriers caught on each other at vertical or horizontal track curves or

catching on obstructions in tight clearance areas.

b) Load or carriers caught on obstructions due to excessive swing at some point in the system. Usually some form of simple guarding will prevent this happening again.

c) Broken or bent load fixtures or carriers caught in tight clearance areas. Load carriers should always be

kept in good repair.

d) Jams caused by push carts, hand or lift trucks, skid pallets, boxes, etc., left in the path of conveyor travel. Guards, or at least lines painted on the floor, will help keep problem areas clear.

e) Load carriers jammed on conveyor guards. The most frequent causes of this is allowing spilled loads to

accumulate in the underguarding. Good housekeeping and correcting the cause of spillage will eliminate this.

f) Ladders, scaffolding and other maintenance equipment left in the conveyor path.

3. If all load carriers are clear and free to move it now becomes necessary to examine the chain itself to determine

if it is caught, jammed or damaged. This necessitates a careful scrutiny of the entire system, starting at the drive and moving in either direction until the cause of trouble is discovered.

Before starting this examination, make sure that the chain is not jammed at the drive unit. Then pull tight by manually operating the V-belt drive in the normal direction of travel until the torque limiter slips. As you move along the system, test the tension in the chain by attempting to move the pendants. “Upstream” from the drive the chain will tend to be tight until the obstruction is reached. “Downstream” from the drive, the chain will tend to be loose up to the obstruction.

Things to look for in examining the chain for trouble spots are: Pusher dogs caught on slight misalignments at track joints. This type of problem usually manifests itself and is corrected during system commissioning. This problem may suddenly appear in an older system when a jammed pusher dog catches on a misalignment that was out of the normal path of travel. A good way to check for this type of jam is to tap the chain on both sides of every track joint with a light hammer. The chain will “jump” when the caught pusher dog is freed. Filing or grinding the misaligned track will correct this problem.

Foreign objects such as a small screw, nut, etc., inserted somehow in the track slot. This type of jam is often very difficult to detect unless the foreign object happens to protrude past the slot. It can be cleared by operating the drive in the forward direction until the offending object drops out.

CANADA /INT’L SALES: PACLINE CORPORATION 5890 Shawson Dr.● Mississauga ● Ontario ● L4W 3W5 Tel: 905.858.2330 ● Fax: 905.858.2333

U.S.A. SALES: PACLINE CONVEYORS, INC.

155 Great Arrow Ave. ● Buffalo ● New York ● 14207

Tel: 716.876.9250 ● Fax: 716.876.9287 email: [email protected] June 2008

13

Pacline Power & Free (S-310)

INSTALLATION OF THE CONVEYOR Worn track slot. Occasionally the track slot, particularly in the vicinity of a horizontal or vertical curve will become worn by constant action of the chain pusher dog to the extent that the chain wheels begin to drop into the slot and jam. This is usually due to a misaligned slot in the adjacent curve. Since all chain track curves are hardened, the curve itself will show very little wear. Examine the curve to see if the chain pusher dogs consistently rub hard on one side of the slot or the other. If so, the best thing to do to correct this condition completely is to replace both the curve and the adjacent worn straight track. A sure sign of curve slot misalignment is a raised burr along one edge of the slot. Another cause of slot wear is excessive side thrust on pusher dogs or load carriers due to unbalanced loads or careless loading or unloading of the system. Often a simple freeline anti back up or guide will correct slot wear at load and unload areas, while improved supervision is required to assure balanced loading.

4. Sometimes the torque limiter will slip intermittently without completely stalling. The result will be a surging

chain. It is often possible to diagnose the cause of the problem by analyzing the frequency of the torque limiter slippage.

If the torque limiter slips with the same frequency that a load fixture or carrier passes any one point in the system, this is almost proof positive that the load fixtures themselves are catching or binding somewhere in the system. If the system is unevenly loaded, you may find the torque limiter slipping only when there are heavy loads on the inclines while the declines are empty or lightly loaded. This is one instance where it may be necessary to lighten the torque limiter, providing other conditions such as take-up adjustment and chain lubrication have been thoroughly checked and are satisfactory. Improperly peened chain rivet. Since the chain is shipped in 10’-0” lengths and joined together in the field by means of a splice rivet, it may be that the head of the splice rivet was not properly peened down. The rivet thus would extend out too far and may catch on a slight irregularity inside the track, usually at a joint. This type of jam will release when you tap an adjacent pusher dog with a light hammer. Hang a wire or other identifying mark on the pusher dog and run the drive until that portion of the chain reaches the drive or a track inspection section, where it can be examined and repaired. Broken chain. If the chain breaks cleanly, the location of the break can be easily discovered. Sometimes, however, only one side plate of the pair will fracture, or a rivet will pull out on one side only, and the broken side will dig into the track. This type of break is evident by unnaturally cocked pusher dogs. In either case, the damaged portion of the chain must be worked around the system to the drive or to an inspection section and repaired. The best way to do this is to grip the next pusher dog “upstream” from the break with a pair of vise grip pliers and pull hard on it in the normal direction of travel, trying to keep it aligned, while someone else “jogs” the drive a couple feet at a time toward the nearest inspection station or to the drive.

CANADA /INT’L SALES: PACLINE CORPORATION 5890 Shawson Dr.● Mississauga ● Ontario ● L4W 3W5 Tel: 905.858.2330 ● Fax: 905.858.2333

U.S.A. SALES: PACLINE CONVEYORS, INC.

155 Great Arrow Ave. ● Buffalo ● New York ● 14207

Tel: 716.876.9250 ● Fax: 716.876.9287 email: [email protected] June 2008

1

Pacline Power & Free (S-310)

MAINTENANCE DOCUMENTATION INDEX 2.1 CHAIN 2.2 DRIVES 2.3 WHEELTURN UNIT 2.4 TAKE-UP AND EXPANSION UNITS 2.5 TRACK SECTION 2.6 AIR STOP UNITS 2.7 TRACK SWITCHES 2.8 LUBRICATION UNIT 2.9 FREE TROLLEYS

CANADA /INT’L SALES: PACLINE CORPORATION 5890 Shawson Dr.● Mississauga ● Ontario ● L4W 3W5 Tel: 905.858.2330 ● Fax: 905.858.2333

U.S.A. SALES: PACLINE CONVEYORS, INC.

155 Great Arrow Ave. ● Buffalo ● New York ● 14207

Tel: 716.876.9250 ● Fax: 716.876.9287 email: [email protected] June 2008

2

Pacline Power & Free (S-310)

MAINTENANCE DOCUMENTATION 2.1 CHAIN 2.11 CHAIN LUBRICATION For proper functioning the chain must be kept well oiled. Lubrication will be carried out in accordance with the following series of steps. DAILY Check the lubrication of the chain it should be moist with oil. If the chain has

been allowed to dry out or become gummy the friction in the system will increase to the point of adding excessive chain pull.

200 HOURS Examine load carrying vertical bearings for wear.

Examine horizontal bearings for wear. 600 HOURS With an oil can or brush, lightly oil the sintered blocks and bearing rivets. 2000 HOURS Re-lube the load carrying bearings. The frequency of this operation can be

considerably reduced or increased by the nature of the work conditions and atmospheric environment.

2.12 CHAIN MAINTENANCE ADJUSTMENT OF TAKE-UP 200 HOURS While the conveyor is running, proceed to turn evenly each of the nuts on the

threaded rods, positioned on either side of the take-up unit. Adjust first one section and then the other; continue in this way until the required tension is reached. Any other method may result in deformation adversely affecting the proper function of the system. When the full extent of tension adjustment is reached, adjustment may be restored to the initial state by removing one or two links from the chain.

Check chain tension by pushing chain upwards on a straight section of track. Correctly tensioned chain should show some resistance. With the conveyor running, inspect the entire layout for signs of the chain ‘bunching up’ inside the track, indicating insufficient tension. This is usually most evident immediately downstream of the drive and at the lowest point of the circuit. LIMIT OF TENSIONING Maximum play per 8” chain pitch = .04” (1/2 %)

CANADA /INT’L SALES: PACLINE CORPORATION 5890 Shawson Dr.● Mississauga ● Ontario ● L4W 3W5 Tel: 905.858.2330 ● Fax: 905.858.2333

U.S.A. SALES: PACLINE CONVEYORS, INC.

155 Great Arrow Ave. ● Buffalo ● New York ● 14207

Tel: 716.876.9250 ● Fax: 716.876.9287 email: [email protected] June 2008

3

Pacline Power & Free (S-310)

MAINTENANCE DOCUMENTATION 2.2 DRIVE UNITS 2.21 DRIVE UNIT MAINTENANCE (INLINE CATERPILLAR DRIVE)

BASIC IN-LINE DRIVE FRAME CHECK Head shaft bearing lubrication.

Motor mounting base, slide ways and tensioning screws should be lubricated to avoid seizing due to rusting.

CHECK Drive chain hold down rails.

LUBRICATION Apply grease with a soft brush to all faces of the hardened guide strips. WEAR If the hold down rails show wear in excess of 1/16 “ these must be replaced.

CHECK Drive chain assembly.

LUBRICATION Apply grease with a soft brush to the inside of the chain, and to the leading edge of the drive dogs. Also check the tightness of the drive dogs. Correct chain tension is maintained by adjusting the idler sprocket tension screws on each side of the drive body.

CHECK Drive sprockets.

WEAR If play between sprocket and drive or tension shaft is in excess of .04” the oilite bushing must be replaced.

CHECK Free track sections for excessive wear.

CANADA /INT’L SALES: PACLINE CORPORATION 5890 Shawson Dr.● Mississauga ● Ontario ● L4W 3W5 Tel: 905.858.2330 ● Fax: 905.858.2333

U.S.A. SALES: PACLINE CONVEYORS, INC.

155 Great Arrow Ave. ● Buffalo ● New York ● 14207

Tel: 716.876.9250 ● Fax: 716.876.9287 email: [email protected] June 2008

4

Pacline Power & Free (S-310)

MAINTENANCE DOCUMENTATION

2.22 DRIVE UNIT MAINTENANCE (WHEEL TURN DRIVE) BASIC WHEELTURN DRIVE FRAME CHECK Head shaft bearing lubrication. CHECK Chain tensioner for wear on the nylon guide. GEARMOTOR UNIT CHECK Gearbox shaft seals every 100 hours.

Gearbox grease filled should be cleaned and re-packed with grease between 6000 and 10,000 hours dependant on duty.

CHECK Mechanical variable speed unit oil level should be checked every 200

hours and topped up as necessary. Lack of oil will lead to premature wear. Drain and refill after every 6000 hrs. To fill the unit remove oil level plug and filler plug and pour new oil in until it flows from the level hole. Replace both plugs. The drain plugs fitted to the units are of the magnetic type, and the plugs should be cleaned at each refill of oil. IMPORTANT: Adjust speed only when unit is running.

2.23 DRIVE UNIT MAINTENANCE

GEARMOTOR VARIABLE SPEED UNIT

CHECK Gearbox shaft seals every 200 hrs.

The gearbox unit is filled with the correct amount of lubricant before dispatch and this has an operational life equivalent to that of the gears. Oil changes are therefore unnecessary.

CHECK Mechanical variable speed unit should be checked every 200 hrs and topped up as necessary. According to the required mounting position the disc variator should be filled to the middle of the oil sight glass. Lack of oil will lead to premature wear. Drain and refill after every 6000 running hours. IMPORTANT: Adjust speed only when unit is running.

CANADA /INT’L SALES: PACLINE CORPORATION 5890 Shawson Dr.● Mississauga ● Ontario ● L4W 3W5 Tel: 905.858.2330 ● Fax: 905.858.2333

U.S.A. SALES: PACLINE CONVEYORS, INC.

155 Great Arrow Ave. ● Buffalo ● New York ● 14207

Tel: 716.876.9250 ● Fax: 716.876.9287 email: [email protected] June 2008

5

Pacline Power & Free (S-310)

MAINTENANCE DOCUMENTATION 2.24 DRIVE UNIT MAINTENANCE TRANSMISSION CHAIN Transmission chain between gearbox output shaft and drive head shaft. Every 1000 hrs, apply oil with a soft brush to the inside of the chain. Maintain in-line drive unit chain tension by sliding the gearmotor unit on the adjustable frame. With hand pressure, the chain should be capable of displacement on either side of its axis between 1/8” and 3/16”. Wheel turn drive unit chain tension, is maintained by the chain tensioner. Check for wear on the nylon guide replace if necessary. TORQUE LIMITER At periodic intervals, or if proper torque is not being maintained, inspect torque limiter for presence of oil, grease, moisture, or corrosion on the driving surfaces and for proper setting of spring load. Clean and adjust as required, friction facings and bushings are the only parts that should normally require replacement. TROUBLE SHOOTING The torque limiting clutch is utilized for four reasons, in the event of a jam it:

1. Protects drive gear reducer from overloading 2. Protects the conveyor chain from overloading 3. Prevents excessive damage to loads and load carriers 4. It helps to protect personnel from possible injury.

The torque limiter is of great value because it provides complete overload protection regardless of the cause. 2.25 TORQUE LIMITER TROUBLE SHOOTING When a drive is installed in a new system, the installer should adjust the torque limiter so that it will slip under a chain pull only slightly higher than it should ever be again, it should not be necessary to increase the setting of the torque limiter unless there is a considerable increase in the load being carried by the system. In fact, the torque limiter setting after the first 30 days of operations should be checked and possibly decreased. If the conveyor system should suddenly stall for some undetermined reason, check the drive immediately. If the motor is running but he drive sprocket is not turning, the torque limiter is slipping. AT THIS POINT DO NOT TIGHTEN THE TORQUE LIMITER! THIS IS THE LAST THING TO DO. Turn off the drive immediately. Clutch slippage should be kept to the absolute minimum.

CANADA /INT’L SALES: PACLINE CORPORATION 5890 Shawson Dr.● Mississauga ● Ontario ● L4W 3W5 Tel: 905.858.2330 ● Fax: 905.858.2333

U.S.A. SALES: PACLINE CONVEYORS, INC.

155 Great Arrow Ave. ● Buffalo ● New York ● 14207

Tel: 716.876.9250 ● Fax: 716.876.9287 email: [email protected] June 2008

6

Pacline Power & Free (S-310)

MAINTENANCE DOCUMENTATION 2.3 WHEELTURN UNIT CHECK For play in main shaft. 200 HRS Inspect thrust washer and bushings for wear. Inspect sprocket and profile ring for wear and play. Tighten of all hardware. Grease rim of sprockets lightly with an adhesive grease. 2.4 TAKE-UP AND EXPANSION UNITS Periodically check the sliding elements they must be kept lubricated in order to prevent any seizing up with rust. Lubricate threaded rod adjusters (if fitted). (If components are in an area of destructive atmospheric conditions i.e. heat, solvent etc special attention must be paid to these components) 2.5 TRACK SECTIONS 1600 HOUR PERIOD Lubricate the rolling of the track sections, pay special attention to the inside curves and

the take-up track included in the layout. (Any areas subject to destructive atmospheric conditions i.e. heat, solvents, etc., must have special attention paid to them to maintain track integrity).

2.6 AIR STOP UNITS CHECK 500 HOURS Seals on air cylinder. Tightness of all hardware. Stop operates on signals. Free blade movement. Blade for signs of wear replace if necessary. GREASE Stop blade cam face Pivot points Running face of tracks

CANADA /INT’L SALES: PACLINE CORPORATION 5890 Shawson Dr.● Mississauga ● Ontario ● L4W 3W5 Tel: 905.858.2330 ● Fax: 905.858.2333

U.S.A. SALES: PACLINE CONVEYORS, INC.

155 Great Arrow Ave. ● Buffalo ● New York ● 14207

Tel: 716.876.9250 ● Fax: 716.876.9287 email: [email protected] June 2008

7

Pacline Power & Free (S-310)

MAINTENANCE DOCUMENTATION 2.7 TRACK SWITCHES CHECK 500 HOURS Seals on air cylinder. Tightness of all hardware. Track switch operates on signals. Free movement of tongue. Alignment of tongue. GREASE Inner faces of free track Running face of track tongue Running face of track 2.8 LUBRICATION UNIT LUBRICATOR UNIT (BRUSH TYPE) The cycle time of the lubricator pump is two minutes, as standard, longer cycle times are available. The volume of oil delivered is adjustable from 0.25 ml per cycle. See below for adjustment. PROCEDURE ADJUSTING PUMP OUTPUT First release screw (1) until the adjusting nut turns freely. Adjust the nut (2) for the required output. The shaft (3) is graduated in 0.5 mil stops to assist in setting. After adjustment, the screw (1) must be carefully re-tightened. Do not over tighten. NOTE! Before tightening the screw (1) ensure that the adjuster (2) is positioned so that the screw (1) is always tightened towards the flat graduated section of the shaft (3). MAINTENANCE DAILY Check level of oil in reservoir and replenish as necessary. Use correct oil, see recommendation chart. Check conditions of applicator bushes and replace if worn.

CANADA /INT’L SALES: PACLINE CORPORATION 5890 Shawson Dr.● Mississauga ● Ontario ● L4W 3W5 Tel: 905.858.2330 ● Fax: 905.858.2333

U.S.A. SALES: PACLINE CONVEYORS, INC.

155 Great Arrow Ave. ● Buffalo ● New York ● 14207

Tel: 716.876.9250 ● Fax: 716.876.9287 email: [email protected] June 2008

8

Pacline Power & Free (S-310)

MAINTENANCE DOCUMENTATION LUBRICATOR UNIT (PULSED SHOT) OPERATING INSTRUCTIONS 1. Fill the reservoir with lubricant. (See lubrication recommendation chart OM310/04/12). 2. Slacken the locknut on the metering screw and turn the screw clockwise as far as it will go without forcing:

the ram of the oil pump is now fully retracted and held in that position by the metering screw. Now turn the screw anti-clockwise five full turns (each full turn represents 35 cu. mm of oil delivery)

3. Supply air at a preferred 72 P.S.I. to port 1 of the actuating valve. 4. Adjust the position of the valve so that its actuating roller is fully opened by contact with the conveyor load

wheel, but is not forced. The maximum travel of the wheel is 3/16”. 5. The ram of the oil pump moves forward as the valve opens and back as it closes at each actuation a

slight ‘knock’ will be heard and felt at the reservoir as the ram contacts the end of the metering screw. 6. After a few cycles the oil should be observed in the translucent pipe leading from the top of the pump

block to the base of the distributor nozzles. This column of oil should move forward about 3/8” each time the valve operates until it enters the base of the nozzles.

7. Continue to operate the valve until oil is seen to be ejecting from the oiler heads on to the chain. 8. Once the conveyor is in service the amount of oil applied should be progressively reduced until the chain

is running with its components just moist with oil but not dripping off. 9. Conveyor systems operating in high temperature environments may require the constant application of a

suitable extreme-temperature lubricant, while those working in less arduous conditions may be lubricated intermittently – preferably by incorporating a solenoid valve and timer into the air supply.

CANADA /INT’L SALES: PACLINE CORPORATION 5890 Shawson Dr.● Mississauga ● Ontario ● L4W 3W5 Tel: 905.858.2330 ● Fax: 905.858.2333

U.S.A. SALES: PACLINE CONVEYORS, INC.

155 Great Arrow Ave. ● Buffalo ● New York ● 14207

Tel: 716.876.9250 ● Fax: 716.876.9287 email: [email protected] June 2008

9

Pacline Power & Free (S-310)

MAINTENANCE DOCUMENTATION PERIODIC INSPECTION AND MAINTENANCE SCHEDULE DATA Reservoir capacity – 10 litres. Pump: Positive displacement delivery, 0.200 cu. mm. Compressed air capacity: 65 P.S.I. and .5 cu. centimeters per actuation. Mode of actuation: Roller/lever valve or electronic proximity switch: to customers specification. GENERAL INSPECTION 1. Check securing clamps and/or bolts. Examine all air and oil connections for leaks. Ensure lubricator is

full with the correct oil. 2. Ensure that clean compressed air at 65 P.S.I. is supplied to Port 1 of the actuating valve. Check that the

valve is correctly set in relation to the conveyor load wheel and is fully opened by contact between the wheel and the valve actuating roller. (The correct travel or ‘lift’ of the valve actuating roller is 3/16” – more than this will strain and damage the valve).

3. Check tightness and alignment of the oil delivery pipes.

Note: All alignments are given in relation to the moment of valve actuation. Correct settings of the jets is as follows:

a) Load wheels (either side of track). Jets aligned on ball races of wheels.

b) Horizontal guide wheel: one jet is mounted above the track on the nozzle support casing. When the valve opens, the jet should be pointed at the horizontal guidewheel.

4. Operate the lubricator and see that the oil ‘shots’ are striking the appropriate points as set out in 3, and

that all the nozzles are unobstructed. Examine the conveyor chain and confirm that it is correctly lubricated. All wheels and bearing shafts should be free of corrosion and lightly coated with oil, without “drip-off". If the volume of oil shot requires regulating this is done by releasing the lock-nut on the oil metering screw and turning its knurled knob: each full turn anti-clockwise increases the total “shot” by 20 cu. mm or 4 cu. mm per delivery jet (5 jets).

CANADA /INT’L SALES: PACLINE CORPORATION 5890 Shawson Dr.● Mississauga ● Ontario ● L4W 3W5 Tel: 905.858.2330 ● Fax: 905.858.2333

U.S.A. SALES: PACLINE CONVEYORS, INC.

155 Great Arrow Ave. ● Buffalo ● New York ● 14207

Tel: 716.876.9250 ● Fax: 716.876.9287 email: [email protected] June 2008

10

Pacline Power & Free (S-310)

MAINTENANCE DOCUMENTATION FAULT FINDING AND DIAGNOSIS Pneumatic Conveyor Lubricators have only two moving parts – the actuating valve and the piston rod of the pump cylinder. If these are not working, check: 1. That air is supplied to the valve at the correct pressure and that it is reaching the cylinder. 2. That the cylinder is working: remove the metering screw and insert a thin rod to contact the end of the

pump ram. Actuate the valve and forward movement of the ram should be felt – if not, either the valve or the cylinder is defective. If the latter, do not attempt to dismantle it from the pump block, but return either the pump unit alone or the complete reservoir and pump assembly to PACLINE, who will replace it at a nominal cost. (Free, within the 12-month warranty period).

3. If the valve and pump unit are working but no oil is being ejected the non-return valve or the delivery pipe

is probably obstructed by dirt. 2.9 FREE TROLLEYS CHECK 200 HOURS Free rotation of load carrying bearings. Free rotation of side guide wheels. Free movement of front trolley floppers. Trolley body for alignment. Tightness of rivets. Tightness of springs. GREASE All bearings and pivots. Driving face of flopper. Disengagement cam. Free trolley body sides.

CANADA /INT’L SALES: PACLINE CORPORATION 5890 Shawson Dr.● Mississauga ● Ontario ● L4W 3W5 Tel: 905.858.2330 ● Fax: 905.858.2333

U.S.A. SALES: PACLINE CONVEYORS, INC.

155 Great Arrow Ave. ● Buffalo ● New York ● 14207

Tel: 716.876.9250 ● Fax: 716.876.9287 email: [email protected] June 2008

11

Pacline Power & Free (S-310)

MAINTENANCE DOCUMENTATION

Exclusive Lubricant Recommendation For

Conveyor Systems Correct lubrication of conveyor systems cannot be overstressed and we therefore wish to draw your attention to this important issue. Operational reliability and trouble free service of high performance conveyor equipment depends on correct selection and permanent use of high quality specialized lubricants. The recommended lubricants enclosed are proven integral machine elements and have been selected to provide extended lubrication intervals under extreme conditions such as high temperatures, high loads, wet processing conditions, etc. Failure to comply with the recommended lubricants could result in voiding of equipment warranty. General maintenance Instruction: Mixing of lubricants must be avoided and may result in reduced performance. Lubricants should be applied in the quantities specified to prevent over lubrication and environmental contamination. Lubrication intervals are dependant on service conditions, operating hours, design construction and environmental conditions. Each conveyor installation must be reviewed individually and lubrication intervals determined in accordance with operating conditions. Where necessary USDA III/USDA 112 lubrication products are provided to fulfill food industry safety legislation requirements. USDA H1 products are certified suitable for incidental contact with “foodstuffs”.

CANADA /INT’L SALES: PACLINE CORPORATION 5890 Shawson Dr.● Mississauga ● Ontario ● L4W 3W5 Tel: 905.858.2330 ● Fax: 905.858.2333

U.S.A. SALES: PACLINE CONVEYORS, INC.

155 Great Arrow Ave. ● Buffalo ● New York ● 14207

Tel: 716.876.9250 ● Fax: 716.876.9287 email: [email protected] June 2008

12

Pacline Power & Free (S-310)

MAINTENANCE DOCUMENTATION

OVERHEAD CONVEYOR LUBRICATION CHART

CONVEYOR TYPE LUBRICATION METHOD

APPLICATION METHOD NOTES

GARMENT HANDLING and ASSEMBLY LINES Conveyor Chains at ambient temperatures. Conveyor Bearings at ambient temperatures.

STRUCTOVIS EHD (LU-1540) CENTOPLEX 2 EP (LU-1541)

Oil lubrication by brush, oil can, automatic lubrication equipment Grease lubrication

CL grade oil, VG 460 NLG1 2 grade grease

PAINT FINISHING OVEN LINES Conveyor Chains temperatures up to 482 degrees F Conveyor Bearings temperatures up to 482 degrees F

HOTEMP OY 95 (LU-0878) BARRIERTA L55/2 (LU-1542)

Oil lubrication by brush, oil can, automatic lubrication equipment Grease lubrication

Heat stable lubricant instructions See technical data for lubrication intervals & instructions

WET PROCESS & PHOSPHATE LINES Conveyor Chains Conveyor Bearings

STRUCTOVIS EHD (LU-1540) KLUBERPLEX BE 31-222 (LU-1543)

Oil lubrication by brush, oil can, automatic lubrication equipment Grease lubrication

See technical data for viscosity/application information NLG1 2 grade grease

MEAT PROCESS LINES Ambient Temperatures Conveyor Chains/Rails Conveyor Bearings

STRUCTOVIS EHD (LU-1540) KLUBERPLEX BE 31-222 (LU-1543)

Oil lubrication by brush, oil can, automatic lubrication equipment Grease lubrication

See technical data for viscosity/application information NLG1 2 grade grease

CANADA /INT’L SALES: PACLINE CORPORATION 5890 Shawson Dr.● Mississauga ● Ontario ● L4W 3W5 Tel: 905.858.2330 ● Fax: 905.858.2333

U.S.A. SALES: PACLINE CONVEYORS, INC.

155 Great Arrow Ave. ● Buffalo ● New York ● 14207

Tel: 716.876.9250 ● Fax: 716.876.9287 email: [email protected] June 2008

13

TECHNICAL PRODUCT DATA

STRUCTOVIS EHD Adhesive, wear protective, water repelling oils for lubrication of chains in overhead conveyor systems, tubular rails in meat processing plant etc. Structovis oils incorporate special polymer based adhesion enhancing additives preventing dripping, centrifuging and migration from overhead conveyors and high speed transport chains: Viscosity of Structovis oils at 100 degree F or 40 degree C Structovis EHD 460 mm 2/sec Operating temperature 50 to 265 degree F or 10 to 130 degree C Structovis EHD may be applied by automatic lubrication equipment

Structovis EHD is USDA 112 authorised “food grade” lubricant HOTEMP OY 95 Fully synthetic high temperature oil for lubrication of conveyor systems subject to high

temperature and extreme process conditions. Hotemp OY 95 maintains cleanliness of chains with minimum residue formation allowing maximum lubricant penetration. Hotemp OY 95 is manufactured free from silicones. Viscosity of Hotemp OY 95 at 100 degree F = 100 mm 2/sec Suitable for operating temperatures up to 482 degree F or 250 degree C (short peak temperatures above this limit may be possible)

CENTOPLEX 2 EP Multipurpose grease for the lubrication of rolling and plain bearings. Centoplex 2 EP provides excellent lubricity and wear protection in bearings subject to high pressures under rolling and oscillating conditions. NLG1 grade 2 Operating temperature 86 to 250 degrees F or 30 to 120 degrees C. Centoplex 2 EP may be applied by grease gun or by centralized lubrication equipment.

KLUBERPLEX BE 31-222

Semi synthetic rolling/plain bearing grease with extraordinary resistance to water, steam, phosphate solutions etc. Kluberplex BE31-222 prevents corrosion and corrosion related bearing failure, resists wash out and provides a long-term lubrication facility under the most severe operating conditions. For optimum results slow speed bearings should be completely filled with grease. NLG1 grade 2 Operating temperature 59 to 284 degrees F or 15 to 140 degrees C. Kluberplex BE31-222 may be applied by grease gun or by centralised lubrication equipment.

BARRIERTA L55/2 Unparalleled high temperature rolling bearing grease for permanent lubrication of high temperature conveyor bearings. Trolley bearings and roller turn roller bearings. Barrierta greases are manufactured free from silicones and dry lubricants such as molybdenum disulphide and graphite. Even following prolonged exposure to high temperatures no unwanted residues are formed to interfere with the mechanical operation of the bearings. Barrierta greases must be applied initially to cleaned rolling bearings, application quantities are extremely small, depending on bearing size please contact-----Kluber Lubrication for further information on optimum lubrication quantities. A lubrication interval of scaled bearings containing Barrierta greases is best determined by chemical analysis of the lubricant. Sample bearings may be provided to Kluber Lubrication for analysis purposes. Barrierta lubricants cannot be mixed with other lubricant types. For initial lubrication of the conveyor bearings use Barrierta 1.55/2 (NLG1 2 grade grease) Suitable for operating temperatures up to 500 degrees F or 260 degrees C.

CANADA /INT’L SALES: PACLINE CORPORATION 5890 Shawson Dr.● Mississauga ● Ontario ● L4W LW5 Tel: 905.858.2330 ● Fax: 905.858.2333

U.S.A. SALES: PACLINE CONVEYORS, INC.

155 Great Arrow Ave. ● Buffalo ● New York ● 14207

Tel: 716.876.9250 ● Fax: 716.876.9287 email: [email protected] June 2008

1

Pacline Power & Free (S-310) RECOMMENDED CONVEYOR SPARES

Part No. Description Drawing # CONVEYOR CHAIN CH31-200 201 CH31-200 SYSTEM 31 CHAIN X 10’0” LG CL31-227 SYSTEM 31 CONNECTING LINK DG35-150 PUSHER DOG LUBRICATOR UNIT (BRUSH TYPE) LR310-600 204 LB-0144 LUBRICATOR BRUSH FU-0145 FLOW UNIT IM28 LR-0149 LUBRICATOR COIL LU-0878 HIGH TEMPERATURE LUBRICANT LU-1540 LOW TEMPERATURE LUBRICANT STOP UNIT SP310-130 221 BE35-044 LHD STOP BLADE BE35-045 RHD STOP BLADE CY-1534 FESTO CYLINDER COMPLETE TRACK SWITCH – ALL TYPES 212 CY-1534 FESTO CYLINDER COMPLETE FB-1504 E.T.P. BUSH WD310-932 L/H SWITCH TONGUE WD310-917 R/H SWITCH TONGUE BG-1503 GLACIER FLANGED BUSH BG-1502 GLACIER PLAIN BUSH WHEEL TURN DRIVE UNIT DR35-371 202 GM-1479 CARTER DISC GEARED MOTOR UNIT SP-1473 19T ½ ” PITCH DUPLEX PINION SP-1472 76T ½ ” PITCH DUPLEX PINION SP-1474 TAPER-LOC BUSH 32 DIA SP-1475 TAPER-LOC BUSH 40 DIA CH-1010 ½ ” PITCH DUPLEX TRANSMISSION CHAIN 5.5 CH-1011 ½ ” PITCH DUPLEX TRANSMISSION CONNECTING LINK CT-1470 ROSTA CHAIN TENSIONER CR-0214 TORQUE LIMITER BUSH TL-0067 TORQUE LIMITER 700 MZ INLINE DRIVE ASSEMBLY DR31-3005 232 GB-1784 ROSSI RV63 U03A/10 GEARBOX MC31-376 19T x ½” P SPROCKET PY-0046 100.PCD BI-LOC PULLEY REF182A0100 PY-1331 132.PCD Bi-Loc PULLEY REF182A0132 VB-0982 VEE BELT SPA 1300 TL-0033 TORQUE LIMIMITER 500 M1 35B 10x8 TPR KEY CR-0212 500 M1 T/L CTR BUSH 0.480” LG MC30-305 IDLER SPROCKET SPINDLE 230 WD31-338 CHAIN GUIDE C/W HARDENED RAIL WD31-310 CHAIN GUIDE BG-0002 ASAHI/FAB BEARING UCF 207 MC31-3003 DRIVE DOG CH-0279 CHAIN 1” PITCH X 7 PITCHES PER DOG MC30-306 HEAD SHAFT